This amendment modifies a solicitation for an indefinite delivery indefinite quantity multiple award task order contract to provide construction services for projects in Yellowstone and Grand Teton National Parks. The amendment extends the bid opening date to February 1, 2024, revises specifications for excavation and embankment work, aggregate materials, and project requirements. Eligible offerors are invited to submit proposals by the new due date to be considered for awards from the Federal Highway Administration to provide construction and maintenance services for upcoming task orders throughout 2024.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A003 1/3/2024 N/A See Box 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056723R000013
9B. DATED (SEE ITEM 11)
12/14/2023
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(_X_) is extended, ( ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
69056723R000013, Yellowstone, Grand Teton, & Surrounding area MATOC 2024
See page 2.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A003, dated 1-3-2024 69056723R000013
Solicitation No. 69056723R000013 Yellowstone, Grand Teton, &
Page 2 Surrounding area MATOC 2024
REVISIONS ARE AS FOLLOWS:
Part I – The Schedule
SF 1442, SOLICITATION, OFFER, AND AWARD (Pen & Ink change)
Page A-3, Block 13A. Revises bid opening date from 01/16/2023 to 02/01/2024.
Part III – List of Documents, Exhibits, and Attachments
Attachment J.3 Sample Project
Page D-6, Revises Subsections 204.02 and adds Subsection 204.03.
Page D-7, Revises Subsection 204.06(d).
Pages D-8 through D-10, Adds Subsection 204.07A.
Pages E-2 through E-2a, Revises Subsections 703.02 and 703.04.
ENCLOSURES
Pages:
D-6 through D-10
E-2 through E-2a
Page(s) not included due to Pen and Ink change(s):
A-3
New bid opening date: 02-01-2024
D-6 DIVISION 200
Special Contract Requirements Project: MT NPS YELL 12(5), NORTHEAST ENTRANCE ROAD, SEED PROJECT
Section 204. — EXCAVATION AND EMBANKMENT
11/12/20– FP-14
Description
204.05 Add the following:
This work also includes salvaging suitable boulders from within construction limits for placing isolated or clustered boulders on selected slopes and landscaped areas.
204.02 Definitions. Add the follosing following to paragraph (c):
Topsoil refers to the uppermost soil horizon, usually 2 to 4 inches deep. It also includes live vegetation less than three feet in height, limbs less than four inches in diameter, and organic duff.
Wetland topsoil and sod refers to the uppermost 12 inches of soil horizon within wetland boundaries.
Material
204.03 Add the following to the material list:
Permeable Backfill 703.04
Construction Requirements
204.04 Preparation for Roadway Excavation and Embankment. Add the following:
Cut existing pavement vertically with wheel or saw prior to excavation.
204.05 Conserved Topsoil. Add the following:
Unless otherwise stated, remove topsoil before starting other earth disturbing operations.
The depth of topsoil to be conserved along the project limits vary with an average topsoil conservation depth of 3 inches. Unless otherwise restricted in the plans, conserve topsoil to the depth of the uppermost soil horizon as defined in Subsection 204.02(c). In impacted wetland areas, conserve the uppermost 12 inches of wetland topsoil and sod.
Nonconventional methods will be required in the removal and stockpiling of topsoil or wetland topsoil and sod. Use equipment capable of excavating small, isolated pockets of topsoil. Hand rake topsoil in areas where topsoil cannot be mechanically removed. Do not compact or drive upon topsoil during removal. Remove the topsoil to be conserved in one pass. Do not mix topsoil with subsoils.
Revised by Amendment A003
D-7 DIVISION 200
Project: MT NPS YELL 12(5), NORTHEAST ENTRANCE ROAD, SEED PROJECT
Excavate down to a depth of 12 inches to collect wetland topsoil and sod, with willows and other plants intact, from the areas designated on the Plans. Collect and stockpile wetland topsoil and sod within one operation. Excavate topsoil pieces with a minimum of 1/3 square yard to a maximum of 1 square yard to collect, transport and stockpile in one operation without breaking the topsoil piece. Keep topsoil and plant material moist and exercise care to prevent damage to bark, branches, foliage and root systems.
Stockpile wetland topsoil and sod conserved from impacted wetlands in rolls or pieces in a windrow. Water wetland topsoil and sod to ensure survivability if wetland topsoil and sod is stockpiled longer than 24 hours. Do not stockpile wetland topsoil and sods for longer than 3 weeks unless otherwise approved by the CO.
