J.2 Technical Information Form 1_A004.pdf
PDF 244 KB Posted
- Solicitation number
- 69056723R000013
About this file
This document contains an attachment to a request for proposals for a Yellowstone and Grand Teton Indefinite Delivery Indefinite Quantity Multiple Award Task Order Contract for 2024. The solicitation seeks proposals for road construction and bridge projects within Yellowstone and Grand Teton National Parks and surrounding areas. Offerors must have experience with road reconstruction of over two miles with an average daily traffic over 3,000 vehicles, protection of wetlands and waterways near construction sites, preservation of cultural resources, stone masonry construction and repair, material sourcing from over 60 miles away, paving of at least 8,000 tons of asphalt, and bridge projects over 100 feet in length. Proposals are evaluated based on recent and relevant experience as demonstrated on an attached technical form, with minimum requirements for size, scope and percentage of work as prime contractor. The solicitation is issued by the Department of Transportation Federal Highway Administration.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Source Selection (when completed, this page is considered source selection information, see FAR 2.101 & 3.104)
Attachment J.2 Technical Information Form 1
Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC) 2024
MATOC Proposal
Source Selection Information
Solicitation: 69056723R000013
ATTACHMENT J.2 TECHNICAL INFORMATION FORM 1
Technical Evaluation Factor 1 ‐ Recent and Relevant Experience Form
Directions: Complete a copy of this form for at least 1 but no more than 5 projects to satisfy all Factor 1 criteria. If any information is unknown leave blank.
Requirements for each project:
(1) Completed after December 14, 2018 (December 14, 2013 if bridge project) or the project is at least 50% complete as of the date of proposal submission; AND
(2) 50% of the work performed by the Prime (25% if bridge project); AND
(3) Work included road reconstruction or new construction; AND
(4) $6 million minimum contract award amount
Company Information
Company Name:
Project Information
Project Name
Contract Number
Project Location
Owner/Agency
Owner/Agency Point‐of‐Contact
Contact Phone & E‐mail address
Contract Information for this project
Contract Award Date:
Construction Start Date:
Original Completion
Final Completion
Contract award amount:
Final contract amount:
Percentage (%) complete if not complete at time of proposal submission
Percentage (%) of work completed as the prime
Source Selection (when completed, this page is considered source selection information, see FAR 2.101 & 3.104)
Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC) 2024
Recent and Relevant Experience
Directions: In addition to the minimum requirements on page 1 of this form, each individual project must include a minimum of four of the following construction elements; and across all submitted projects all seven of the construction elements must be cumulatively represented. Bridge construction projects do not need to contain any other construction element to be evaluated (i.e., bridge construction projects do not need to contain elements 1 thru 6).
This project satisfies which of the Factor 1 criteria (select all that apply)
Construction Elements
☐ (1) Roadway reconstruction of 2‐mile or more corridor, 2‐lane with ADT 3,000 vehicles/ day or greater, and with no available detours or closures
☐ (2) Protection of wetlands or Class 1 waters within 20‐feet of construction limits
☐ (3) Protection or preservation of cultural resources such as: historic features or sites;
archaeological sites; or historic stone masonry such as found in Yellowstone and Grand Teton National Parks
☐ (4) Reassembly or new construction of stone masonry features such as: headwalls, curbing or rock facing
☐ (5) Performance where material sources were 60 miles or greater from the construction site
☐ (6) Paving – 8,000 3,500 tons minimum
☐ (7) Bridge construction of a vehicular bridge, with 100‐feet or longer of structure length, in that includes a single span or multiple spans. (This element does not apply to a contractor that is a small business under NAICS 237310).
Narrative that describes the project in sufficient detail to support the minimum four requirements on page 1 and construction elements that were selected above.
Revised by Amendment A004 Revised by Amendment A002 Revised by Amendment A001
Source Selection (when completed, this page is considered source selection information, see FAR 2.101 & 3.104)
Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC) 2024
Revised by Amendment A004
Source Selection (when completed, this page is considered source selection information, see FAR 2.101 & 3.104)
Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC) 2024
Revised by Amendment A004
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |