I_Non-Functional Requirements RTM.xlsx

XLSX spreadsheet 123 KB Posted

Attached to
DCYF Enterprise Payment Solution
Solicitation number
24-DCYF-CS-081
Issued by
Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington

About this file

This is a non-functional requirements traceability matrix document for the Washington State Department of Children, Youth, and Families (DCYF) Enterprise Payment Solution (DEPS) project, RFP No. 24-DCYF-CW-081. The document outlines comprehensive implementation and performance requirements across 11 key areas: project management, requirements validation, solution design and development, data migration, testing, user training, SaaS solution provisioning, cutover/decommission, maintenance and operations, knowledge transfer, and deliverables. The matrix includes detailed service level requirements (SLRs) covering system availability, performance metrics, incident resolution timeframes, disaster recovery, enhancement delivery, and customer satisfaction targets.

The document specifies critical performance targets including 99.90% system availability, average response times of 2 seconds for 95% of transactions, incident resolution times of 4 hours for critical issues, and disaster recovery objectives of less than 0.5 hours with no data loss. The requirements emphasize the need for comprehensive security measures, detailed documentation, thorough testing protocols, and structured knowledge transfer processes. The matrix serves as both a compliance checklist for vendors responding to the RFP and a framework for measuring ongoing performance once the solution is implemented. Each requirement is marked as either "Required" or "Preferred" and vendors must indicate whether they will meet each requirement with a "Y" or "N" response, providing justification for any requirements they cannot meet.

View the file

Other files

File Type Posted
RFP-24-DCYF-CW-081-Amendment 4.pdf PDF
RFP-24-DCYF-CW-081-Amendment 8.pdf PDF
C_Solution Functional RTM.xlsx XLSX spreadsheet
E_Solution Data and Reporting RTM.xlsx XLSX spreadsheet
J_Non-Functional RTM Narrative.docx DOCX document
L_Cost Proposal Template.xlsx XLSX spreadsheet
DCYF DEPS Business Process Analysis.pdf PDF
RFP-24-DCYF-CS-081-Amendment 1.pdf PDF
RFP-24-DCYF-CW-081-Amendment 5.pdf PDF
RFP-24-DCYF-CW-081-Amendment 6.pdf PDF
M_Cost Proposal Narrative.docx DOCX document
O_Cert of Compliance with Negotiation.docx DOCX document
RFP 24-DCYF-CW-081_DEPS_V7.0.docx DOCX document
DCYF DEPS Payment Data Flow.pdf PDF
DCYF SSPS Unisys System Assessment.pdf PDF
DEPS Project Scope.pdf PDF
P_Cert of Compliance.pdf PDF
RFP-24-DCYF-CW-081-Amendment 3.pdf PDF
A.1_Administrative Review.docx DOCX document
B_Vendor Qual Experience Staffing.docx DOCX document
D_Solution Functional RTM Narrative.docx DOCX document
F_Solution Data Report RTM Narrative.docx DOCX document
G_Solution Technology RTM.xlsx XLSX spreadsheet
H_Solution Technology RTM Narrative.docx DOCX document
K_Experience and Management.docx DOCX document
N_Issues List Template.docx DOCX document
Q_Bidder Certifications and Assurances.docx DOCX document
DCFY DEPS Architecture Plan.pdf PDF
DCYF SSPS Systems Architectural Overview.pdf PDF
RFP-24-DCYF-CW-081-Amendment 2.pdf PDF
RFP-24-DCYF-CW-081-Amendment 7 with PPT.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Introduction

State of Washington Department of Children, Youth, and Families (DCYF)
DCYF Enterprise Payment Solution (DEPS)
Attachment I: Implementation and Performance Non-Functional Requirements Traceability Matrix
RFP No. 24-DCYF-CW-081
Introduction
This document captures the Implementation and Performance Non-Functional Requirements for the Department of Children Youth and Families' (DCYF's) DEPS Project. This document should be used in conjunction with the General System Design (GSD) report which documents the principles and guidelines for the DEPS future solution architecture.

The Implementation and Performance Non-Functional Requirements document contains the following sections:

1) Introduction

2) Instructions

3) Non-Functional Implementation Requirements (tabs I1-11)

4) Non-Functional Performance Requirements (tabs P1 and P2)

Within the Implementation Requirements, the requirements are categorized by area as detailed below. Each category has its own tab in this workbook.

IDSection TitleTab #
IImplementation Requirement Section
I1Project Management3
I2Requirements Validation4
I3Solution Design & Development5
I4Data Migration6
I5Testing7
I6User Training8
I7SaaS (solution provisioning)9
I8Cutover | Decommission10
I9Maintenance & Operations11
I10Knowledge Transfer12
I11Deliverable List13
PPerformance Requirement Section
P1Incident and Defect Priority14
P2Service Levels15

&"Arial,Regular"&A

&"Arial,Regular"&9&F &"Arial,Regular"&9&P of &N

Respondent Instructions

State of Washington Department of Children, Youth, and Families (DCYF)
DCYF Enterprise Payment Solution (DEPS)
Attachment I: Implementation and Performance Non-Functional Requirements Traceability Matrix
RFP No. 24-DCYF-CW-081
Respondent Instructions
This workbook contains Requirements for the DEPS system. The response codes below should be used by Vendors to indicate the fit of its solution to the State Requirements specified in this workbook.

This template must be completed and submitted as an MS Excel file as part of the response to this RFP.

