SECTION J
DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
TABLE OF CONTENTS
| ATTACHMENT NUMBER |
| ATTACHMENT TITLE |
| J-1602000-01 |
| Definitions and Acronyms |
| J-1602000-02 |
| References and Technical Documents |
| J-1602000-03 |
| Stand-by Electrical Power Generators Inventory |
| J-1602000-04 |
| Electrical Transmission and Distribution System Inventory |
ATTACHMENT J-1602000-01
DEFINITIONS AND ACRONYMS
| Equipment, Collateral |
| Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project. |
| Equipment, Installed |
| Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial. |
| Equipment, Personal Property |
| Personal property equipment includes all equipment other than collateral equipment. Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed after erection or installation without substantial loss of value or damage thereto or to the premises where installed. |
| Facilities Life Cycle |
| A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal. |
| Facilities Maintenance Management |
| The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.” |
| High Voltage Transmission |
| Transmission of electrical loads greater than 69 kilovolts (KV). |
| Integrated Maintenance Plan |
| IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness. |
| Life-Cycle Costs |
| A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life. |
| Low Voltage Distribution |
| Distribution of electrical loads less than or equal to 600 volts (V). |
| Medium Voltage Distribution |
| Distribution of electrical loads ranging from greater than 600 V up to and including 69 KV. |
| NEC |
| National Electrical Code |
| NFPA |
| National Fire Protection Association |
| Repair |
| Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition. |
| Replacement |
| Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters. Replacement is performed when the equipment has reached the end of its useful life; when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance. |
| Restoration |
| Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes. |
| Sustainment |
| Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities. |
| AC |
| Alternating Current (electricity) |
| ANSI |
| American National Standards Institute |
| ASME |
| American Society of Mechanical Engineers |
| IMP |
| Integrated Maintenance Program |
| SRM |
| Sustainment, Restoration and Modernization |
| UFC |
| Unified Facilities Criteria |
ATTACHMENT J-1602000-02
REFERENCES AND TECHNICAL DOCUMENTS
| MO-209 |
| Engineering Criteria |
| UFC 3-501-01 |
| Electrical Engineering |
| UFC 3-550-01 |
| Exterior Electrical Power Distribution |
| UFC 3-560-01 |
| Electrical Safety. O&M |
Non-Government Publications.
American National Standards Institute, Inc. (ANSI)
ATTACHMENT J-1602000-03
STAND-BY GENERATOR INVENTORY
| Facility |
| Facility Description |
| Generator ID |
| Capacity |
kW
| Site |
| Navy Backup Power |
| DG-4177001 |
| 1820 |
| Site |
| MDA Backup Power |
| DG-2177001 |
| 1820 |
Attachment J-1602000-03 Electrical Power Generator List
| Technical Description |
| Qty |
| Use |
| Provided by |
| Purpose |
| Required Date |
| Annex / Spec Item Ref # |
MDA GENERATORS
| 300kW, 50hz, 400/230V, 3-phase |
| 1 ea. |
| Back-up |
