15911601632589rfp03of03.pdf

PDF 32 MB Posted

Attached to
SOLICTATION - P1800/1801, DESIGN BUILD 2nd Marine Division and 2nd MLG Operations Center, Camp Lejeune, NC
Solicitation number
N40085-19-R-9147
Issued by

About this file

This solicitation requests design-build construction services for two operations center projects at Camp Lejeune, North Carolina. The projects include constructing a new multi-story headquarters and academic facility for II Marine Expeditionary Force and 2nd Marine Expeditionary Brigade with a Littoral Warfare Training Center. Additionally, a new multi-story headquarters building will be built for 2nd Marine Logistics Group. Renovations and an administrative addition will also be made to 2nd Marine Division headquarters building. The Navy seeks to award a firm-fixed-price contract for the design and construction of these facilities. The period of performance is 1,095 calendar days from notice to proceed. Proposals are due by August 19, 2019 and the Navy intends to award the contract by October 2019.

View the file

Other files

File Type Posted
Amendment 0013.pdf PDF
Amendment 0012.pdf PDF
Amendment 0011.pdf PDF
H1 Scan Key.pdf PDF
TruView QuickGuide.pdf PDF
Building 2 Sign.docx DOCX document
P1800 and1801 Virtual Site Visit Information.docx DOCX document
Amendment 0010.pdf PDF
Amendment 0009.pdf PDF
C.2.1MARDIV Affinity Diagram.pdf PDF
BO_11014.3 Sign Policy MCB CLNC.pdf PDF
Wallace Creek Survey Revised.pdf PDF
0008.pdf PDF
Amendment 0007.pdf PDF
Amendment 0006.pdf PDF
15911601632589rfp01of03.pdf PDF
Amendment 0005 Phase II.pdf PDF
P1800-1801 Price Proposal Rev 2.docx DOCX document
15911601632589rfp02of03.pdf PDF
0004.pdf PDF
Amendment 0003.pdf PDF
0002.pdf PDF
0001.pdf PDF
ATTACHMENT H.docx DOCX document
Attachment E - Small Business Participation and Commitment Strategy.docx DOCX document
Attachment F - Past Performance Questionnaire.docx DOCX document
ATTACHMENT C Construction Design Exp.docx DOCX document
Attachment B _SECNAV_5512_Attachment B.pdf PDF
Attachment D - Small Business Subcontracting Record.docx DOCX document
Final RFP.pdf PDF
Attachment G- SBSP Template.doc DOC document
Attachment A PPII log.doc DOC document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NAVFAC MID ATLANTIC

WORK ORDER NO.

1591160 / 1632589

CONSTRUCTION CONTRACT

No.: XXXXX-XX-X-XXXX

APPROPRIATION: MILCON

REPLACE II MEF, 2ND MARDIV,

AND 2ND MLG HQTRS

Volume 3 of 3

At

MCB Camp Lejeune, NC

(P-1800/1801)

SUBMITTED BY:

HDR

440 S. Church St, Suite 900

Charlotte, NC 28202

FINAL DB RFP SUBMISSION

PREPARED BY:

Geotechnical:

Civil:

Landscape:

Architecture:

Interior Design:

Structural:

Mechanical:

Electrical:

Communications:

Cyber Security:

Building Security:

AT/FP:

Fire Protection:

Sustainability:

Submitted By:

Date:

Paul Zhang, P.E.; HDR Jason Galloway, P.E.; HDR David West, LA.; HDR Alexandria Vann Supino, R.A.; HDR Kevin Lynch, NCIDQ; HDR Randy Maccaferri, P.E.; HDR Chris Kopec, P.E.; HDR Edward Chinnis, P.E.; HDR John Fallon, RCCD; HDR Christopher Yak, PMP; HDR Bill Onderick, PSP; HDR Robert Bosco, CPP; HDR Adam Senk, P.E.; HDR Jean Hansen, LEED Fellow; HDR

Nicholas Nash R.A. HDR

26 JUNE 2020

APPROVED BY:

For Commander, NAVFAC Mid-Atlantic:

Date: 8 JULY 2020

This page intentionally left blank.

06-26-20

Table of Contents - Page 1 6/26/2020

REPLACE II MEF, 2ND MARDIV, AND 2ND MLG HQTRS 20P1800/P1801

MCB CAMP LEJEUNE, NC ePROJECTS WORK ORDER NO.: 1591160/1632589

DESIGN/BUILD RFP TABLE OF CONTENTS

PART 1 - CONTRACT DOCUMENTS (Included under separate attachment)

PART 2 - GENERAL REQUIREMENTS

PART 3 - PROJECT PROGRAM

PART 4 - PERFORMANCE TECHNICAL SPECIFICATIONS (PTS)

PART 5 - PRESCRIPTIVE TECHNICAL SPECIFICATIONS

PART 6 - ATTACHMENTS

6/26/2020

PART 6 - ATTACHMENTS

PART 6 - Table of Contents

Part 6 - Attachments

Chapter A - Miscellaneous Documents

Chapter B - Drawings

Chapter C - Affinity Diagrams

Chapter D - Low Impact Development

Chapter E - Mechanical and Fire Protection

Chapter F - Electrical

Chapter G - FF&E

Chapter H - Elevator Guide (Not Used)

Chapter I - Forms

Chapter J - Reference Drawings and Documents (Not Used)

Chapter K - Subsurface Soil Information

PART 6 - ATTACHMENTS

CHAPTER E - Mechanical and Fire Protection E.1 Fire Hydrant Flow Test Report - P1800 - II MEF - Wallace Creek E.2 Fire Hydrant Flow Test Report - P1801 - 2nd MARDIV - Hadnot Point E.3 Fire Hydrant Flow Test Report - P1801 - 2nd MLG - French Creek E.4 Baseline Energy Cost Data E.5 EMCS Equipment and Points Nomenclature for Camp Lejeune E.6 Geo Exchanger Pipe Casing thru Slab E.7 Estimated Gas and Plumbing (Sewer and Water) Loads E.8 MCB Camp Lejeune Water Meter Specification E.9 MCB Camp Lejeune Mechanical Design Guidance E.10 Section 28 31 76, Interior Fire Alarm and Mass Notification System, Addressable E.11 Connection to the Base-Wide Mass Notification System – Riser Diagram E.12 UFGS 23 00 00, Manual Balancing Damper Editing Guide E.13 UFGS 23 09 00.00 22, Homerun Editing Guide

FIRE HYDRANT FLOW TEST REPORT | Marine Corps Base Camp Lejeune

FIRE & LIFE SAFETY

hdrinc.com 8404 Indian Hills Drive, Omaha, NE 68114-4098

(402) 399-1000

FIRE HYDRANT FLOW TEST REPORT

LOCATION: P1800 (Parachute Tower Road)

