Section F A00013

View the file

Other files

File Type Posted
Section_J _Attachment_4 _References_A00016.pdf PDF
SF30_A00016.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00016.xls XLS spreadsheet
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00015.xls XLS spreadsheet
Section_J _Attachment_3 _CDRL_A00015.pdf PDF
A00015.pdf PDF
A00014_SF30_signed.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00014.xls XLS spreadsheet
Section_J _Attachment_3 _CDRL_A00013.pdf PDF
Section_H_FRC_Phase_II_A00013.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00013.xls XLS spreadsheet
A00013_SF30.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00012.xls XLS spreadsheet
Section_J_Attachment_3_CDRL_A00012.pdf PDF
A00012_SF30_signed.pdf PDF
Section_J _Attachment_4 _References_A00011.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00011.xls XLS spreadsheet
Signed_SF30_A00011.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00010.xls XLS spreadsheet
SF30_A00010.pdf PDF
SF30_A00009_signed.pdf PDF
Section_J _Attachment_4 _References_A00009.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_J _Attachment_9 _Contract_Drawing_List _RFP_A00008.pdf PDF
SF_30_A00008_signed.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_J _Attachment_4 _References_A00007.pdf PDF
Section_E_FRC_Phase_II_A00007.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
SF30_A00007_signed.pdf PDF
Section_I_FRC_Phase_II_A00007.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_L_FRC_Phase_II_A00006.pdf PDF
SF_30_A00006.pdf PDF
Section_J _Attachment_7 _GFE_A00005.pdf PDF
Section_J_Attachment_9_Contract_Drawing_List_A00005.xlsx XLSX spreadsheet
SF30_A00005.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
FRC_COR_Section400_Phase_II_A00004.pdf PDF
FRC_COR_Section000_Phase_II_A00004.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
SF30_A0004_signed.pdf PDF
Section_L_FRC_Phase_II_A00004.pdf PDF
FRC_COR_Section500_Phase_II_A00004.pdf PDF
A00003_SF30.pdf PDF
FRC_COR_Section600_Phase_II_A00003.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_J _Attachment_4 _References_A00003.pdf PDF
Section_J _Attachment_9 _Contract_Drawing_List _A00003.pdf PDF
Section_L_FRC_Phase_II_A00002.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCG Fast Response Cutter (FRC) Solicitation HSCG23-15-R-FRCPII Amendment #A00013

Part I - The Schedule Section F – Deliveries or Performance

F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

F.1.1. This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://www.arnet.gov/far/

Federal Acquisition Regulation (48 CFR Chapter 1) Clauses

Number Title Date

FAR 52.242-15 Stop Work Order Aug 1989

FAR 52.242-17 Government Delay of Work Apr 1984

FAR 52.247-30 FOB Origin, Contractor’s Facility Feb 2006

FAR 52.247-34 FOB Destination Nov 1991

FAR 52.247-55 FOB Point of Delivery of Government Furnished Property Jun 2003

FAR 52.247-65 F.O.B. Origin, Prepaid Freight—Small Package Shipments Jan 1991

F.2 DEFINITION OF DAYS

F.2.1. Wherever used, “days” means calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day. When used, "working day" excludes weekends and U.S. Federal holidays.

F.3 PLACE OF DELIVERY – GOVERNMENT FURNISHED EQUIPMENT

F.3.1. The Government Furnished Equipment (GFE) identified in Attachment 7 to Section J for the lead FRC will be delivered within one hundred eighty (180) days of contract award to the Contractor-designated location, in accordance with FAR 52.247-55 incorporated at F.1. GFE for subsequent FRCs will be delivered in accordance with the Contractor’s Integrated Master Schedule (IMS).

F.4 PLACE OF DELIVERY – GOVERNMENT FURNISHED INFORMATION

F.4.1. The Government Furnished Information (GFI) identified in Attachment 6 to Section J for the lead FRC will be delivered within thirty (30) days of contract award to the Contractor-designated location, in accordance with FAR 52.247-55 incorporated at F.1. GFI for subsequent FRCs will be delivered in accordance with the Contractor’s Integrated Master Schedule (IMS).

