J-2_WI_Package_(Specifications)(Post_Shakedown_Avail)
30 KB Posted
- Attached to
- USS MT WHITNEY FY '17 ESLP Availability Federal contract opportunity
- Solicitation number
- N32205-16-R-4601
About this file
Attachment J-2
Text of this file
MILITARY SEALIFT COMMAND
NORFOLK, VIRGINIA
S P E C I F I C A T I O N S
FOR
USS MOUNT WHITNEY
USCG No. N/A ABS ID No.: 71213053
Solicitation No.: N32205-16-R-4601
February 2016
POST SHIPYARD AVAILABILITY (PSA)
PRINCIPAL DIMENSIONS
LENGTH.........................................627 ft 03 in
BREADTH........................................108 ft 00 in
FULL LOAD WL................................24 ft 09 in ABL
DISPLACEMENT UPON ARRIVAL..................18,893 LONG TONS
THIS SPECIFICATION CONSISTS OF THE FOLLOWING PAGES
WORK ITEMS INDEX.....................................PAGE 2
WORK ITEMS...........................AS LISTED IN THE INDEX
USS MT WHITNEY N32205-16-R-4601
(LCC-20) FEBRUARY 2016
PSA WORK ITEM INDEX MSC/N74/REVFEB2016
000 GENERAL REQUIREMENTS
ITEM TITLE
0022 DOCK TRIALS AND SEA TRIALS
0031 CONTINUATION OF SERVICES
0100 HULL STRUCTURE
0200 PROPULSION MACHINERY
ITEM TITLE
0300 ELECTRICAL SYSTEMS
0400 ELECTRONICS
0500 MACHINERY AND AUXILIARIES
0530 LABOR ASSIST FOR VARIOUS ABS ANNUAL SURVEYS
0600 OUTFIT, FURNISHINGS, HABITABILITY
0700 SPONSOR
0800 HEATING, VENTILATION AND AIR CONDITIONING
0900 DOCKING UNDOCKING
USS MT WHITNEY
(LCC 20)
GENERAL REQUIREMENTS RFP NO. N32205-16-R-4601
JAN 2016
ITEM NO. 0022 Category "A" MSC/N74/RHA
DOCK TRIALS AND SEA TRIALS
022-1
1.0 ABSTRACT:
1.1 This item describes the requirements for dock trials
and sea trials. Compass calibration will be accomplished during sea trials.
2.0 REFERENCES: None.
3.0 ITEM LOCATION AND DESCRIPTION:
3.1 Various
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIALS/SERVICES: None.
5.0 NOTES:
5.1 The contractor and subcontractors must consult
Military Sealift Command’s General Technical Requirements, (GTR’s), to determine applicability to this work item. The contractor and all subcontractors must comply with all applicable GTR requirements.
5.2 The contractor and subcontractors shall review other
work items under this contract, to determine their effect on the work required by this item. Based on this review the contractor shall plan and schedule work to minimize conflicts between work items.
5.3 The definitions of many terms used in this work item
are found in work item 001.
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.
7.0 STATEMENT OF WORK:
7.1 DOCK TRIALS
7.1.1 In coordination with MSCREP, Contractor shall
develop a Dock Trial Agenda five (5) days prior to the schedule dock trials, The agenda that includes:
022-2
a. List of equipment to be tested
b. List of tests
c. Test performance criteria
d. Test acceptance criteria
e. Test schedule
f. Test data to be recorded
g. Test data recording format
h. Instrumentation required
i. List of shipyard personnel involved
j. List of vendor technical representatives
k. List of regulatory body representatives
7.1.2 Dock trials shall be carried out jointly with
ship’s force. Representatives of contractor or subcontractor shall be present onboard to witness testing and record operational testing and performance data. Dock trial results shall be summarized by the contractor and submitted to the MSCREP prior to sea trials.
7.1.3 Dock trials shall be scheduled to occur in
accordance with Work Item 0013, para 7.1.7.2.6
7.1.4 Allocate four (4) hours minimum duration for
running of each equipment/system.
7.1.5 Schedule all dock trials during the day shift.
022-3
7.1.6 Perform dock trials in accordance with the
published agenda.