DATE: July 29th, 2019

TEST CONDUCTED BY: Adam Senk (HDR), Marty Grasso (Public Works Camp Lejeune)

WITNESS(ES): Adam Senk (HDR), Marty Grasso (Public Works Camp Lejeune)

PURPOSE OF TEST: Verify Fire Water Supply for MILCON

PUMP AFFECT (INDICATE OPERATIONS): NA

FLOW HYDRANTS: F1 F2 F3 F4 F5

NOZZLE SIZE: 2.5 inches

PITOT READING: 45 psi

DISCHARGE COEFFICIENT: C= 0.9

GPM: 1,130

TOTAL GPM: 1,130

STATIC PRESSURE: 62 psi

RESIDUAL PRESSURE: 55 psi

PROJECTED RESULTS @ 20 PSI RESIDUAL (GPM): 2,974

OR @ ( ) PSI RESIDUAL (GPM): NA

COMMENTS: See Attached Hydrant Map for Locations of Testing

FOR SATISFACTORY TEST RESULTS OF THEORETICAL CALCULATIONS OF

EXPECTED FLOWS, A DROP IN PRESSURE AT THE RESIDUAL HYDRANT OF

AT LEAST 25% OF THE STATIC PRESSURE SHOULD BE OBTAINED.

ADDITIONAL HYDRANT OPENINGS MAY BE REQUIRED TO OBTAIN THIS.

FIRE HYDRANT MARKING GUIDE

CLASS GPM COLOR

AA ≥ 1500 LIGHT BLUE

A 1000 – 1499 GREEN

B 500 – 999 ORANGE

C ≤ 500 RED

P1800 - II MEF - Wallace Creek

P1800 - II MEF - Wallace Creek hdrinc.com 8404 Indian Hills Drive, Omaha, NE 68114-4098

(402) 399-1000

FIRE HYDRANT FLOW TEST REPORT

LOCATION: P1800 (Julian Smith)

DATE: July 29th, 2019

TEST CONDUCTED BY: Adam Senk (HDR), Marty Grasso (Public Works Camp Lejeune)

WITNESS(ES): Adam Senk (HDR), Marty Grasso (Public Works Camp Lejeune)

PURPOSE OF TEST: Verify Fire Water Supply for MILCON

PUMP AFFECT (INDICATE OPERATIONS): NA

FLOW HYDRANTS: F1 F2 F3 F4 F5

NOZZLE SIZE: 2.5 inches

PITOT READING: 40 psi

DISCHARGE COEFFICIENT: C= 0.9

GPM: 1,060

TOTAL GPM: 1,060

STATIC PRESSURE: 70 psi

RESIDUAL PRESSURE: 65 psi

PROJECTED RESULTS @ 20 PSI RESIDUAL (GPM): 3,675

OR @ ( ) PSI RESIDUAL (GPM): NA

COMMENTS: See Attached Hydrant Map for Locations of Testing

FOR SATISFACTORY TEST RESULTS OF THEORETICAL CALCULATIONS OF

EXPECTED FLOWS, A DROP IN PRESSURE AT THE RESIDUAL HYDRANT OF

AT LEAST 25% OF THE STATIC PRESSURE SHOULD BE OBTAINED.

ADDITIONAL HYDRANT OPENINGS MAY BE REQUIRED TO OBTAIN THIS.

FIRE HYDRANT MARKING GUIDE

CLASS GPM COLOR

AA ≥ 1500 LIGHT BLUE

A 1000 – 1499 GREEN

B 500 – 999 ORANGE

C ≤ 500 RED

P1801 - 2nd MARDIV - Hadnot Point

P1801 - 2nd MARDIV - Hadnot Point hdrinc.com 8404 Indian Hills Drive, Omaha, NE 68114-4098

(402) 399-1000

FIRE HYDRANT FLOW TEST REPORT

LOCATION: P1800 (Gonzalez Blvd)

DATE: July 29th, 2019

TEST CONDUCTED BY: Adam Senk (HDR), Marty Grasso (Public Works Camp Lejeune)

WITNESS(ES): Adam Senk (HDR), Marty Grasso (Public Works Camp Lejeune)

PURPOSE OF TEST: Verify Fire Water Supply for MILCON

PUMP AFFECT (INDICATE OPERATIONS): NA

FLOW HYDRANTS: F1 F2 F3 F4 F5

NOZZLE SIZE: 2.5 inches

PITOT READING: 40 psi

DISCHARGE COEFFICIENT: C= 0.9

GPM: 1,060

TOTAL GPM: 1,060

STATIC PRESSURE: 67.5 psi

RESIDUAL PRESSURE: 60 psi

PROJECTED RESULTS @ 20 PSI RESIDUAL (GPM): 2,872

OR @ ( ) PSI RESIDUAL (GPM): NA

COMMENTS: See Attached Hydrant Map for Locations of Testing

FOR SATISFACTORY TEST RESULTS OF THEORETICAL CALCULATIONS OF

EXPECTED FLOWS, A DROP IN PRESSURE AT THE RESIDUAL HYDRANT OF

AT LEAST 25% OF THE STATIC PRESSURE SHOULD BE OBTAINED.

ADDITIONAL HYDRANT OPENINGS MAY BE REQUIRED TO OBTAIN THIS.

FIRE HYDRANT MARKING GUIDE

CLASS GPM COLOR

AA ≥ 1500 LIGHT BLUE

A 1000 – 1499 GREEN

B 500 – 999 ORANGE

C ≤ 500 RED

P1801 - 2nd MLG - French Creek

P1801 - 2nd MLG - French Creek

REPLACE II MEF, 2ND MLG, AND 2ND MARDIV HQTRS 20P1801

Part 6 - Attachments

Chapter E – Baseline Energy Cost Data

The Baseline Energy Cost Data shall be utilized to develop Technical Evaluation Factor Six (6) –

Energy and Sustainable Design. This data shall serve no other purpose. The following documents are included.

