QA_01-03-2024.pdf
PDF 104 KB Posted
- Solicitation number
- 69056723R000013
About this file
This document contains questions and answers related to a solicitation for an Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) to provide construction services within Yellowstone and Grand Teton National Parks and surrounding areas. The solicitation is being conducted by the Department of Transportation Federal Highway Administration.
The questions and answers provide clarification on several requirements of the solicitation, including allowing the use of bridges with wing walls over 100 feet in total length to meet the bridge construction experience requirement. Additionally, they address that no geotechnical data is available for specific material pits, but prime contractor contact information will be made public after awards to enable subcontracting opportunities. An executive order on the use of project labor agreements on large federal projects is also discussed as potentially applying at the task order level.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
69056723R000013
Yellowstone, Grand Teton, & Surrounding area MATOC 2024
# General Technical Question Answer Date
1 X
We are respectfully requesting a bid due date extension of 2 weeks due to the lost time over the holidays. This will allow us and our team to provide the best proposal possible.
At this time the Government does not intend on extending the proposal due date.
12/18/2023
2 X
In regards to the technical proposal (7) Bridge construction of a vehicular bridge 100‐feet or longer, is it acceptable to use a bridge that has a total structure length of over 100 feet with tie backs or wing walls etc. or does the span have to be 100‐feet or longer?
This will be addressed under Amendment
A001.
12/20/2023
3 X
Regarding Factor 3, Past Performance, does
FHWA have a specific form to provide State
DOT’s that do not perform performance evaluations as part of their contract administration? If not, can FHWA provide the scoring criteria they would like an owner to use for the five sub factors listed for the past performance evaluation?
This will be addressed under Amendment
A001.
12/20/2023
4 X
Will the President's Executive Order (14063) ‐
Use of Project Labor Agreements for Federal
Construction Projects, for projects larger than
$35M be enforced for task orders that meet this criteria? Enforcing this requirement will limit the amount of Contractors that submit on this solicitation.
Federal Acquisition Circular (FAC) 2024‐02 was published in the Federal Register
December 22, 2023 implementing
Executive Order 14063 with an effective date of Jan 22, 2024. It is anticipated the use of project labor agreements for certain federal construction projects may be required at the task order level for projects solicited during the period of performance of this Multiple Award Task Order Contract
(MATOC). If applicable, this requirement will be stated in each subsequent Task
Order. A summary of the final rule can be found at the following link:
https://www.federalregister.gov/documen ts/2023/12/22/2023‐27736/federal‐ acquisition‐regulation‐use‐of‐project‐labor‐ agreements‐for‐federal‐construction‐ projects. Offerors are advised to review solicitations for project specific requirements.
12/27/2023
Check General or Technical
5 X
The requirements on the Recent and Relevant
Experience Forms that the projects are in the last 5 years and needing to be able to check at least 4 boxes make this a challenging requirement to meet, so we are requesting one of the following changes:
1. Allow projects to have been completed in the last 10 years (instead of 5 years);
2. Reduce the amount of boxes that need to be checked to two as long as all 7 requirements are met across the projects submitted; or
3. Not require that all 7 boxes need to be satisfied if the Contractor can show ample relevant experience.
The Government does not intend to adjust the recent and relevant work experience requirements.
12/27/2023
6 X
In reference to Amendment A001 and Technical information construction element #7 is it the entire structure that has to be greater than 100 feet in length?
This will be addressed under Amendment
A002.
12/27/2023
7 X
Is there Geotech data available for Lulu pass and Post Creek pits to help determine material quality?
There is no Geotech data available for Lulu pass or Post Creek pits at this time.
12/27/2023
8 X
Is there a way to get the contact information for the prime contractors who get awarded this contract so we can reach out for subcontracting opportunities?
Once the Indefinite‐Delivery Indefinite
Quantity (IDIQ) contracts are awarded, the contact information for prime contractors that receive awards will be made available to the public.
12/28/2023
9 X
Regarding Bid Item A0400 Backfill, Permeable, the specifications are not listed in the SPC or FP‐
14. Can you clarify what material specifications to use for this item.
This will be addressed under Amendment
A003.
1/3/2024