J-1503010-07 PWD Indian Head REGION Custodial Inventory15May24.xlsx
XLSX spreadsheet 180 KB Posted
- Attached to
- Regional 8(a) Janitorial Services
- Solicitation number
- N40080-25-R-2233
About this file
This is a custodial inventory spreadsheet for the Naval Washington District (NDW) Regional 8(a) Janitorial Services contract at Indian Head, Maryland. The document details 26 buildings under the Public Works Department (PWD) South Potomac region, specifying facility configurations, square footage, floor types, and security requirements for each space. The inventory encompasses diverse facility types including administrative offices, restrooms, kitchens, weight rooms, fitness centers, classrooms, youth centers, and a child development center. Total documented square footage across all buildings exceeds 180,000 square feet. Floor types vary by space function, including carpet, tile, rubber, wood, vinyl tile, resilient tile, concrete, and other surfaces. Security requirements are marked as "Standard" classification across all spaces, with none designated as requiring higher security levels.
The spreadsheet provides detailed room-by-room breakdowns for larger buildings such as Building 900 (31,232 SF with multiple floors), Building D323 (17,816 SF), and Building 1901 CDC (12,991 SF), while smaller facilities such as Building 323 contain minimal space (180 SF restrooms only). Specialized facilities are noted, including Building 441 (Youth Center), Building 1901 (Child Development Center), and Building 3134 (Teen Center), with specific inventory for child and youth program activities. Building D328 is flagged as currently under construction with modifications to be completed upon building completion. This inventory serves as the baseline for determining custodial service requirements, staffing levels, cleaning frequencies, and resource allocation for the regional janitorial services contract performance period.
View the file
Other files
Show 40 more
Latest 50 of 66 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLDG 1SN
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 1SN | Weight Room | Rubber | 1023 | N | Standard | ||
| 1SN | Admin/Vestibule | Tile | 144 | N | Standard | ||
| 1SN | handball court | wood | 800 | N | Standard | ||
| 1SN | workout room | carpet | 1132 | N | Standard | ||
| 1SN | Restroom (2) | Tile | 578 | N | Standard | ||
| TOTAL SF | 3677 |
BLDG 266
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 266 | Admin | Tile | 253 | N | Standard | ||
| 266 | Restroom | Tile | 60 | N | Standard | ||
| TOTAL SF | 313 |
BLDG 289
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 289 | Admin | Carpet | 1593 | N | Standard | ||
| 289 | Restroom (2) | Tile | 87 | N | Standard | ||
| 289 | Kitchen | Tile | 51 | N | Standard | ||
| TOTAL SF | 1731 |
BLDG 290
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 290 | Admin | Carpet | 1484 | N | Standard | ||
| 290 | Admin | Tile | 535 | N | Standard | ||
| 290 | Kitchen | Tile | 405 | N | Standard | ||
| 290 | Restroom (2) | Tile | 646 | N | Standard | ||
| TOTAL SF | 3070 |
BLDG 320