Activity Rates:

Electricity: $70.92/MWh

Water: $2.53/kgal

Wastewater: $2.24/kgal

NG (Rates published monthly, rates reflect FEB posting):

Nov-March $8.66/Dth

April-October $8.34/Dth

No. Nomenclature Description

1 AHU Air Handling Unit 2 B Heating Water Boiler 3 B Steam Boiler 4 C Chiller 5 CCC Closed Circuit Cooler 6 CCT Closed Circuit Tower 7 COM RM Communication Room 8 CP Condenser Water Pump 9 CRAC Computer Room Air Conditioner

10 CT Cooling Tower 11 CTP Cooling Tower Pump 12 CTRL PNL Control Panel 13 CU Air Cooled Condensing Unit 14 CWP Chilled Water Supply Pump 15 DECAHP Defense Commissary Agency HP 16 DHW Domestic Hot Water 17 DPR Damper 18 DTS Dual Temperature System 19 DWP Domestic Hot Water Pump 20 ECT Evaporative Cooling Tower 21 EF Exhaust Fan 22 EST Elevated Storage Tank 23 FCU Fan Coil Unit 24 FLTR Filter 25 GLBT Ground Level Booster Tank 26 HP Heat Pump (On Ground) 27 HWP Hot Water Pump 28 HWT Hot Water Tank 29 HV Heating and Ventilating Unit 30 HX Steam to Hot Water Converter 31 LS Lift Station 32 LP-PMP Loop Pump 33 MAD Mixed Air Damper 34 MAU Make-up Air Unit 35 MZ Multizone Unit 36 OA Outside Air 37 OAT Outside Air Temperature 38 PACU Package Unit 39 PHP Packaged Heat Pump (On Ground) 40 PX Plate Exchanger 41 RA Return Air 42 RAF Return Air Fan 43 RTHP (RTU) Packaged Rooftop Heat Pump Unit 44 RTMZ Rooftop Multizone Unit 45 RTU Rooftop Unit (Packaged DX) 46 RVS-VLV Reversing Valve 47 SA Supply Air

48 STP Secondary Treatment Plant 49 SV Solenoid Valve/Steam Valve 50 TS Temperature Sensor 51 TWAC Thru-Wall Air Conditioner 52 TWHP Thru-Wall Heat Pump 53 UH Unit Heater 54 VAV Variable Air Volume 55 WAC Window Air Conditioner 56 WS Work Station 57 WSHP Water Source Heat Pump 58 WTP Water Treatment Plant 59 WP Well Pump 60 ZD Zone Mixing Damper

61 AHU-DHUM Air Handling Unit Dehumidifier 62 AHU-OVRRD Air Handling Unit Override 63 ALM-CMD Alarm Command 64 ALM-HORN Alarm Horn 65 ALM-RST Alarm Reset 66 ALM-SIL Alarm Silence 67 BLR-A Boiler Alarm 68 BLR-C Boiler Command 69 BLR-S Boiler Start 70 BOILER-EN Boiler Enable 71 BYPD-C Bypass Damper Command 72 C-? Chiller Status 73 CD-T Cold Deck Temperature 74 CH-CMD Chiller Command 75 CH-OVR Chiller Override 76 CH-ALM Chiller Alarm 77 CH-DP Chiller Differential Pressure 78 CH-FLO-S Chiller Flow Switch 79 CHILLER-EN Chiller Enable 80 CHS-T Chiller Supply Temperature 81 CHW-DP Chilled Water Differential Pressure 82 CHW-FLOW Chilled Water Flow 83 CHW-SYS ENABLE Chilled Water System Enable 84 CLG-C Cooling Command 85 CLGMAX Cooling Maximum 86 CLG-NITE Cooling Night Set Point 87 CLG-SP Cooling Set Point 88 CLG-VLV Chilled Water Valve Status 89 CLG-VLV Chilled Water Valve Operation 90 COND1-S Condenser 1 Status 91 COND2-S Condenser 2 Status 92 COOL1-C Cooling Stage 1 Command 93 COOL2-C Cooling Stage 2 Command 94 CTFAN-C Cooling Tower Fan Command 95 CTFAN-S Cooling Tower Fan Status 96 CWR-T Chilled Water Return Temperature 97 CWS-GPM Chilled Water Supply GPM 98 CWS-T Chilled Water Supply Temperature 99 DHW-SET Domestic Hot Water Set Point 100 DHWS-T Domestic Hot Water Supply Temperature 101 DHW-TANK Domestic Hot Water Tank Temperature 102 DHW-VLV Domestic Hot Water Steam Valve 103 ELEC-HEAT Electric Heat 104 FLTR-DP Filter Differential Pressure 105 FLTR-S Air Filter Differential 106 HD-T Hot Deck Temperature 107 HTG1-C Heating Stage 1 Command

108 HTG2-C Heating Stage 2 Command 109 HTGMAX Heating Maximum Set Point 110 HTG-NITE Heating Night Set Point 111 HTG-SP Heating Set Point 112 HTGV-CMD Heating Command 113 HTG-VLV Heating Valve 114 HUM-SPT Humidity Set Point 115 HW-ENA Hot Water Enable 116 HWP-1-C Hot Water Pump 1 Command 117 HWP-SPT Hot Water Pump Set Point 118 HWP-SS Hot Water Pump Status 119 HWR-T Hot Water Return Temperature 120 HW-SET Hot Water Reset Set Point 121 HWS-FL Hot Water Supply Flow 122 HWS-P Hot Water Supply Pressure 123 HWS-SPT Hot Water Supply Set Point 124 HWS-T Hot Water Supply Temperature 125 HW-SYS ENABLE Hot Water System Enable 126 HWVLV-C Hot Water Valve Command 127 HX-VLV Heat Exchanger Valve 128 IA-H Indoor Humidity Sensor 129 INST-DMD Instantaneous Demand 130 INTV-DMD Interval Demand 131 LOOPR-T Loop Return Temperature 132 LOOPS-T Loop Supply Temperature 133 LPMP-1-C Loop Pump 1 Command 134 MAD-CMD Mixed Air Damper Command 135 MA-T Mixed Air Temperature 136 MAX-CLG Maximum Cooling Set Point 137 MAX-HTG Maximum Heating Set Point 138 MIN-HTG Minimum Heating Set Point 139 MIN-OAD Minimum Outside Air Damper 140 OA-CFM Outside Air Cubic Feet Per Minute 141 OAD-C Outside Air Damper Position 142 OAD-SET Outside Air Damper Set Point 143 OAF-C Outside Air Fan Command 144 OAF-S Outside Air Fan Status 145 OA-H Outside Humidity Sensor 146 OA-RH Outside Air Relative Humidity 147 OA-T Outside Air Temperature 148 OCC-CLG Occupied Cooling 149 OCC-HTG Occupied Heating 150 OCCTIME Occupied Time (Schedule) 151 OCCTIMER Occupied Timer (Schedule) 152 OCLG-SP Occupied Cooling Set Point 153 OHTG-SP] Occupied Heating Set Point 154 OHWP-SPT Occupied Hot Water Sump Set Point

