SF30_A00007_signed.pdf

PDF 181 KB Posted

Attached to
United States Coast Guard Phase II Fast Response Cutter (FRC) Request for Proposals (RFP)
Solicitation number
HSCG23-15-R-FRCPII
Issued by

About this file

SF 30 Amendment A00007

View the file

Other files

File Type Posted
Section_J _Attachment_4 _References_A00016.pdf PDF
SF30_A00016.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00016.xls XLS spreadsheet
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00015.xls XLS spreadsheet
Section_J _Attachment_3 _CDRL_A00015.pdf PDF
A00015.pdf PDF
A00014_SF30_signed.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00014.xls XLS spreadsheet
Section_J _Attachment_3 _CDRL_A00013.pdf PDF
Section_H_FRC_Phase_II_A00013.pdf PDF
Section_F_FRC_Phase_II_A00013.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00013.xls XLS spreadsheet
A00013_SF30.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00012.xls XLS spreadsheet
Section_J_Attachment_3_CDRL_A00012.pdf PDF
A00012_SF30_signed.pdf PDF
Section_J _Attachment_4 _References_A00011.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00011.xls XLS spreadsheet
Signed_SF30_A00011.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII_A00010.xls XLS spreadsheet
SF30_A00010.pdf PDF
SF30_A00009_signed.pdf PDF
Section_J _Attachment_4 _References_A00009.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_J _Attachment_9 _Contract_Drawing_List _RFP_A00008.pdf PDF
SF_30_A00008_signed.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_J _Attachment_4 _References_A00007.pdf PDF
Section_E_FRC_Phase_II_A00007.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_I_FRC_Phase_II_A00007.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_L_FRC_Phase_II_A00006.pdf PDF
SF_30_A00006.pdf PDF
Section_J _Attachment_7 _GFE_A00005.pdf PDF
Section_J_Attachment_9_Contract_Drawing_List_A00005.xlsx XLSX spreadsheet
SF30_A00005.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
FRC_COR_Section400_Phase_II_A00004.pdf PDF
FRC_COR_Section000_Phase_II_A00004.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
SF30_A0004_signed.pdf PDF
Section_L_FRC_Phase_II_A00004.pdf PDF
FRC_COR_Section500_Phase_II_A00004.pdf PDF
A00003_SF30.pdf PDF
FRC_COR_Section600_Phase_II_A00003.pdf PDF
Question_and_Answer_Report_HSCG23_15_R_FRCPII.xls XLS spreadsheet
Section_J _Attachment_4 _References_A00003.pdf PDF
Section_J _Attachment_9 _Contract_Drawing_List _A00003.pdf PDF
Section_L_FRC_Phase_II_A00002.pdf PDF
Show 40 more

Latest 50 of 88 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

HSCG23-15-R-FRCPII

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Washington DC 205930001

2703 MARTIN LUTHER KING JR AVE SE

USCG HEADQUARTERS (CG-912)

02/26/2015000007

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/26/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to issue an updated Question and Answer Report, Dated May

4, 2015.

This amendment also updates the Request for Proposals based on these questions. See page 2 for changes.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Erica E. Fetter

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

Phase II Fast Response Cutter (FRC) HSCG23-15-R-FRCPII Amendment A00007

SF-30 BLOCK 14 (Continued):

The purpose of this amendment is to issue an updated Questions and Answer report, dated May 4, 2015. In addition, this amendment issues updated RFP Sections incorporating the following changes into the RFP:

1) Section I, FAR Clause 52.246-19 has been updated to include fill-in information.

2) Section E, FAR Clause 52.246-11 has been updated to include fill-in information.

3) COR Section 593-1.3.1: The requirement is changed from "...holding capacity sized for 11.3 liters (3 gal) per day per permanent berthing accommodation, for the entire Independent Operations duration, in accordance with COR Section 070 plus 25%..." to "...holding capacity sized for 11.3 liters (3 gal) per day per permanent berthing accommodation, for the entire Independent Operations duration, in accordance with COR Section 070 plus 14%...".

4) COR Section 593-2.2: The requirement is changed from "...holding capacity sized for 75.82 liters

(19.5 gal) per day per permanent berthing accommodation for the Independent Operations endurance required in COR Section 070-2; plus 15%..." to "...holding capacity sized for 75.82 liters (19.5 gal) per day per permanent berthing accommodation for the Independent Operations endurance required in COR Section 070-2; plus 11%...".

