J-6_Contractor_Price_Breakdown_REV-3.xls
XLS spreadsheet 102 KB Posted
- Attached to
- USS MT WHITNEY FY '17 ESLP Availability Federal contract opportunity
- Solicitation number
- N32205-16-R-4601
About this file
Revised Attachment J-6 Pricing Breakdown
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J-1 Cat A Items
| CATEGORY “A” ITEMS | |||||||||||||
| GENERAL REQUIREMENT | PRIME Contractor | SUB Contractor | Govt Mandated Tech Rep / Sub | OTHER COSTS | TOTAL PRICE | ||||||||
| ITEM NO. | TITLE CAT A ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | TOTAL LABOR HOURS | TOTAL MATERIAL | CLIN | ||
| CATEGORY "A" | |||||||||||||
| 000 | GENERAL REQUIREMENTS | ||||||||||||
| 001 | Intent, Scope, General Requirements, and Definitions | NSP | 0001 | ||||||||||
| 002 | Technical and Manufacturer’s Representatives | NSP | 0001 | ||||||||||
| 003 | Approach, Berth, and Mooring Requirements | NSP | 0001 | ||||||||||
| 004 | Testing and Quality Assurance | NSP | 0001 | ||||||||||
| 005 | Electrical Safety Procedure Requirements | NSP | 0001 | ||||||||||
| 006 | Heavy Weather Plan | NSP | 0001 | ||||||||||
| 007 | Cold Weather Plan | NSP | 0001 | ||||||||||
| 10 | Furnish Office for Overhaul Management Team (OMT) | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 11 | Furnish General Services | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 12 | Telephone Services | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 13 | Project Planning; Production Status Monitoring Reports | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 14 | Preparation of Weight and Moment Report | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 15 | Integrated Logistics and GFM Support Requirements | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 16 | Fire Protection and Ship's Safety Program | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 17 | Handling Ships Stores | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 18 | Delivery and Redelivery | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 19 | Shipboard Access and Security | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 20 | Gas Free Certificates | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 21 | Clean and Gas Free Tanks, Voids, Cofferdams & Spaces | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 24 | Physical Security of MTW Vessel, FP BRAVO AMEND 0003 | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 100 | HULL STRUCTURES | ||||||||||||
| 101 | Tank Inspections (ABS/ USCG) | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 102 | Laundry and Structural Fire Protection | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 103 | Freeboard and Hawse Pipe Preservation | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 104 | Ultrasonic Hull Gaugings | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 105 | Tanks and Void Preservation | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 106 | Helo Deck Gutter Install | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 107 | RHIB and Davit Install | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 108 | Vessel Incline Survey | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 109 | Steel Replacement - Machinery and Equipment Foundations | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 110 | Steel Replacement - Supply Plenumto Fire Room | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 111 | Steel Replacement - Mooring Station Hatch Repairs | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 112 | Steel Replacement - Forced Draft Blower Uptake Space | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 113 | Steel Replacement - Oily Waste Holding Tank and Waste Oil Holding Tank | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 114 | Steel Replacement - Cross Flooding Duct | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 115 | Steel Replacement - Inner Bottom Plating Engine Room | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 116 | Steel Replacement - Inner Bottom Plating Fire Room | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 117 | Steel Replacement - Anchor Line Handling Space | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 118 | Steel Replacement - Bulkhead 118, Shaft Alley | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 119 | Steel Replacement - CHT Tanks | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 120 | Steel Replacement - In Trunk 4-143-1-T | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 121 | Steel Replacement - Preservation Cargo Elevator | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 122 | Steel Replacement - Overboard Discharges and Sea Chests | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 123 | Steel Replacement - Port and STBD Sponson | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 124 | Steel Replacement - Locked In Ballast Tanks 9-86-5/6 | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 125 | Steel Replacement - Main Deck AMEND 0003 | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 126 | Steel Replacement - Sideshell (Indents) | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 200 | MAIN PROPULSION | ||||||||||||