| Government- furnished |
| To power the SA Man Camp in case of commercial power outage |
| contract start date |
| 1602000 / 3.1 |
| 400kVA, 400V/3 phase, 50hz |
| 1 ea. |
| Back-up |
| Government-furnished |
| Optional - Back-up unit for the ACS Laydown Area |
| contract start date |
| J-1502000-08 |
| 60-70kW, 480/240/120 Volt, 60hz, 3 phase and single phase Government may order load banks as required. |
| up to 5 ea. |
| Prime |
| SA BOS Contractor |
| To support I&CO powered tools and equipment |
| contract start date |
| J-1700000-04 |
| TBD |
| 3 ea. |
| Prime |
| Government-furnished |
| To power 3 ea. CNIC Guard Shacks |
| contract start date |
| J-1502000-03 |
| Light Carts , 6kW, with 4x1000W metal halide bulbs |
| As Required |
| Lighting |
| SA BOS Contractor |
| Optional - To illuminate the ACS Laydown area. Light carts shall be turned on at least 30 minutes prior to official sunset and shall operate continuously until they are turned off after sunrise. |
| contract start date |
| J-1502000-08 |
| Light Carts , 6kW, with 4x1000W metal halide bulbs |
| 20 ea. |
| Lighting |
| SA BOS Contractor |
| Exterior lighting for outdoor I&CO operations during shorter winter days |
| During I&CO operations |
| J-1700000-04 |
REGION GENERATORS
| Light Carts , 6kW, with 4x1000W metal halide bulbs |
| 10 ea. |
| Lighting |
| Government-furnished (Government may order these) |
| To illuminate CNIC Security and other operation areas perimeter. Light carts shall be turned on at least 30 minutes prior to official sunset and shall operate continuously until they are turned off after sunrise. |
| contract start date |
| 1602000 / 3.5 |
| Light Cart, 6kW, with 4x1000W metal halide bulbs |
| 1 ea. |
| Lighting + Prime |
| SA BOS Contractor |
| To illuminate the Mobile Armory. Light cart shall be turned on at least 30 minutes prior to official sunset and shall operate continuously until they are turned off after sunrise. |
To power the IDS installed in the armory (24/7).
| contract start date |
| 1602000 / 3.3 and 3.4 |
| 10kW, 50hz, 220/380V |
| 1 ea. |
| Prime (occasional use) |
| SA BOS Contractor |
Government-operated
| To power the mobile firing range (when in use). |
| contract start date |
| 1602000 / 3.3 and 3.4 |
PERMANENT GENERATORS
| Similar to SDMO T2200, 2200kVA, 50hz |
| 2 ea. |
| Back-up |
| Government-owned |
| AAMDSF generator (MILCON Facilities) |
| Upon facility BOD |
| 1602000 / 3.3 and 3.4 |
Attachment J-1602000-04 Electrical Transmission and Distribution System/Equipment Inventory
ELECTRICAL DISTRIBUTION PANELS
| FACILITY |
| Frequency |
| Voltage |
| BUS |
| AIC |
| MCB |
| DS |
| Enclosure Type |
| Hz |
| VOLT AC |
| AMP |
| kA |
| AMP |
| AMP |
| Missile Storage Facility |
| 50 |
| 400/230 |
| 250 |
| 15 |
| 100 |
IP56
| Secure Warehouse |
| 50 |
| 400/230 |
| 250 |
| 15 |
| 100 |
IP30
| Secure Warehouse |
| 50 |
| 400/230 |
| 125 |
| 15 |
| 50 |
IP30
| Entry Control Facility |
| 50 |
| 400/230 |
| 250 |
| 25 |
| 60 |
IP30
| Entry Control Facility |
| 50 |
| 400/230 |
| 125 |
| 15 |
| 125 |
IP30
| Entry Control Facility |
| 50 |
| 400/230 |
| 125 |
| 25 |
| 125 |
IP30
| Security Control facility |
| 50 |
| 400/230 |
| 400 |
| 15 |
| 400 |
IP30