5) COR Section 651-1.3: The requirement is changed from "Adequate food storage areas consisting of 18.4L (0.65 ft3)/day/permanent berthing for dry stores shall be provided in or immediately adjacent to the galley." to "Adequate food storage areas consisting of 2,024L (71.5 ft3) for dry stores shall be provided in or immediately adjacent to the galley.".

6) COR Section 533-7.3: The requirement is changed from "Expansion Tank – A nonferrous expansion tank shall be provided and sized for a water capacity to accommodate the thermal expansion of the total volume of coolant in the system through a temperature gradient from 0°C (32°F) to 49°C (120°F) plus a reserve equal to 10 seconds pumping capacity of the chilled water pumps. The expansion tank when charged, shall maintain a minimum pressure of 0.35 bar (5 psi) throughout the system under all operating conditions. The expansion tank shall be provided with a vacuum relief valve and a liquid level sensor that shall provide a low level alarm when the tank is at the 5 second reserve capacity. The use of a bladder type tank or diaphragm type tank configuration requires the approval of the Contracting Officer."

To

"Expansion Tank – A nonferrous expansion tank shall be provided and sized for a water capacity to accommodate the thermal expansion of the total volume of coolant in the system through a temperature gradient from 0°C (32°F) to 49°C (120°F). The expansion tank when charged, shall maintain a minimum pressure of 0.35 bar (5 psi) throughout the system under all operating conditions. The expansion tank shall be provided with a vacuum relief valve. The use of a bladder type tank or diaphragm type tank configuration requires the approval of the Contracting Officer."

7) The following changes are being incorporated into RFP Section J, Attachment #2, COR Sections

400, 500, and 700, as well as RFP Section J, Attachment #4:

a) COR Section 400-3.2: "MIL-DTL-24640" is changed to "MIL-DTL-24640B."

b) COR Section 421-3.1: "COMDTINST M16672.2" is changed to "COMDTINST

M16672.2E."

c) COR Section 422-2.1: "COMDTINST M16672.2" is changed to "COMDTINST

d) COR Section 422-2.2: "COMDTINST M16672.2" is changed to "COMDTINST

e) COR Section 422-2.3: "COMDTINST M16672.2" is changed to "COMDTINST

f) COR Section 422-3.2: "COMDTINST M16672.2" is changed to "COMDTINST

g) COR Section 443-1.2: "COMDTINST M16672.2" is changed to "COMDTINST

h) COR Section 443-1.2.1: "COMDTINST M16672.2" is changed to "COMDTINST

i) COR Section 443-2.3.1: "COMDTINST M16672.2" is changed to "COMDTINST

j) COR Section 582-4.2: "CID A-A-50435" is changed to "CID A-A-50435B."

k) COR Section 593-1.6: "IMO" is changed to "MARPOL 73/78" to clarify the IMO requirement.

l) COR Section 700-2.2.5.1: Drawing 8180368, Rev E is corrected as 8180368, Rev H.

m) COR Section 700-2.3.11: Drawing 8180368, Rev G is corrected as 8180368, Rev H.

n) RFP Section J, Attachment 4: All ABYC Standards and Technical Information Reports for Small Craft references are changed to "Reserved."

o) RFP Section J, Attachment 4, SNAME T&R Bulletin 2-29A: COR Section 568-1 is removed as a location.

p) RFP Section J, Attachment 4, ANSI S2.25: COR Section 568-1 is removed as a location.

q) RFP Section J, Attachment 4, MIL-DTL-24640B: COR Section 583-1 is removed as a location.

r) RFP Section J, Attachment 4, 40 CFR 94: COR Section 583-1 is removed as a location.

s) RFP Section J, Attachment 4, COMDTINST M16672.2: COR Section 583-1 is removed as a location.

t) RFP Section J, Attachment 4, ASTM A276-06: "ASTM A276-06 Standard Specification for Stainless Steel Bars and Shapes" is changed to "Reserved."