ResponsesDefinition
Response Code: Y or N -- Will this Non-Functional Requirement be met by your solution?Indicate whether the requirement, as currently written, will be met by the Respondent's proposal. Respond Y=Yes or N=No.
Vendor Justification for Not Meeting Requirement, if applicableIf the Vendor Response Code is "N," the Vendor is required to provide an explanation for not meeting the requirement.
Additional CommentsAdditional comments. (Not Required). The Vendor may include additional comments at their discretion.

Do not edit this worksheet.

I1 Project Management

State of Washington Department of Children, Youth, and Families (DCYF)
DCYF Enterprise Payment Solution (DEPS)
Attachment I: Implementation and Performance Non-Functional Requirements Traceability Matrix
RFP No. 24-DCYF-CW-081

Project Management

Req #Requirement DescriptionVendor ResponsibilityState ResponsibilityRequirement PriorityVendor Response:
Y or NVendor Justification for Not Meeting Requirement, if applicable
(If selecting N)Additional Comments (Not Required)
I1.1Provide, at minimum, one full-time Project Manager (PM) to represent the Vendor in the management of the Project and interfacing with the State Project Manager (SPM) in any decisions relating to the Project. Vendor PM should be PMI certified (e.g., PMP, PMI-ACP).XRequired
I1.2Provide project management oversight for the project and track project artifacts, processes, and performance per industry best practices. Work with Vendor PM to meet the State expectations for conduct of the project management.XRequired
I1.3Provide a robust Project Management methodology founded on industry best practices and covering all key project management processes. DCYF prefers an Agile project management methodology but is open to other proposed approaches.XRequired
I1.4Develop, revise, and maintain a formal Project Management Plan (PMP) that includes the following key components:

A. Project Schedule B. Implementation Plan C. Risk Management Plan: including Issue and Risk identification, quantification of impact, monitoring, and mitigation plans D. Change Management Plan: describing change management processes and including change request template, impact analysis template, request approval process, and processes for management and tracking of change requests E. Deliverable review/acceptance process, and other acceptance criteria F. Requirements Management Plan: including process and tools for functional and technical requirements tracking, maintenance, and traceability (e.g., to test scenarios/cases) in a Requirements Traceability Matrix (RTM) G. Quality Management H. Resource Management: of Vendor and subcontractor resources I. Project success evaluation criteria and Project close-out activities J. Identification and management of relationships to other IT or business efforts K. Status Report template(s): including deliverable status reports, issues, risks, plan vs. actual status, etc. as identified by the State L. Status and other reporting activities as identified by the State

M. Tools to be used for all project management processes (e.g., change management, documentation management, issue/risk management, etc.)XRequired
I1.5Assume and lead all day-to-day management of all Vendor personnel, including subcontractor personnel, and development of deliverables related to the required service.XRequired
I1.6Conduct project management activities throughout the life of the Project, maintaining current planning documents and executing the associated plans.XRequired
I1.7Escalate items to the project governance (e.g., Steering Committee) for awareness and decision-making.XRequired
I1.8Participate in governance committee meetings upon request, and present project status.XRequired
I1.9Adhere to Service Level Requirements as described in P2 Service Level Targets.XRequired
I1.10Conduct project oversight activities and ensure contract compliance.XRequired
I1.11Interface with and support requests from Independent Project Oversight and Independenant Verification and Validation (IV&V) Consultant(s) contracted by the State.XRequired
I1.12Risk Management: Identify, document, provide, and implement risk mitigation measures and contingency plans as high-priority risks are identified and monitored, as documented in the Project Management Plan (PMP) and agreed upon by the State. Includes participation in a monthly project risk assessment meeting.XRequired
I1.13Facilitate weekly project meetings to provide Weekly Status Reviews, Issues Logs, and Progress Reports at the sub-team level (e.g., functional teams, technical team, data migration team, and deployment team) as identified by the State.XRequired
I1.14Provide Weekly Status Report and conduct regularly scheduled status meetings reviewing Project progress, risk mitigation, issue resolution, deliverable status, and next steps as mutually agreed upon by the State and the Vendor.XRequired
I1.15Maintain Document Repository as documented in the Project Management Plan (PMP) and agreed upon by the State and provide State access to the repository via the State Project Manager (SPM).XRequired
I1.16Provide, update, and maintain a Project Schedule (e.g., in Smartsheet, MS Project) that includes the following key components:
A.Work breakdown structure
B.Tasks and activities required to successfully complete the Project
C.Schedule/milestone tracking

D.Allocation and loading of specific team resources across the tasks and activities