| 202 | HP Turbine Rotor Removal/Replacement | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 203 | Main Reduction Sump Foundation Repairs | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 204 | Redundant Cooling Water Supply to Main Engine | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 205 | Refurbish Boiler Burner Registers | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 206 | Port and STBD Boiler Sootblower Repairs | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 209 | Overhaul 1A Boiler Main Feed Stop VLV | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 210 | Overhaul 1A and 1B Boiler Brickwork Repairs | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 213 | Various Steam Valves Replacement | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 214 | Steel Repairs to Boiler Foundation | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 219 | Main Reduction Gears Inspection AMEND 0005 | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 300 | ELECTRICAL Systems | ||||||||||||
| 301 | Cleaning Various Electrical Load Centers | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 304 | Multi-Cable Transit Installation | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 305 | Load Center 32A and 32B CB Replacement | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 306 | Replace Refrigerant Monitors | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 308 | FD Blower Fan Inspection and Balance | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 309 | Clean, Dip and Bake SSTG 1C | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 310 | SSTG 1C Turbine and Reduction Gear Replace | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 400 | COMMUNIC ATION & NAV AIDS | ||||||||||||
| 402 | Gyro Repeater Installation | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 500 | AUXILIARY MACHINERY | ||||||||||||
| 501 | Hotel Steam Valve Replacement | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 502 | Auxiliary Condensate Pump and Motor Replace | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 503 | Incinerator Installation | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 504 | CHT Cross Connect Tank Install | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 505 | CHT Piping Cleaning | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 506 | Clean and Preserve Machinery Space Bilges | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 507 | Port Side SS/EDG Room Void De-Water Pipe Removal | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 508 | SS/EDG Racor Differential Pressure Sensor Install | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 509 | AUX Boiler Blowdown Piping and Coaming Install | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 510 | Fuel Oil Purifier Piping and Coaming Install | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 512 | Wire Rope Renewal, Cargo Elevator | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 514 | Water Heating System Upgrades | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 515 | Potable Water System Upgrades | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 516 | Sea Water Strainer Installation | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 517 | Ballast Tank Sounding Tube & TLI Install | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 518 | Refurbish Main Condenser Suct/Disch VLVs and Main Circ PP Suct VLV | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 600 | HABITABILITY | ||||||||||||
| 601 | MSC HAB MODS Crew Lounge | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 602 | MSC HAB MODS Group 1 | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 603 | MSC HAB MODS Group 2 | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 604 | MSC HAB MODS Group 3 | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 605 | MSC HAB MODS Group 4 | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 606 | MSC HAB MODS Group 5 | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 607 | MSC HAB MODS Tech Library | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 608 | NAVY HAB MODS Group 6 | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 609 | NAVY HAB MODS Group 7 | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 610 | NAVY HAB MODS Group 8 | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 611 | NAVY HAB MODS Group 9 | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 612 | NAVY HAB MODS Group 10 | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 613 | Midships AC Space Access | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 614 | Anti-Roll Tank Removal/ STRM Install | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 615 | MSC STRM MODS | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 616 | GYM Install | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 617 | Steering Gear Space Access | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 619 | CBR-D Storeroom Installation | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 620 | Captain's Galley Modifications | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 621 | C/E Office & Stateroom Modifications | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 622 | 1st Engineer Stateroom Modifications | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 623 | Medical Space Upgrades | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 700 | Sponsor | ||||||||||||
| 701 | CANES Install | - 0 | € 0.00 | € 0.00 | 0003 | ||||||||
| 702 | NMT Install | - 0 | € 0.00 | € 0.00 | 0003 | ||||||||
| 703 | CBSP Install | - 0 | € 0.00 | € 0.00 | 0003 | ||||||||
| 704 | DCGS Install | - 0 | € 0.00 | € 0.00 | 0003 | ||||||||
| 705 | ADNS Install | - 0 | € 0.00 | € 0.00 | 0003 | ||||||||
| 706 | NAVMACS Install | - 0 | € 0.00 | € 0.00 | 0003 | ||||||||
| 800 | Heating, Ventilation and Air Conditioning | ||||||||||||
| 803 | Fan Room 1-69-2 Equipment Repair | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 804 | Fan Room 2-38-1 Equipment and Deck Repair | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 805 | Fan Room 2-44-1 Equipment and Deck Repair | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 806 | Fan Room 2-44-2 Equipment and Deck Repair | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 807 | Fan Room 2-53-1 Equipment and Drain/ Deck Repair | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 808 | Fan Room 2-73-2 Equipment Repair | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 809 | Fan Room 2-98-2 Equipment Repair | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 810 | Fan Room 2-109-3 Equipment Drain/Deck Repair | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 811 | Fan Room 3-53-1 Equipment Repair | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 812 | Fan Room 3-121-1 Equipment and Deck Repair | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 813 | Fan Room 4-85-2 Equipment and Deck/ Drain Repair | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 814 | Fan Room 5-62-3 Equipment and Deck Repair | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 815 | Fan Room 5-91-2 Equipment Repair | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 816 | Fan Room 5-119-0 Equipment Repair | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 900 | Docking and Undocking | ||||||||||||
| 901 | Docking and Undocking | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 902 | Sea Valve and Waste Piece Inspection and Repair | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 903 | Under Water Hull Preservation | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 904 | Bilge Keel Cleaning and Preservation | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 905 | Anchors, Anchor Chains, Locker Inspection & Preservation | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 906 | Impressed Current Cathodic Protection System | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 907 | Propeller and Propeller Shaft Removal and Inspection | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 908 | Propeller Shaft Refurbishment | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 909 | Stern Tube Shaft and Bearings Removal/ Inspection | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 910 | Stern Tube Shaft Refurbishment | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 911 | Stern Tube Bearings and Bearing Carriers Replacement | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 912 | Stern Tube Assembly Steel Replacement | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 913 | Rudder Stock Removal and Stern Tube Frame Inspection | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 914 | Rudder Stock Refurbishment | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 915 | Rudder Blue Fit and Retaining Key | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 916 | Rudder Upper Bearing Replacement | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 917 | Rudder Lower Bearing Seal Modifications | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 918 | Install O-Ring Seal at the Rudder/Stock Joint | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 919 | Line Shaft Bearing Alignment Checks and Correction | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| 920 | Shaft Alignment Checks | - 0 | € 0.00 | € 0.00 | 0001 | ||||||||