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 320 | Admin | Carpet | 1310 | N | Standard | ||
| 320 | Admin | Tile | 1014 | N | Standard | ||
| 320 | Restroom (2) | Tile | 108 | N | Standard | ||
| TOTAL SF | 2432 |
BLDG 323
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 323 | Restroom (2) | Tile | 180 | N | Standard | ||
| TOTAL SF | 180 |
BLDG 351
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 351 | Admin | Carpet | 3444 | N | Standard | ||
| 351 | Admin | Tile | 512 | N | Standard | ||
| 351 | Restrooms (2) | Tile | 190 | N | Standard | ||
| 351 | Kitchen (2) | Tile | 104 | N | Standard | ||
| TOTAL SF | 4250 |
BLDG 421
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 421 | Admin | Carpet | 1302 | N | Standard | ||
| 421 | Admin | Tile | 120 | N | Standard | ||
| 421 | Kitchen | Tile | 88 | N | Standard | ||
| 421 | Restroom (2) | Tile | 267 | N | Standard | ||
| TOTAL SF | 1777 |
YOUTH CENTER BLDG 441
| PWD SOUTH POTOMAC | |||||||||
| Customer: REGION INDIAN HEAD - YOUTH CENTER | |||||||||
| FREQUENCY PER ATTACHMENT J-1503010-04 CHILD YOUTH PROGRAM ACTIVITES | |||||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Window Count | Size | Area Rug Count | Size |
| 441 | 1 | R101 | Restroom | Vinyl Tile | 47 | 0 | 0 | 0 | 0 |
| 441 | 1 | R102 | Restroom | Vinyl Tile | 47 | 0 | 0 | 0 | 0 |
| 441 | 1 | 101 | Classroom | Carpet | 600 | 8 | 0 | 0 | |
| 441 | 1 | 101 | Classroom | Tile | 827 | ||||
| 441 | 1 | 102 | Classroom | Carpet | 388 | 7 | 0 | 0 | |
| 441 | 1 | 102 | Reception | Tile | 80 | 0 | 0 | 0 | 0 |
| 441 | 1 | 103 | Office Areas | Tile | 289 | 7 | 0 | 0 | |
| 441 | 1 | H101 | Hall Areas | Tile | 155 | 0 | 0 | 0 | 0 |
| 441 | 1 | R103 | Restroom | Vinyl Tile | 29 | 0 | 0 | 0 | 0 |
| 441 | 1 | R104 | Restroom | Vinyl Tile | 28 | 0 | 0 | 0 | 0 |
| 441 | 1 | R105 | Restroom | Vinyl Tile | 29 | 0 | 0 | 0 | 0 |
| 441 | 1 | 104 | Food Service Areas | Tile | 56 | 0 | 0 | 0 | 0 |
| 441 | 1 | H102 | Corridor | Tile | 102 | 0 | 0 | 0 | 0 |
| 441 | 1 | 105 | Janitorial | N/A | NIC | 0 | 0 | ||
| 441 | 1 | 107 | Storage Areas | N/A | 112 | 0 | 0 | ||
| 441 | 1 | 108 | Office Areas | Tile | 231 | 7 | 0 | 0 | |
| 441 | 1 | 109 | Fitness Center | Resilient Tile | 2,636 | 0 | 0 | 0 | 0 |
| TOTAL SF | 5,656 |
BLDG 503
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 503 | Admin | Carpet | 2613 | N | Standard | ||
| 503 | Admin | Tile | 150 | N | Standard | ||
| 503 | Kitchen | Tile | 124 | N | Standard | ||
| 503 | Restrooms (2) | Tile | 120 | N | Standard | ||
| TOTAL SF | 3007 |
BLDG 3134 Teen Center
| 8A Janitorial | ||||||
| Custodial - Mandated Service Classes for Child Youth Program Facilities | ||||||
| Bldg 3134 - Add to Region inventory | ||||||
| FREQUENCY PER ATTACHMENT J-1503010-04 CHILD YOUTH PROGRAM ACTIVITES | ||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Window Count |
| 3134 | 1 | N/A | Classroom | Carpet | 897 | 6 |
| 3134 | 1 | N/A | Storage Area | Carpet | 152 | 3 |
| 3134 | 1 | N/A | Restroom 1 | Tile | 100 | 1 |
| 3134 | 1 | N/A | Restroom 2 | Tile | 100 | 1 |
| 3134 | 1 | N/A | Hall Area | Carpet | 110 | 0 |
| Total | 1359 | 11 |
BLDG 525
