Questions and Answers MTW Shipcheck 18 May 2016
View the file
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
| RFP N32205-16-R-4601 | USS MOUNT WHITNEY ESLP FY ’17 | Questions and Answers (Q&A) |
| #4 (18 May 2016) |
0000 Series Items Q: WI 011 General Services to the Vessel Are details available regarding the expected shore power consumption during the different phases of the project? (ie upon arrival, in drydock, etc) A: Shore power consumption is anticipated to be highest while pierside and ships crew is living on board.
0100 Series Items Q: WI 0102 Laundry Structural Fire Protection (General Question) Is it required to renew steel combing (blue colored) below the joiner bulkheads that are to be replaced?
A: Yes in accordance with the drawings the joiner bulkhead shall be removed in its entirety, including the blue combing kick plate.
Q: WI 0102 Laundry Structural Fire Protection Section 3.1(e) Space 5-88-0-Q For access to installation of new bulkheads, it is necessary to dismount and withdraw approximately 30 pieces of different cables (3x70 to 3x1.5mm) and mount in passage ways.
1. Which systems do these cables belong to and what are the approximate lengths?
2. Does the insulation present on the old cables contain asbestos?
3. Do the cables on the port side of this laundry space belong to the de-gousing system and is it necessary to dismount/withdraw them for bulkhead installation?
A:
1. It is the Contractors responsibility to determine the best method to satisfy the requirements of the WI.
2. MSC is unaware of any cable insulation containing asbestos.
3. Yes these cables belong to the De-gousing system. Removal is not required however penetrations shall be in accordance with A-0 Class.
Q: WI 0102 Laundry Structural Fire Protection With regard to room 2-14-0 Officer Laundry, there is an elbow to be rebuilt in heavy steel 5mm, connected to this bend there is a dryer exhaust duct. Is it acceptable to change the connection with a heavy steel elbow, install the fire damper, and make the new distribution galvanized steel?
A: MSC agrees with the proposed solution. MSC intends to amend this WI to reflect this approach as acceptable.
Q: WI 0102 Laundry Structural Fire Protection We understand that new fire dampers must be manual type (not with electrical actuator). Is it required to supply double manual control? (each side of the bulkhead?).
A: Yes, MSC intends to amend the WI to reflect this requirement.
Q: WI 0110 Steel Replacement Fire Room Plenum Are there any drawings available of the area to be renewed?
A: MSC does not have drawings of the area to be renewed. Contractors should prepare its estimate in accordance with provided guidance on location and quantities.
0600 Series Items Q: Joiner Bulkheads General Questions On some drawings for the 0600 items, the new joiner bulkheads are 80” in height while on others nothing is mentioned. Should it be assumed that 80” height would be applicable for all areas?
A: It should not be assumed that 80” height will apply for all areas. Heights will vary depending on location. The contractor is responsible to determine the appropriate height as applicable.
Q: 0600 Items General Question on HVAC/ Air Balancing Following discussion on board, the assumption is made that existing airflow will be enough to cover the required standard in terms of air flow needed and quality. How will the air flow be regulated inside the dorm areas? (Regulation dampers; how many? Where?)
A: Per the WI the Contractor is required to balance the system. In order to balance the system the contractor will be required to install balancing dampers at each branch. This requirement is reflected in the General Technical Requirements (GTRs), however MSC also intends to amend the WI to reflect this requirement.
Q: 0600 Items General Question Please specify the differences in HVAC modification for MSC and Navy Spaces?
A: Provided reference drawings specifically identify differences between MSC and Navy spaces.
Q: 0600 Items General Question Galvanized Duct Standard Please confirm that thin plate galvanized ducts can be installed using flange joint connection?
A: As referenced in the general technical requirements (GTRs) Connections shall be in accordance with ASHRAE.
0800 Series Items Q: WI 0815 Fan Room 5-91-2 Equipment Repair Please confirm that fan room 5-91-2 is in fact 5-92-2. The listed space 5-91-2 was unable to be located?
A: Correct, the actual space where repairs are to be performed is 5-92-2.
Q: 0800 Items General Question Are there available drawings for the casing that contain the cooling coil?
A: MSC intends to provide a standard drawing for reference.
Q: WI 0802 HVAC Duct Replacement Please specify the thickness of steel plate and kind of steel plate? (ie galvanized or heavy steel).
A: MSC intends to amend the WI to reflect the appropriate thickness.
0900 Series Items Q: WI 0920 Load Test Line Shaft Bearings Please provide contractors with the original load test report and the last test report for both afloat and in dry dock.
A: MSC has the requested information available and shall be provided.
Q: WI 0900 Shaft Line and Stern Tube Components Can MSC provide a better clarification of the stern tube skids?
A: The shaft skids are used for mounting/dismounting the stern tube shaft to prevent damage to the stern tube bearings.