Stockpile topsoil in windrows less than three feet high along outer edge of the disturbance or in turnouts within the vicinity that it was removed. Identify removal areas and stockpiles so that the topsoil may be placed over the same general location(s) they were conserved from. If it is impractical to windrow topsoil adjacent to the disturbed area due to environmental or other concerns, remove the topsoil and stockpile at an approved location.
Place conserved topsoil and wetland sod on finished slopes upon completion of finished slopes according to Section 624.
Mulch and finish all slopes with topsoil prior to December 1 of any given year, and according to Sections 625.
Do not mulch wetland areas.
204.06 Roadway Excavation. Delete the second to last paragraph and substitute the following:
(c) Conserved roadway excavation rock material (6-inch minus). Conserve sufficient quantities of 6-inch (150-millimeter) minus material from the roadway excavation to use for finishing the roadbed. Sufficient quantities are available within the roadway excavation.
Dispose of unsuitable or excess excavation material according to Subsection 204.14. Replace shortage of suitable material caused by premature disposal of roadway excavation.
(d) Conserved boulders. Conserve the following boulder material, from sources identified under Section 105, for placement on finished slopes or landscaped areas, or stockpile as directed by the CO.:
(1) Boulders encountered in the roadway excavation ranging from 36 to 72 inches in the largest diameter, or as selected by the CO;
(2) Boulders that are sound, durable and resistant to weathering and water action;
(3) Boulders free of seams that may break into smaller pieces in the process of handling and placing;
D-8 DIVISION 200
Project: MT NPS YELL 12(5), NORTHEAST ENTRANCE ROAD, SEED PROJECT
(4) Boulders not suitable for stone masonry or rockeries (i.e., do not match color, texture or the required size); and
(5) Barrier rocks or existing landscape boulders currently located along the roadside.
Place conserved boulders from the excavation as shown in plans and at locations identified by the CO prior to topsoil placement:
Stockpile boulders individually, directly adjacent to the final placement location whenever possible. Handle materials in a manner to minimize scarring or damage to the patina and lichen surface. Set final boulder placements at the locations identified in the field by the CO.
Do not use large boulders encountered in the excavation or barrier rocks for the construction of stone items of work. Leave in the slope and construct final back slopes around the boulder or relocate the boulder to a new location directly adjacent to the limits of construction.
Minimize scarring of the surfaces to the extent practical.
Place boulders in the slope face at locations staked by the CO. Bury boulders to a depth of 1/3 their diameter. Lay boulders on firm beds and backfill as required using hand operated equipment.
204.07A Placing Backfill Material Below Subgrade. (Added Subsection).
Place backfill material according to Subsection 204.07.
204.10 Embankment Construction. Add the following to paragraph (b):
Construct the top 12 inches (300 millimeters) of the embankment with 6-inch (150-millimeter) minus material conserved from the roadway cuts.
204.11© Less than 50 percent retained on a No. 4 (4.75-millimeter) sieve. Delete the third paragraph and substitute the following:
Use compression-type or vibratory rollers. Compact each layer of material full width to at least 95 percent of the maximum density. Determine the in-place density and moisture content according to AASHTO T 310 or other approved test procedures.
204.13 Sloping, Shaping, and Finishing. Amend as follows:
Delete paragraph (a) and substitute the following:
(a) Sloping. Construct slopes to staked slope rates but flatten randomly and intermittently to simulate the irregularity of existing terrain. Sculpt slopes to produce irregular ledges, shelves, and planting pockets for vegetation by steepening the nominal slope rate in staggered locations suitable for placement of topsoil and vegetation.
D-9 DIVISION 200
Project: MT NPS YELL 12(5), NORTHEAST ENTRANCE ROAD, SEED PROJECT
Add material to the fill slopes to obtain varying and undulating contoured slope, rounding at toe of fills, and to flatten selected slopes to blend with existing landforms or promote revegetation, when shown on the plans or determined by the CO. Round tops and bottoms of all slopes, including the slopes of drainage ditches. Do not round slopes in wetlands or other sensitive areas.
Leave undisturbed boulders that are firmly in place and protruding from the slope but will be more than 10 feet from the edge of the finished pavement.
Place boulders conserved from excavations to stabilize or to landscape slopes as directed by the CO.
Do not place topsoil or mulch on slopes until authorized by the CO.
