J.2 Technical Information Form 1_A004.pdf

PDF 255 KB Posted

Attached to
Yellowstone & Grand Teton Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC) 2024
Solicitation number
69056723R000013
Issued by

About this file

This document contains a technical information form and details for a federal indefinite delivery indefinite quantity multiple award task order contract opportunity. The solicitation is for road construction and maintenance services in Yellowstone and Grand Teton National Parks, including requirements for recent experience with projects of similar size and scope. Eligible projects must have been at least 50% complete or finished after December 2018, with the prime contractor performing 50% of the work. Services sought include road reconstruction of over 2 miles with daily traffic over 3,000 vehicles, protection of wetlands and water resources, preservation of cultural sites, stonework, paving of at least 8,000 tons, and bridge construction over 100 feet. The solicitation number is 69056723R000013 and was issued by the Department of Transportation Federal Highway Administration for an award date in 2024.

View the file

Other files

File Type Posted
QA_01-25-2024_2.pdf PDF
QA_01-25-2024.pdf PDF
Amendment A005.pdf PDF
J.2 Technical Information Form 1_A004.pdf PDF
QA_01-16-2024_2.pdf PDF
J.4 Past Performance Form 2_A001.pdf PDF
QA_01-16-2024.pdf PDF
Amendment A004.pdf PDF
QA_01-05-2024.pdf PDF
Amendment A003.pdf PDF
QA_01-03-2024.pdf PDF
QA_12-28-2023.pdf PDF
Amendment A002.pdf PDF
QA_12-27-2023.pdf PDF
Amendment A001.pdf PDF
QA_12-20-2023.pdf PDF
QA_12-18-2023.pdf PDF
RFP_Yellowstone MATOC_Final.pdf PDF
J.3 YELL 12(5)_PLANS_70pct.pdf PDF
J.2 Technical Information Form 1.pdf PDF
J.3 Sample Project YELL 12(5).pdf PDF
J.1 MASTER SUBCONTRACTING PLAN.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Source Selection (when completed, this page is considered source selection information, see FAR 2.101 & 3.104)

Attachment J.2 Technical Information Form 1

Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC) 2024

MATOC Proposal

Source Selection Information

Solicitation: 69056723R000013

ATTACHMENT J.2 TECHNICAL INFORMATION FORM 1

Technical Evaluation Factor 1 ‐ Recent and Relevant Experience Form

Directions: Complete a copy of this form for at least 1 but no more than 5 projects to satisfy all Factor 1 criteria. If any information is unknown leave blank.

Requirements for each project:

(1) Completed after December 14, 2018 (December 14, 2013 if bridge project) or the project is at least 50% complete as of the date of proposal submission; AND

(2) 50% of the work performed by the Prime (25% if bridge project); AND

(3) Work included road reconstruction or new construction; AND

(4) $6 million minimum contract award amount

Company Information

Company Name:

Project Information

Project Name

Contract Number

Project Location

Owner/Agency

Owner/Agency Point‐of‐Contact

Contact Phone & E‐mail address

Contract Information for this project

Contract Award Date:

Construction Start Date:

Original Completion

Final Completion

Contract award amount:

Final contract amount:

Percentage (%) complete if not complete at time of proposal submission

Percentage (%) of work completed as the prime

Source Selection (when completed, this page is considered source selection information, see FAR 2.101 & 3.104)

Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC) 2024

Recent and Relevant Experience

Directions: In addition to the minimum requirements on page 1 of this form, each individual project must include a minimum of four of the following construction elements; and across all submitted projects all seven of the construction elements must be cumulatively represented. Bridge construction projects do not need to contain any other construction element to be evaluated (i.e., bridge construction projects do not need to contain elements 1 thru 6).

This project satisfies which of the Factor 1 criteria (select all that apply)

Construction Elements

☐ (1) Roadway reconstruction of 2‐mile or more corridor, 2‐lane with ADT 3,000 vehicles/ day or greater, and with no available detours or closures

☐ (2) Protection of wetlands or Class 1 waters within 20‐feet of construction limits

☐ (3) Protection or preservation of cultural resources such as: historic features or sites;

archaeological sites; or historic stone masonry such as found in Yellowstone and Grand Teton National Parks

☐ (4) Reassembly or new construction of stone masonry features such as: headwalls, curbing or rock facing

☐ (5) Performance where material sources were 60 miles or greater from the construction site

☐ (6) Paving – 8,000 4,000 tons minimum

☐ (7) Bridge construction of a vehicular bridge, with 100‐feet or longer of structure length, in that includes a single span or multiple spans. (This element does not apply to a contractor that is a small business under NAICS 237310).

Narrative that describes the project in sufficient detail to support the minimum four requirements on page 1 and construction elements that were selected above.

Revised by Amendment A004 Revised by Amendment A002 Revised by Amendment A001

Source Selection (when completed, this page is considered source selection information, see FAR 2.101 & 3.104)

Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC) 2024

Revised by Amendment A004

Source Selection (when completed, this page is considered source selection information, see FAR 2.101 & 3.104)

Yellowstone, Grand Teton, & Surrounding Area Multiple Award Task Order Contract (MATOC) 2024

Revised by Amendment A004

File details come from the government source that posted it. Updated .