About this file

Amendment_0011.pdf

View the file

Other files

File Type Posted
Amendment_0022.pdf PDF
P199_235_-_Price_Proposal_Form_CORRECTED.10.15.19.pdf PDF
Amendment_0021.pdf PDF
P199_235_-_Price_Proposal_Form_CORRECTED.10.9.19.pdf PDF
Amendment_0020.pdf PDF
NC_65.pdf PDF
Amendment_0019.pdf PDF
Amdendment_0018.pdf PDF
05_40_00_Cold-Formed_Metal_Framing.pdf PDF
Amendment_0017.pdf PDF
Amendment_0016.pdf PDF
Amendment_0015.pdf PDF
Amendment_0014.pdf PDF
Pages_from_P198_1397538_FIO_Grounding.pdf PDF
Amendment_0013.pdf PDF
Amendment_0012.pdf PDF
5_Room_Requirements_OH.pdf PDF
Amendment_0010.pdf PDF
P199_235_-_Price_Proposal_Form_CORRECTED.pdf PDF
site_visit_P199_and_P235.pdf PDF
Amendment_0009.pdf PDF
1565553supdrawings1of1.pdf PDF
Amendment_0008.pdf PDF
1565553replaceECB2014-02.1of1.pdf PDF
P199_235_-_Price_Proposal_Form.docx DOCX document
Amendment_0007.pdf PDF
Attach_F_Master_-_One_Day_Pass.xlsx XLSX spreadsheet
Map_to_B-163.pdf PDF
Amendment_0006.pdf PDF
Amendment_0005.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_2.pdf PDF
Amendment_0001.pdf PDF
Attachment_B__SECNAV_5512_Attachment_B.pdf PDF
ATTACHMENT_C_Construction_Design_Exp.docx DOCX document
Attachment_A_PPII_log.doc DOC document
RFP_0644.pdf PDF
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACQR5489062

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is:

1. To REVISE the response to PPI #11 (Amendment 0008) as show n on the attached.

2. To provide responses to PPIs.

Proposal due date remains October 8, 2019.

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R0644

X 9B. DATED (SEE ITEM 11)

08-May-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Aug-2019

CODE

NAVFAC MID ATLANTIC

ACQUISITION CORE

9324 VIRGINIA AVENUE

NORFOLK VA 23511-3095

N40085 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N4008518R0644

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AM 0011 PPIS

PRE‐PROPOSAL INQUIRY ATTACHMENT (5.3)

Solicitation Number: N40085‐18‐R‐0644

Contractor Name: AMENDMENT 0011 Contractor POC:

Instructions: DO NOT submit in PDF format. DO submit as a word document

Contractor

PPI#

Section of RFP or Page Number

Paragraph Reference

Drawing Number

Question RESPONSE

011 Part 3 Chapter 2,

2.6 Part 3‐Chapter 2‐2.6

"Special Design Challenges" note 5 says the structural steel must be surface‐prepared, primed and painted w/ HP coatings (epoxy primer and polyurethane coatings) in a SHOP setting, not in the field.

Please verify the joists and decking will only require to be prep'd and primed per the joist manufacturer specifications. The joist and deck manufacturers do not offer the HP coatings on their products and the cost to ship to another SSPC specialty coatings facility is extremely costly.

Update:

Provide Protective Coatings in accordance with UFC 4‐ 211‐01 Section 3‐3.4.3.

Primary and secondary steel framing is required to be shop coated.

14 Part 3 In Part 3 of the RFP, chapter 2 page 5, the RFP requires that, “The O1 and O2 spaces must, as a minimum, have internal noise levels lowered by at least 40 dB due to site’s location within the 85 DNL

The effort to design the exterior envelop of the O1 / O2 spaces to achieve a 40 dB reduction in exterior noise is important for this hangar since the F35 aircraft are particularly loud. The masonry / precast concrete walls for this space, as contour” In Part 3 room requirements, for example, Lobby 01 Level, indicates no special acoustics requirement.

However, in order to achieve the 40 dB reduction in noise, an STC 40 curtainwall is likely necessary.

Please confirm that the external envelop of the O1/O2 space must have acoustic characteristics to reduce external 85dB noise to 40 dB level in the interior. This would likely require OITC rating for roof/ceiling assemblies, STC ratings for walls, doors, windows, curtainwalls and other penetrations.

required by the RFP 1.0 Project Description, will help achieve this reduction. Note that the roof assembly above the O2 space must be designed with sufficient mass to absorb sound energy – insulation board over metal roof decking is not sufficient .

The windows in the O1 / O2 spaces are required to be glazed with laminated glass which will serve to dampen exterior noise.

An exception for the Lobby space is allowed since it will likely have more glass than other interior spaces and will have doors that open to the exterior; the laminated glass in the curtainwall assembly and acoustical gaskets for the interior vestibule door(s) will suffice to dampen the exterior noise in the Lobby space

26 Part 3‐ Chapter

6/ESR B10

In Part 3‐Chapter 6/ESR B10, B1010 notes a catwalk is required and it is to be galvanized. Please verify this and any other steel such a ladders and platforms do not require surface prep and paint per Part 3‐Chapter 2‐2.6.

B1010 FLOOR

CONSTRUCTION states that the steel bearing bar grating shall be galvanized, not its structural framing support, i.e. provide galvanized grating. The structural steel framing members of the catwalks will have the same coating as the rest of the exposed structural steel framing members in the hangar bay.

27 Part 3‐ Chapter 6

Please verify what SSPC steel prep is required for the structural steel along w/ primer and finish coat paint types. There are numerous available in the paint tree of MPI.

Requirements for Protective coatings can be found in UFC 4‐211‐01 Section 3‐3.4.3.

30 Per the RFP we are being asked to provide Vertical Lift Fabric Doors (VLFD).

Per the UFC we are in a windborne debris region.

Fabric doors to not meet

Bid per RFP, See Hangar Bay room requirement for door requirements.

windborne debris resistance requirements.

Please confirm if it is acceptable to use VLFD’s?

31 Table 7.1, UFC 4‐211‐

01 Spr 13, 2017; Part 3 rood data sheets

Per the UFC referenced the hangar clear height is 32.5’ and nothing is allowed to be installed below this elevation including cranes. Per the UFC the hook height needs to be 29.5 feet. The Room Data sheet for the hangar bay is asking for a hook height of 22’. 1: can the overhead crane structure be built below the 32.5’ elevation? 2:

What minimum hook height are you requiring?

22’ or 29.5’?

Follow criteria in UFC 4‐211‐ 01 Table 7‐1 for required hook height and clear height.

32 Part 3, chapter 6, d 509002

The RFP says we need to have one generator feeding emergency power for each squadron. Do you want two separate emergency generators feeding two separate emergency back‐up power systems in this hangar?

Bid per RFP Section D509002 Emergency Lighting and Power. Each squadron/module must have dedicated emergency/backup generator systems.

33 Is it your intention to award this project by 30 September 2019? Is this FY 19 money? If not, what date should we use for award when building our schedules for the Phase 2 submission?

PROPOSAL DUE DATE

EXTENDED TO OCTOBER 8,

2019. INTENT TO AWARD

BY OCTOBER 31, 2019.

(End of Summary of Changes)