| CLIN TOTALS | |||||||||||||
| J-1 CAT "A" | 0001 | € 0.00 | |||||||||||
| J-1 AGR | 0002 | ||||||||||||
| J-1 CAT "A" 700s | 0003 | € 0.00 | |||||||||||
| RESERVED | 0004 | RESERVED | |||||||||||
| J-1 CAT "B" 023 | 0005 | € 0.00 | |||||||||||
| RESERVED | 0006 | RESERVED | AMEND 0003 | ||||||||||
| J-1 CAT "B" 028 | 0007 | € 0.00 | |||||||||||
| J-1 CAT "B" 029 | 0008 | € 0.00 | |||||||||||
| J-1 CAT "B" 030 | 0009 | € 0.00 | |||||||||||
| J-1 CAT "B" 032 | 0010 | € 0.00 | |||||||||||
| J-1 CAT "B" 033 | 0011 | € 0.00 | |||||||||||
| J-1 CAT "B" 0207 | 0012 | € 0.00 | |||||||||||
| RESERVED | 0013 | RESERVED | AMEND 0005 | ||||||||||
| J-1 CAT "B" 0303 | 0014 | € 0.00 | |||||||||||
| J-1 CAT "B" 0401 | 0015 | € 0.00 | |||||||||||
| J-1 CAT "B" 0513 | 0016 | € 0.00 | |||||||||||
| J-1 CAT "B" 0707 | 0017 | € 0.00 | |||||||||||
| J-1 CAT "B" 0802 | 0018 | € 0.00 | |||||||||||
| J-2 CAT "A" | 0019 | € 0.00 | |||||||||||
| J-1 CAT "B" 0220 | 0020 | € 0.00 |
&LUSS MOUNT WHITNEY ESLP FY '17&CCONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMS J-1 Base &RN32205-16-R-4601
&CATTACHMENT J-6
J-1 Cat B Items
| Contractor's price will be broken down for each item of the specification, as follows: | ||||||||||||||
| CATEGORY “B” ITEMS | ||||||||||||||
| GENERAL REQUIREMENT | Unit Price (If Applicable) | PRIME Contractor | SUBCONTRACTOR | Govt Mandated Tech Rep / Sub | OTHER COSTS | |||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | Cost | Total Labor Hours | Total Material | TOTAL PRICE | CLIN | |
| CATEGORY "B" | ||||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||||
| 23 | Hazardous Waste Disposal at Contractors Facility | - 0 | € 0.00 | € 0.00 | 0005 | |||||||||
| 28 | Provide Berthing Vessel, Pier and FP | - 0 | € 0.00 | € 0.00 | 0007 | |||||||||
| 29 | Food Service for USN Personnel | - 0 | € 0.00 | € 0.00 | 0008 | |||||||||
| 30 | Food Cost for USN Personnel | - 0 | € 0.00 | € 0.00 | 0009 | |||||||||
| 32 | Temporary AC for Spaces | - 0 | € 0.00 | € 0.00 | 0010 | |||||||||
| 33 | Additional Security for Vessel | - 0 | € 0.00 | € 0.00 | 0011 | |||||||||
| 200 | Propulsion Machinery | |||||||||||||
| 207 | NSWC Installation Support | - 0 | € 0.00 | € 0.00 | 0012 | |||||||||
| 220 | HP Turbine Rotor Refurbish Amend 0002 | - 0 | € 0.00 | € 0.00 | 0020 | |||||||||
| 300 | Electrical Systems | |||||||||||||
| 303 | Repairs to Various Motors | - 0 | € 0.00 | € 0.00 | 0014 | |||||||||
| 400 | Electronics | 0010 | ||||||||||||
| 401 | Vessel Control System (VCS) Upgrades | - 0 | € 0.00 | € 0.00 | 0015 | |||||||||
| 500 | Machinery and Auxiliaries | |||||||||||||
| 513 | CHT Piping Replacement | - 0 | € 0.00 | € 0.00 | 0016 | |||||||||
| 700 | Sponsor | |||||||||||||
| 707 | TC2S Install | - 0 | € 0.00 | € 0.00 | 0017 | |||||||||
| 800 | Heating, Ventilation and Air Conditioning | |||||||||||||
| 802 | HVAC Ducting Replacement AMEND 0003 | - 0 | € 0.00 | € 0.00 | 0018 |
&L&14USS MOUNT WHITNEY ESLP FY '17
&C&14CONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "B" ITEMS J-1 Base&R&14N32205-16-R-4601
&CATTACHMENT J-4
J-2 PSA
| Contractor's price will be broken down for each item of the specification, as follows: | ||||||||||||||
| CATEGORY “B” ITEMS | ||||||||||||||
| GENERAL REQUIREMENT | Unit Price (If Applicable) | PRIME Contractor | SUBCONTRACTOR | Govt Mandated Tech Rep / Sub | OTHER COSTS | |||||||||
| ITEM NO. | TITLE CAT B ITEM | PRIME L/H | LABOR PRICE | MATERIAL PRICE | SUB L/H | LABOR PRICE | MATERIAL PRICE | Price | Cost | Total Labor Hours | Total Material | TOTAL PRICE | CLIN | |
| CATEGORY "B" | ||||||||||||||
| 000 | GENERAL REQUIREMENTS | |||||||||||||
| 22 | Dock Trials and Sea Trials | - 0 | € 0.00 | € 0.00 | 0019 | |||||||||
| 31 | Continuation of Services | - 0 | € 0.00 | € 0.00 | 0019 | |||||||||
| 500 | Machinery and Auxiliaries | |||||||||||||
| 530 | Labor Assist for Various ABS Annual Surveys | - 0 | € 0.00 | € 0.00 | 0019 |
&L&14USS MOUNT WHITNEY ESLP FY '17
&C&14CONTRACTOR PRICE BREAKDOWN
&"Arial,Bold"CATEGORY "A" ITEMS J-2 PSA Option Period&R&14N32205-16-R-4601
&CATTACHMENT J-4