155 PH-LEV PH Level 156 PH-SET PH Set Point 157 PWR-FAIL Power Fail 158 PWR-MTR Power Meter 159 RAD-C Return Air Damper Position 160 RAF-C Return Air Fan Command 161 RAF-S Return Air Fan Status 162 RA-T Return Air Temperature 163 REV-VLV Reversing Valve 164 RM-T Room Temperature 165 SA-SMKD-C Smoke Detector Command 166 SA-SMK-S Smoke Detector Status 167 SA-SP Supply Air Set Point 168 SA-T Supply Air Temperature 169 SETPNT1 Set Point 1 170 SETPNT2 Set Point 2 171 SF-C Supply Fan Command 172 SF-S Supply Fan Status 173 SF-VFD Supply Fan Variable Frequency Drive 174 SHDN-CMD Shutdown Command 175 SMK-S Duct Smoke Detector 176 STM-C Steam Command 177 STM-S Steam Pressure 178 STM-T Steam Temperature 179 STM-VLV Steam Valve Operation 180 STM-VLV Steam Valve Status 181 SUMMER Summer Mode 182 SUMWIN-C Summer/Winter Command 183 TANK-L-A Tank Level 184 TOTAL-KW Total Kilowatt (kW) 185 TOTLFLOW Total Flow 186 TRIPLOCK Trip Lock Out 187 TWR-CMD Tower Command 188 UH-ENA Unit Heater Enable 189 UH-SPT Unit Heater Set Point 190 UNOCC-CLG Unoccupied Cooling 191 UNOCC-HTG Unoccupied Heating 192 VFD-S Variable Frequency Drive Status 193 WINDO-AC Window Air Conditioner 194 WINTER Winter Mode 195 WSHP-SPT Water Source Heat Pump Set Point 196 ZNHTG-SP Zone Heating Set Point 197 ZN-T Space/Zone Temperature

REPLACE II MEF, 2ND MLG, AND 2ND MARDIV HQTRS 20P1801

PART 6 - Page 1

Part 6 - Attachments

Chapter E – Estimated Gas and Plumbing (Sewer and Water) Loads

Marine Logistics

Group (MLG) 35,718 231 25 5,775 400 127

Marine Division

(MARDIV)

65,491 409 25 10,225 500 143

Marine

Expeditionary Force

(MEF)

180,940 782 25 19,550 1,500 269

SEWER AND WATER LOAD ESTIMATES

Building Area

(sq. ft.)

Number of occupants WSFU

[Based on IPC] Sewage

Load

Gals/day

Gals/day per

Occupnat per shift

[Based 15A NCAC

18A. 1949 Sewer

Flow Rates]

WaterSewage

GPM

[Based on

IPC]

MBH

Output

MBH

Input

[at 80% equipm ent

Marine Logistics

Group (MLG) 35,718 231 157 249 1,429 1,835 2,294

Marine Division

(MARDIV)

65,491 409 243 249 2,620 3,113 3,891

Marine

Expeditionary

Force (MEF)

180,940 782 565 249 7,238 8,052 10,065 heating

[based on

40 btu/sq.

ft.] total

NATURAL GAS LOAD ESTIMATES

Building Area

(sq. ft.)

Number of occupan ts

Natural Gas (MBH)

Domestic Hot

Water

[based on plumbing fixture count and ground water

Ventilation for occupants

[based on occupancy and 20 CFM

UNIFIED FACILITIES GUIDE SPECIFICATIONS

References are in agreement with UMRL dated July 2018

SECTION 28 31 76

INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM, ADDRESSABLE

10/18

NOTE: This specification is not available on the Whole Building Design Group website. It is a draft in progress and has not been released to the public.

It has been provided by NAVFAC MIDATLANTIC Fire Protection Engineering and edited to provide a template for multiple MILCONS at Camp Lejeune and Cherry Point related to the rebuilding after Hurricane Florence. The Design-Build Qualified Fire Protection Engineer (defined herein) must edit this section for project specific requirements.

Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable item(s) or insert appropriate information.

Remove information and requirements not required in respective project, whether or not brackets are present.

PART 1 GENERAL

1. On the drawings, show location of control panels, batteries and charger (if remotely mounted), supervising station transmitter, annunciator, primary power supply, remote annunciator, detectors, notification appliances, and each alarm initiating device including fire extinguishing system switches.

2. Show single-line fire alarm/mass notification systems riser diagram. Each device on the riser should be identified by type. Indicate connection of equipment.

3. A fire alarm operating matrix/mass notification system must be placed on the drawings. Show actions of input devices such as detectors, manual stations, waterflow switches, initiating devices, etc. on one axis and output functions such as door releases, elevator relays, indicating/notification appliances etc. on the other. Entries which require descriptions, explanation of processes, sequences, interfaces, etc. can be flagged by symbols keyed to supplementary notes. Alternately provide a zone-by-zone sequence of operation or a schedule identifying all initiators, outputs, and interfaces.

4. Addressable Fire Alarm Systems generally utilize Signal Line Circuits (SLC) for communication between devices. Normally all devices are addressable or will have an addressable interface device installed integrally with the device. Initiating Device Circuits (IDC) should be provided for connection between non-addressable devices and the SLC.

1.1 RELATED SECTIONS

Section 26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS, applies to this section, with the additions and modifications specified herein. In addition, refer to the following sections for related work and coordination:

Section 21 13 13.00 20 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION [ Section 21 30 00 FIRE PUMPS] [ Section 21 23 00.00 20 WET CHEMICAL FIRE EXTINGUISHING for KITCHEN

CABINET]

[ Section 21 13 16.00 20 DRY PIPE FIRE SPRINKLER SYSTEMS] [ Section 23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST

SYSTEMS]

[ Section 21 13 20.00 20 FOAM FIRE EXTINGUISHING FOR AIRCRAFT HANGARS] [ Section 08 71 00 DOOR HARDWARE for [door release][door unlocking] and additional work related to finish hardware.] [ Section[s] [14 21 13 ELECTRIC TRACTION FREIGHT ELEVATORS] [14 21 23

ELECTRIC TRACTION PASSENGER ELEVATORS] [and] [14 24 13 HYDRAULIC FREIGHT ELEVATORS] [14 24 23 HYDRAULIC PASSENGER ELEVATORS] for additional work related to elevators.]

[ Section 07 84 00 FIRESTOPPING for additional work related to firestopping.]

1.2 SUMMARY

1.2.1 Scope

a. This work includes designing and providing a new, complete, fire alarm and mass notification (MNS) system as described herein and on the contract drawings. Include system wiring, raceways, pull boxes, terminal cabinets, outlet and mounting boxes, control equipment, initiating devices, notification appliances, supervising station fire alarm system, and other accessories and miscellaneous items required for a complete operational system even though each item is not specifically mentioned or described. Provide systems complete and ready for operation.

b. Provide equipment, materials, installation, workmanship, inspection, and testing in strict accordance with NFPA 72, except as modified herein. The system layout on the drawings show the intent of coverage and suggested locations. Final quantity, system layout, and coordination are the responsibility of the Contractor.

[c. Each remote fire alarm control unit must be powered from a wiring riser specifically for that use or from a local emergency power panel located on the same floor as the remote fire alarm control unit. Where remote fire control units are provided, equipment for notification appliances may be located in the remote fire alarm control units.]