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 525 | Admin | Carpet | 88 | N | Standard | ||
| 525 | Admin | Tile | 512 | N | Standard | ||
| TOTAL SF | 600 |
BLDG 551
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 551 | Admin | Carpet | 5113 | N | Standard | ||
| 551 | Admin | Tile | 211 | N | Standard | ||
| 551 | Restroom (3) | Tile | 153 | N | Standard | ||
| 551 | Kitchen | Tile | 120 | N | Standard | ||
| TOTAL SF | 5597 |
BLDG 554
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 554 | Admin | Carpet | 1799 | N | Standard | ||
| 554 | Admin | Tile | 750 | N | Standard | ||
| 554 | Kitchen | Tile | 54 | N | Standard | ||
| 554 | Restroom (2) | Tile | 230 | N | Standard | ||
| TOTAL SF | 2833 |
BLDG 620
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 620 | Admin | Carpet | 2410 | N | Standard | ||
| 620 | Admin | Tile | 439 | N | Standard | ||
| 620 | Restroom (4) | Tile | 579 | N | Standard | ||
| TOTAL SF | 3428 |
BLDG 698
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 698 | Admin | Carpet | 700 | N | Standard | ||
| 698 | Restroom (2) | Tile | 150 | N | Standard | ||
| TOTAL SF | 850 |
BLDG 878
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 878 | Admin | Carpet | 416 | N | Standard | ||
| 878 | Admin | Tile | 2599 | N | Standard | ||
| 878 | Kitchen | Tile | 413 | N | Standard | ||
| 878 | Restroom (3) | Tile | 1087 | N | Standard | ||
| TOTAL SF | 4515 |
BLDG 900
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 900 | 1 | S101 | Stairway | Tile | 100 | Y | Standard |
| 900 | 1 | V101 | Main Entrance | Tile | 130 | Y | Standard |
| 900 | 1 | 113A | Office | Carpet | 180 | Y | Standard |
| 900 | 1 | 113 | Office | Carpet | 200 | Y | Standard |
| 900 | 1 | 114 | Office | Carpet | 160 | Y | Standard |
| 900 | 1 | 115 | Office | Carpet | 280 | Y | Standard |
| 900 | 1 | H101 | Hallway | Carpet | 65 | Y | Standard |
| 900 | 1 | 117A | Restroom | Tile | 201 | Y | Standard |
| 900 | 1 | 117B | Restroom | Tile | 123 | Y | Standard |
| 900 | 1 | V102 | Westside Entrance | Tile | 145 | Y | Standard |
| 900 | 1 | S102 | Stairway | Tile | 70 | Y | Standard |
| 900 | 1 | H103 | Stairway | Tile | 140 | Y | Standard |
| 900 | 1 | 112 | Admin Support | Carpet | 570 | Y | Standard |
| 900 | 1 | 116A | Office | Carpet | 90 | Y | Standard |
| 900 | 1 | 116B | Office | Carpet | 95 | Y | Standard |
| 900 | 1 | H110 | Hallway | Carpet | 280 | Y | Standard |
| 900 | 1 | S103 | Stairway | Tile | 100 | Y | Standard |
| 900 | 1 | 100 | Kitchen | Tile | 1,407 | Y | Standard |
| 900 | 1 | 100B | Kitchen | Tile | 104 | Y | Standard |
| 900 | 1 | 102 | Restroom | Tile | 119 | Y | Standard |
| 900 | 1 | 103 | Restroom | Tile | 110 | Y | Standard |
| 900 | 1 | H104 | Hallway | Carpet | 190 | Y | Standard |
| 900 | 1 | H105 | Hallway | Carpet | 230 | Y | Standard |
| 900 | 1 | H106 | Hallway | Carpet | 190 | Y | Standard |
| 900 | 1 | 117C | Admin Support | Carpet | 770 | Y | Standard |
| 900 | 1 | H107 | Hallway | Carpet | 340 | Y | Standard |
| 900 | 1 | 118A | Admin Support | Carpet | 500 | Y | Standard |
| 900 | 1 | 119 | Conference Room | Carpet | 650 | Y | Standard |
| 900 | 1 | 118B | Admin Support | Carpet | 1,427 | Y | Standard |