E.Critical path identification and dependenciesXRequired
I1.17Provide periodic updates (as mutually agreed upon by the State and the Vendor, e.g., bi-weekly or monthly) to the Project Schedule which is maintained by the Vendor.XRequired
I1.18Requirements Management: establish and implement a formal requirements management process throughout the term of the contract and following the Requirements Management Plan as documented in the Project Management Plan (PMP) and agreed upon by the State.XRequired
I1.19Provide a detailed plan on the SDLC (System Development Lifecycle) methodology that will be used for the project where applicable (e.g. Modified Waterfall, Agile, Scrum etc.) or SaaS implementation approach which includes an overview of the different phases, the number of iterations (releases) being proposed and how each release will flow through the different phases including, where applicable, planning, design, configuration, testing, roll-out etc.
Work with State to blend State methodology and standards with Vendor approach and delivery methodology. End product with these decisions will be described in the Project Management Plan (PMP).XRequired
Deliverables Management
I1.20Execute deliverables management as documented in the Project Management Plan (PMP) and agreed upon by the State.XRequired
I1.21For all deliverables, document proposed deliverable content, format, and acceptance criteria in Deliverable Expectation Documents (DEDs) as mutually agreed upon by the State and the Vendor.XRequired
I1.22Approve or request changes to Deliverable Expectation Documents (DEDs).XRequired
I1.23Submit completed deliverables aligned with Deliverable Expectation Documents and meet target deliverable submission dates.XRequired
I1.24Coordinate deliverable reviews and approvals.XRequired
I1.25Provide deliverable review comments and revisions needed for deliverable approval within five (5) business days of deliverable submission or as agreed to in the approved Project Schedule or otherwise.XRequired
I1.26Obtain approval of all deliverables and maintain the deliverables current (if necessary) during the life of the project.XRequired
Change Management
I1.27Communicate Project scope change process and procedures to the State stakeholders.XRequired
I1.28Execute change management as documented in the Project Management Plan (PMP) and agreed upon by the State.XRequired
I1.29Prepare system change requests as required.XRequired
I1.30Document impact analysis associated with proposed changes and follow the agreed upon change management process as documented in the Project Management Plan (PMP) and agreed upon by the State.XRequired
I1.31Approve and prioritize system changes.XRequired
Staff/Resource Management
I1.32The Vendor shall not remove any approved Key Staff from performing their assigned tasks without the prior written approval of the State, except in the case of a leave of absence, sickness, death, termination, or resignation of employment or association, or other circumstances outside the reasonable control of the Vendor. Immediately upon learning of the need for replacement of Key Staff, the Vendor shall provide written notice to the State and within 10 business days thereafter shall provide résumés of the proposed replacement and the plan for transition.XRequired
I1.33The State shall have the right to participate in the selection process and approve or disapprove Key Staff replacements.XRequired
I1.34The State reserves the right to approve or disapprove Vendor’s personnel or to require the removal or reassignment of any personnel at the sole discretion of the State.XRequired
Documentation Management
I1.35Execute documentation management as documented in the Project Management Plan (PMP) and agreed upon by the State.XRequired
I1.36Create, update, revise, and maintain all business and system documentation for functionality during the life of the contract.XRequired

&"Arial,Regular"&A

&"Arial,Regular"&9&F &"Arial,Regular"&9&P of &N

I2 Requirements Validation

State of Washington Department of Children, Youth, and Families (DCYF)
DCYF Enterprise Payment Solution (DEPS)
Attachment I: Implementation and Performance Non-Functional Requirements Traceability Matrix
RFP No. 24-DCYF-CW-081

Requirements Validation

Req #Requirement DescriptionVendor ResponsibilityState ResponsibilityRequirement PriorityVendor Response:
Y or NVendor Justification for Not Meeting Requirement, if applicable
(If selecting N)Additional Comments (Not Required)
I2.1Establish and implement a formal requirements management process throughout the life of the contract and following the Requirements Management Plan as documented in the Project Management Plan (PMP) and agreed upon by the State.XRequired
I2.2Perform requirements management throughout the contract term as documented in the Project Management Plan (PMP) and agreed upon by the State.XRequired
I2.3Develop a plan and schedule to conduct the State interviews, group workshops, and surveys to refine, and prioritize the detailed functional and technical requirements.XRequired
I2.4State Project Manager to act as primary point of contact with stakeholders and offices to refine functional and technical requirements, including scheduling the State staff for interviews and workshops.XRequired
I2.5State Project Manager to coordinate, schedule and communicate with all functional and technical subject matter experts (SMEs) for planning sessions.XRequired
I2.6Conduct and document the State interviews, group workshops, and surveys to refine, and prioritize the detailed functional and technical requirements.XRequired
I2.7Review and ensure the data needed to adequately satisfy all current and desired child welfare operational and analysis activities (including those to satisfy those for Info-DEPS and to report on the Priority Performance Measures - PPM) is adequately represented in the requirements.XRequired
I2.8Provide updates to refine, clarify and prioritize the detailed functional and technical requirements at a frequency that the state and the vendor have mutually set during the planning phase (for example: bi-weekly, monthly, etc..).XRequired
I2.9Conduct business process analysis and reengineering focused on the transition or transformation of source system business processes to the target system.XRequired
I2.10Produce a Requirements Validation Report that documents any changes, revisions, clarifications to functional and technical requirements in the requirements repository (i.e., Requirements Traceability Matrix) to be maintained by the Vendor. This deliverable, once approved, serves as the validated detailed functional and technical requirements and includes security features. The requirements traceability matrix must be updated to reflect the approved Requirements Validation Document.XRequired
I2.11Provide validation that DEPS requirements are met with these requirementsXRequired
I2.12Provide validation that all federal reporting requirements are met with these requirementsXRequired
I2.13The Vendor will provide data exchange agreements with all parties with whom DCYF exchanges data. At a minimum, these data exchange agreements should proivde a description of each data element exchanged, their data types, their relationships with other data elements and any constraints (rules, validations or other constraints that apply to the data). The Vendor will create and adhere to processes for ensuring these data contracts are regularly reviewed, updated and followed.XRequired

&"Arial,Regular"&A

&"Arial,Regular"&9&F &"Arial,Regular"&9&P of &N

I3 Solution Design & Develop

State of Washington Department of Children, Youth, and Families (DCYF)
DCYF Enterprise Payment Solution (DEPS)
Attachment I: Implementation and Performance Non-Functional Requirements Traceability Matrix
RFP No. 24-DCYF-CW-081

Solution Design and Development

Req #Requirement DescriptionVendor ResponsibilityState ResponsibilityRequirement PriorityVendor Response:
Y or NVendor Justification for Not Meeting Requirement, if applicable
(If selecting N)Additional Comments (Not Required)
Configuration Management
I3.1Create a Configuration Management Plan that addresses:

