(x)
HSCG23-15-R-FRCPII
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Washington DC 205930001
2703 MARTIN LUTHER KING JR AVE SE
USCG HEADQUARTERS (CG-912)
02/26/2015000005
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/26/2015
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment continued on Page 2.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Erica E. Fetter
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Phase II Fast Response Cutter (FRC) HSCG23-15-R-FRCPII Amendment A00005
SF-30 BLOCK 14 (Continued):
The purpose of this amendment is to issue an updated Questions and Answer report, dated April 10, 2015.
In addition, this amendment issues updated RFP Sections incorporating the following changes into the
RFP:
1) The following Circular of Requirements (COR) Sections have been updated to identify the Dell PowerEdge R630 as a replacement for the Dell PowerEdge R620:
a) COR Section 425-2.2.4.2: The Dell PowerEdge R620 is changed to a Dell PowerEdge R630.
b) COR Section 425-2.2.4.3: The requirement is clarified that the offeror is not required to provide the operating system.
c) COR Section 425-2.2.4.4: The Processor requirements have been amended to 10 core, 2.3 GHz.
d) COR Section 425-2.2.4.12: The Processor dimensions have been amended to 482.3mm (18.98
in) x 42.8mm (1.68 in) x 700.5mm (27.57 in)
e) COR Section 425-2.2.9.2: The Dell PowerEdge R620 is changed to a Dell PowerEdge R630.
f) COR Section 425-2.2.9.3: The requirement is clarified that the offeror is not required to provide the operating system.
g) COR Section 425-2.2.9.4: The Processor requirements have been amended to 10 core, 2.3 GHz.
h) COR Section 425-2.2.9.12: The Processor dimensions have been amended to 482.3mm (18.98
in) x 42.8mm (1.68 in) x 700.5mm (27.57 in
2) The following COR sections have been updated to clarify transitional power requirements:
a) COR Section 300-4.1.2: This section is added to clarify transitional power requirements for the High Frequency – Automated Link Establishment (HF-ALE) Transceiver Sub-System.
b) COR Section 300-4.1.3: This section is added to clarify transitional power requirements for the Military Very High Frequency (VHF-FM) transceiver.
c) COR Section 300-4.1.4: This section is added to clarify transitional power requirements for the Tactical Very High Frequency (Tactical-VHF) Transceivers.
d) COR Section 300-4.1.4: This section is added to clarify transitional power requirements for the Marine Band Very High Frequency / Digital Selective Calling (MarineBand-VHF/DSC) transceiver.COR Section 440-1.1: Back-up emergency power requirements for HF and VHF- FM transceivers are removed from this section for clarity.
e) COR Section 440-1.5: Back-up emergency power requirements for HF and VHF-FM transceivers are clarified in this section.
3) Section J, Attachment #2, COR Section 440-11.1.3 has been amended to remove the requirement for the KWR-46 algorithm for the MILSATCOM/UHF-LOS Transceivers.
4) Section J, Attachment #9, Contract Drawing Exceptions is provided to clarify exceptions for A9.8 and A9.9.
5) The following file names have been changed:
a) A9.38_154R-WPC-562-402_A_Rudder Arrangement and Details Supporting Design Documentation.doc is now A9.38_154R-WPC-562-402_-_Rudder Arrangement and Details Supporting Design Documentation.doc
b) A9.38_154R-WPC-562-402_A_Rudder Arrangement and Details Supporting Design Documentation.pdf is now A9.38_154R-WPC-562-402_-_Rudder Arrangement and Details Supporting Design Documentation.pdf
c) COR Section 070-3.1: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
d) COR Section 070-8.4: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
e) COR Section 100-1.1.1: The revision of referenced drawing 154R-WPC-085-301 is changed from Rev "-" to Rev "A".
f) COR Section 200-1.4.3: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
g) COR Section 300-1.4.2: The revision of referenced drawing 154R-WPC-324-301 is changed from Rev "-" to Rev "A".
h) COR Section 300-1.4.4: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
i) COR Section 300-4.4.2: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
j) COR Section 300-5.1.2: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
k) COR Section 505-1.1.11: The revision of referenced drawing 154R-WPC-540-301 is changed from Rev "-" to Rev "A".
l) COR Section 505-1.1.14: The revision of referenced drawing 154R-WPC-555-301 is changed from Rev "-" to Rev "A".
m) COR Section 555-1.1.1.1: The revision of referenced drawing 154R-WPC-555-301 is changed from Rev "-" to Rev "A".
n) COR Section 573-1.1: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
o) COR Section 573-1.6: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
p) COR Section 583-3.1: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
q) COR Section 593-2.3: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
r) COR Section 623-1.1: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
s) COR Section 625-2.1: The revision of referenced drawing 154R-WPC-601-302 is changed
t) COR Section 631-1.4: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
u) COR Section 651-1.1: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
v) COR Section 652-2.2: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
w) COR Section 663-1.2: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
x) COR Section 663-2.5: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
y) COR Section 663-3.1: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
z) COR Section 663-4.2: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
aa) COR Section 664-1.2: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
bb) COR Section 664-2.1.3.1: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
cc) COR Section 664-4.3: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
dd) COR Section 671-4.1.1: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
ee) COR Section 671-4.5: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev "-" to Rev "A".
ff) COR Section 700-2.2.5: The revision of referenced drawing 154R-WPC-700-301 is changed from Rev "-" to Rev "A".
gg) COR Section 700-3.1: The revision of referenced drawing 154R-WPC-601-302 is changed from Rev “-" to Rev "A".
hh) COR Section 700-3.1.2: The revision of referenced drawing 154R-WPC-601-302 is changed
6) Section J, Attachment #7 has been updated and incorporated into this RFP.
End of Amendment A00005