| 900 | 1 | 108 | Office | Carpet | 200 | Y | Standard |
| 900 | 1 | 109 | Admin Support | Carpet | 550 | Y | Standard |
| 900 | 1 | 110 | Office | Carpet | 720 | Y | Standard |
| 900 | 1 | S106 | Stairway | Tile | 68 | Y | Standard |
| 900 | 1 | H108 | Hallway | Carpet | 360 | Y | Standard |
| 900 | 1 | H109 | Hallway | Carpet | 400 | Y | Standard |
| 900 | 1 | 129 | Office | Carpet | 840 | Y | Standard |
| 900 | 1 | 129A | Office | Carpet | 40 | Y | Standard |
| 900 | 1 | 128 | Office | Carpet | 560 | Y | Standard |
| 900 | 1 | 128A | Office | Carpet | 40 | Y | Standard |
| 900 | 1 | 127A | Office | Carpet | 170 | Y | Standard |
| 900 | 1 | 126 | Conference Room | Carpet | 1,500 | Y | Standard |
| 900 | 1 | 134A | Restroom | Tile | 186 | Y | Standard |
| 900 | 1 | 134B | Restroom | Tile | 37 | Y | Standard |
| 900 | 1 | 134C | Restroom | Tile | 17 | Y | Standard |
| 900 | 2 | S201 | Stairway | Tile | 40 | Y | Standard |
| 900 | 2 | 234 | Office | Carpet | 405 | Y | Standard |
| 900 | 2 | 235A | Office | Carpet | 227 | Y | Standard |
| 900 | 2 | 235 | Office | Carpet | 318 | Y | Standard |
| 900 | 2 | V201 | Vestibule | Tile | 170 | Y | Standard |
| 900 | 2 | 236 | Office | Carpet | 95 | Y | Standard |
| 900 | 2 | S202 | Stairway | Tile | 70 | Y | Standard |
| 900 | 2 | H201 | Hallway | Carpet | 288 | Y | Standard |
| 900 | 2 | 233 | Office | Carpet | 99 | Y | Standard |
| 900 | 2 | 232 | Office | Carpet | 92 | Y | Standard |
| 900 | 2 | 231 | Office | Carpet | 1,151 | Y | Standard |
| 900 | 2 | 231A | Office | Carpet | 100 | Y | Standard |
| 900 | 2 | 237A | Restroom | Tile | 155 | Y | Standard |
| 900 | 2 | 237B | Restroom | Tile | 174 | Y | Standard |
| 900 | 2 | 237C | Kitchen | Tile | 100 | Y | Standard |
| 900 | 2 | 239 | Office | Carpet | 128 | Y | Standard |
| 900 | 2 | 240 | Office | Carpet | 130 | Y | Standard |
| 900 | 2 | 241 | Office | Carpet | 86 | Y | Standard |
| 900 | 2 | 242 | Office | Carpet | 106 | Y | Standard |
| 900 | 2 | 243 | Office | Carpet | 106 | Y | Standard |
| 900 | 2 | H202 | Hallway | Carpet | 557 | Y | Standard |
| 900 | 2 | 245 | Office | Carpet | 122 | Y | Standard |
| 900 | 2 | 220 | Office | Carpet | 151 | Y | Standard |
| 900 | 2 | 221 | Office | Carpet | 401 | Y | Standard |
| 900 | 2 | 224 | Conference Room | Carpet | 515 | Y | Standard |
| 900 | 2 | 236 | Office | Carpet | 53 | Y | Standard |
| 900 | 2 | 225 | Office | Carpet | 96 | Y | Standard |
| 900 | 2 | 226A | Office | Carpet | 100 | Y | Standard |
| 900 | 2 | 226 | Office | Carpet | 100 | Y | Standard |
| 900 | 2 | 226B | Office | Carpet | 100 | Y | Standard |
| 900 | 2 | 223 | Office | Carpet | 155 | Y | Standard |
| 900 | 2 | H203 | Hallway | Carpet | 688 | Y | Standard |
| 900 | 2 | 222 | Office | Carpet | 155 | Y | Standard |
| 900 | 2 | 219 | Office | Carpet | 148 | Y | Standard |
| 900 | 2 | H204 | Hallway | Carpet | 193 | Y | Standard |
| 900 | 2 | S203 | Stairway | Tile | 63 | Y | Standard |
| 900 | 2 | 200 | Office | Carpet | 146 | Y | Standard |
| 900 | 2 | 200A | Office | Carpet | 30 | Y | Standard |
| 900 | 2 | 201 | Conference Room | Carpet | 345 | Y | Standard |
