Amendment_0008.pdf
PDF 211 KB Posted
- Solicitation number
- N4008518R0644
About this file
Amendment_0008.pdf
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACQR5489062
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to:
1. Provide revisions to various Specification sections.
2. Provide responses to PPIs.
The follow ing attachments are attached hereto and made a part hereof:
1565553replaceECB2014-02.1of1 AND 1565553supdraw ings1of1 Proposal due date remains 9/17/19 at 2:00 p.m. (Eastern) .
1. CONTRACT ID CODE PAGE OF PAGES
1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Aug-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N4008518R0644
X 9B. DATED (SEE ITEM 11)
08-May-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Aug-2019
CODE
NAVFAC MID ATLANTIC
ACQUISITION CORE
9324 VIRGINIA AVENUE
NORFOLK VA 23511-3095
N40085 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N4008518R0644
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0008
1565553 Amendment 0008
SECTION 01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
1.12.1 NAVY CONSTRUCTION REPRESENTATIVE’S OFFICE
Delete this paragraph in its entirety and replace with the following:
1.12.1 NAVY CONSTRUCTION REPRESENTATIVE’S OFFICE
Provide an office trailer with a minimum of 2000 square feet of useable floor area for the exclusive use of Government personnel, in addition to and separate from any other office space provided by the Contractor. Provide a weather tight structure with adequate heating and cooling, toilet facilities, lighting, ventilation and a conference / meeting space that is a minimum of 12 FT X 20 FT with tables and chairs to accommodate at least 16 people. The trailer shall have a total of ten workspaces where four are enclosed offices with doors and six are cubicles each furnished with a standard size office desk, chair and file cabinet. There shall also be a 4 FT by 8 FT plan table with a plan rack and a location for at least one full size multifunctional printer that are contiguous with but in addition to the conference / meeting space. Toilet facilities must be located in the trailer and are required to include running water, not chemical toilets and hand sanitizer. Each office and cubicle shall be provided with sufficient electrical outlets, telephones and data lines for computers and for the central printer. Coordinate with NMCI to provide computer, printer and phone connections. Include a split system heat pump (or comparable system) sized for the geographical location of the project, with ductwork and a thermostat, that is capable of evenly providing sufficient heating and cooling to all of the above spaces to provide an office environment. Make all utility connections and include the cost of the utilities required to keep these systems operable for the duration of the project. Provide an exterior door with a cylinder lock and windows with locking hardware. Coordinate the location of the trailer with the Government. After completion of the work, disconnect and remove all temporary utilities and remove the entire structure from the site.
SECTION 01 33 29.05 20 SUSTAINABILITY REPORTING FOR DESIGN-BUILD
1.6.2 Optimize Energy Performance
Delete the following “Reduce measured building energy use by at least 30 percent compared to building energy use in 2003 or a year thereafter with metered energy use data. Reduce measured building energy use by at least 20 percent compared to building energy use in 2015 or year thereafter with metered energy use data.”
SECTION 01 33 29.05 20 SUSTAINABILITY REPORTING FOR DESIGN-BUILD
1.6.2 Optimize Energy Performance
Delete the following “Reduce modeled energy use (from all sources including renewable energy) by 20 percent compared to the ASHRAE 90.1 – IP baseline building design.” And replace with “For Commercial and Multi- Family High-Rise Residential Buildings, meet the requirements of ASHRAE 90.1 - SI ASHRAE 90.1 - IP, and achieve at least 30 percent energy efficiency below baseline, when life cycle cost effective.”
PART 3 PROJECT PROGRAM
3.2.12 Surface Parking
In the first sentence delete “and a minimum of 30 POV parking spaces, including ADA compliant parking spaces, and four (4) concrete surface motorcycle parking spaces.” And replace with “as shown in Figure 4 with required ADA compliant parking spaces.”
PART 3 PROJECT PROGRAM
G30 Site Civil/Mechanical Utilities G303090 Other Storm Sewer
In the second sentence delete “10” And replace with “15”
PART 6 ATTACHMENTS
Chapter A Delete NAVFAC ECB Issue No 2014-02 Revised 23 March 2016 and replace with ECB Issue No 2014-02 Revised 20 December 2016
PART 6 ATTACHMENTS
Chapter B Include Topographic Survey P197 Aircraft Maintenance Hanger Sheet V-100, V-200, V-300, V-400, V-500, V-600, V-700, and V-800 for information only. Contractor is required to verify existing conditions after award.