A. Solution Environment (e.g., sandbox, development, testing, training, etc.) required to support all project activities and obtaining licenses and other required infrastructure B. Security configuration management

C. Development/ConfigurationXRequired
I3.2Implement the Configuration Management Plan, including the establishment of environment configurations required to support the project implementation.XRequired
Design
I3.3Conduct user research, facilitate interviews, group workshops, focus groups, journey mapping sessions, etc. to obtain and gain consensus on design.XRequired
I3.4Ensure that across all the User journeys there is a comprehensive, coherent, and streamlined information flow including System inputs, displays, dashboards and reportsXRequired
I3.5Conduct and document functional and technical planning sessions to establish system(s) configuration.XRequired
I3.6Provide a System Design Document, including “to-be” business process flows to address any requirements gaps identified and implement the validated detailed functional and technical requirements via configuration settings and custom development.XRequired
I3.7The System Design Document must demonstrate and detail how the architecture and design of the system will be modular and composable to enable future system modifications and enhancement as needs change in the future.Required
I3.8Establish and document the Detailed Functional and Technical Design Documents (including forms, reports, interfaces, conversions, enhancements, and workflow).XRequired
I3.9Define Data and Data Exchange Standards for the DEPS Solution consistent with the National Information Exchange Model (NIEM) principles to enable the solution to be delivered with documented data catalog and meta model repositories and meet the requisite DEPS regulations.XRequired
I3.10Review and approve the Design Documents and Data Exchange Standards at the State’s discretion based on agreed timelines.XRequired
Build
I3.11SDLC: The Vendor must apply consistent quality standards for all development work as described in the Vendor's SDLC approach including coding, database and field naming conventions and in compliance with State standards and methodology.XRequired
I3.12Solution Functional and Technical Capabilities. Perform all necessary technical design, configuration, testing, or scripting, of systems as required to provide and implement the user stories, functional and technical requirements.XRequired
I3.13Reports and Dashboards. Develop and document custom reports and dashboards (as required to provide and implement functional and technical requirements).XRequired
I3.14Integration. Perform all necessary technical design, configuration, testing, or scripting, of temporary and permanent interfaces as required to provide and implement the functional and technical requirements.XRequired
I3.15Coordinate and communicate with the State partners, owners of external systems, and/or third-party service providers regarding interfaces, including establishing Memorandum of Understanding (MOU).XRequired
I3.16Work with the State partners, owners of external systems, and/or third-party service providers to collect information required to develop and document a detailed interface design and approach according to the State standards.XRequired
I3.17Document interfaces and maintain Interface Control Documents (ICDs) as interfaces are added or modified.XRequired
I3.18Manage all configuration and interface development efforts using the State-approved tools and methodologies adhering to defined standards and guidelines.XRequired
I3.19Define and document configuration management policies and procedures consistent with industry best practices.XRequired
I3.20Adhere to the State audit and configuration management standards.XRequired
I3.21Manage documentation of changes to the underlying environment via use of library management version control and turnover management.XRequired
I3.22Provide configuration management tools.XRequired
I3.23Perform configuration management activities throughout the Project.XRequired
I3.24Review configuration management results.XRequired
I3.25Conduct and facilitate code reviews per the coding standards included in the Vendor's SDLC approach to ensure customized software and interfaces comply with coding standards and to minimize defects.XRequired
I3.26Support the DCYF staff in reviews of documentation and code to ensure the solution is conforming to State-approved standards.XRequired
I3.27Review and approve results of Vendor code and configuration reviews at the State’s discretion.XRequired
I3.28Maintain an inventory of software.XRequired
I3.29Ensure software license compliance.XRequired
I3.30Schedule releases (e.g., configuration changes).XXRequired

&"Arial,Regular"&A

&"Arial,Regular"&9&F &"Arial,Regular"&9&P of &N

I4 Data Migration

State of Washington Department of Children, Youth, and Families (DCYF)
DCYF Enterprise Payment Solution (DEPS)
Attachment I: Implementation and Performance Non-Functional Requirements Traceability Matrix
RFP No. 24-DCYF-CW-081

Data Migration

Req #Requirement DescriptionVendor ResponsibilityState ResponsibilityRequirement PriorityVendor Response:
Y or NVendor Justification for Not Meeting Requirement, if applicable
(If selecting N)Additional Comments (Not Required)
I4.1Provide a Data Migration Strategy, consisting of two main elements:

a) Identification of the methodology and tools for the migration of the source legacy data to the target system(s).

