M-503 MECHANICAL DETAILS.pdf

PDF 134 KB Posted

Attached to
DLA Fitness Center Renovation Federal contract opportunity
Solicitation number
1430
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This document provides mechanical details for a base mounted pump system. It includes drawings depicting a grooved piping configuration and welded piping configuration for connecting pumps to associated valves, fittings, insulation, hangers, and anchoring the pump base to a concrete pad. The related federal contract opportunity is a solicitation from the Department of the Army Corps of Engineers Engineering District Norfolk to renovate the fitness center at Defense Supply Center Richmond. Solicitation number 1430 has an posting date of April 13, 2020 for the DLA Fitness Center Renovation project. The opportunity involves providing mechanical systems including base mounted pumps, valves, piping, and associated details as depicted in the drawings.

View the file

Other files for this federal contract opportunity

Other files attached to DLA Fitness Center Renovation, newest first.
File Type Posted
H.01.04_Convert B32, Bays F-G for Fitness Center_RTA_Specifications_22Nov19.pdf PDF
Section 09 51 00 Acoustical Ceiling.pdf PDF
118ECE908 RTA FF and E Binder 22Nov19.pdf PDF
Section 09 64 66 Wood Athletic Flooring.pdf PDF
Section 09 30 10 Porcelain Tiling.pdf PDF
Lead Based Paint Survey Report Building No. 32.pdf PDF
Section 12 66 00 Telescoping Stands.pdf PDF
A-111B REFLECTED CEILING PLAN -AREA B.pdf PDF
A-101C FLOOR PLAN -AREA C.pdf PDF
118ECE908_RTA_SID Binder_22Nov19.pdf PDF
Section 11 66 23 Gymnasium Equipment.pdf PDF
ED111B ELECTRICAL DEMOLITION PLAN -AREA B.pdf PDF
Section 09 65 00 Resilient Flooring.pdf PDF
H.01.01_Convert B32, Bays F-G for Fitness Center_RTA_Drawings_22Nov19.pdf PDF
Section 09 65 66 Resiliend Athletic Flooring.pdf PDF
Section 09 68 00 Carpet Tiles.pdf PDF
I101D FLOOR FINISH PLAN -AREA D.pdf PDF
W91236-20-B-2011 Fitness Center.pdf PDF
A-512 ROOF DETAILS.pdf PDF
A-111A REFLECTED CEILING PLAN -AREA A.pdf PDF
A-121 OVERALL ROOF PLAN.pdf PDF
A-521 MISCELLANEOUS DETAILS.pdf PDF
Section 08 14 00 Wood Doors.pdf PDF
I101C FLOOR FINISH PLAN -AREA C.pdf PDF
ED111A ELECTRICAL DEMOLITION PLAN -AREA A.pdf PDF
Asbestos Re-Inspection Report DSCR Building No. 32.pdf PDF
ED111C ELECTRICAL DEMOLITION PLAN -AREA C.pdf PDF
A-111D REFLECTED CEILING PLAN -AREA D.pdf PDF
A-201 BUILDING ELEVATIONS.pdf PDF
ED111D ELECTRICAL DEMOLITION PLAN -AREA D.pdf PDF
A-111C REFLECTED CEILING PLAN -AREA C.pdf PDF
A-101B FLOOR PLAN -AREA B.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STANDARD CLEVIS

HANGER AND ROD

TREATED WOOD BLOCK SIZED TO

MATCH PIPE INSULATION

GROOVED RIGID COUPLINGS

GROOVED RIGID COUPLING

BUTTERFLY VALVE (TYP.)

GROOVED FLEXIBLE COUPLING (TYP.)

CHECK VALVE

GROOVED CONCENTRIC REDUCER WITH

FLANGE ADAPTER

ANCHOR PUMP BASE TO CONCRETE FLOOR.

GROUT PUMP BASE SOLID.

CONCRETE HOUSEKEEPING PAD.

DRAIN VALVE

SUCTION DIFFUSER WITH SUPPORT LEG. IF INLET

DOES NOT MATCH SYSTEM PIPE SIZE PROVIDE

FLANGED INCREASER.

RR

R R

R

F

F

F

F

F

F

GROOVED PIPE OPTION

BALANCING VALVE (ONLY REQUIRED IF PUMP

DOES NOT HAVE A VFD)

F

F

THREE PORT TRUMPET VALVE

SUCTION DIFFUSER WITH SUPPORT LEG. IF

INLET DOES NOT MATCH SYSTEM PIPE SIZE

PROVIDE FLANGED INCREASER.

DRAIN VALVE

CONCRETE HOUSEKEEPING PAD.

ANCHOR PUMP BASE TO

CONCRETE FLOOR. GROUT BASE

SOLID.

SINGLE GAGE WITH GAGE COCKS AND

UNION PIPED BETWEEN DISCHARGE AND

SUCTION TAPS ON PUMP

FLANGED INCREASER (TYP)

CHECK VALVE

PUMP SUCTION PIPE

DOUBLE, SPHERICAL NEOPRENE FLEXIBLE CONNECTION

WITH FLANGED ENDS (TYP). DO NOT ALLOW WEIGHT OF

PIPE TO BEAR ON FLEXIBLE CONNECTION. DO NOT USE

CONNECTION FOR PIPE MISALIGNMENT.

BUTTERFLY VALVE (TYP)

PUMP DISCHARGE PIPE

WOOD BLOCK SIZED TO MATCH PIPE

INSULATION

STANDARD CLEVIS

HANGER AND ROD

WELDED PIPE OPTION

BALANCING VALVE (ONLY REQUIRED IF THE

PUMP DOES NOT HAVE A VFD)

THREE PORT TRUMPET VALVE

US Army Corps of Engineers ®

SHEET

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I 'D

F

IL

E

N A

M E

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

F

IL

E N

U M

B E

R

1 2 3 4 5

D

C

B

A

N O

R F

O L K

D

IS

T

R

IC

T N

O R

F O

L K

V

IR

G

IN

IA

READY TO ADVERTISE

D E

F E

N S

E S

U P

P L Y

C E

N T

E R

R

IC

H M

O N

D

D S

C R

V

IR

G

IN

IA

C O

N V

E R

T B

B

A Y

S F

G

F

IT

N

E S

S C

E N

T E

R P

R O

J E

C T

E

C E

N O

V E

M B

E R

W -1

-R

-0

W -1

-R

-0

M-503

M E

C H

A N

IC

A

L D

E T

A

IL

S K

M

IL

L E

R

A S

C H

N U

R

M B

E H

R M

A N

N

M B

E H

R M

A N

N

SCALE : NTSA1 BASE MOUNTED PUMP DETAIL-GROOVED

SCALE : NTSA2 BASE MOUNTED PUMP DETAIL-WELDED

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

A

M E

N D

M E

N T

-2

-2

File details come from the government source that posted it. Updated .