PART I, SECTION F F-1 Deliveries or Performance http://www.arnet.gov/far/

F.5 TIME OF DELIVERY

F.5.1. The Coast Guard is not obligated and does not intend to accept early delivery of any ship.

Crew Training and familiarization preclude the Coast Guard from accepting a ship early. At no time shall the delivery of a subsequent hull predate the delivery of a preceding hull.

Additionally, no hull will be delivered less than 56 days after the delivery of the preceding hull.

F.5.2. The Government requires delivery to be made according to the following schedule:

REQUIRED DELIVERY SCHEDULE

CLIN NAME PERFORMANCE/DELIVERY PERIOD

00001A 10001A 20001A 30001A 40001A 50001A 60001A 70001A

Construction of Fast Response Cutter (FRC) (4 each)

Initial hull in the contract Base Period shall be delivered 1,040 Days After Issuance of Notice to Proceed.

Each remaining hull shall be delivered 91 Calendar Days After the Previous Hull (DAPH) delivery.

00001A 10001A 20001A 30001A 40001A 50001A 60001A 70001A

Construction of Fast Response Cutter (FRC) (6 each)

Initial hull in the contract Base Period shall be delivered 1,040 Days After Issuance of Notice to Proceed.

Each remaining hull shall be delivered 56 Calendar Days After the Previous Hull (DAPH) delivery.

00002A 10002A 20002A 30002A 40002A 50002A 60002A 70002A 00003A 10003A 20003A 30003A 40003A 50003A 60003A 70003A

Construction of Fast Response Cutter (FRC) (1 each)

Each remaining hull shall be delivered 91 Calendar Days After the Previous Hull (DAPH) delivery.

PART I, SECTION F F-2 Deliveries or Performance

REQUIRED DELIVERY SCHEDULE

CLIN NAME PERFORMANCE/DELIVERY PERIOD

00001B 10001B 20001B 30001B 40001B 50001B 60001B 70001B 00002B 10002B 20002B 30002B 40002B 50002B 60002B 70002B 00003B 10003B 20003B 30003B 40003B 50003B 60003B 70003B

Warranty Associated Cutter Delivery Date (ACDD)

00001C 10001C 20001C 30001C 40001C 50001C 60001C 70001C 00002C 10002C 20002C 30002C 40002C 50002C 60002C 70002C 00003C 10003C 20003C 30003C 40003C 50003C 60003C 70003C

Data IAW CDRL

PART I, SECTION F F-3 Deliveries or Performance

00001D 10001D 20001D 30001D 40001D 50001D 60001D 70001D 00002D 10002D 20002D 30002D 40002D 50002D 60002D 70002D 00003D 10003D 20003D 30003D 40003D 50003D 60003D 70003D

Supply Support ACDD

00001E 10001E 20001E 30001E 40001E 50001E 60001E 70001E 00002E 10002E 20002E 30002E 40002E 50002E 60002E 70002E 00003E 10003E 20003E 30003E 40003E 50003E 60003E 70003E

Training Training Shall be delivered 90 days prior to cutter delivery date for each hull.

PART I, SECTION F F-4 Deliveries or Performance

00004A 00008A 00009A 00010A 10004A 10008A 10009A 10010A 20004A 20008A 20009A 20010A 30004A 30008A 30009A 30010A 40004A 40008A 40009A 40010A 50004A 50008A 50009A 50010A 60004A 60008A 60009A 60010A 70004A 70008A 70009A 70010A

Insurance Spares – Propellers 360 Days After Option Exercised (DAOE)

PART I, SECTION F F-5 Deliveries or Performance

00004B 00008B 00009B 00010B 10004B 10008B 10009B 10010B 20004B 20008B 20009B 20010B 30004B 30008B 30009B 30010B 40004B 40008B 40009B 40010B 50004B 50008B 50009B 50010B 60004B 60008B 60009B 60010B 70004B 70008B 70009B 70010B

Insurance Spares – Rudders 360 DAOE

PART I, SECTION F F-6 Deliveries or Performance

00004C 00008C 00009C 00010C 10004C 10008C 10009C 10010C 20004C 20008C 20009C 20010C 30004C 30008C 30009C 30010C 40004C 40008C 40009C 40010C 50004C 50008C 50009C 50010C 60004C 60008C 60009C 60010C 70004C 70008C 70009C 70010C

Insurance Spares – Propulsion Shaft Bearings

360 DAOE

PART I, SECTION F F-7 Deliveries or Performance

00004D 00008D 00009D 00010D 10004D 10008D 10009D 10010D 20004D 20008D 20009D 20010D 30004D 30008D 30009D 30010D 40004D 40008D 40009D 40010D 50004D 50008D 50009D 50010D 60004D 60008D 60009D 60010D 70004D 70008D 70009D 70010D

Insurance Spares – Propulsion Engines 360 DAOE

PART I, SECTION F F-8 Deliveries or Performance

00004E 00008E 00009E 00010E 10004E 10008E 10009E 10010E 20004E 20008E 20009E 20010E 30004E 30008E 30009E 30010E 40004E 40008E 40009E 40010E 50004E 50008E 50009E 50010E 60004E 60008E 60009E 60010E 70004E 70008E 70009E 70010E

Insurance Spares – Reduction Gears 360 DAOE

PART I, SECTION F F-9 Deliveries or Performance

00004F 00008F 00009F 00010F 10004F 10008F 10009F 10010F 20004F 20008F 20009F 20010F 30004F 30008F 30009F 30010F 40004F 40008F 40009F 40010F 50004F 50008F 50009F 50010F 60004F 60008F 60009F 60010F 70004F 70008F 70009F 70010F

Insurance Spares – S/S Generator Sets 360 DAOE

PART I, SECTION F F-10 Deliveries or Performance

00004G 00008G 00009G 00010G 10004G 10008G 10009G 10010G 20004G 20008G 20009G 20010G 30004G 30008G 30009G 30010G 40004G 40008G 40009G 40010G 50004G 50008G 50009G 50010G 60004G 60008G 60009G 60010G 70004G 70008G 70009G 70010G

Insurance Spares – Emergency Generator Set

360 DAOE

PART I, SECTION F F-11 Deliveries or Performance

00004H 00008H 00009H 00010H 10004H 10008H 10009H 10010H 20004H 20008H 20009H 20010H 30004H 30008H 30009H 30010H 40004H 40008H 40009H 40010H 50004H 50008H 50009H 50010H 60004H 60008H 60009H 60010H 70004H 70008H 70009H 70010H

Insurance Spares – Propulsion Shafts 360 DAOE

PART I, SECTION F F-12 Deliveries or Performance

00004I 00008I 00009I 00010I 10004I 10008I 10009I 10010I 20004I 20008I 20009I 20010I 30004I 30008I 30009I 30010I 40004I 40008I 40009I 40010I 50004I 50008I 50009I 50010I 60004I 60008I 60009I 60010I 70004I 70008I 70009I 70010I

Insurance Spares – Propulsion Couplings 360 DAOE

00005 Interim Contractor Supply Support Lead Cutter Delivery Date (LCDD)

00006 System Stock 180 DAOE

00007 Model LCDD

F.5.3. A System Safety Program as required by COR Section 077 will be implemented and conducted during the detailed design and construction of the lead FRC.

F.5.4. Two functional mock-ups of the SEAWATCH-FRC Command and Control System, as required by COR Section 410-2.2.2 shall be delivered 60 days after receipt of government furnished software.

F.5.5. The date of the CDR is established in the Integrated Master Schedule (IMS). See CDRL 042- 006 for IMS.

PART I, SECTION F F-13 Deliveries or Performance http://www.fastresponsecutter.net/CDRLS/viewCDRLReport.asp?CDRL_ID=16 http://www.fastresponsecutter.net/CDRLS/viewCDRLReport.asp?CDRL_ID=16

USCG Fast Response Cutter (FRC) Solicitation HSCG23-14-R-FRCDRAFT

F.6 PLACE OF DELIVERY – DESTINATION

F.6.1. Data shall be delivered as required in Block 14 – Distribution of the appropriate Contract Data Requirements List (CDRL), or as required by the Schedule or Statement of Work.

F.6.2. All Fast Response Cutters (FRCs) shall be delivered fully outfitted and tested, FOB, Origin (Contractor’s Facility).

