About this file

This document is an amendment to a solicitation for the Yellowstone and Grand Teton Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) 2024. The amendment revises the technical evaluation criteria to require that each project submitted for evaluation under Factor 1, Recent and Relevant Experience, includes a minimum of four out of seven defined construction elements. It also revises the construction element related to bridge projects. The solicitation, issued by the Department of Transportation Federal Highway Administration, seeks an IDIQ contract to provide road construction and maintenance services within Yellowstone and Grand Teton National Parks and surrounding areas. The response due date and award timing are not specified.

View the file

Other files

File Type Posted
QA_01-25-2024_2.pdf PDF
QA_01-25-2024.pdf PDF
Amendment A005.pdf PDF
J.2 Technical Information Form 1_A004.pdf PDF
QA_01-16-2024_2.pdf PDF
J.4 Past Performance Form 2_A001.pdf PDF
QA_01-16-2024.pdf PDF
J.2 Technical Information Form 1_A004.pdf PDF
Amendment A004.pdf PDF
QA_01-05-2024.pdf PDF
Amendment A003.pdf PDF
QA_01-03-2024.pdf PDF
QA_12-28-2023.pdf PDF
QA_12-27-2023.pdf PDF
Amendment A001.pdf PDF
QA_12-20-2023.pdf PDF
QA_12-18-2023.pdf PDF
RFP_Yellowstone MATOC_Final.pdf PDF
J.3 YELL 12(5)_PLANS_70pct.pdf PDF
J.2 Technical Information Form 1.pdf PDF
J.3 Sample Project YELL 12(5).pdf PDF
J.1 MASTER SUBCONTRACTING PLAN.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A002 12/28/2023 N/A See Box 14

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X 69056723R000013

9B. DATED (SEE ITEM 11)

12/14/2023

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

(__ ) is extended, ( x ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A D OTHER (Specify type of modification and authority)

N/A E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

69056723R000013, Yellowstone, Grand Teton, & Surrounding area MATOC 2024

See Page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A002, dated 12-28-2023 69056723R000013 Solicitation No. 69056723R000013 Yellowstone, Grand Teton, & Page 2 Surrounding area MATOC 2024

REVISIONS ARE AS FOLLOWS:

Part III – List of Documents, Exhibits, and Other Attachments

Page J-1, List of Attachments.

1. Revises Attachment J.2 Technical Information Form 1.

Part IV – Representations and Instructions

Page M-1, Evaluation Factors for Award.

1. Revises Construction Element (7).

ENCLOSURES

Attachments:

J.2 Technical Information Form 12

Pages:

J-1 M-1

J-1

SECTION J – List of Attachments Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC) 2024

Part III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J – LIST OF ATTACHMENTS

J.1 Master Subcontracting Plan (will be incorporated into MATOC Awards)

J.2 Technical Information Form 1_A002 (will not be incorporated into MATOC Awards)

J.3 Sample Project: MT NPS YELL 12(5), Northeast Entrance Road, Seed Project (will not be incorporated into MATOC Awards)

J.4 Past Performance Form 2 (will not be incorporated into MATOC Awards)

Revised by Amendment A002 Revised by Amendment A001

M-1

Source Selection Information | See FAR 2.101 and 3.104 | (Applicable when filled‐in) SECTION M – Evaluation Factors for Award Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC) 2024

SECTION M – EVALUATION FACTORS FOR AWARD

Factor 1: Proposed Prime Contractor Recent and Relevant Experience Projects submitted for this factor must meet the requirements defined below and the offeror must have been the prime contractor for the project.

Minimum Project Requirements A minimum of one and maximum of five projects performed by the offeror as the prime contractor meeting the following requirements:

(1) Completed after December 14, 2018, or the offeror has earned at least 50% of the awarded contract value as of the date of proposal submission; AND

(2) 50% of the work performed by the offeror as the prime contractor (25% if a bridge project); AND

(3) Work included road reconstruction or new road construction; AND

(4) $6 million minimum contract award amount

Each individual project must meet all four of the above requirements to be considered.

Individual projects that do not meet all four of the above requirements will not be further evaluated with the exception of bridge projects. Bridge projects must be 50% completed after December 14, 2013.