b) Identification of the methodology, tools and Solution components necessary to enable DCYF's departmental Cloud Analytics Strategy such that the data extracts needed for any DEPS Data Warehouse / Data Marts are supported throughout transition, the reporting and analytics needs of the DEPS Solution are enabled and the DCYF strategic Analytics data needs are satisfied.XRequired
I4.2Provide a Data Pipelines Design for Cloud Analytics, consisting of an evaluation of the current data pipelines and requirements, and design the data pipelines and transformations needed to satisfy the requirements for data in the DCYF Cloud Analytics and DEPS data warehouse / Data Mart used for reporting and analytics to generate any PPM (Priority Performance Measures) reporting.XRequired
I4.3Perform all necessary technical design, configuration, testing, or scripting, of temporary and permanent interfaces as required to provide and implement the cloud analytics data pipeline design.XRequired
I4.4Provide a Data Migration Plan, including identification of roles and responsibilities for Vendor and the State staff, and policies and procedures to ensure controls are in place in accordance with the State rules and regulations. This deliverable includes documentation of detail mappings from source to target data fields.XRequired
I4.5Execute the approved Data Migration Strategy and the approved Data Migration Plan.XRequired
I4.6Specify Extract, Transform, and Load (ETL) tools for data conversion in the Data Migration Strategy deliverable.XRequired
I4.7Provide ETL tools and install and configure these as needed.XRequired
I4.8Create data conversion extracts from legacy/existing data files in a format specified by the Data Migration Plan.XRequired
I4.9Provide coding of automated data conversion extracts from legacy/existing data files, using techniques that are consistent with the development standards.XRequired
I4.10Extract legacy data for purposes of transformation and loading into the target application files structures.XRequired
I4.11Transform and load cleansed legacy data.XRequired
I4.12Review and validate the data and the data cleansing metrics as delineated in Data Migration Plan.XRequired
I4.13Perform manual data cleansing (cleansing of data that cannot be cleansed automatically).XRequired
I4.14Coordinate and execute manual data loads if required.XRequired
I4.15Provide converted legacy data for transactional testing during integration, end-to-end, parallel, user acceptance, etc. test events.XRequired
I4.16Perform Data Conversion from the source system(s) to the target system(s), by electronic or manual methods and track data conversion status and notifications.XRequired
I4.17Provide tool for obfuscation of data (subject to approval by the State).XRequired
I4.18Validate that data integrity is maintained after the migration of the data has occurred in the new systemXRequired

&"Arial,Regular"&A

&"Arial,Regular"&9&F &"Arial,Regular"&9&P of &N

I5 Testing

State of Washington Department of Children, Youth, and Families (DCYF)
DCYF Enterprise Payment Solution (DEPS)
Attachment I: Implementation and Performance Non-Functional Requirements Traceability Matrix
RFP No. 24-DCYF-CW-081

Testing

Req #Requirement DescriptionVendor ResponsibilityState ResponsibilityRequirement PriorityVendor Response:
Y or NVendor Justification for Not Meeting Requirement, if applicable
(If selecting N)Additional Comments (Not Required)
I5.1Develop a Test Management Strategy deliverable that lists all test events, entrance and exit criteria for each test event, roles and responsibilities, defect management processes, high-level data requirements for each test event, tools used for each test event, including User Acceptance Testing.XRequired
I5.2Provide test plans for each test event that provides the detailed approach that shall be taken to fully test all components of the system including test control and approval processes, test participants, how testing will interface with the configuration management process, and test documentation expectations for the following test types: unit, integration, parallel, end-to-end, interface, user acceptance, data conversion, performance (including stress and volume), availability, disaster recovery (including failover), regression, and security. These test plans must include the following at a minimum:
A.Functional Test Plan
B.Parallel Comparison Test Plan
C.Performance (Load and Stress) Test Plan
D.Integration Test Plan
E.Security Test Plan
F.User Acceptance Test Plan
G.Data Migration Test Plan
H.Cutover/Deployment Test Plan
I.Disaster Recovery Test Plan
I.DEPS Requirements Test Plan
I.Federal Reporting Test PlanXRequired
I5.3Maintain the Test Management Strategy and all Test Plans.XRequired
I5.4Manage and execute the agreed upon Test Management Strategy and approved Test Plans, including regression testing, and creating and maintaining the required test data during the testing period.XRequired
I5.5Provide automated testing tools and procedures for testing including integration, parallel, UAT, end to end, regression, performance, stress, etc.XRequired
I5.6Document/create standards and procedures for the use of the tools that support all testing activities.XRequired
I5.7Install, configure, and implement the testing application software, hardware, data, desktops, etc.XRequired
I5.8Create Test Scripts, Test Cases, and Test Data, aligned to functional and technical requirements; and perform all appropriate testing events as agreed to in the approved test plans.XRequired
I5.9Assist with all testing (i.e., integration, parallel, and end-to-end) and provide input to scripts and perform user acceptance testing.XRequired
I5.10Test the capability of failover to secondary disaster recovery site.XRequired
I5.11Test the capability to move back to primary data center after deployment on secondary disaster recovery data center.XRequired
I5.12Provide documentation of meeting agreed upon exit success criteria for each test event in the following deliverables:
A.Functional Test Results Report
B.Parallel Comparison Test Results Report
C.Performance Test Results Report
D.Integration Test Results Report
E.Security Test Results Report
F.User Acceptance Test Results Report
G.Data Migration Test Results Report
H.Cutover/Deployment Test Results Report
I.Disaster Recovery Test ReportXRequired
I5.13Validate the system for compliance with the System Security Plan.XRequired
I5.14Correct defects found as a result of testing efforts.XRequired
I5.15Review testing results for compliance with policies, procedures, plans, and test criteria and metrics (e.g., defect rates, progress against schedule).XRequired
User Acceptance Testing
I5.16Manage and execute the agreed upon Test Management Strategy and approved User Acceptance Test Plan, including regression testing, and creating and maintaining the required test data during the testing period.XRequired
I5.17Coordinate the scheduling of user acceptance testing (e.g., gain user involvement, establish and define acceptance criteria, set high-level test objectives, establish high-level test scenarios).XRequired
I5.18Facilitate and support user acceptance test as prescribed by the State, including: a. Establishing adequate test environments based on user acceptance criteria

b. Preparing data to support test scenarios within modified system as well as managing the relationship with all interfaced systems necessary to conduct test

c. Troubleshooting; supporting users to progress through scenarios

d. Simulating interfaces or working with integrated systems to conduct end-to-end test

e. Supporting batch processing

f. Exercising functionality

g. Converting production data

h. Reporting results.XRequired
I5.19Manage and conduct user acceptance testing.XRequired
I5.20Use a Defect Tracking System (provided by the Vendor) for purposes of allowing the State to initiate, track, and report all testing defects (e.g., integration, end-to-end, parallel, and user acceptance testing).XRequired
I5.21Correct defects found as a result of testing efforts adhering to all service level requirements for defect resolution.XRequired
I5.22Provide documentation of satisfying agreed upon exit success criteria for User Acceptance Testing in the User Acceptance Test Results Report.XRequired

&"Arial,Regular"&A

&"Arial,Regular"&9&F &"Arial,Regular"&9&P of &N

I6 User Training

State of Washington Department of Children, Youth, and Families (DCYF)
DCYF Enterprise Payment Solution (DEPS)
Attachment I: Implementation and Performance Non-Functional Requirements Traceability Matrix
RFP No. 24-DCYF-CW-081

User Training

Req #Requirement DescriptionVendor ResponsibilityState ResponsibilityRequirement PriorityVendor Response:
Y or NVendor Justification for Not Meeting Requirement, if applicable
(If selecting N)Additional Comments (Not Required)
I6.1Develop a comprehensive End-User Training Plan to document training requirements and the approach the State will use for updating training requirements, development of training curricula, and deploying training for the State’s end-users as required and mutually agreed upon by the State and the Vendor.XRequired
I6.2Implement the approved End-User Training Plan.XRequired
I6.3Provide Training Curriculum Document, including the course outlines and schedules for Train-the-Trainer training and End-User Training.XRequired
I6.4Provide Train-the-Trainer Training Materials.XRequired
I6.5Provide Final Training Materials, including end-user documentation, standard templates, and online training, to support initial End-User Training.XRequired
I6.6Tailor the standard training templates to incorporate the State-specific business processes.XRequired
I6.7Conduct Train-the-Trainer Training for the system.XRequired
I6.8Participate in Train-the-Trainer training for the system.XRequired
I6.9Conduct End-User Training for the system.XRequired
I6.10Support Train the Trainder and End-User Training for the system (reviewing material, available to answer trainers questions etc.)XRequired
I6.11Participate in End-User Training for the system.XRequired
I6.12Establish environment needed to support training as defined in End-User Training Strategy.XRequired
I6.13Create and maintain the State training data as required by the State.XRequired
I6.14Survey end-users following End-User Training for End-User training effectiveness reports.XRequired
I6.15Provide the End-User Survey and develop End-User Training Effectiveness Reports.XRequired

&"Arial,Regular"&A

&"Arial,Regular"&9&F &"Arial,Regular"&9&P of &N

I7 SaaS (solution provisioning)

State of Washington Department of Children, Youth, and Families (DCYF)
DCYF Enterprise Payment Solution (DEPS)
Attachment I: Implementation and Performance Non-Functional Requirements Traceability Matrix
RFP No. 24-DCYF-CW-081

SaaS (Solution Provisioning)

Req #Requirement DescriptionVendor ResponsibilityState ResponsibilityRequirement PriorityVendor Response:
Y or NVendor Justification for Not Meeting Requirement, if applicable
(If selecting N)Additional Comments (Not Required)
I7.1Host the solution(s) at the Vendor’s own data center or with a cloud service provider. In the event the Vendor proposes to use a Third Party to provide hosting services, the hosting agreement must be assignable to the State upon termination of the contract.XRequired
I7.2Develop and submit an Infrastructure Management Plan to the State. The Infrastructure Management Plan shall describe the plan for hosting or provisioning the solution (e.g., SaaS), including:
A.Approach to environment management, including with respect to Security Architecture and Design
B.Roles and responsibilities of all relevant team members
C.Maintenance and operations procedures
D.Approach to Disaster Recovery (DR) and backup, including ransomware protections
E.Security monitoring approach, including a communication and resolution plan for prompt State notification of a security event and a Security IncidentXRequired
I7.3Provide infrastructure, network, batch cycle, interface, hosting, and data center services to support the solution(s) provided while meeting applicable SLAs.XRequired
I7.4Ensure that all infrastructure complies with State and federal security requirements as specified in this solicitation.XRequired
I7.5Provide ongoing security of the solution(s) infrastructure, including regular network and code scans.XRequired
I7.6Suggest and develop modifications to existing security policies and procedures or draft new security policies and procedures when gaps are identified.XRequired
I7.7Provide and maintain all environments needed to satisfy the requirements of this RFP.XRequired
I7.8Provide data for development, testing, training, and pre-production.XRequired
I7.9Monitor and report on Solution performance.XRequired
I7.10Notify and obtain approval from State network and application support teams in advance of planned changes and possible impacts to ensure that upstream or downstream impacts can be addressed.XRequired
I7.11As part of the hosting services, the Vendor must provide robust system performance as defined in P2 Service Level TargetsXRequired
I7.12Propose an Infrastructure and Solution Recovery Plan with detailed DR plans, including data backup and system failover methodologies.XRequired
I7.13Participate with the State in comprehensive tests of failover and backup recovery annually or more frequently as requested by the State or deemed necessary by the Vendor.XRequired
I7.14Provide a robust communication link to support timely data replication between primary and DR site to support SLAs.XRequired
I7.15Monitor production databases using data quality monitoring scripts and other tools, according to a mutually agreed upon schedule. Use monitoring and alerts to identify data integrity and other database-related performance issues and tune accordingly to ensure response times meet SLAs.XRequired
I7.16Continuously monitor the application for issues related to performance, errors, exceptions, availability, capacity, and defects.XRequired
I7.17Maintain and update a quarterly inventory of system software including:
A.The version currently in use
B.End-of-life and end-of-support dates for the current version
C.The latest version available
D.In use/out of use
E.Flagged for decommissioning
F.Licenses maintained and usedXRequired
I7.18Proactively plan and execute major, minor, and patch upgrades to infrastructure or component software to ensure the software components are supported and meet security standards.XRequired
I7.19Proactively monitor capacity and execute upgrades to ensure infrastructure is supported and meets performance and security standards.XRequired