| 900 | 2 | 203 | Office | Carpet | 218 | Y | Standard |
| 900 | 2 | 203A | Office | Carpet | 137 | Y | Standard |
| 900 | 2 | 203B | Office | Carpet | 181 | Y | Standard |
| 900 | 2 | S205 | Stairway | Tile | 70 | Y | Standard |
| 900 | 2 | 204 | Admin Support | Carpet | 370 | Y | Standard |
| 900 | 2 | 204A | Office | Carpet | 146 | Y | Standard |
| 900 | 2 | 204E | Office | Carpet | 113 | Y | Standard |
| 900 | 2 | 205 | Office | Carpet | 1,000 | Y | Standard |
| 900 | 2 | 205A | Office | Carpet | 113 | Y | Standard |
| 900 | 2 | 206 | Office | Carpet | 96 | Y | Standard |
| 900 | 2 | 207 | Office | Carpet | 135 | Y | Standard |
| 900 | 2 | 208 | Office | Carpet | 376 | Y | Standard |
| 900 | 2 | 208A | Office | Carpet | 114 | Y | Standard |
| 900 | 2 | 208B | Office | Carpet | 90 | Y | Standard |
| 900 | 2 | 209 | Office | Carpet | 427 | Y | Standard |
| 900 | 2 | 210 | Office | Carpet | 685 | Y | Standard |
| 900 | 2 | 210B | Office | Carpet | 202 | Y | Standard |
| 900 | 2 | 211 | Restroom | Tile | 58 | Y | Standard |
| 900 | 2 | 212 | Restroom | Tile | 58 | Y | Standard |
| 900 | 2 | H205 | Hallway | Carpet | 265 | Y | Standard |
| 900 | 2 | 213 | Office | Carpet | 180 | Y | Standard |
| 900 | 2 | 214 | Office | Carpet | 180 | Y | Standard |
| 900 | 2 | 215 | Office | Carpet | 170 | Y | Standard |
| 900 | 2 | S204 | Stairway | Tile | 50 | Y | Standard |
| 900 | 2 | 217 | Office | Carpet | 114 | Y | Standard |
| 900 | 2 | 246 | Office | Carpet | 2,626 | Y | Standard |
| 900 | 2 | 246A | Office | Carpet | 125 | Y | Standard |
| 900 | 2 | 246B | Office | Carpet | 121 | Y | Standard |
| TOTAL SF | 31,232 |
BLDG 1660
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 1660 | Weight Room | Rubber Mats | 6269 | N | Standard | ||
| 1660 | Weight Room | Wood | 1600 | N | Standard | ||
| 1660 | Admin | Carpet | 1552 | N | Standard | ||
| 1660 | Restroom (2) | Tile | 740 | N | Standard | ||
| TOTAL SF | 10161 |
BLDG 1751
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 1751 | Restroom (2) | Tile | 609 | N | Standard | ||
| TOTAL SF | 609 |
BLDG 1779
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 1779 | Admin | Carpet | 861 | N | Standard | ||
| 1779 | Admin | Tile | 780 | N | Standard | ||
| 1779 | Kitchen | Tile | 48 | N | Standard | ||
| 1779 | Restroom (2) | Tile | 78 | N | Standard | ||
| TOTAL SF | 1767 |
CDC BLDG 1901
| PWD SOUTH POTOMAC | |||||||||
| Customer: REGION INDIAN HEAD - CHILD DEVELOPMENT CENTER | |||||||||
| FREQUENCY PER ATTACHMENT J-1503010-04 CHILD YOUTH PROGRAM ACTIVITES | |||||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Window Count | Size | Area Rug Count | Size |
| 1901 | 1 | 101 | Foyer | Tile | 68 | 0 | 0 | 0 | 0 |
| 1901 | 1 | H101 | Corridor | Tile | 2102 | 0 | 0 | 0 | 0 |
| 1901 | 1 | 102 | Admin Support | Tile | 244 | 0 | 0 | 0 | 0 |
| 1901 | 1 | 103 | Office | Carpet | 120 | 1 | 0 | 0 | |
| 1901 | 1 | 103A | Storage | N/A | NIC | ||||
| 1901 | 1 | 104A | Storage | N/A | NIC | ||||
| 1901 | 1 | 104 | Office | Carpet | 99 | 1 | 0 | 0 | |
| 1901 | 1 | 105 | Admin Support | Carpet | 147 | 1 | 0 | 0 | |
| 1901 | 1 | 105A | Storage | N/A | NIC | ||||