7.1.7 Coordinate with ship’s force to operate and
test main propulsion machinery, auxiliary machinery, and equipment that has been overhauled, repaired or otherwise worked on during the performance of the Work Package.
7.1.8 Turn the shaft during dock trials, taking all
necessary precautions to obtain wheel clearance prior to turning the shaft. Contractor shall provide (4) tug services at the pier to provide positive holdback during dock trials.
Contractor shall provide additional lines, make temporary removals and disconnections as necessary to support dock trial evolution.
7.1.9 Manufacturer and authorized technical
representatives, used by the contractor to install, repair and/or modify any equipment or system shall be present during operational testing of that equipment or system during the dock trial event.
7.1.10 Correct deficiencies attributable to contractor
or subcontractor workmanship found during dock trials, prior to accomplishing sea trials.
7.2 Sea Trials:
7.2.1 In coordination with MSCREP, Contractor shall
develop and submit an agenda to the MSCREP, five
(5) days prior to sea trials. Sea Trial agenda shall include:
a. List of equipment to be tested
b. List of tests
022-4
c. Test performance criteria
e. Test schedule
f. Test data to be recorded
g. Test data recording format
h. Instrumentation required
i. List of shipyard personnel involved
j. List of vendor technical representatives. All manufacturer and authorized technical representatives, used by the contractor to install, repair and/or modify any equipment or system shall be present during operational testing of that equipment or system during the sea trial event.
k. List of regulatory body representatives
l. List of equipment requiring special operating conditions (e.g., sea state, navigational clearance, test ranges, etc.).
m. Equipment requiring calibration and adjustment while at sea (e.g., compass adjustment).
7.2.2 Sea Trials shall be scheduled to occur in
accordance with Work Item 0013, para 7.1.7.2.7
022-5
7.2.3 Perform sea trials in accordance with
published agenda.
7.2.4 Operate and test at equipment full power
rating, all main propulsion machinery, auxiliary machinery, and equipment that has been overhauled, repaired or otherwise worked on during the performance of the Work Package.
7.2.5 Allocate for an overnight sea trial with
minimum four (4) hours of actual full power running time in open seas. Transit times shall not be included in the sea trial time requirement.
7.2.6 Provide the following personnel at minimum
(with respective craft tools) to ride the ship and perform final adjustments, calibrations, data collection, deficiency correction and observance of equipment/system performance during the entire sea trial:
a. One (1) supervisor
b. One (1) machinists
c. Two (2) pipe fitters
d. Two (2) electricians
7.2.7 Provide services of a qualified
representative to calibrate the magnetic compass in accordance with manufacturer instructions during sea trial.
022-6
7.2.8 Submit an as-found condition report to the
MSCREP within 24-hours of Sea Trial completion documenting deficiencies identified during sea trials. Catalog deficiencies by work item number.
7.2.9 Correct deficiencies attributed to
Contractor or sub-contractor workmanship found during sea trials prior to redelivery.
7.2.10 Repeat the Sea Trial at Contractor’s
expense until satisfactory results are achieved if the initial sea trial is deemed unsatisfactory by the MSCREP.
7.2.11 Upon successful completion of the sea
trial, as accepted by the MSCREP, contractor shall provide sea and/or land transportation to pick up all contractor, subcontractor and government riders from the traditional pick-up point for the local launch service and return those personnel to the shipyard.
7.2.12 Contractor shall provide all tugs, pilots, line-handlers, etc. to support ship departure and return from sea trials.
7.3 Dock and Sea Trial Reports:
7.3.1 Within five (5) days after completion of a
successful sea trial, contractor shall prepare and submit to MSCREP a final Dock Trial and Sea Trial reports addressing:
a. Equipment/systems tested
b. Test environmental conditions
022-7
c. Test date and time
e. Test results
8.0 GENERAL REQUIREMENTS: None additional.
GENERAL REQUIREMENTS RFP NO. N32205-16-R-4601
JAN 2016
ITEM NO. 0031 Category "A" MSC/N74/RHA
CONTINUATION OF SERVICES
031-1
1.1 Continue delivering services described in parent work
items 010, 011, 012, 013, 016, 018, 019, and 020.