7) The following updates have been made to COR Section 700:

a) COR Section 700-2.2.5.2: Drawing 8180369, Rev E is corrected as 8180369, Rev J.

b) COR Section 700-2.2.5.3: Drawing 8180367, Rev D is corrected as 8180367, Rev F.

c) COR Section 700-2.2.6: Drawing 8180348, Rev C is corrected as 8180367, Rev E.

d) COR Section 700-2.3.2: Drawing 8180343, Rev J is corrected as 8180367, Rev K.

e) COR Section 700-2.3.3: Drawing 8180354, Rev G is corrected as 8180367, Rev H.

f) COR Section 700-2.3.5: Drawing 8180346, Rev G is corrected as 8180367, Rev H.

g) COR Section 700-2.3.6: Drawing 8180347, Rev H is corrected as 8180367, Rev J.

h) COR Section 700-2.3.7: Drawing 8180348, Rev D is corrected as 8180367, Rev E.

i) COR Section 700-2.3.8: Drawing 8180349, Rev H is corrected as 8180367, Rev J.

j) COR Section 700-2.3.9: Drawing 8180350, Rev E is corrected as 8180367, Rev F.

k) COR Section 700-2.3.10: Drawing 8180367, Rev E is corrected as 8180367, Rev F.

l) COR Section 700-2.3.12: Drawing 8180369, Rev H is corrected as 8180367, Rev J.

8) COR Section 502-1.1.2: The requirements are changed to require an engine which meets the same power/RPM, weight, and space characteristics as the Cummins 6BTA5.9-DM and is EPA Tier 3 requirements.

9) COR Section 079-3.1: The requirement is clarified that the FRC shall meet the stability requirements without the awning or its associated structure.

10) The following updates have been made to Section J, Attachment #2, Circular of Requirements:

a) COR Section 070-8.4: The Galley and Mess Deck requirements are clarified by adding drawing 154R-WPC-640-301 Rev A Living Compartments and Arrangements as a reference.

b) COR Section 422-1.2: The referenced drawing is changed from 154R-WPC-623-301

Rev “-“ Ladder Arrangement to 154R-WPC-601-302 Rev A General Arrangement.

c) COR Section 432-2.8: The referenced drawing is changed from 154R-WPC-440-301 Rev “-“ Exterior Communications Systems to 154R-WPC-601-302 Rev A General Arrangement. In addition, COR Sections 432-2.8.1 through 432-2.8.13 are added to clarify which locations require telephones.

d) COR Section 432-2.11.1: The requirement for two white flashing lights is clarified for the Engine Room.

e) COR Section 440-1.2: The reference to drawing 154R-WPC-440-301 Rev “-“ Exterior Communications Systems is removed as the MARCOM and Symphony requirements are clear without the drawing reference.

f) COR Section 432-3.5: The referenced drawing is changed from 154R-WPC-440-308

Rev “-“ HF Rack Elevation to 154R-WPC-400-301 Rev “-“C4ISR Space Arrangement.

g) COR Section 432-7.3.1: The referenced drawing is changed from 154R-WPC-440-307 Rev “-“ VHF/UHF Rack Elevation to 154R-WPC-400-301 Rev “-“C4ISR Space Arrangement.

h) COR Section 432-20.1.1: The referenced drawing is changed from 154R-WPC-440-301

Rev “-” SVSS Rack Elevation to 154R-WPC-400-301 Rev “-”C4ISR Space Arrangement.

i) COR Section 443-2.1.1: The location for the ship's bell is clarified and referenced drawing is changed from 154R-WPC-440-301 Rev “-“ Exterior Communications Systems to 154R-WPC-601-302 Rev A General Arrangement.

j) COR Section 562-1.1: Construction of the rudders is clarified by adding drawings 154R-

WPC-562-202 Rev A Rudder Arrangement and Details, and 154R-WPC-562-402 Rev “- ” Rudder Arrangement and Details Supporting Design Documentation as references.

k) COR Section 582-1.1: The mooring and towing systems arrangements are clarified by adding drawing 154R-WPC-582-201 Rev “-“ Mooring and Towing A&D as reference.

l) COR Section 640-1.1: The living compartment arrangements are clarified by adding drawings 154R-WPC-601-302 Rev A General Arrangement and WPC-640-301 Rev A Living Compartments and Arrangements as references.

11) COR Section 582-3.2.2: The requirement is clarified that the towing arrangement complies with drawing 154R-WPC-582-201 Rev “-“Mooring and Towing A&D.

12) COR Section 433-2.1.1.4: The references are corrected from COR Sections 433-2.2.4 and 433-2.3.1 to COR Sections 433-2.2.1.1.5 and 433-2.1.2, respectively.

--- End of Amendment A000007---