Signed_SF30_A00011.pdf

PDF 162 KB Posted

Attached to
United States Coast Guard Phase II Fast Response Cutter (FRC) Request for Proposals (RFP)
Solicitation number
HSCG23-15-R-FRCPII
Issued by

About this file

SF 30 Amendment A00011

View the file

Other files

File Type Posted
Section_J _Attachment_4 _References_A00016.pdf PDF
SF30_A00016.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00016.xls XLS spreadsheet
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00015.xls XLS spreadsheet
Section_J _Attachment_3 _CDRL_A00015.pdf PDF
A00015.pdf PDF
A00014_SF30_signed.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00014.xls XLS spreadsheet
Section_J _Attachment_3 _CDRL_A00013.pdf PDF
Section_H_FRC_Phase_II_A00013.pdf PDF
Section_F_FRC_Phase_II_A00013.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00013.xls XLS spreadsheet
A00013_SF30.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00012.xls XLS spreadsheet
Section_J_Attachment_3_CDRL_A00012.pdf PDF
A00012_SF30_signed.pdf PDF
Section_J _Attachment_4 _References_A00011.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00011.xls XLS spreadsheet
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00010.xls XLS spreadsheet
SF30_A00010.pdf PDF
SF30_A00009_signed.pdf PDF
Section_J _Attachment_4 _References_A00009.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_J _Attachment_9 _Contract_Drawing_List _RFP_A00008.pdf PDF
SF_30_A00008_signed.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_J _Attachment_4 _References_A00007.pdf PDF
Section_E_FRC_Phase_II_A00007.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
SF30_A00007_signed.pdf PDF
Section_I_FRC_Phase_II_A00007.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_L_FRC_Phase_II_A00006.pdf PDF
SF_30_A00006.pdf PDF
Section_J _Attachment_7 _GFE_A00005.pdf PDF
Section_J_Attachment_9_Contract_Drawing_List_A00005.xlsx XLSX spreadsheet
SF30_A00005.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
FRC_COR_Section400_Phase_II_A00004.pdf PDF
FRC_COR_Section000_Phase_II_A00004.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
SF30_A0004_signed.pdf PDF
Section_L_FRC_Phase_II_A00004.pdf PDF
FRC_COR_Section500_Phase_II_A00004.pdf PDF
A00003_SF30.pdf PDF
FRC_COR_Section600_Phase_II_A00003.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_J _Attachment_4 _References_A00003.pdf PDF
Section_J _Attachment_9 _Contract_Drawing_List _A00003.pdf PDF
Section_L_FRC_Phase_II_A00002.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

HSCG23-15-R-FRCPII

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Washington DC 205930001

2703 MARTIN LUTHER KING JR AVE SE

USCG HEADQUARTERS (CG-912)

02/26/2015000011

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/26/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to issue an updated Question and Answer Report, Dated May

21, 2015.

This amendment also updates the Request for Proposals. See page 2 for changes.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Erica E. Fetter

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Phase II Fast Response Cutter (FRC) HSCG23-15-R-FRCPII Amendment A00011

SF-30 BLOCK 14 (Continued):

The purpose of this amendment is to issue an updated Questions and Answer report, dated May 21, 2015. In addition, this amendment issues updated RFP Sections incorporating the following changes into the RFP:

1. COR Section 400-3.8.1: The requirement is clarified to exempt the SEAWATCH-FRC equipment from the 20% growth space allowance.

2. COR Section 457-1.1.2.2: The requirement for the daylight camera sensor's field of vision is changed from 59°-1.4° to 54.4°-1.5°.

3. The following updates have been made to RFP, Section J, Attachment #4:

a) RFP Section J, Attachment 4, U. S. Navy Design Data Sheet 581-1 – Calculation and

Use of Anchoring Nomographs: The reference is removed.

b) RFP Section J, Attachment 4, NAVSEA OP3565, Vol. II – “Electromagnetic

Radiation Hazards (Hazards to Ordnance)”: The reference date is changed from 01 May 2002 to 01 Jul 2008.

c) RFP Section J, Attachment 4, UL 299, Dry Chemical Fire Extinguishers: The reference is added.

d) RFP Section J, Attachment 4, UL 711, Rating and Fire Testing of Fire Extinguishers:

The reference is added.

e) RFP Section J, Attachment 4, ASTM B271/B271M-14a, Standard Specification for

Copper-Base Alloy Centrifugal Castings: The reference is added

f) RFP Section J, Attachment 4, ASTM B584 -14, Standard Specification for Copper

Alloy Sand Castings for General Applications: The reference is added.

g) RFP Section J, Attachment 4, ASTM B88 -14, Standard Specification for Seamless

Copper Water Tube: The reference is added.

h) RFP Section J, Attachment 4, ASTM F1155 -10, Standard Practice for Selection and

Application of Piping System Materials: The reference is added.

i) RFP Section J, Attachment 4, ASTM F1386-92(2010), Standard Guide for

Construction of a Sounding Tube and Striker Plate for Tank Sounding: The reference is added.

j) RFP Section J, Attachment 4, NAVSEA S9AA0-AA-SPN-010/GEN-SPEC: COR

Section 533-5 is added as a location.

k) RFP Section J, Attachment 4, MIL-F-1183J, Fitting, Pipe, Cast Bronze, Silver

Brazing, General Specification For: The reference is added.

Phase II Fast Response Cutter (FRC) HSCG23-15-R-FRCPII Amendment A00011

l) RFP Section J, Attachment 4, S9086-RW-STM-010/CH-516R4 U.S. Navy Naval Ship’s Technical Manuals (NSTM) Chapter 516 – Refrigeration Systems: The reference is added.

m) RFP Section J, Attachment 4, UL 174, Household Electric Storage Tank Water

Heaters: The reference is added.

n) RFP Section J, Attachment 4, 46 CFR 56: COR Section 505-2 is added as a location.

o) RFP Section J, Attachment 4, Guide for Building and Classing High Speed Naval

Craft (HSNC): COR Sections 540-4, 581-3, and 581-5 are added as locations.

p) RFP Section J, Attachment 4, ASME International Boiler And Pressure Vessel Code:

COR Section 516-3 is added as a location.

q) RFP Section J, Attachment 4, ASTM A312/A312M-06: COR Section 541-1 is added as a location.

r) RFP Section J, Attachment 4, ASTM F1106-87: COR Section 581-1 is deleted as a location and 581-3 is added as a location.

s) RFP Section J, Attachment 4, ASTM F1166-07: COR Section 581-3 is added as a location.

t) RFP Section J, Attachment 4, MIL-F-24385F(1): COR Section 555-1 is added as a location.

u) RFP Section J, Attachment 4, MIL-STD-777E: COR Sections 505-3 and 541-1 are added as locations.

v) RFP Section J, Attachment 4, Guide for Building and Classing High Speed Naval

Craft (HSNC): COR Sections 100-5 and 100-6 are removed as locations.

----End of Amendment A00011----

SF30_A00011
SF30 text
2015-05-21T12:08:04-0400
FETTER.ERICA.EILEEN.1395332534

File details come from the government source that posted it. Updated .