[d. Where a fire pump is provided, the fire alarm and mass notification system must monitor and transmit the fire pump controller signals in accordance with the provisions of NFPA 72.

[e. Where an emergency generator provides standby power supply for life safety system circuits, the generator must be monitored by the FMCU and transmit emergency generator signals in accordance with NFPA 72.

f. The fire alarm and mass notification system must be independent of the building security, building management, and energy/utility monitoring systems other than for control functions.

1.2.2 Qualified Fire Protection Engineer (QFPE)

The scope includes the services of a QFPE. The QFPE must be a registered professional engineer who has passed the Fire Protection Engineering written examination administered by the National Council of Examiners for Engineering and Surveying (NCEES) and have relevant experience. The QFPE's services must include:

a. Reviewing SD-02, SD-03, and SD-05 submittal packages for completeness and compliance with the provisions of this specification.

b. Providing a Letter of Confirmation documenting the SD-02, SD-03, and SD-05 submittal package has been reviewed and noting any outstanding comments.

c. Performing in-progress construction surveillance prior to installation of ceilings (rough-in inspection).

d. Witnessing preliminary functional performance testing and performing a final installation review.

1.2.3 Fire Protection Quality Control Specialist (FPQC)

The scope includes the services of a FPQC as detailed in Specification Section 01 45 00.05 20 DESIGN AND CONSTRUCTION QUALITY CONTROL. The FPQC must be a registered professional engineer who has passed the Fire Protection Engineering written examination administered by the National Council of Examiners for Engineering and Surveying (NCEES) and have relevant experience. The FPQC may be the same person as the QFPE.

NOTE: ENSURE THE FPQC RESPONSIBILITIES REMAIN IN

SPEC SECTION 01 45 00.05 20

1.3 REFERENCES

NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.

Use the Reference Wizard's Check Reference feature when you add a Reference Identifier (RID) outside of the Section's Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizard's Check Reference feature to update the issue dates.

References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ACOUSTICAL SOCIETY OF AMERICA (ASA)

ASA S3.2 (2009; R 2014) Method for Measuring the Intelligibility of Speech Over Communication Systems (ASA 85)

ASME INTERNATIONAL (ASME)

ASME A17.1/CSA B44 (2016) Safety Code for Elevators and Escalators

ASTM INTERNATIONAL (ASTM)

ASTM F402 (2005; R 2012) Safe Handling of Solvent Cements, Primers, and Cleaners Used for Joining Thermoplastic Pipe and Fittings

FM GLOBAL (FM)

FM APP GUIDE (updated on-line) Approval Guide http://www.approvalguide.com/

INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)

IEEE C62.41.1 (2002; R 2008) Guide on the Surges Environment in Low-Voltage (1000 V and Less) AC Power Circuits

IEEE C62.41.2 (2002) Recommended Practice on Characterization of Surges in Low-Voltage

(1000 V and Less) AC Power Circuits

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 1221 (2016; TIA 17-1; TIA 17-2) Standard for the Installation, Maintenance and Use of Emergency Services Communications Systems

NFPA 4 (2018) Standard for Integrated Fire Protection and Life Safety System Testing

NFPA 170 (2018) Standard for Fire Safety and Emergency Symbols

NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;

TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;

TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;

TIA 17-11; TIA 17-12; TIA 17-13; TIA

17-14) National Electrical Code

NFPA 72 (2019) National Fire Alarm and Signaling Code

NFPA 720 (2015) Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment

NFPA 90A (2018) Standard for the Installation of Air Conditioning and Ventilating Systems

U.S. DEPARTMENT OF DEFENSE (DOD)

UFC 3-601-02 (2010) Operations and Maintenance:

Inspection, Testing, and Maintenance of Fire Protection Systems

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

47 CFR 15 Radio Frequency Devices

47 CFR 90 Private Land Mobile Radio Services

UNDERWRITERS LABORATORIES (UL)

UL 1283 (2017) UL Standard for Safety Electromagnetic Interference Filters

UL 1449 (2014; Reprint Jul 2017) UL Standard for Safety Surge Protective Devices

UL 1480 (2016; Reprint Sep 2017) UL Standard for Safety Speakers for Fire Alarm and Signaling Systems, Including Accessories

UL 1638 (2016; Reprint Sep 2017) UL Standard for Safety Visible Signaling Devices for Fire Alarm and Signaling Systems, Including

Accessories

UL 1971 (2002; Reprint Oct 2008) Signaling Devices for the Hearing Impaired

UL 2017 (2008; Reprint Jan 2016) General-Purpose Signaling Devices and Systems

UL 2034 (2017; Reprint Dec 2017) UL Standard for Safety Single and Multiple Station Carbon Monoxide Alarms

UL 2075 (2017) UL Standard for Safety Gas and Vapor Detectors and Sensors

UL 228 (2006; Reprint Nov 2008) Door Closers-Holders, With or Without Integral Smoke Detectors

UL 2572 (2016) Standard for Mass Notification Systems

UL 268 (2016; Reprint Jul 2016) UL Standard for Safety Smoke Detectors for Fire Alarm Systems

UL 464 (2016; Reprint Sep 2017) UL Standard for Safety Audible Signaling Devices for Fire Alarm and Signaling Systems, Including Accessories

UL 497A (2001) Standard for Secondary Protectors for Communications Circuits

UL 497B (2004; Reprint Dec 2012) Protectors for Data Communication Circuits

UL 864 (2014; Reprint Mar 2018) UL Standard for Safety Control Units and Accessories for Fire Alarm Systems

UL Electrical Constructn (2012) Electrical Construction Equipment Directory

UL Fire Prot Dir (2012) Fire Protection Equipment Directory

1.4 DEFINITIONS

Wherever mentioned in this specification or on the drawings, the equipment, devices, and functions must be defined as follows:

1.4.1 Interface Device

An addressable device that interconnects hard wired systems or devices to an analog/addressable system.

1.4.2 Remote Fire Alarm and Mass Notification Control Unit

A control panel, electronically remote from the fire alarm and mass notification control panel, that receives inputs from automatic and manual fire alarm devices; may supply power to detection devices and interface devices; may provide transfer of power to the notification appliances; may provide transfer of condition to relays or devices connected to the control unit; and reports to and receives signals from the fire alarm and mass notification control panel.

1.4.3 Fire Alarm and Mass Notification Control Unit (FMCU)

A master control panel having the features of a fire alarm control unit (FACU) and an autonomous control unit (ACU) where these units are interconnected to function as a combined fire alarm/mass notification system. The FACU and ACU functions may be contained in a single cabinet or in independent, interconnected, and co-located cabinets.

1.4.4 Local Operating Console (LOC)

A unit designed to allow emergency responders and/or building occupants to operate the MNS including delivery of recorded messages and/or live voice announcements, initiate visual, and audible appliance operation and other relayed functions.