F.6.3. Initial binning shall take place at the Contractor's facility. Custody transfer shall take place at the cutter's homeport. Per COR Section 083-6.4.6, all allowance material received by the Contractor after cutter delivery and prior to departure from the Contractor's facility shall be turned over to the cutter. Contractor furnished onboard allowance material received after cutter departure shall be packaged and shipped, at Contractor's expense, in accordance with instructions provided by the Coast Guard.

F.7 DISPLAY MODELS

F.7.1. The FRC Models shall be delivered fully assembled, FOB Destination to the following location:

Commandant (CG-9324) US Coast Guard Headquarters 2703 Martin Luther King Jr Ave SE Stop 7800 Washington DC 20593-7800

F.8 INTERIM CONTRACTOR SUPPLY SUPPORT

F.8.1. Interim Contractor Supply Support (ICSS) shall be delivered FOB Destination to the following location(s):

Commanding Officer Surface Forces Logistics Center Receiving Room, Building 86 2401 Hawkins Point Road Baltimore, MD 21226-5000

F.9 SUPPLY SUPPORT ITEMS

F.9.1. Supply Support items shall be delivered FOB Destination to the following location(s):

HM&E:

Commanding Officer Surface Forces Logistics Center Receiving Room, Building 86 2401 Hawkins Point Road Baltimore, MD 21226-5000

Electronics:

Commanding Officer Surface Forces Logistics Center Warehouse Annex 6751 Alexander Bell Drive Columbia, MD 21226-2102

PART I, SECTION F F-14 Deliveries or Performance

USCG Fast Response Cutter (FRC) Solicitation HSCG23-14-R-FRCDRAFT

F.10 INSURANCE SPARES

F.10.1. Insurance Spares shall be delivered FOB Destination to the following location(s):

Commanding Officer Surface Forces Logistics Center Receiving Room, Building 86 2401 Hawkins Point Road Baltimore, MD 21226-5000

F.11 SYSTEM STOCK

F.11.1. System Stock shall be delivered FOB Destination to the following location(s):

Commanding Officer Surface Forces Logistics Center Receiving Room, Building 86 2401 Hawkins Point Road Baltimore, MD 21226-5000

F.12 3D MODEL WORKSTATIONS

F.12.1. The 3D Model Workstations shall be delivered FOB Destination to the following location(s) (one to each location):

Commanding Officer Surface Forces Logistics Center Receiving Room, Building 86 2401 Hawkins Point Road Baltimore, MD 21226-5000

Commanding Officer Project Resident Office (TBD)

Commandant (CG-9324) US Coast Guard Headquarters 2703 Martin Luther King Jr Ave SE Stop 7800 Washington DC 20593-7800

F.13 SEAWATCH-FRC COMMAND AND CONTROL SYSTEM MOCK-UP

F.13.1. One SEAWATCH-FRC Command and Control System mock-up shall be delivered FOB Destination to the below location.

Commanding Officer USCG Command, Control, and Communications Engineering Center (C3CEN) Attn: SEAWATCH Lab 4000 Coast Guard Blvd Portsmouth, VA 23703-2199

F.13.2. Per COR Section 410.2.2.3, a mock-up identical to the one delivered to the USCG shall be retained at the Contractor’s facility and delivered to the Coast Guard at the end of the contract.

PART I, SECTION F F-15 Deliveries or Performance

Part I - The Schedule Section F – Deliveries or Performance
F.1 FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
F.2 DEFINITION OF DAYS
F.3 PLACE OF DELIVERY – GOVERNMENT FURNISHED EQUIPMENT
F.4 PLACE OF DELIVERY – GOVERNMENT FURNISHED INFORMATION
F.5 TIME OF DELIVERY
F.6 PLACE OF DELIVERY – DESTINATION
F.7 DISPLAY MODELS
F.8 INTERIM CONTRACTOR SUPPLY SUPPORT
F.9 SUPPLY SUPPORT ITEMS
F.10 INSURANCE SPARES
F.11 SYSTEM STOCK
F.12 3D MODEL WORKSTATIONS
F.13 SEAWATCH-FRC COMMAND AND CONTROL SYSTEM MOCK-UP