A00013_SF30.pdf

PDF 167 KB Posted

Attached to
United States Coast Guard Phase II Fast Response Cutter (FRC) Request for Proposals (RFP)
Solicitation number
HSCG23-15-R-FRCPII
Issued by

About this file

A00013 SF 30

View the file

Other files

File Type Posted
Section_J _Attachment_4 _References_A00016.pdf PDF
SF30_A00016.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00016.xls XLS spreadsheet
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00015.xls XLS spreadsheet
Section_J _Attachment_3 _CDRL_A00015.pdf PDF
A00015.pdf PDF
A00014_SF30_signed.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00014.xls XLS spreadsheet
Section_J _Attachment_3 _CDRL_A00013.pdf PDF
Section_H_FRC_Phase_II_A00013.pdf PDF
Section_F_FRC_Phase_II_A00013.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00013.xls XLS spreadsheet
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00012.xls XLS spreadsheet
Section_J_Attachment_3_CDRL_A00012.pdf PDF
A00012_SF30_signed.pdf PDF
Section_J _Attachment_4 _References_A00011.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00011.xls XLS spreadsheet
Signed_SF30_A00011.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00010.xls XLS spreadsheet
SF30_A00010.pdf PDF
SF30_A00009_signed.pdf PDF
Section_J _Attachment_4 _References_A00009.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_J _Attachment_9 _Contract_Drawing_List _RFP_A00008.pdf PDF
SF_30_A00008_signed.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_J _Attachment_4 _References_A00007.pdf PDF
Section_E_FRC_Phase_II_A00007.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
SF30_A00007_signed.pdf PDF
Section_I_FRC_Phase_II_A00007.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_L_FRC_Phase_II_A00006.pdf PDF
SF_30_A00006.pdf PDF
Section_J _Attachment_7 _GFE_A00005.pdf PDF
Section_J_Attachment_9_Contract_Drawing_List_A00005.xlsx XLSX spreadsheet
SF30_A00005.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
FRC_COR_Section400_Phase_II_A00004.pdf PDF
FRC_COR_Section000_Phase_II_A00004.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
SF30_A0004_signed.pdf PDF
Section_L_FRC_Phase_II_A00004.pdf PDF
FRC_COR_Section500_Phase_II_A00004.pdf PDF
A00003_SF30.pdf PDF
FRC_COR_Section600_Phase_II_A00003.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_J _Attachment_4 _References_A00003.pdf PDF
Section_J _Attachment_9 _Contract_Drawing_List _A00003.pdf PDF
Section_L_FRC_Phase_II_A00002.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

HSCG23-15-R-FRCPII

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Washington DC 205930001

2703 MARTIN LUTHER KING JR AVE SE

USCG HEADQUARTERS (CG-912)

06/09/2015000013

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/26/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to issue an updated Question and Answer Report, Dated June

9, 2015.

This amendment also updates the Request for Proposals. See page 2 for changes.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Erica E. Fetter

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Phase II Fast Response Cutter (FRC) HSCG23-15-R-FRCPII Amendment A00013

SF-30 BLOCK 14 (Continued):

The purpose of this amendment is to issue an updated Questions and Answer report, dated June 09, 2015. In addition, this amendment issues updated RFP Sections incorporating the following changes into the RFP:

1. Section F, paragraph F.5.2 has been updated to include the following, “Initial hull in the contract Base Period shall be delivered 1,040 Days After Issuance of Notice to Proceed.”

2. Section H, paragraph H.36.A, “Notice to Proceed with Contract Performance After Award (Hull Construction),” has been added.

3. The following updates have been made to COR Section 581:

a. COR Section 581-1.2: The requirement for one primary anchor is clarified.

b. COR Section 581-1.4: The requirement is clarified to apply to the primary anchor.

c. COR Section 581-3.1.2: The requirement is clarified to apply to the primary anchor.

d. COR Section 581-3.1.3: This section is added to clarify the requirements for the spare anchor.

e. COR Section 581-1.1: The requirement is clarified that the worst case bottom shall be analyzed for the worst case bottom based on the selected anchor. The CDRL is corrected from CDRL 085-506 to CDRL 085-512.

f. COR Section 581-1.3: CDRL 085-506 is associated with the requirements of this section.

4. COR Section 074-7.1: The definitions for hull structure, hull girder, support structure, and damage control structure are clarified.

5. COR Section 330-3.1: The requirement clarified to include fixtures for shipboard SSL lighting.

6. The following updates have been made to COR Section 440:

a. COR Section 440-7.3.2: The requirement clarified to require a Digital Remote Control Head for a Tactical-VHF Transceiver.

b. COR Section 440-7.3.3: The requirement clarified to require a label for the Digital Remote Control Head for the Tactical-VHF Transceiver #1.

c. COR Section 440-7.3.4: The requirement clarified for the mounting of a single Digital

Remote Control Head for a Tactical-VHF Transceiver.

Phase II Fast Response Cutter (FRC) HSCG23-15-R-FRCPII Amendment A00013

d. COR Section 440-12.3: The requirement clarified to require a Digital Remote Control Head for a Tactical-UHF Transceiver.

e. COR Section 440-12.3.1: The requirement clarified to require a label for the Digital Remote

Control Head for the Tactical-UHF Transceiver #1.

f. COR Section 440-12.3.2: The requirement clarified for the mounting of a single Digital Remote Control Head for a Tactical-UHF Transceiver.

7. Section J, Attachment 3, CDRL, CDRL 084-002, Block 16: The title of the attachment for CDRL 084-002 is corrected in block 16 from "CDRL_ATCH_084-04 236_PHST_LPD_Template" to " CDRL_084-003_Attachment 1."

8. COR Section 089-3.1.1.3: The title of USCG (CG-132) SOP Vol II is corrected from "E- Learning" to "Analysis."

9. COR Section 088-1.2: The requirement is clarified that the Phase I FRC was designed to meet the requirements of ASTM F1166-95a and that any changes to the design shall comply with

ASTM F1166-07.

---- End of Amendment A00013----