2.0 REFERENCES: None.
3.0 ITEM LOCATION/DESCRIPTION: Various.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE: None.
5.0 NOTES: None.
6.0 QUALITY ASSURANCE REQUIREMENTS: None.
7.0 STATEMENT OF WORK REQUIRED:
7.1 Submit a unit price per day up to a maximum of fifteen
(15) days for the continuation services described in parent work item 010 ‘‘Overhaul Management Team Services.’’
7.2 Submit a unit price per day up to a maximum of fifteen
parent work item 011’’ General Services for the Ship.’’
7.3 Submit a unit price per day up to a maximum of fifteen
parent work item 012 ‘‘Telephone Services.’’
7.4 Submit a unit price per day up to a maximum of fifteen
parent work item 013 ‘‘Project Planning and Monitoring.’’
7.5 Submit a unit price per day up to a maximum of fifteen
parent work item 016 ‘‘Fire Protection and Ship’s Safety.’’
7.6 Submit a unit price per day up to a maximum of fifteen
parent work item 019 ‘‘Shipboard Access and Security.’’
7.7 Submit a unit price per day up to a maximum of fifteen
parent work item 020 ‘‘Gas Free Certificates.’’
8.0 GENERAL REQUIREMENTS: None additional.
(LCC-20)
MACHINERY, AUXILIARIES N32205-16-R-4601
FEB 2016
ITEM NO. 0530 Category "A" MSC/N74/RHA
VARIOUS ABS ANNUAL SURVEYS
0530-1
1.1 The intent of this work item is to provide shipyard
labor assistance to accomplish various ABS Annual Surveys for the attending ABS Surveyor.
2.0 REFERENCES:
2.1 USS MT WHITNEY’s ABS Safenet Report
3.0 ITEM LOCATION/DESCRIPTION
3.1 Location/Quantity:
3.1.1 Various
3.2 Description:
3.2.1 Various machinery and equipment
4.0 GOVERNMENT FURNISHED MATERIAL/EQUIPMENT/SERVICES:
4.1 Government Furnished Material: None
5.0 NOTES
5.1 The Contractor and all subcontractors, regardless of
tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1 through 7, 22, 23, 24, 27, 28 and 29.
5.2 The Contractor and all subcontractors regardless of
tier are advised to review the other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.
5.3 The USS Mount Whitney is known to have a considerable
amount of asbestos. Additionally, it is known that the coating systems may contain lead. The contractor should expect this condition and factor in removal and remediation time
(LCC-20)
MACHINERY, AUXILIARIES N32205-16-R-4601
FEB 2016
ITEM NO. 0530 Category "A" MSC/N74/RHA
VARIOUS ABS ANNUAL SURVEYS
0530-2 requirements into his overall planning schedule. Costs associated with unexpected hazardous waste remediation and removal shall be attributed to Work Item 023, rather than to the individual work items. Wastes removed in the course of work package accomplishment shall be removed from the ship, handled and disposed of in accordance with Work Item 023 of this work package. Contractor shall be responsible to follow all international, national and US Federal regulations in the containment and removal of these wastes as encountered.
5.4 The contractor is expected to use best management
practice to identify and dispose of all hazardous waste. Every effort shall be made to minimize the disturbance, removal and handling of hazardous wastes in the accomplishment of the work package.
6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional
7.0 STATEMENT OF WORK
7.1 In accordance with Ref 2.1, provide shipyard labor to
assist ship’s crew with accomplishing various ABS Annual Surveys for the attending ABS Surveyor.
7.2 For bidding purposes, shipyard labor assistance shall
include the following crafts:
7.2.1 80 hrs inside machinist
7.2.2 80 hrs outside machinist
7.2.3 80 hrs welders
7.2.4 80 hrs pipe fitters
7.2.5 80 hrs lagging/insulation
7.2.6 80 hrs riggers
7.2.7 80 hrs general mechanics
7.3 Any unused portion of this work item shall be credited
back to the government in a Change Order.
8.0 GENERAL REQUIREMENTS: None Additional
| MTW FY17 PSA Cover Page and Index |
| 0000 General Requirements |
| 0022_A_DOCK TRIALS AND SEA TRIALS |
| 0031_A_CONTINUATION OF SERVICES |
| 0500 Machinery and Auxiliaries |
| 0530_A_Shipyard Assist with Various ABS Annual Surveys |
Other files for this federal contract opportunity
Show all 43
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .