SF30_A00016.pdf
PDF 173 KB Posted
- Attached to
- United States Coast Guard Phase II Fast Response Cutter (FRC) Request for Proposals (RFP)
- Solicitation number
- HSCG23-15-R-FRCPII
About this file
A000016 SF 30
View the file
Other files
Show 40 more
Latest 50 of 88 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
HSCG23-15-R-FRCPII
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Washington DC 205930001
2703 MARTIN LUTHER KING JR AVE SE
USCG HEADQUARTERS (CG-912)
06/30/2015000016
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/26/2015
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to issue an updated Questions and Answer report, dated
July 17, 2015. Additional updates to Section J, Attachment #2, "Circular of Requirements," along with Section J, Attachment #4, "References," are incorporated into this amendment and noted on page 2.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Erica E. Fetter
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Phase II Fast Response Cutter (FRC) HSCG23-15-R-FRCPII Amendment A00016
SF-30 BLOCK 14 (Continued):
The purpose of this amendment is to issue an updated Questions and Answer report, dated July 17, 2015. In addition, this amendment issues updated RFP Sections incorporating the following changes into the RFP:
1. COR Section 568-1.4: The text in this section is amended to allow the replaceable CRES wear ring sleeve insert to be surface-mounted.
2. COR Section 516-3.10: The design temperature requirements are changed from 12.2°C (54°F) chill water inlet and 6.7°C (44°F) chill water outlet to 10°C (50°F) chill water inlet and 4.4°C (40°F) chill water outlet.
3. An engineering change to add D-ring attachment points to the mast of the Phase I FRC has been cancelled. In order to keep this consistent with the Phase II FRC, the requirement is eliminated in the COR. COR Section 170-1.3: All text after "Fittings and equipment shall be accessible for maintenance." is deleted
4. It has been determined that an all-chain anchor rode is no longer required. The changes to Section J, Attachment #2 incorporating this update are as follows:
a. COR Section 100-1.3: The requirement is changed to eliminate modification required for an all-chain anchor rode.
b. COR Section 581-1.1: The requirement is changed to specify that the anchoring system analysis shall be performed for a sand bottom.
c. COR Section 581-1.3: The requirement is changed to no longer require an all-chain rode.
d. COR Section 581-1.4: The requirement is changed to no longer require a windlass and an all-chain rode.
e. COR Section 581-1.6: The requirement is changed to no longer require an all-chain rode.
f. COR Section 581-2.1: The requirement is changed to no longer require a wildcat and an all-chain rode.
g. COR Section 581-2.2: The requirement is changed to no longer require a wildcat.
h. COR Section 581-3.1: The requirement is changed to specify a Rocna 150 anchor, or equivalent, and provides the definition of equivalency.
Phase II Fast Response Cutter (FRC) HSCG23-15-R-FRCPII Amendment A00016
i. COR Section 581-3.1.3: The requirement for the spare anchor is clarified.
j. COR Section 581-3.3: The requirement is changed to no longer require a wildcat.
k. COR Section 581-3.4: The requirement is clarified for proximity of the capstan control to the capstan.
l. COR Section 581-3.5: The requirement is changed to support a line/chain anchor rode.
m. COR Section 581-3.7: The requirement is changed to support a line/chain anchor rode.
n. COR Section 581-4.1: The requirement is clarified to support stowage requirements for a line/chain anchor rode.
o. COR Section 581-5.1: The requirement is changed to support a line/chain anchor rode.
5. Section J, Attachment #4, References has been updated based upon previously answered questions.
----End of Amendment A00016----
| SF30 Cover Page |
| SF30_A00016 |
| 2015-07-17T12:06:23-0400 | |
| FETTER.ERICA.EILEEN.1395332534 |
File details come from the government source that posted it. Updated .