This document contains a question and answer log for a federal Multiple Award Task Order Contract solicitation for construction services in Yellowstone and Grand Teton National Parks. The solicitation is seeking proposals for an Indefinite Delivery Indefinite Quantity contract to be awarded in 2024. Questions were accepted between December 18, 2023 and January 25, 2024 regarding requirements for recent and relevant experience, construction elements, subcontracting opportunities, and the applicability of project labor agreements. Amendment A001 provided clarification on bridge and past performance requirements, while subsequent amendments adjusted minimum quantities for paving and permeable backfill. The Federal Highway Administration will make contact information for awarded prime contractors available to facilitate subcontracting. Project labor agreements may be required at the task order level depending on project size.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
69056723R000013
Yellowstone, Grand Teton, & Surrounding area MATOC 2024
# General Technical Question Answer Date
1 X
We are respectfully requesting a bid due date extension of 2 weeks due to the lost time over the holidays. This will allow us and our team to provide the best proposal possible.
At this time the Government does not intend on extending the proposal due date.
12/18/2023
2 X
In regards to the technical proposal (7) Bridge construction of a vehicular bridge 100‐feet or longer, is it acceptable to use a bridge that has a total structure length of over 100 feet with tie backs or wing walls etc. or does the span have to be 100‐feet or longer?
This will be addressed under Amendment
A001.
12/20/2023
3 X
Regarding Factor 3, Past Performance, does
FHWA have a specific form to provide State
DOT’s that do not perform performance evaluations as part of their contract administration? If not, can FHWA provide the scoring criteria they would like an owner to use for the five sub factors listed for the past performance evaluation?
This will be addressed under Amendment
A001.
12/20/2023
4 X
Will the President's Executive Order (14063) ‐
Use of Project Labor Agreements for Federal
Construction Projects, for projects larger than
$35M be enforced for task orders that meet this criteria? Enforcing this requirement will limit the amount of Contractors that submit on this solicitation.
Federal Acquisition Circular (FAC) 2024‐02 was published in the Federal Register
December 22, 2023 implementing
Executive Order 14063 with an effective date of Jan 22, 2024. It is anticipated the use of project labor agreements for certain federal construction projects may be required at the task order level for projects solicited during the period of performance of this Multiple Award Task Order Contract
(MATOC). If applicable, this requirement will be stated in each subsequent Task
Order. A summary of the final rule can be found at the following link:
https://www.federalregister.gov/documen ts/2023/12/22/2023‐27736/federal‐ acquisition‐regulation‐use‐of‐project‐labor‐ agreements‐for‐federal‐construction‐ projects. Offerors are advised to review solicitations for project specific requirements.
12/27/2023
Check General or Technical
5 X
The requirements on the Recent and Relevant
Experience Forms that the projects are in the last 5 years and needing to be able to check at least 4 boxes make this a challenging requirement to meet, so we are requesting one of the following changes:
1. Allow projects to have been completed in the last 10 years (instead of 5 years);
2. Reduce the amount of boxes that need to be checked to two as long as all 7 requirements are met across the projects submitted; or
3. Not require that all 7 boxes need to be satisfied if the Contractor can show ample relevant experience.
The Government does not intend to adjust the recent and relevant work experience requirements.
12/27/2023
6 X
In reference to Amendment A001 and Technical information construction element #7 is it the entire structure that has to be greater than 100 feet in length?
This will be addressed under Amendment
A002.
12/27/2023
7 X
Is there Geotech data available for Lulu pass and Post Creek pits to help determine material quality?
There is no Geotech data available for Lulu pass or Post Creek pits at this time.
12/27/2023
8 X
Is there a way to get the contact information for the prime contractors who get awarded this contract so we can reach out for subcontracting opportunities?
Once the Indefinite‐Delivery Indefinite
Quantity (IDIQ) contracts are awarded, the contact information for prime contractors that receive awards will be made available to the public.
12/28/2023
9 X
Regarding Bid Item A0400 Backfill, Permeable, the specifications are not listed in the SPC or FP‐
14. Can you clarify what material specifications to use for this item.
This will be addressed under Amendment
A003.
1/3/2024
10 X What does CEC stand for?
It was the predecessor to DUNS, now UEI, and stood for Contractor Establishment
Code. Came out in 1998. Nothing related to our YELL MATOC solicitation.
1/5/2024
11 X Can you relax Construction Element 6, Paving –
8000 tons minimum to 4000 tons minimum?
This will be addressed under Amendment
A004.
1/5/2024
12 X Will a project that has an unsatisfactory rating not be evaluated?
Proposals will be evaluated against the criteria on page M‐1 through M‐6.
1/5/2024
13 X Can you please provide the wage requirement for this project?
See B‐Pages in Attachment J.3 Sample
Project.
1/5/2024
14 X
In Amendment A004, form J.4 Past
Performance Form 2 is called out as an attachment but the form is not included in the
Attachments/Links portion of the contract advertisement page. Will this form be included on the advertisement page or is it available for download from another site?
J.4 Past Performance Form 2 was added under Amendment A001 and not revised under Amendment A004. For administrative convenience, in addition to already being included under Amendment
A001, this form will also be uploaded separately as an attachment on SAM.gov.
1/16/2024
15 X
I see that addendum #4 posted with a change to 3500 minimum tons required to meet the paving criteria. The new J2 form that was posted as a part of addendum 4 says 4000 tons.
I just wanted to point out the discrepancy.
The new J2 form that was uploaded for administrative convenience has been updated to match the form that was revised and included under Amendment
A004.
1/16/2024
16 X
It appears amendment 5 to this solicitation added the following two FAR clauses:
52.222‐34 Project Labor Agreement (Jan 2024)
Alternate II JAN 2024
52.222‐33 Notice of Requirement for Project
Labor Agreement (Jan 2024) Alternate III JAN
Is it the intent of FHWA to include these FAR
Clauses in all of the bid task orders under this upcoming MATOC?
These will be included at the task order level when the threshold of large‐scale construction project is met.
1/25/2024
17 X
Could FHWA distinguish the difference between the two added FAR clauses as they read differently, however, both are added in amendment.
52.222‐33 Notice of Requirement for
Project Labor Agreement, is a provision applicable during solicitations. 52.222‐34
Project Labor Agreement, is a clause applicable after award.
1/25/2024