ACQR5489062
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is :
1. To provide responses to PPI's.
2. Proposal due date remains October 15, 2019.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R0644
X 9B. DATED (SEE ITEM 11)
08-May-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Sep-2019
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008518R0644
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AM 19
PRE‐PROPOSAL INQUIRY ATTACHMENT (5.3)
Solicitation Number: N40085‐18‐R‐0644 AMENDMENT
Contractor Name:
Contractor POC (Name and email):
Instructions: DO NOT submit in PDF format. DO submit as a word document
Contractor
PPI#
Section of RFP or Page Number
Paragraph Reference
Drawing Number
Question RESPONSE
86 P‐235 CU113,
FX501
Drawing FX501 shows an 8" domestic water supply, drawing CU113 shows a 12" DIP water main supply line. Please confirm the correct size of pipe
UPDATE
Provide a 12” DIP water main supply to the building.
Install a 12” x 8” reducer at the building connection point.
Provide an 8” water supply inside the fire pump building.
87 P‐235 CU113,
FX501
FX501 shows a riser diagram with piping between the fire pump house and the water tanks. Nothing is shown on the civil plans between the tanks and pump house.
Please provide a plan view showing the pipe layout to confirm length and depth of piping.
UPDATE
Utilize the schematic shown on Sheet FX501 for the piping layout between the fire pump house and fire water tanks.
Install water line at a minimum depth of 2.5’ per the specifications.
88 P‐235 CS113 On drawing CS113, and throughout the Site Plans, Work Note 4 calls out to "Replace Chain Link Fence Following Utility Installation. Match Existing Fence Height
UPDATE
Fencing is only required to be
N4008518R0644 and Material." The note shows up in several places, but it does not identify the if a short section of fence will need replaced or if all of the fencing on that plan will need to be replaced. Please identify where fencing will need to be replaced.
removed and replaced to the extent necessary for utility installation. Short sections may be replaced at these locations identified.
105 RFP Part 3, Section 6, Paragraph D303001 Requires “The cooling load for each facility must be served by 1 chiller providing 100 percent of the load”. Please confirm that the same, single chiller will serve both squadrons.
UPDATE:
Bid per RFP: single chiller for both squadrons
106 RFP Part 3, Section 6, Paragraph D303001 Requires “The cooling load for each facility must be served by 1 chiller providing 100 percent of the load”. Was the intent of this requirement to provide 1 chiller for the Hangar building and a separate chiller for the Paraloft Building? The cooling load for the Paraloft building is quite low and below the range where chillers are typically installed. The Paraloft building is also 1,000s of feet from the main Hangar building, so chilled water distribution from the chiller serving the Hangar building would not be appropriate. Is it acceptable to provide one chiller for the Hangar building, while the Paraloft building is cooled through a DX split system with a condensing gas furnace?
UPDATE:
Bid per RFP: It is not the intent to pipe chilled water between the facilities.
(End of Summary of Changes)