1.4.5 Terminal Cabinet

A steel cabinet with locking, hinge-mounted door where terminal strips are securely mounted inside the cabinet.

1.4.6 Control Module and Relay Module

Terms utilized to describe emergency control function interface devices as defined by NFPA 72.

1.4.7 Designated Fire Protection Engineer (DFPE)

The NAVFAC MIDATLANTIC fire protection engineer that oversees that Area of Responsibility for that project. This is sometimes referred to as the "cognizant" fire protection engineer. Interpret reference to "authority having jurisdiction" and/or AHJ in referenced standards to mean the Designated Fire Protection Engineer (DFPE). The DFPE is responsible for review of the contractor submittals having a "G" designation and for witnessing final inspection and testing.

1.4.8 Qualified Fire Protection Engineer (QFPE)

See Part 1.2 Scope for qualifications and services required by the QFPE.

1.4.9 Fire Protection Quality Control Specialist (FPQC)

See Part 1.2 Scope for qualifications and services required by the FPQC.

1.5 SUBMITTALS

NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES (or the particular specification section for submittal procedures in this project) and edit the following list to reflect only the submittals required for the project. The Guide Specification technical editors have designated those items that require Government approval, due to their complexity or criticality, with a "G."

Government approval is required for submittals with a "G" designation

Shop drawings (SD-02), product data (SD-03) and calculations (SD-05) must be prepared by the fire alarm designer and combined and submitted as one complete package. The QFPE must review the SD-02/SD-03/SD-05 submittal package for completeness and compliance with the Contract prior to submission to the Government. The QFPE must provide a Letter of Confirmation that they have reviewed the submittal package for compliance with the contract provisions. This letter must include their registered professional engineer stamp and signature. Partial submittals and submittals not reviewed by the QFPE will be returned by the Government disapproved without review.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

The Contractor must submit the following for review and approval.

SD-02, SD-03 and SD-05 submittals received prior to the review and approval of the qualifications of the fire alarm subcontractor and QFPE will be returned disapproved without review. All resultant delays will be the sole responsibility of the Contractor.

Qualified Fire Protection Engineer (QFPE); G

Fire Protection Quality Control Specialist (FPQC); G

Designer; G

Supervisor; G

Installers/Technicians; G

Test Personnel; G

Fire Alarm System Site-Specific Software Acknowledgement; G

SD-02 Shop Drawings

Shop drawings must not be smaller than 1/8" = 1' scale. Drawings must comply with the requirements of NFPA 72 and NFPA 170.

Nameplates; G

Nameplate illustrations and data to obtain approval by the Contracting Officer before installation.

Instructions; G

Wiring Diagrams; G

Point-to-point wiring diagrams showing the points of connection and terminals used for electrical field connections in the system, including interconnections between the equipment or systems that are supervised or controlled by the system. Diagrams must show connections from field devices to the FMCU and remote fire alarm control units, initiating circuits, switches, relays and terminals, including pathway diagrams between the control unit and shared communications equipment within the protected premises.

Point-to-point wiring diagrams must be job specific and must not indicate connections or circuits not being utilized. Provide complete riser diagrams indicating the wiring sequence of all devices and their connections to the control equipment. Include a color-code schedule for the wiring.

System Layout; G

Plan view drawing showing device locations, terminal cabinet locations, junction boxes, other related equipment, conduit routing, conduit sizes, wire counts, conduit fill calculations, wire color-coding, circuit identification in each conduit, and circuit layouts for all floors. Indicate candela rating of each visual notification appliance. Indicate the wattage of each speaker. Identify the locations of isolation modules. Indicate the addresses of all devices, modules, relays, etc. Show/identify all acoustically similar spaces.

Provide a complete description of the system operation in matrix format similar to the "Typical Input/Output Matrix" included in the Annex of NFPA 72.

[For air sampling smoke detection systems, provide floor plan layouts indicating location of fire alarm control panel, air sampling piping (lengths of pipe) and sampling ports (sizes and locations). Floor plan must also indicate geographic monitor zone boundaries, location of display control panel, bar level annunciation panels if separate, and all other associated equipment that is required to provide a complete operational system.]

System Operation; G

A complete list of device addresses and corresponding messages.

Notification Appliances; G

Data on each circuit to indicate that there is at least 25 percent spare capacity for notification appliances. Annotate data for each circuit on the drawings.

Initiating devices; G

Data on each circuit to indicate that there is at least 25 percent spare capacity for initiating devices. Annotate data for each circuit on the drawings.

Amplifiers; G

Data to indicate that amplifiers have sufficient capacity to simultaneously drive all notification speakers plus 25 percent spare capacity. Annotate data for each circuit on the drawings.

Battery Power; G

Provide battery calculations as required in paragraph Battery Power Calculations for alarm, alert, and supervisory power requirements. Calculations including ampere-hour requirements for each system component and each panel component, and the battery recharging period, must be included on the drawings.

Voltage Drop Calculations; G

Voltage drop calculations indicating that sufficient voltage is available for proper operation of the system and all components, at a minimum rated voltage of the system operating on batteries.

Include the calculations on the system layout drawings.

SD-03 Product Data

Include annotated catalog data as required in the paragraph SUBMITTAL, in table format on the drawings, showing manufacturer's name, model, voltage, and catalog numbers for equipment and components. Product data for all equipment must be combined into a single submittal.

Fire Alarm and Mass Notification Control Unit (FMCU); G

Local Operating Console (LOC); G

Amplifiers; G

Tone Generators; G

Digitalized voice generators; G

Remote Annunciator Panel; G

Manual Stations; G

Smoke Detectors; G

Duct Smoke Detectors; G

[Air sampling smoke detectors; G]

Heat Detectors; G

[Flame Detectors; G]

Carbon monoxide detectors

Addressable Interface Devices; G

Addressable Control Modules; G

Isolation Modules; G

Notification Appliances; G

Batteries; G

Battery Chargers; G

Supplementary Notification Appliance Circuit Panels; G

Auxiliary Power Supply Panels; G

Surge Protective Devices; G

Alarm Wiring; G

Back Boxes and Conduit; G

Ceiling Bridges for Ceiling-Mounted Appliances; G

Terminal Cabinets; G

Digital Alarm Communicator Transmitter (DACT); G

[ Automatic Fire Alarm Transmitters (including housing); G

Electromagnetic Door Holders; G

Environmental Enclosures or Guards; G

Document Storage Cabinet; G

Spare Parts Cabinet; G

Equipment for Interface to the Base-wide Mass Notification Network; G

SD-05 Design Data

[ Air Sampling Smoke Detection System Calculations; G

Submit air sampling detection system design analysis calculations consisting of battery capacity, loading calculations, and fan speed and air flow/transport calculations. Include schematic diagrams showing pipe segments, pipe diameters, lengths of pipe, node numbers, and sample port diameters to verify the requirements are met.]