PPI RESPONSES
PRE‐PROPOSAL INQUIRY ATTACHMENT (5.3)
Solicitation Number: N40085‐18‐R‐0644
Contractor Name:
Contractor POC (Name and email):
Instructions: DO NOT submit in PDF format. DO submit as a word document
Contractor
PPI#
Section of RFP or Page Number
Paragraph Reference
Drawing Number
Question RESPONSE
001 Part 3 Chapter 4.5
In Part 3 – Chapter 4.5 a concept design floor plan was provided. Please provide scaled drawing of this layout for review.
The concept design drawing is for informational purposes only.
No scaled drawing is available.
002 01 33 29.05
1.4.4.1 Is Third‐Party
Certification required for both the Aircraft Maintenance Hangar and the Paraloft facility?
Yes
003 01 33 29.05
1.4.4.1 Referenced
paragraph requires Third‐ Party Certification of "GBI Green Globes for NC 2 globes, or Government‐ approved equivalent TPC sustainability certification or validation." Please confirm that any of the approved
Any of the approved TPC listed in ECB 2014‐02 is acceptable.
TPC listed in ECB 2014‐02 is acceptable.
004 Part 6, Chapter A
ECB 2014‐02
included in this section is out of date; the current version is dated Revised 20 December 2016.
Should project teams use the version in the RFP or the most up to date version?
See amendment, use latest version of ECB 2014‐02.
005 01 33 29.05
1.6.3 Referenced
paragraph states to reduce modeled energy use by 20 percent compared to
ASHRAE 90.1
baseline. Please confirm this should be 30 percent in accordance with federal requirements.
See amendment, use 30 percent energy reduction.
006 Part 3 Ch. 6
ESR G20
Para.
G2020;
Part 3 Ch. 3 Figure 4;
Part 3 Ch. 3 Para. 3.2.3;
Part 3 Ch. 3 Para. 3.2.12
Discrepancy with the # of parking spaces required near Paraloft facility. One part of RFP says provide parking per Figure 4 and any deviation requires Government approval. There are 56 parking spaces shown in Figure 4. Another part says a minimum of 50 spaces and yet another says provide a minimum of 30 POV spaces with 4 motorcycle.
See amendment.
Please clarify the minimum required number of parking spaces.
007 Part 3 Ch. 6
ESR G30
Para.
G303090
Per the RFP, effluent of the oil/water separator serving the hangar bay must discharge to the storm sewer system. This contradicts UFC 3‐ 240‐01 Wastewater Collection Chapter 4 Oil/Water Separators (OWS) which says conventional pollutants such as oil or grease flow through an OWS prior to connection to a wastewater sewer. Please clarify if it is acceptable to deviate from UFC's and discharge hangar trench drain oil/water separators into storm sewer and not sanitary sewers.
Bid per RFP, Discharge of containment that may contain PFAS from an AFFF release are to be discharged to the stormwater system after containment limit is met.
008 Part 3 Ch. 3 Para. 3.2.8;
Part 3 Ch. 6
ESR G30
Para.
G303090;
Part 3 Ch. 3 Para. 3.2.16;
RFP says to provide a rain water detection system for the wash rack pad but Part 3 Chapter 3 Paragraph 3.2.16 Sunshades says to provide a sunshade over the wash rack. Is the rainwater detection & diverter system
Bid per RFP and provide rain water detection system for wash rack.
still required if the pad is covered?
009 Part 6 Attachments Chapter B
Topographic Survey and Demolition Plans do not encompass the entire site plan. Please provide additional survey information for future F‐35 parking apron and sunshades. Need underground utility information across the future parking spaces.
See amendment.
010 Part 3 Ch. 3 Figure 4;
Please provide scaled drawing of Figure 4 Site Plan.
Bid per RFP, Figure 4 is for informational purposes only dimensions are shown on figure.
011 Part 3 Chapter 2,
2.6 Part 3‐Chapter 2‐
2.6 "Special Design Challenges" note 5 says the structural steel must be surface‐ prepared, primed and painted w/ HP coatings (epoxy primer and polyurethane coatings) in a SHOP setting, not in the field.
Please verify the joists and decking will only require to be prep'd and primed per the joist manufacturer specifications.
The joist and deck manufacturers do not offer the HP coatings on their products and the cost to ship to another SSPC specialty coatings
Confirmed facility is extremely costly.
(End of Summary of Changes)
File details come from the government source that posted it.