Construction Elements In addition, each individual project (with the exception of bridge project(s)) must include a minimum of four of the following construction elements to be considered for evaluation.

(1) Roadway reconstruction of 2-mile or more corridor, 2-lane with ADT 3,000 vehicles/day or greater, AND with no available detours or closures.

(2) Protection of wetlands or Class 1 waters within 20-feet of construction limits.

(3) Protection or preservation of cultural resources such as: historic features or sites;

archeological sites; or historic stone masonry such as found in Yellowstone and Grand Teton National Parks.

(4) Reassembly or new construction of stone masonry features such as: headwalls, curbing or rock facing.

(5) Performance where material sources were 60 miles or greater from the construction site.

(6) Paving – 8000 tons minimum.

(7) Bridge construction of a vehicular bridge, with 100-feet or longer of structure length , in that includes a single span or multiple spans. (This element does not apply to a contractor that is a small business under NAICS 237310).

Each individual project (except bridge projects) must include a minimum of four of the above construction elements. Individual projects that do not contain at least four of the above construction elements will not be further evaluated . This minimum requirement does not apply to bridge construction projects. Bridge construction projects do not need to contain construction elements 1 thru 6 to be evaluated (i.e., bridge construction projects only need to contain construction element 7).

Source Selection (when completed, this page is considered source selection information, see FAR 2.101 & 3.104) Attachment J.2 Technical Information Form 1 Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC) 2024

MATOC Proposal Source Selection Information

Solicitation: 69056723R000013

ATTACHMENT J.2 TECHNICAL INFORMATION FORM 1

Technical Evaluation Factor 1 - Recent and Relevant Experience Form

Directions: Complete a copy of this form for at least 1 but no more than 5 projects to satisfy all Factor 1 criteria. If any information is unknown leave blank.

Requirements for each project:

(1) Completed after December 14, 2018 (December 14, 2013 if bridge project) or the project is at least 50% complete as of the date of proposal submission; AND

(2) 50% of the work performed by the Prime (25% if bridge project); AND

(3) Work included road reconstruction or new construction; AND

(4) $6 million minimum contract award amount

Company Information Company Name:

Project Information Project Name

Contract Number

Project Location

Owner/Agency

Owner/Agency Point-of-Contact

Contact Phone & E-mail address

Contract Information for this project Contract Award Date: Construction Start

Date:

Original Completion Date:

Final Completion Date:

Contract award amount: Final contract amount:

Percentage (%) complete if not complete at time of proposal submission

Percentage (%) of work completed as the prime

Source Selection (when completed, this page is considered source selection information, see FAR 2.101 & 3.104)

Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC) 2024

Recent and Relevant Experience

Directions: In addition to the minimum requirements on page 1 of this form, each individual project must include a minimum of four of the following construction elements; and across all submitted projects all seven of the construction elements must be cumulatively represented. Bridge construction projects do not need to contain any other construction element to be evaluated (i.e., bridge construction projects do not need to contain elements 1 thru 6).

This project satisfies which of the Factor 1 criteria (select all that apply)

Construction Elements

☐ (1) Roadway reconstruction of 2-mile or more corridor, 2-lane with ADT 3,000 vehicles/ day or greater, and with no available detours or closures

☐ (2) Protection of wetlands or Class 1 waters within 20-feet of construction limits ☐ (3) Protection or preservation of cultural resources such as: historic features or sites;

archaeological sites; or historic stone masonry such as found in Yellowstone and Grand Teton National Parks

☐ (4) Reassembly or new construction of stone masonry features such as: headwalls, curbing or rock facing

☐ (5) Performance where material sources were 60 miles or greater from the construction site

☐ (6) Paving – 8,000 tons minimum ☐ (7) Bridge construction of a vehicular bridge, with 100-feet or longer of structure length, in that includes a single span or multiple spans. (This element does not apply to a contractor that is a small business under NAICS 237310).

Narrative that describes the project in sufficient detail to support the minimum four requirements on page 1 and construction elements that were selected above.

Source Selection (when completed, this page is considered source selection information, see FAR 2.101 & 3.104)

Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC) 2024

Source Selection (when completed, this page is considered source selection information, see FAR 2.101 & 3.104)

Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC) 2024

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A002

File details come from the government source that posted it. Updated .