Delete paragraph (d) and substitute the following:
(d) Finishing. Remove material larger than 6 inches (150 millimeters) from the top 6 inches (150 millimeters) of the roadbed. Remove unsuitable material from the roadbed, and replace it with suitable material.
(1) AMG method. Finish roadbeds that are compacted according to Subsection 204.11(b) and (c) to within ±0.05 foot (±15 millimeters) of the design line and grade. Finish roadbeds that are compacted according to Subsection 204.11(a) to within ±0.10 foot (±30 millimeters) of the design line and grade. Finish ditch cross-sections to within ±0.10 feet (±30 millimeters) of the design line and grade. Maintain proper ditch drainage.
(2) Conventional survey method. Finish roadbeds that are compacted according to Subsection 204.11(b) and (c) to within ±0.05 foot (±15 millimeters) of the staked line and grade. Finish roadbeds that are compacted according to Subsection 204.11(a) to within ±0.10 foot (±30 millimeters) of the staked line and grade. Finish ditch cross-sections to within ±0.10 feet (±30 millimeters) of the staked line and grade. Maintain proper ditch drainage.
204.14 Disposal of Unsuitable or Excess Material. Add the following:
Unsuitable material generated from the work may removed from the project according to Subsection 203.05(a) or buried within roadway obliteration areas that are outside the roadway prism, according to Subsection 203.05(c) and as approved by the CO.
Stockpile excess suitable material at locations identified in Subsection 105.04(b) in the designated area as directed by the CO. Shape and compact the disposal areas as provided in Section 622 and 623.
If material is disposed of off the project, comply with Subsection 105.02 as well as any applicable local, State, and Federal laws.
D-10 DIVISION 200
Project: MT NPS YELL 12(5), NORTHEAST ENTRANCE ROAD, SEED PROJECT
Water and compact material disposed of at locations identified in Subsection 105.04(b).
204.15 Acceptance. Add the following:
Landscape boulders and placement of conserved boulders will be evaluated under Subsection 106.02.
Measurement
204.16 Amend as follows:
Add the following to paragraph (a)(1)(a):
Use the design volume. The design volume is defined as the bid schedule quantity less any allowance, as shown in the summary of quantities sheet of the plans. This volume is subject to adjustments resulting from changes to slope stakes according to Subsection 152.05(d).
Delete the text of paragraph (a)(1)(e).
204.16(b) Unclassified borrow, select borrow, and topping. Delete the text of the first paragraph and substitute the following:
When measuring by the cubic yard, measure in-place.
E-2 DIVISION 700
Project: MT NPS YELL 12(5), NORTHEAST ENTRANCE ROAD, SEED PROJECT
Section 703. — AGGREGATE
11/08/21–FP14
703.02 Coarse Aggregate for Concrete. Delete the text in paragraph (b) and substitute the following:
(b) Grading, AASHTO M 43 All sizes
703.04 Reserved. Delete this Subsection and substitute the following:
703.04 Permeable Backfill. Furnish coarse aggregate consisting of sound, durable particles of gravel, slag, or crushed stone conforming to Table 703-1.
Table 703-1 Permeable Backfill Gradation
Sieve Size Percent by Mass Passing Designated Sieve (AASHTO T 27 & T 11)
3 inch 100 ¾ inch 50-90 No. 4 20-50
No. 200 0.0-2.0
703.05 Subbase, Base, and Surface Course Aggregate. Amend as follows:
Delete text in paragraph (a) and substitute the following:
(a) General. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming to the following:
(1) Los Angeles abrasion, AASHTO T 96 35 percent max.
(2) Soundness of aggregate using sodium sulfate, AASHTO T 104 (course and fine) (5 cycles) 12 percent loss max.
(3) Durability index (coarse), AASHTO T 210 35 min.
(4) Durability index (fine), AASHTO T 210 35 min.
(5) Fractured faces, ASTM D5821 50 percent min.
(6) Without organic matter and lumps or balls of clay.
(7) Accelerated weathering of aggregate by use of Dimethyl Sulfoxide (DMSO), WFLHD Standard Test Method 12% max.
E-2a DIVISION 700
Project: MT NPS YELL 12(5), NORTHEAST ENTRANCE ROAD, SEED PROJECT
Delete the text in paragraph (b) and substitute the following:
(b) Subbase or base aggregate. In addition to paragraph (a) above, conform to the following:
(1) Gradation Table 703-2
(3) SEP (SE/P200) (SE/P75 Index) 1.000 min.