| Security Control facility |
| 50 |
| 400/230 |
| 125 |
| 15 |
| 100 |
IP30
| Security Control facility |
| 50 |
| 400/230 |
| 250 |
| 15 |
| 250 |
IP30
| Security Control facility |
| 50 |
| 400/230 |
| 125 |
| 15 |
| 100 |
IP30
| Security Control facility |
| 50 |
| 400/230 |
| 125 |
| 15 |
| 100 |
IP30
| Security Control facility |
| 50 |
| 400/230 |
| 125 |
| 15 |
| 100 |
IP30
| Fire Station |
| 50 |
| 400/230 |
| 400 |
| 15 |
| 315 |
IP30
| Fire Station |
| 50 |
| 400/230 |
| 250 |
| 15 |
| 160 |
IP30
| Water Supply Building |
| 50 |
| 400/230 |
| 400 |
| 35 |
| 320 |
IP30
| Water Supply Building |
| 50 |
| 400/230 |
| 125 |
| 15 |
| 125 |
IP30
| Water Supply Building |
| 50 |
| 400/230 |
| 125 |
| 15 |
| 125 |
IP30
| Water Supply Building |
| 50 |
| 400/230 |
| 125 |
| 15 |
| 125 |
IP30
| Access Control facility |
| 50 |
| 400/230 |
| 250 |
| 25 |
| 250 |
IP30
| Access Control facility |
| 50 |
| 400/230 |
| 125 |
| 25 |
| Access Control facility |
| 50 |
| 400/230 |
| 125 |
| 25 |
| Multipurpose facility |
| 50 |
| 400/230 |
| 400 |
| 35 |
| Multipurpose facility |
| 50 |
| 400/230 |
| 250 |
| 25 |
| Multipurpose facility |
| 50 |
| 230 |
| 100 |
| 15 |
| Multipurpose facility |
| 50 |
| 400/230 |
| 125 |
| 25 |
| Multipurpose facility |
| 50 |
| 400/230 |
| 800 |
| 50 |
| Multipurpose facility |
| 50 |
| 400/230 |
| 250 |
| 25 |
| Multipurpose facility |
| 50 |
| 400/230 |
| 125 |
| 25 |
| Multipurpose facility |
| 50 |
| 400/230 |
| 250 |
| 25 |
| Multipurpose facility |
| 50 |
| 400/230 |
| 250 |
| 25 |
| Multipurpose facility |
| 50 |
| 400/230 |
| 400 |
| 35 |
| Multipurpose facility |
| 50 |
| 400/230 |
| 400 |
| 35 |
| Multipurpose facility |
| 50 |
| 400/230 |
| 250 |
| 25 |
| Multipurpose facility |
| 50 |
| 400/230 |
| 250 |
| 25 |
| 160 |
IP30
| Multipurpose facility |
| 50 |
| 400/230 |
| 125 |
| 25 |
| GP Warehouse #2 / Post Office |
| 50 |
| 400/230 |
| 250 |
| 25 |
| GP Warehouse #2 / Post Office |
| 50 |
| 400/230 |
| 250 |
| 25 |
| GP Warehouse #2 / Post Office |
| 50 |
| 400/230 |
| 125 |
| 25 |
| GP Warehouse #2 / Post Office |
| 50 |
| 400/230 |
| 630 |
| 25 |
| 450 |
IP30
| PW building |
| 50 |
| 400/230 |
| 250 |
| 25 |
| PW building |
| 50 |
| 400/230 |
| 250 |
| 25 |
| PW building |
| 50 |
| 400/230 |
| 125 |
| 25 |
ELECTRICAL DISTRIBUTION EQUIPMENT
| FACILITY |
| Equipment Description |
| Service |
| Site |
| Switch Gear 10 KV Breaker |
| USG Substation |
| Site |
| Switch Gear 10 KV Breaker |
| USG Substation |
| Site |
| Transformer |
| USG Substation |
| Site |
| Transformer |
| USG Substation |
| Site |
| Transformer |
| USG Substation |
| Site |
| Transformer |
| USG Substation |
| Site |
| Switch Gear |
| MDA Power |
| Site |
| Transformer |
| MDA Power |
| Site |
| Transformer |
| MDA Power |
| Site |
| 10 KV Switch Gear |
| Navy Power |
| Site |
| Load Bank Transformer |
| Navy Power |
| GP Warehouse #2 / PW |
| GP Warehouse 2/PW Transformer |
| Navy Power |
| Multipurpose facility |
| Medical Transformer |
| Navy Power |
| Multipurpose facility |
| Housing/Dining Transformer |
| Navy Power |
| Access Control facility |
| Access Control Facility Transformer |
| Navy Power |
| Site |
| Wastewater Lift Station Transformer |
| Navy Power |