&"Arial,Regular"&A

&"Arial,Regular"&9&F &"Arial,Regular"&9&P of &N

I8 Cutover | Decommission

State of Washington Department of Children, Youth, and Families (DCYF)
DCYF Enterprise Payment Solution (DEPS)
Attachment I: Implementation and Performance Non-Functional Requirements Traceability Matrix
RFP No. 24-DCYF-CW-081

Cutover / Deployment, Hypercare and DEPS Decommission

Req #Requirement DescriptionVendor ResponsibilityState ResponsibilityRequirement PriorityVendor Response:
Y or NVendor Justification for Not Meeting Requirement, if applicable
(If selecting N)Additional Comments (Not Required)
I8.1Develop a detailed Cutover/Deployment Plan deliverable that includes, at a minimum:
A.Final data migration and cutover tasks
B.Schedule
C.Roles and responsibilities
D.Description of key processes
E.Description of go/no-go criteria
F.Criteria for exiting HypercareXRequired
I8.2Perform deployment and support activities as agreed in the approved Cutover/Deployment Plan.XXRequired
I8.3Provide the solution platform and environments (production and disaster recovery), including all hardware and software necessary to provision the solution for production use while meeting all Service Levels (Refer to P2 Service Level Targets).XRequired
I8.4Provide documentation, including specification of hardware, network, storage, utilities, licensees, and other required infrastructure.XRequired
I8.5Facilitate Go/No-go Meetings with the State and document assessment of status of each of the readiness criteria for go-live.XRequired
I8.6Perform deployment and support activities as approved by the State.XRequired
I8.7Provide recommended operations and administration procedures related to the deployment.XRequired
I8.8Approve production deployment go/no-go decisions.XRequired
I8.9Deploy target solution capabilities into production.XRequired
I8.10Track deployment status and notification.XRequired
Hypercare
I8.11Immediately following a system Go Live in production, provide an elevated level of support to ensure the seamless adoption of the new capabilities. This Hypercare Support must include at a minimum:
A.Six months of ongoing support from date of Go-Live
B.Continuous monitoring of customer service
C.Continuous monitoring of data integrity
D.Continuous developer support for enhancements/fixes
E.Continuous monitoring of operations of the implemented application for technical support
F.On-site availability of technical support team
G.Resolution of any system configuration issues for a full operational and technical transitionXRequired
I8.12Provide Successful Deployment Report deliverable that confirms the success of the deployment according to success criteria documented in the approved Cutover / Deployment Plan.XRequired
I8.13Provide the configuration and customization documentation and readable source code and object (executable) code for the system in the configuration management system.XRequired
Legacy Systems Decommission
I8.14Work collaboratively with DCYF to develop a legacy systems Decommissioning Plan based on the DEPS deployment / implementation strategy. Ensure the plan includes:

A. Clearly defined time frame for when the legacy and the new DEPS system will operate in parallel.

B. Nature of user access (e.g., read-only) to legacy systems when the new DEPS sytem will operate in parallel.

C. If applicable, detailed description of data syncing between the new DEPS system and SSPS while both systems operate in parallel.

D. If applicable, for each data element, the clearly defined source record and data provenance, while the new DEPS and legacy systems operate in parallel.

E. Clearly defined time roles and responsibilities for M&O of legacy systems while they remain in operation.

F. If applicable, clearly defined time frame that historical data will be available post decommissioning of legacy systems.

G. If applicable, clearly defined storage and access plan for historical data post decommissioning of legacy systems.

H. Clearly defined end-to-end functionality and data conversion testing, including acceptance criteria, for the new DEPS system before legacy systems can be decommissioned.

I. Step-by-step instructions, including roles and responsibilities, for the activities required to decommission legacy systems.XXRequired
I8.15Perform deployment and support activities as agreed in the approved DEPS Decommission Plan.XXRequired
I8.16Review and approve DEPS Decommission Plan.XRequired

&"Arial,Regular"&A

&"Arial,Regular"&9&F &"Arial,Regular"&9&P of &N

I9 Maintenance & Operations

State of Washington Department of Children, Youth, and Families (DCYF)
DCYF Enterprise Payment Solution (DEPS)
Attachment I: Implementation and Performance Non-Functional Requirements Traceability Matrix
RFP No. 24-DCYF-CW-081