Preliminary Equipment List; G

Provide a preliminary Equipment List identifying the type, quantity, make, and model number of each piece of equipment to be provided under this submittal. The Equipment List must include the type, quantity, make and model of spare equipment. Types and quantities of equipment submitted must coincide with the types and quantities of equipment used in the battery calculations and those shown on the shop drawings.

SD-06 Test Reports

Test Procedures; G

Verification of Compliant Installation; G

Request for Government Final Test; G

SD-09 Manufacturer's Field Reports

System Operation; G

SD-10 Operation and Maintenance Data

Operation and Maintenance (O&M) Instructions; G

Four copies of the Operation and Maintenance Instructions. The O&M Instructions must be prepared in a single volume or in multiple volumes, with each volume indexed, and may be submitted as a Technical Data Package. Manuals must be approved prior to training. The Interior Fire Alarm And Mass Notification System Operation and Maintenance Instructions must include the following:

a. "Manufacturer Data Package five" as specified in Section

01 78 23 OPERATION AND MAINTENANCE DATA.

b. Operating manual outlining step-by-step procedures required for system startup, operation, and shutdown. The manual must include the manufacturer's name, model number, service manual, parts list, and preliminary equipment list complete with description of equipment and their basic operating features.

c. Maintenance manual listing routine maintenance procedures, possible breakdowns and repairs, and troubleshooting guide. The manuals must include conduit layout, equipment layout and simplified wiring, and control diagrams of the system as installed.

d. Complete procedures for system revision and expansion, detailing both equipment and software requirements.

e. Software delivered for this project on each type of CD/DVD media utilized.

f. Printouts of configuration settings for all devices.

g. Routine maintenance checklist. The routine maintenance checklist must be arranged in a columnar format. The first column must list all installed devices, the second column must state the maintenance activity or state no maintenance required, the third column must state the frequency of the maintenance activity, and the fourth column provided for additional comments or reference.

All data (devices, testing frequencies, etc.) must comply with

UFC 3-601-02.

h. A final Equipment List must be submitted with the Operating and Maintenance (O&M) manual.

Instruction of Government Employees; G

SD-11 Closeout Submittals

As-Built Drawings; G

Spare Parts; G

1.6 SYSTEM OPERATION

NOTE: Circuit wiring shall be Class "B" unless Class "A" is required by the RFP. Circuits and pathways shall have survivability levels as defined by NFPA 72.

The addressable interior fire alarm and mass notification system must be a complete, supervised, noncoded, analog/addressable fire alarm and mass notification system conforming to NFPA 72, UL 864, and UL 2572. Systems meeting UL 2017 only are not acceptable. Fire alarm system/mass notification system components requiring power, except for the control panel(s) power supply, must operate on 24 Volts dc.

1.6.1 Alarm Initiating Devices and Notification Appliances (Visual, Voice)

a. Connect alarm initiating devices to [Class "A"] [Class "B"] signaling line circuits (SLC).

b. Connect notification appliances to [Class "A"] [Class "B"] notification appliance circuits (NAC).

c. The system must be activated into the alarm mode by actuation of any alarm initiating device. The system must remain in the alarm mode until the initiating device is reset and the control panel is reset and restored to normal. The system may be placed in the alarm mode by local microphones, LOC, FMCU, or remotely from authorized locations/users.

1.6.2 Functions and Operating Features

The system must provide the following functions and operating features:

a. Power, annunciation, supervision, and control for the system.

Addressable systems must be microcomputer (microprocessor or microcontroller) based with a minimum word size of eight bits with sufficient memory to perform as specified.

b. Visual alarm notification appliances must have the flash rates synchronized as required by NFPA 72.

c. Electrical supervision of the primary power (AC) supply, presence of the battery, battery voltage, and placement of system modules within the control panel.

d. An audible and visual trouble signal to activate upon a single break or open condition, or ground fault. The trouble signal must also operate upon loss of primary power (AC) supply, absence of a battery supply, low battery voltage, or removal of alarm or supervisory panel modules.

After the system returns to normal operating conditions, the trouble signal must again sound until the trouble is acknowledged. A smoke detector in the process of being verified for the actual presence of smoke must not initiate a trouble condition.

e. A trouble signal silence feature that must silence the audible trouble signal, without affecting the visual indicator.

f. Program capability via switches in a locked portion of the FMCU to bypass the automatic notification appliance circuits and the following when applicable: fire reporting system, air handler shutdown, elevator recall, door release, door unlocking features. Operation of this programmed action must indicate on the FMCU display as a supervisory or trouble condition.

h. Alarm functions must override trouble or supervisory functions.

Supervisory functions must override trouble functions.

h. The system must be capable of being programmed from the panel keyboard. Programmed information must be stored in non-volatile memory.

i. The system must be capable of operating, supervising, and/or monitoring non-addressable alarm and supervisory devices.

j. There must be no limit, other than maximum system capacity, as to the number of addressable devices that may be in alarm simultaneously.

k. Where the fire alarm/mass notification system is responsible for initiating an action in another emergency control device or system, such as HVAC, elevator recall, releasing service, the addressable fire alarm relay must be located in the vicinity of the emergency control device.

l. An alarm signal must automatically initiate the following functions:

(1) Transmission of an alarm signal to the dispatch center.

Transmission must be point specific via contact ID format with the address, location, and description of the condition as it appears on the FMCP.

(2) Visual indication of the device operated on the FMCU and on the remote annunciator.

(3) Continuous actuation of all alarm notification appliances.

(4) Recording of the event via electronically in the history log of the FMCU.

[(5) Release of doors held open by electromagnetic devices.]

[( 6) Release of power to electric locks (delayed egress locks) on doors that are part of the means of egress.]

[(7) Operation of a smoke detector in an elevator lobby or other location associated with the automatic recall of elevators.]

[(8) Operation of a sprinkler waterflow switch serving an elevator machinery room or elevator shaft must operate shunt trip circuit breaker(s) to shut down power to the elevators in accordance with

ASME A17.1/CSA B44.]

m. A supervisory signal must automatically initiate the following functions:

(1) Visual indication of the device operated on the FMCU and on the remote annunciator.

(2) Transmission of a supervisory signal to the dispatch center.

Transmission must be point specific via contact ID format with the address, location, and description of the condition as it appears on the FMCP.

(3) Operation of a duct smoke detector must shut down the appropriate air handler in accordance with NFPA 90A in addition to other requirements of this paragraph and as allowed by NFPA 72.

(4) Recording of the event electronically in the history log of the

FMCU.

n. A trouble condition must automatically initiate the following functions:

(1) Visual indication of the device operated on the FMCU and on the remote annunciator.