| 1901 | 1 | 106 | Office | Carpet | 106 | 1 | 0 | 0 | |
| 1901 | 1 | 107 | Office | Carpet | 126 | 1 | 0 | 0 | |
| 1901 | 1 | 110 | Office | Tile | 100 | 0 | 0 | 0 | 0 |
| 1901 | 1 | 111 | Restroom | Tile | 23 | 0 | 0 | 0 | 0 |
| 1901 | 1 | 112 | Storage | N/A | NIC | ||||
| 1901 | 1 | 113 | Unisex Restroom | Tile | 57 | 0 | 0 | 0 | 0 |
| 1901 | 1 | 114 | Unisex Restroom | Tile | 58 | 0 | 0 | 0 | 0 |
| 1901 | 1 | 115 | Hourly Care | Carpet | 465 | 10 | 2 | ||
| 1901 | 1 | 115 | Hourly Care | Tile | 100 | ||||
| 1901 | 1 | 115A | Storage | N/A | NIC | ||||
| 1901 | 1 | 116 | Infant Room | Carpet | 504 | 10 | 1 | ||
| 1901 | 1 | 116 | Infant Room | Tile | 60 | ||||
| 1901 | 1 | 116A | Storage | N/A | NIC | ||||
| 1901 | 1 | 117 | Infant Room | Carpet | 504 | 10 | |||
| 1901 | 1 | 117 | Infant Room | Tile | 60 | ||||
| 1901 | 1 | 117A | Storage | N/A | NIC | ||||
| 1901 | 1 | 118 | Infant Room | Carpet | 504 | 10 | |||
| 1901 | 1 | 118 | Infant Room | Tile | 60 | ||||
| 1901 | 1 | 118A | Storage | N/A | NIC | ||||
| 1901 | 1 | 109 | Isolation Room | Tile | 8 | 0 | 0 | 0 | 0 |
| 1901 | 1 | 120 | Janitor's Closet | N/A | NIC | ||||
| 1901 | 1 | 121 | Storage | N/A | NIC | ||||
| 1901 | 1 | 123A | Storage | N/A | NIC | ||||
| 1901 | 1 | 123 | Kitchen | N/A | NIC | ||||
| 1901 | 1 | 124 | Laundry Room | N/A | NIC | ||||
| 1901 | 1 | 125 | Pre-Toddler Room | Carpet | 342 | 10 | 1 | ||
| 1901 | 1 | 125 | Pre-Toddler Room | Tile | 125 | ||||
| 1901 | 1 | 125A | Storage | N/A | NIC | ||||
| 1901 | 1 | 126 | Pre-Toddler Room | Carpet | 342 | 10 | 2 | ||
| 1901 | 1 | 126 | Pre-Toddler Room | Tile | 125 | ||||
| 1901 | 1 | 126A | Storage | N/A | NIC | ||||
| 1901 | 1 | 127 | Pre-Toddler Room | Carpet | 342 | 10 | 2 | ||
| 1901 | 1 | 127 | Pre-Toddler Room | Tile | 125 | ||||
| 1901 | 1 | 127A | Storage | N/A | NIC | ||||
| 1901 | 1 | 128 | Preschool Room | Carpet | 958 | 10 | 2 | ||
| 1901 | 1 | 128 | Preschool Room | Tile | |||||
| 1901 | 1 | 128A | Storage | N/A | NIC | ||||
| 1901 | 1 | 128B | Storage | N/A | NIC | ||||
| 1901 | 1 | 129 | Preschool Room | Carpet | 804 | 10 | |||
| 1901 | 1 | 129 | Preschool Room | Tile | 150 | ||||
| 1901 | 1 | 129A | Storage | N/A | NIC | ||||
| 1901 | 1 | 129B | Storage | N/A | NIC | ||||
| 1901 | 1 | 130 | Preschool Room | Carpet | 804 | 11 | |||
| 1901 | 1 | 130 | Preschool Room | Tile | 150 | ||||
| 1901 | 1 | 130A | Storage | N/A | NIC | ||||
| 1901 | 1 | 130B | Storage | N/A | NIC | ||||
| 1901 | 1 | 131 | Storage | N/A | NIC | ||||
| 1901 | 1 | 131A | Storage | N/A | NIC | ||||
| 1901 | 1 | 131B | Storage | N/A | NIC | ||||
| 1901 | 1 | 132 | Teacher's Lounge | Carpet | 853 | 9 | |||
| 1901 | 1 | 132 | Teacher's Lounge | Tile | 100 | ||||
| 1901 | 1 | 132A | Storage | N/A | NIC | ||||
| 1901 | 1 | 132B | Storage | N/A | NIC | ||||
| 1901 | 1 | 133 | Training Room | Carpet | 473 | 10 | |||
| 1901 | 1 | 133 | Training Room | Tile | 100 | ||||
| 1901 | 1 | 133A | Storage | N/A | NIC | ||||
| 1901 | 1 | 133B | Storage | N/A | NIC | ||||
| 1901 | 1 | 134 | Toddler Room | Carpet | 433 | 10 | |||
| 1901 | 1 | 134 | Toddler Room | Tile | 150 | ||||
| 1901 | 1 | 134A | Storage | N/A | NIC | ||||
| 1901 | 1 | 134B | Storage | N/A | NIC | ||||
| 1901 | 1 | 135 | Toddler Room | Carpet | 429 | 10 | 2 | ||
| 1901 | 1 | 135 | Toddler Room | Tile | 150 | ||||
| 1901 | 1 | 135A | Storage | N/A | NIC | ||||
| 1901 | 1 | 135B | Storage | N/A | NIC | ||||
| 1901 | 1 | 136 | Toddler Room | Carpet | 371 | 10 | 2 | ||
| 1901 | 1 | 136 | Toddler Room | Tile | 150 | ||||
| 1901 | 1 | 136A | Storage | N/A | NIC | ||||
| 1901 | 1 | 136B | Storage | N/A | NIC | ||||
| TOTAL SF | 12,991 | 155 | 14 |
BLDG 2220SN
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 2220SN | Admin | Carpet | 547 | N | Standard | ||
| 2220SN | Admin | Tile | 515 | N | Standard | ||
| 2220SN | Restroom (2) | Tile | 160 | N | Standard | ||
| 2220SN | Kitchen | Tile | 270 | N | Standard | ||
| TOTAL SF | 1492 |
BLDG 3106
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| 3106 | Restroom (2) | Concrete | 960 | N | Standard | ||
| TOTAL SF | 960 |
BLDG D28
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| D28 | Admin | Carpet | 2069 | N | Standard | ||
| D28 | Admin | Tile | 60 | N | Standard | ||
| D28 | Admin | Wood | 509 | N | Standard | ||
| D28 | Kitchen | Tile | 127 | N | Standard | ||
| D28 | Restroom (4) | Tile | 494 | N | Standard | ||
| TOTAL SF | 3259 |
BLDG D63
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| D63 | Admin | Tile | 1000 | N | Standard | ||
| D63 | Restroom (2) | Tile | 25 | N | Standard | ||
| TOTAL SF | 1025 |
BLDG D323
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| D323 | Admin | Carpet | 14480 | N | Standard | ||
| D323 | Admin | tile | 2320 | N | Standard | ||
| D323 | Kitchen(2) | Tile | 505 | N | Standard | ||
| D323 | Restroom (4) | Tile | 511 | N | Standard | ||
| TOTAL SF | 17816 |
BLDG D324
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| D324 | Admin | Carpet | 3759 | N | Standard | ||
| D324 | Admin | Tile | 486 | N | Standard | ||
| D324 | Restroom (7) | Tile | 593 | N | Standard | ||
| TOTAL SF | 4838 |
BLDG D327
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| D327 | Admin | Carpet | 9837 | N | Standard | ||
| D327 | Admin | Tile | 132 | N | Standard | ||
| D327 | Kitchen | Tile | 264 | N | Standard | ||
| D327 | Restroom (4) | Tile | 664 | N | Standard | ||
| TOTAL SF | 10897 |
BLDG D328
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| D-328 | Admin Area | Tile | 4007 | N | Standard | ||
| D-328 | Admin Area | Tile | 2788 | N | Standard | ||
| D-328 | Restroom (2) | Tile | 1962 | N | Standard | ||
| TOTAL SF | 8757 | ||||||
| BUILDING IS CURRENTLY UNDER CONSTRUCTION-MODIFICATION WILL BE DONE WHEN BUILDING IS COMPLETE |
BLDG D339
| PWD SOUTH POTOMAC | |||||||
| Customer: REGION INDIAN HEAD | |||||||
| Building No. | Floor No. | Room No. | Type of Space | Floor Type | Area (SF) | Security Requirements Y/N | COL Level |
| D339 | Admin | Tile | 373 | N | Standard | ||
| D339 | Admin | Carpet | 3871 | N | Standard | ||
| D339 | Kitchen | Carpet | 458 | N | Standard | ||
| D339 | Restroom (2) | Tile | 586 | N | Standard | ||
| TOTAL SF | 5288 |
File details come from the government source that posted it. Updated .