Maintenance & Operations

Req #Requirement DescriptionVendor ResponsibilityState ResponsibilityRequirement PriorityVendor Response:
Y or NVendor Justification for Not Meeting Requirement, if applicable
(If selecting N)Additional Comments (Not Required)
I9.1Develop a Production Support Plan to cover the Post Go-Live/Hypercare Maintenance and Operations (M&O) Support period. The plan shall document ITIL-aligned incident management processes and include, at a minimum:
A.The proposed organizational structure
B.Description of key processes
C.Description of service desk support
D.Use of incident tracking tools as agreed to by the State (e.g., Jira)
E.Escalation procedures
F.Maintenance and repair policies and procedure
G.Processes and procedures for tracking and reporting the status of all post-implementation support services
H.Report templates
I.Exit criteria for successfully completing the M&O services
J.Help desk scripts (e.g., Level 1 and Level 2 help desk)
K.Roles and responsibilities, and
L.Estimated level of effort for the Vendor and the StateXRequired
I9.2Execute the approved Production Support Plan and provide technical and functional support to the State as agreed upon.XRequired
I9.3Provide 12 weeks of post go-live deployment support prior to final acceptance and resolve issues with the Vendor’s post-production support team.XRequired
I9.4Maintain system architecture documentation.XRequired
I9.5Perform diagnostics on software and services.XRequired
I9.6Perform system fixes for problems that the Vendor was responsible for providing.XRequired
I9.7Perform data fixes for errors that the Vendor was responsible for, including but not limited to improperly converted files or data.XRequired
I9.8Regression test the system to ensure that no errors are introduced.XRequired
I9.9Approve all post-implementation support service fixes with formal sign-off.XRequired
I9.10Update all documentation and related files/Deliverables associated with post-implementation support services.XRequired
I9.11Repair the configuration and customized code provided by Vendor during the post-implementation period at no charge to the State provided that:
A.The problem encountered occurs within twelve (12) months of the acceptance of such provided component
B.The root cause analysis indicates the problem is in the system not meeting requirements where the Vendor has responsibility (e.g., a problem caused by configured or customized software component not meeting requirements, a defect in the configuration or code created by the Vendor, a problem with the system not meeting SLAs)XRequired
I9.12Test remediated code or configurations (and regression test the entire solution) to verify that no errors are introduced.XRequired
I9.13Update all appropriate documentation to reflect defect corrections.XRequired
I9.14Provide monthly reports showing the amount of support work (i.e., number of defects and hours to correct).XRequired
I9.15Provide ongoing reporting of all operational activitiesXRequired
I9.16Implement occasional updates in response to legal or regulatory changes.XRequired
Interface Management
I9.17Manage interfaces with solution trading partners while adhering to applicable SLAs.XRequired
I9.18Maintain a contact list for all inbound and outbound interfaces and batch jobs, including the business unit contact and developer contact for each batch job and/or interface.XRequired
I9.19Monitor and maintain interfaces to ensure the timeliness of all current incoming and outgoing system interfaces, including, but not limited to, state, federal, and third-party interfaces.XRequired
I9.20Perform ongoing interface quality analysis and fix performance issues following approved SDLC processes.XRequired
I9.21Maintain and test interfaces to reflect changes from interface partners.XRequired
I9.22Monitor interface errors and exceptions and correct issues as outlined in applicable SLAs.XRequired
I9.23Ensure that all interface trading partners have completed a Trading Partner Agreement (TPA) as required.XRequired
I9.24Provide immediate notification to interface contacts by phone or email for any incomplete jobs or job runs.XRequired
I9.25Produce interface monitoring reports.XRequired
Service Desk
I9.26Provide effective service desk and incident management process support.XRequired
I9.27Maintain knowledge base.XPreferred
I9.28Escalate and assist with the resolution of issues with Vendor post-production support team.XRequired
I9.29Maintain help desk scripts.XPreferred
I9.30Provide Level 1 Help Desk— Basic end-user support (provide training document location, training team contacts, verify the application is working properly) and user account and password administration.XRequired
I9.31Provide Level 2 and 3 Help Desk for the system-related incidents and problems.XRequired
I9.32Assist the State in the development of support organization.XRequired
I9.33Provide support organization to advise and assist business end-users and staff in the use of systems and the State-specific policies.XRequired
I9.34Establish priority of trouble ticket items / service requests.XRequired
I9.35Respond to escalated trouble ticket items in accordance with established procedures and meeting specified service levels (refer to P2 Service Level Targets.XRequired
I9.36Maintain detailed information on all tickets within the State’s ticket tracking tool.XRequired
I9.37Assign full time resources to support the ongoing resolution of tickets.XRequired
I9.38Vendor shall provide a monthly report of all service desk activity.XRequired
Release Management
I9.39Develop a Release Management Plan that details the Vendor’s processes and procedures related to the promotion of code through each environment.
This will include release notes, supporting materials (such as Quick Reference Guides and communication materials), deployment timeline, deployment readiness checklist, deployment playbook, and go/no-go meeting presentation.XRequired
I9.40Promote code into all environments, including production.XRequired
I9.41Implement the approved Release Management Plan and the well-defined process for release management that is consistent with modern release practices.XRequired
I9.42Software Management – Manage changes in source code provided by the Vendor, including how changes will be incorporated into future versions of the software that the State may or may not acquire.XRequired
I9.43Change Control Board Approval – Obtain approval for all releases via the Change Control Board and by hosting the go/no-go decision meeting with State leadership.XRequired
I9.44All Deployments – Complete application release deployments and all associated configurations, data changes, security changes, and batches.XRequired
I9.45Post Release – Realign UAT environments with all code implemented in production including role/office security setups and associations and maintain a Gold Copy of the role/office security setups and associations.XRequired
I9.46Provide communication as approved by the State to internal end-users and other State staff on upcoming changes in functionality and planned outages.XRequired
Security and Privacy
I9.47Provide a System Security Plan detailing the methodology and approach to the implementation of system security throughout the application. This deliverable must include:
A.Security Policies and Procedures
B.Incident Response Plan, which includes protocols for reporting, evaluation, and escalation of potential security breachesXRequired
I9.48Implement the approved System Security Plan for the solution and services within scope of this solicitation. Changes to policies or procedures must have written approval from the State.XRequired
I9.49Ensure compliance with all State and federal laws and policies, including laws and policies protecting privacy and confidentiality throughout the term of the contract (not just during M&O activities).XRequired