This document is a technical evaluation form for a multiple award task order contract solicitation from the Department of Transportation Federal Highway Administration. Contractors are required to submit details of recent and relevant projects demonstrating experience with roadway reconstruction of at least two miles with an average daily traffic over 3,000 vehicles, protection of wetlands or waterways within 20 feet of construction, preservation of cultural resources, stone masonry construction or reassembly, material sourcing from over 60 miles away, paving of at least 8,000 tons, or bridge construction over 100 feet. Eligible projects must have been completed after December 2018 or be at least 50% complete, with the prime contractor performing at least 50% of the work or 25% for bridge projects. The contract will provide task orders for road construction and maintenance services in Yellowstone and Grand Teton National Parks through 2024.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Source Selection (when completed, this page is considered source selection information, see FAR 2.101 & 3.104)
Attachment J.2 Technical Information Form 1
Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC) 2024
MATOC Proposal
Source Selection Information
Solicitation: 69056723R000013
ATTACHMENT J.2 TECHNICAL INFORMATION FORM 1
Technical Evaluation Factor 1 - Recent and Relevant Experience Form
Directions: Complete a copy of this form for at least 1 but no more than 5 projects to satisfy all Factor 1 criteria. If any information is unknown leave blank.
Requirements for each project:
(1) Completed after December 14, 2018 (December 14, 2013 if bridge project) or the project is at least 50% complete as of the date of proposal submission; AND
(2) 50% of the work performed by the Prime (25% if bridge project); AND
(3) Work included road reconstruction or new construction; AND
(4) $6 million minimum contract award amount
Company Information
Company Name:
Project Information
Project Name
Contract Number
Project Location
Owner/Agency
Owner/Agency Point-of-Contact
Contact Phone & E-mail address
Contract Information for this project
Contract Award Date:
Construction Start Date:
Original Completion
Final Completion
Contract award amount:
Final contract amount:
Percentage (%) complete if not complete at time of proposal submission
Percentage (%) of work completed as the prime
Source Selection (when completed, this page is considered source selection information, see FAR 2.101 & 3.104)
Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC) 2024
Recent and Relevant Experience
Directions: In addition to the minimum requirements on page 1 of this form, each individual project must include a minimum of four of the following construction elements; and across all submitted projects all seven of the construction elements must be cumulatively represented. Bridge construction projects do not need to contain any other construction element to be evaluated (i.e., bridge construction projects do not need to contain elements 1 thru 6).
This project satisfies which of the Factor 1 criteria (select all that apply)
Construction Elements
☐ (1) Roadway reconstruction of 2-mile or more corridor, 2-lane with ADT 3,000 vehicles/day or greater, and with no available detours or closures
☐ (2) Protection of wetlands or Class 1 waters within 20-feet of construction limits
☐ (3) Protection or preservation of cultural resources such as: historic features or sites;
archaeological sites; or historic stone masonry such as found in Yellowstone and Grand Teton National Parks
☐ (4) Reassembly or new construction of stone masonry features such as: headwalls, curbing or rock facing
☐ (5) Performance where material sources were 60 miles or greater from the construction site
☐ (6) Paving – 8,000 tons minimum
☐ (7) Bridge construction of a vehicular bridge 100-feet or longer. (This element does not apply to a contractor that is a small business under NAICS 237310).
Narrative that describes the project in sufficient detail to support the minimum four requirements on page 1 and construction elements that were selected above.
Source Selection (when completed, this page is considered source selection information, see FAR 2.101 & 3.104)
Source Selection (when completed, this page is considered source selection information, see FAR 2.101 & 3.104)
File details come from the government source that posted it. Updated .