(2) Transmission of a trouble signal to the dispatch center.

Transmission must be point specific via contact ID format with the address, location, and description of the condition as it appears on the FMCP.

(3) Recording of the event electronically in the history log of the

FMCU.

o. A carbon monoxide signal must automatically initiate the following functions:

(1) Visual indication of the device operated on the FMCU and on the remote annunciator

(2) Transmission of a carbon monoxide alarm signal to the dispatch center. Transmission must be point specific via contact ID format with the address, location, and description of the condition as it appears on the FMCP.

(3) Continuous actuation of all strobes and the audible carbon monoxide message throughout the building.

(4) Recording of the event electronically in the history log of the

FMCU.

p. System control equipment must be programmed to provide a 60-minute to 180-minute delay in transmission of trouble signals resulting from primary power failure.

q. Activation of a LOC pushbutton must activate the audible and visual alarms in the facility. The audible message must be the one associated with the pushbutton activated.

r. A lockout code must not be installed in the hardware, firmware, or software of the fire alarm system. Installer and operator codes shall remain as the factory default setting.

[1.6.3 Elevator Recall

NOTE: Delete this paragraph if no elevator work is included in the project.

Provide elevator recall in accordance with ASME A17.1/CSA B44, Section [

14 21 13 ELECTRIC TRACTION FREIGHT ELEVATORS][14 21 23 ELECTRIC TRACTION

PASSENGER ELEVATORS][14 24 13 HYDRAULIC FREIGHT ELEVATORS][14 24 23

HYDRAULIC PASSENGER ELEVATORS], and as specified herein. Activation of any smoke detector in an elevator shaft, machine room, or lobby (except at designated recall level) must cause all elevators associated with that shaft, machine room, or lobby to return nonstop to the designated level.

Activation of a smoke detector in the lobby or machine room at the designated level must cause all elevators associated with that lobby to return nonstop to the assigned alternate level. Activation of a detector in an elevator shaft, machine room, or lobby must also cause illumination of elevator cab warning signal (fire hat) and complete operation of fire alarm system as specified in paragraph titled "Functions and Operating Features".]

1.7 TECHNICAL DATA AND SITE-SPECIFIC SOFTWARE

Technical data and site-specific software (meaning technical data that relates to computer software) that are specifically identified in this project, and may be required in other specifications, must be delivered, strictly in accordance with the CONTRACT CLAUSES. The fire alarm system manufacturer must submit written confirmation of this contract provision as "Fire Alarm System Site-Specific Software Acknowledgement". Identify data delivered by reference to the specification paragraph against which it is furnished. Data to be submitted must include complete system, equipment, and software descriptions. Descriptions must show how the equipment will operate as a system to meet the performance requirements of this contract.A lockout code must not be installed in the hardware, firmware, or software of the fire alarm system. Installer and operator codes must remain as the factory default setting. The site-specific software data package must also include the following:

a. Items identified in NFPA 72, titled "Site-Specific Software".

b. Identification of programmable portions of the system equipment and capabilities.

c. Description of system revision and expansion capabilities and methods of implementation detailing both equipment and software requirements.

d. Provision of operational software data on all modes of programmable portions for fire alarm and mass notification.

e. Description of Fire Alarm and Mass Notification Control Unit equipment operation.

f. Description of auxiliary and remote equipment operations.

g. Library of application software.

h. Operation and maintenance manuals.

1.8 QUALITY ASSURANCE

1.8.1 Qualifications

1.8.1.1 Fire Protection Quality Control Specialist (FPQC)

See Part 1.2 Scope for qualifications and services required by the QFPE.

1.8.1.2 Fire Protection Quality Control Specialist (FPQC)

See Part 1.2 Scope for qualifications and services required by the FPQC.

1.8.1.3 Designer

The designer must be certified as a Level IV Technician by National Institute for Certification in Engineering Technologies (NICET) in the Fire Alarm Systems Layout subfield of Fire Protection Engineering Technology.

1.8.1.4 Supervisor

The supervisor must be certified as a NICET Level III or IV fire alarm technician with a minimum of eight years experience[, and must be thoroughly experienced in the installation of air sampling detection systems]. The fire alarm technicians supervising the installation of equipment must be factory trained in the installation, adjustment, testing, and operation of the equipment specified herein and on the drawings.

1.8.1.5 Installers/Technicians

Electricians may be allowed to install wire, cable, conduit and backboxes for the fire alarm system/mass notification system. Fire alarm technicians must be utilized to assist with the installation of fire alarm/mass notification devices, cabinets and panels. Fire alarm technicians must have a minimum of four years experience and must be factory trained in the installation, adjustment, testing, and operation of the equipment specified herein and on the drawings[, and must be thoroughly experienced in the installation of air sampling detection systems].

1.8.1.6 Test Personnel

Test Personnel must include a NICET Level IV fire alarm technician with a minimum of eight years experience in testing and certifying the installation of the fire alarm/mass notification devices, cabinets and panels. Test Personnel must be factory trained in the installation, adjustment, testing, and operation of the equipment installed as part of this project.

1.8.1.7 Manufacturer

Components must be of current design and must be in regular and recurrent production at the time of installation. Provide design, materials, and devices for a protected premises fire alarm system, complete, conforming to NFPA 72, except as specified herein.

1.8.2 Regulatory Requirements

Equipment and material must be listed or approved. Listed or approved, as used in this Section, must mean listed, labeled or approved by a Nationally Recognized Testing Laboratory (NRTL) such as UL Fire Prot Dir or FM APP GUIDE. The omission of these terms under the description of any item of equipment described must not be construed as waiving this requirement. All listings or approval by testing laboratories must be from an existing ANSI or UL published standard. The recommended practices stated in the manufacturer's literature or documentation must be considered as mandatory requirements.

1.9 DELIVERY, STORAGE, AND HANDLING

Protect equipment delivered and placed in storage from the weather, humidity, and temperature variation, dirt and dust, and other contaminants.

1.10 MAINTENANCE

1.10.1 Spare Parts

Furnish the following spare parts in the Spare Parts Cabinet detailed in Part 2:

a. Five complete sets of system keys.

b. Four spare fuses for each fused circuit.

c. Two manual stations.

d. Two of each type of detector installed.

e. Two of each type of detector base and head installed.

[ [f. Two electromagnetic door holders.]

[g. Two air sampling smoke detection system filter assemblies.]

h. Two of each type of audible and visual alarm device installed.

i. [Two][____] low voltage, [one][____] [telephone][internet][ethernet], and [one][____] 120 VAC surge protective device.

1.10.2 Special Tools

Software, connecting cables and proprietary equipment, necessary for the maintenance, testing, and reprogramming of the equipment must be furnished to the Contracting Officer, prior to…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .