Attachment 2 RFP HQ0147-11-R-0002.doc

DOC document 643 KB Posted

Attached to
Clear / Cod Upgrade EWR (UEWR)
Solicitation number
HQ0147-11-R-0002
Issued by

About this file

HQ0147-11-R-0002

View the file

Other files

File Type Posted
Atch L1 OCI Disclosure Form —
Atch L7 Cost Price Exhibits 2-22-11.xlsx XLSX spreadsheet
Atch 19 - SPDP Cost and Software Data Reporting —
HQ0147-11-R-0002 Clear Cod Solicitation Amendment01_5 Mar 2012.pdf PDF
Atch 17 - Clear Cost and Software Data Reporting —
Atch 16 - Critical Design Review —
Atch 10 - Evaluation Factors for Award -Section M_28 FEB 2012.pdf PDF
Atch 18 - Cod Cost and Software Data Reporting —
Atch 09 - Instructions Conditions and Notices to Offerors - Section L_28 Feb 2012.pdf PDF
Atch 01 - CLIN Pricing Data Entry Sheet_21 Feb 2012.pdf PDF
Atch L6 - Client Authorization Letter.pdf PDF
Atch L9 Total Resources Volume.xlsx XLSX spreadsheet
Exhibit A - Clear CDRLs DD Form 1423-1.pdf PDF
Exhibit B - Cod CDRLs DD Form 1423-1.pdf PDF
Atch L4a Clear Cod PPQ Cover Letter 22 Feb.pdf PDF
Atch L1 - OCI Analysis-Disclosure Form.doc DOC document
Atch L4 - Clear-Cod Past Performance Questionnaire.docx DOCX document
Atch 04 - Government Furnished Property List_06 Feb 2012.pdf PDF
Atch 15 - List of Acronyms_06 Feb 2012.pdf PDF
Atch L2 - Past_Performance Reference List.docx DOCX document
Atch L3 - PAST PERFORMANCE INFORMATION.docx DOCX document
Atch 03 - DOD Contract Security Classification Specification —
Atch 12 - List Instructions for Cod CDRLs ADPs_06 Feb 2012.pdf PDF
Atch 07 - Clear Base Support Requirements List —
Atch 11 - List Instructions for Clear CDRLs ADPs_06 Feb 2012.pdf PDF
Atch L6 - Client Authorization Letter.docx DOCX document
Atch 02 - Scope of Work —
RFP Cover Letter.pdf PDF
Atch 10 - Evaluation Factors for Award - Section M_06 Feb 2012.pdf PDF
Atch L7 - Cost-Price Exhibits 11-18-11.xlsx XLSX spreadsheet
Atch 08 - Cod Base Support Requirements List —
Atch L4a - Clear Cod PPQ Cover Letter.docx DOCX document
Atch 06 - Incentive Fee Plan_06 Feb 2012.pdf PDF
Atch 13 - Air Force Technical Manual Contract Requirements —
Atch 05 - Award Fee Plan.docx DOCX document
Atch 09 - Instructions Conditions and Notices to Offerors - Section L_06 Feb 2012.pdf PDF
Atch L8 - WBS to CLIN To SOW Cross Reference Matrix Final.xlsx XLSX spreadsheet
Atch 01 - CLIN Pricing Data Entry Sheet_06 Feb 2012.pdf PDF
Atch L5 - Subcontractor Consent Letter.docx DOCX document
Atch 14 - MDA Policy Memorandum No. 51 Organization Conflicts of Interest_06 Feb 2012.pdf PDF
HQ0147-11-R-0002 Request for Proposal Clear_Cod Upgrade Solicitation_6Feb12_FINAL.pdf PDF
Clear-Cod Section L 9 DEC 2011.docx DOCX document
Clear-Cod Section M 9 DEC 2011--CLEAN.docx DOCX document
Clear-Cod UEWR SOW-2Ltr Results CLEAN.1 8Dec11.docx DOCX document
Industry Day_1 Q.As 08.31.11.pdf PDF
Attachment 1 Cover Letter Executed.pdf PDF
Attachment 4 Section M.docx DOCX document
Attachment 7 GFE.pdf PDF
Attachment 5 Statement of Work.docx DOCX document
Attachment 3 Section L.docx DOCX document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B - Supplies or Services and Prices

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLEAR Design, Development, Sustain -RevG

FPI

Fixed Price Incentive (Firm Target) - FPI

CLEAR Design, Development & Sustainment

The Share Ratio shall be 50/50 Below Target and 50/50 Above Target; the Ceiling Price shall be no greater than 120% of the Target Cost. Target Profit shall be no greater than 10% of the Target Cost.

FOB: Destination

TARGET COST

TARGET PROFIT

TOTAL TARGET PRICE

CEILING PRICE

SHARE RATIO ABOVE TARGET

SHARE RATIO BELOW TARGET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLEAR Integration & Deployment

CPAF

Cost Plus Award Fee - CPAF

CLEAR Integration & Deployment

The Maximum Award Fee is 12%. There will be no Base Fee.

ESTIMATED COST

BASE FEE

SUBTOTAL EST COST + BASE

MAX AWARD FEE

TOTAL EST COST + FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Award Fee for CLIN 0002

COST

Reference Section G, G-14 Clause and Section J, Attachment 4, Award Fee Plan. The funding for this CLIN will be authorized for billing only IAW the Contract, Award Fee Plan and Determination by FDO.

Based Fixed Amount: Award Amount for "XX" Performance.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Signal Processor/Data Processor (SP/DP)

CPIF

Cost Plus Incentive Fee - CPIF Signal Processor/Data Processor (SP/DP) The Share Ratio shall be 40/60 Below Target Cost and 60/40 Above Target Cost. The Minimum Fee is 3%. The Target Fee shall be 6%. The Maximum Fee is 7.5%

TARGET FEE

TOTAL TGT COST + FEE

MINIMUM FEE

MAXIMUM FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Perf/Sch Incentive for CLIN 0004.

COST

Maximum: Performance/Schedule Incentive for CLIN 0004.

ESTIMATED COST

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Hours

OPTION
CLEAR Special Studies (LOE)

CPFF

Cost Plus Fixed Fee Level of Effort - CPFF LOE

CLEAR Special Studies

The Fixed Fee shall be no greater than 8% of the estimated Maximum Cost exclusive of Other Direct Cost (ODC) and Material. Maximum Hours of 2,000 per year.

FIXED FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

CLEAR/COD Data: CDRLs NSP

Data to be delivered under this contract shall be that cited in the Contract Data Requirements List (CDRL), DD Form 1423, complete listing provided in Section J as Exhibit A and Exhibit B.

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
COD Design & Development

FPI

Fixed Price Incentive (Firm Target) - FPI

COD Design and Development

The Share Ratio shall be 50/50 Below Target and 50/50 Above Target; the Ceiling Price shall be no greater than 120% of the Target Cost. Target Profit shall be no greater than 10% of the Target Cost.

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
COD Integration & Deployment

CPIF

Cost Plus Incentive Fee - CPIF

COD Integration & Deployment

The Share Ratio shall be 40/60 Below Target Cost and 60/40 Above Target Cost. The Minimum Fee is 3%. The Target Fee shall be no greater than 12%. The Maximum Fee is 15%.

TARGET FEE

TOTAL TGT COST + FEE

MINIMUM FEE

MAXIMUM FEE

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
COD Facility Modifications

FPI

Fixed Price Incentive (Firm Target) - FPI

COD Facility Modifications

The Share Ratio shall be 50/50 Below Target and 50/50 Above Target; the Ceiling Price shall be no greater than 120% of the Target Cost. Target Profit shall be no greater than 10% of the Target Cost.

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
Radar Sustainment

FPI

Fixed Price Incentive (Firm Target) - FPI

Radar Sustainment

The Share Ratio shall be 50/50 Below Target and 50/50 Above Target; the Ceiling Price shall be no greater than 120% of the Target Cost. Target Profit shall be no greater than 10% of the Target Cost.

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
OPTION
COD Long Lead Items

FFP

Firm Fixed Price - FFP

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT

Hours

OPTION
COD Special Studies (LOE)

CPFF

Cost Plus Fixed Fee Level of Effort - CPFF LOE

COD Special Studies

The Fixed Fee shall be no greater than 8% of the estimated Maximum Cost exclusive of Other Direct Cost (ODC) and Materials. Maximum Hours of 2,000 per year.

FIXED FEE

Section C - Descriptions and Specifications

STATEMENT OF WORK (SOW)

The Contractor shall perform the work specified in the Statement of Work (SOW) and Attachments/Exhibits in Section J of this contract. The Contractor shall provide all necessary materials, labor, equipment and facilities incidental to the performance of this requirement.

Section D - Packaging and Marking

CLAUSES INCORPORATED BY REFERENCE

252.211-7006
Radio Frequency Identification
FEB 2007

CLAUSES INCORPORATED BY FULL TEXT

D-01

PACKAGING AND MARKING OF TECHNICAL DATA (APR 2009)

Technical data items shall be preserved, packaged, packed, and marked in accordance with the best commercial practices to meet the packaging requirements of the carrier and insure safe delivery at destination. Classified reports, data and documentation shall be prepared for shipment in accordance with the current National Industrial Security Program Operation Manual (NISPOM), DOD 5220.22-M.

CLAUSES INCORPORATED BY FULL TEXT

D-02

PACKAGING AND MARKING OF HARDWARE ITEMS (APR 2009)

a. The contractor shall utilize best commercial practices for the preservation, packaging, marking and labeling of any hardware delivered under this contract to insure safe delivery at final destination. However, the contractor should also note the requirements of DFARS 252.211-7003, Item Identification and Valuation, if applicable.

b. Packaging and marking of hazardous materials shall comply with Title 49 of the Code of Federal Regulation and the International Maritime Dangerous Goods.

c. MARKING INSTRUCTIONS FOR MISSILE DEFENSE AGENCY (MDA) REQUIREMENTS – Request for marking instructions shall be submitted electronically at least 90 days prior to required delivery date, to the Contracting Officer Representative (COR), or the Procuring Contracting Officer (PCO); or both as appropriate to the acquisition.

Missile Defense Agency, MDA/DACX

Attn: Carol Rivard

Address: Building 5222, Martin Road, Redstone Arsenal, AL 35898

Email: Carol.Rivard@mda.mil

Missile Defense Agency, MDA/SNU

Attn: COR (To Be provided at Contract Award)

Address: (To Be provided at Contract Award)

Email: (To Be Provided at Contract Award)

Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
0002
Destination
Government
Destination
Government
0003
Destination
Government
Destination
Government
0004
Destination
Government
Destination
Government
0005
Destination
Government
Destination
Government
0006
Destination
Government
Destination
Government
0007
Destination
Government
Destination
Government
0008
Destination
Government
Destination
Government
0009
Destination
Government
Destination
Government
0010
Destination
Government
Destination
Government
0011
Destination
Government
Destination
Government
0012
Destination
Government
Destination
Government
0013
Destination
Government
Destination
Government

CLAUSES INCORPORATED BY REFERENCE

52.246-2
Inspection Of Supplies--Fixed Price
AUG 1996
52.246-2 Alt I
Inspection Of Supplies Fixed Price (Aug 1996) - Alternate I
JUL 1985
52.246-3
Inspection Of Supplies Cost-Reimbursement
MAY 2001
52.246-4
Inspection Of Services--Fixed Price
AUG 1996
52.246-5
Inspection Of Services Cost-Reimbursement
APR 1984
52.246-8
Inspection Of Research And Development Cost Reimbursement
MAY 2001
52.246-16
Responsibility For Supplies
APR 1984
252.246-7000
Material Inspection And Receiving Report
MAR 2008

52.246-11 HIGHER-LEVEL CONTRACT QUALITY (FEB 1999)

The Contractor shall comply with the higher-level quality standard selected below. (If more than one standard is listed, the offeror shall indicate its selection by checking the appropriate block.)

Title

Number

Date

Tailoring

MDA Assurance Provisions (MAP)

MDA-QS-001-MAP-REVA

29 Oct 2006 None

MDA Parts, Materials and Processes

MDA-QS-003-PMAP-REVA

26 Mar 2008 None

Mission Assurance Plan (PMAP)

(End of clause)

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
UIC
0001
POP 01-SEP-2012 TO

31-AUG-2017

N/A
N/A
0002
POP 01-JUL-2015 TO

28-FEB-2017

N/A
N/A
0003
POP 01-JUL-2015 TO

28-FEB-2017

N/A
N/A
0004
POP 01-SEP-2012 TO

31-AUG-2016

N/A
N/A
0005
POP 01-SEP-2012 TO

31-AUG-2016

N/A
N/A
0006
POP 01-SEP-2012 TO

31-AUG-2016

N/A
N/A
0007
POP 01-SEP-2012 TO

31-AUG-2016

N/A
N/A
0008
POP 01-OCT-2013 TO

31-JAN-2016

N/A
N/A
0009
POP 01-JAN-2016 TO

28-FEB-2018

N/A
N/A
0010
POP 01-MAR-2013 TO

29-FEB-2016

N/A
N/A
0011
POP 01-JAN-2016 TO

31-MAY-2018

N/A
N/A
0012
POP 01-SEP-2012 TO

31-AUG-2013

N/A
N/A
0013
POP 01-MAR-2013 TO

31-MAY-2018

N/A
N/A

CLAUSES INCORPORATED BY REFERENCE

52.242-15
Stop-Work Order
AUG 1989
52.242-15 Alt I
Stop-Work Order (Aug 1989) - Alternate I
APR 1984
52.242-17
Government Delay Of Work
APR 1984
52.247-34
F.O.B. Destination
NOV 1991
52.247-55
F.O.B. Point For Delivery Of Government-Furnished Property
JUN 2003
252.211-7003
Item Identification and Valuation
JUN 2011
252.247-7023
Transportation of Supplies by Sea
MAY 2002

F-02

MILESTONE EVENTS (APR 2009)

The Contractor shall successfully accomplish the following milestone events within the period specified to assure completion of contract requirements:

Milestone Events

Months After Contract Award

TBD

TBD

Total Contract Performance 6 years after contract award Section G - Contract Administration Data

CLAUSES INCORPORATED BY REFERENCE

252.201-7000
Contracting Officer's Representative
DEC 1991
252.204-0001
Line Item Specific: Single Funding
SEP 2009
252.204-7006
Billing Instructions
OCT 2005
252.232-7003
Electronic Submission of Payment Requests and Receiving Reports
MAR 2008
252.232-7010
Levies on Contract Payments
DEC 2006

G-01

CONTRACT ADMINISTRATION (SEP 2010)

Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract will require maximum coordination between the Government and the Contractor. The following individuals will be the Government points of contact during the performance of this contract:

a. CONTRACTING OFFICERS

All contract administration will be effected by the Procuring Contracting Officer (PCO) or designated Administrative Contracting Officer (ACO). Communication pertaining to the contract administration should be addressed to the Contracting Officer. Contract administration functions (see FAR 42.302 and DFARS 242.302) are assigned to the cognizant contract administration office. No changes, deviations, or waivers shall be effective without a modification of the contract executed by the Contracting Officer or his duly authorized representative authorizing such changes, deviations, or waivers.

The point of contact for all contractual matters is:

Name: Carol Rivard Organizational Code: MDA/DACX Telephone Number: 256-450-1474 E-Mail Address: Carol.Rivard@mda.mil

b. CONTRACTING OFFICER’S REPRESENTATIVE/CONTRACTING OFFICER’S TECHNICAL REPRESENTATIVE

Neither the Contracting Officer’s Representative (COR) nor the Contracting Officer’s Technical Representative (COTR) is authorized to change any of the terms and conditions of the contract. The Contractor is advised that only the Contracting Officer can change or modify the contract terms or take any other action which obligates the Government. Then, such action must be set forth in a formal modification to the contract. The authority of the COR and the COTR is strictly limited to him/her, without redelegation, to the specific duties set forth in his/her letter of appointment, a copy of which is furnished to the Contractor. Contractors who rely on direction from other than the Contracting Officer, a COR or a COTR acting outside the strict limits of his/her responsibilities as set forth in his/her letter of appointment do so at their own risk and expense. Such actions do not bind the Government contractually. Any contractual questions shall be directed to the Contracting Officer.

The COR under this contract is:

Name: To Be Determined (TBD) Organizational Code: MDA/DACX Telephone Number: TBD E-Mail Address: TBD

The COTR under this contract is:

Name: To Be Determined (TBD) Organizational Code: MDA/DACX Telephone Number: TBD E-Mail Address: TBD

c. CONTRACTING OFFICIAL FOR eSRS

FAR 52.219-9, Small Business Subcontracting Plan (April 2008) requires the use of the Electronic Subcontracting Reporting System (eSRS) for subcontract reporting. The contracting official for eSRS under this contract is:

Name: Carol Rivard Organizational Code: MDA/DACX Telephone Number: 256-450-1474 E-Mail Address: Carol.Rivard@mda.mil For detailed information regarding eSRS visit http://www.acq.osd.mil/dpap/pdi/eb/index.html.

G-05 SUBMISSION OF PAYMENT REQUESTS USING WIDE AREA WORK FLOW – RECEIPT AND ACCEPTANCE (WAWF-RA) (SEP 2009)

a. Requirement for Electronic Payment Requests by WAWF-RA

1. The Contractor shall submit all payment requests electronically in accordance with FAR Part 32. As prescribed in DFARS clause 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports, contractors shall submit all payment requests in electronic form unless the exception in the DFARS clause applies. Paper copies will no longer be processed for payment.

2. To facilitate electronic submission, contractors shall submit all payment requests through the Wide Area Work Flow-Receipt and Acceptance (WAWF-RA) System as described at http://www.dfas.mil/contractorpay/electroniccommerce/wideareaworkflow.html using the appropriate Service Acceptor’s DoDAAC (MDA/NCR is HQ0006, MDIOC is H95001, MDA/HSV is HQ0147). When using WAWF-RA, the contractor must include the Contracting Officer’s Representative’s (COR) e-mail in the invoice submission template in order to notify the COR that a WAWF document has been submitted for approval.

3. In accordance with Appendix F of the DFARS, at the time of each delivery of supplies or services under this contract, the contractor shall prepare and furnish to the Government the WAWF-RA electronic form in lieu of a paper copy Material Inspection and Receiving Report (MIRR), DD Form 250.

4. When requesting final payment, the Contractor must establish compliance with all terms of the contract by submitting a Final Receiving Report through WAWF-RA, or Letter of Transmittal, as applicable.

5. The WAWF Training Links are located on the Internet at http://www.wawftraining.com/ and on the ‘live’ site at https://wawf.eb.mil under “About WAWF”.

6. Questions regarding the use of the system are to be directed to the WAWF Help Desk:

DISA DECC Ogden

Electronic Business Service Desk

CONUS ONLY: 1-866-618-5988

COMMERCIAL: 801-605-7095

DSN: 338-7095

FAX COMMERCIAL: 801-605-7453

FAX DSN: 388-7453

cscassig@csd.disa.mil

b. Submission of Invoices under Fixed Price Type Contracts

1. “Invoice” as used in this paragraph does not include the contractor’s requests for progress payments.

2. The use of WAWF-RA electronic form and invoice are in accordance with DFARS Appendix F.

3. In addition to the requirements of the Prompt Payment clause of the contract, the contractor shall cite on each invoice the contract line item (CLIN); the contract subline item number (SUBCLIN), if applicable; the accounting classification reference number (ACRN), and the payment terms.

4. The contractor shall prepare either:

a separate invoice for each activity designated to receive the supplies or services; or, a consolidated invoice covering all shipments delivered under an individual order.

5. If acceptance is at origin, the contractor shall submit the WAWF-RA electronic form or other acceptance verification directly to the designated payment office.

6. If acceptance is at destination, the consignee will forward acceptance verification to the designated payment office.

c. Submission of Vouchers under Time and Materials and Cost Type Contracts

1. Contractors approved under the Defense Contract Audit Agency’s (DCAA) direct billing program may submit the first and subsequent interim vouchers directly to the disbursing office. Contractors participating in the direct billing program must provide a copy of the first interim voucher to the cognizant DCAA office within 5 days of its submission to the disbursing office.

2. Upon written notification to the contractor, DCAA may rescind the direct submission authority. Upon receipt of the notice to rescind the direct submission authority, the contractor will immediately begin to submit invoices for the affected contracts to DCAA.

3. When authorized by the DCAA in accordance with DFARS 242.803(b) (i) (C), the contractor may submit interim payment requests. Such authorization does not extend to the first and final vouchers. Vouchers requesting interim payments shall be submitted no more than once every two weeks. For indefinite delivery type contracts, interim payment requests shall be submitted no more than once every two weeks for each delivery order. There shall be a lapse of no more than 90 calendar days between performance and submission of an interim payment request.

4. The contractor agrees to segregate costs incurred under this contract at the level of performance, either task or subtask, or CLIN or SUBCLIN, rather than on a total contract basis, and to submit vouchers reflecting costs incurred at that level. Vouchers shall contain summaries of work charged during the period covered, as well as overall cumulative summaries for all work invoiced to date, by line item, subline item, task or subtask. Delivery orders will be segregated by individual order.

5. Prior to final voucher submission, the contractor must submit the final report/final deliverable to the contracting officer's representative (COR) for approval. The COR will provide to the contractor an e-mail stating acceptance of the final report/final deliverable. The contractor must attach the approval to the final voucher in WAWF and forward to the cognizant DCAA office and ACO for approval.

G-06

ALLOTMENT OF FUNDS (MAY 2005)

CLINs under this Contract may be incrementally funded. Pursuant to FAR 52.232-22, “Limitation of Funds,” the total amount of funds presently available for payment and allotted to this contract (which covers all items, including fee payable), and the estimated period of performance of said funds will be specified on each CLIN.

Any resulting contract/option(s) awarded under this acquisition may be incrementally funded.

The estimated period of performance for said funds will be specified in each CLIN.

G-08 PAYMENT OF FIXED FEE (ORDERING – LEVEL OF EFFORT / CLINS 0006 and 0013) (OCT 2009)

The Government will make payments to the Contractor when requested as work progresses in accordance with Federal Acquisition Regulation (FAR) 52.216-7. The Contractor shall invoice the fee separately and submit such invoices to the MDA Contracting Officer's Representative (COR) for verification of the percentage of Direct Productive Labor Hours (DPLHs) performed for the billing period. Each invoice for DPLHs shall contain a statement by the Contractor as to the cumulative percentage of DPLHs invoiced. Each invoice for fee shall contain a statement by the Contractor as to the cumulative percentage of fee invoiced. Fee shall be payable, subject to other provisions of FAR 52.216-8, “Fixed Fee,” in amounts commensurate with the percentage of work performed. In no case shall the cumulative amount of the fee invoiced, when expressed as a percentage of the total fixed fee for the applicable CLIN, exceed the cumulative percentage of DPLHs performed for that CLIN (as verified by the MDA COR) at the end of the billing period.

G-10

SEGREGATION OF COSTS (MAY 2005)

For all CLIN(s), and their respective Option CLINs, vouchers shall contain actual hours and costs by cost element (cost elements shall be at the lowest level of identification/ discrimination consistent with the Contractor's cost accounting system) and overall cumulative summaries of all work vouchered to date.

G-13 NOTICE OF THE GOVERNMENT'S USE OF OUTSIDE CONTRACTORS TO REVIEW SUBMITTED INVOICES, PAYMENT REQUESTS, AND MATERIAL INSPECTION AND RECEIVING REPORTS (MAY 2009) The Government may utilize support contractors to assist the Government in the review and evaluation of the offeror's invoices, payment requests, material inspection and receiving reports, and similar requests for payment or evidence of delivery. These contractors will be provided access to these and other records which may contain the proprietary information of the offeror, to include awarded contracts, to support Government officials in reviewing and reconciling invoices, payment records, and the Government's financial and budgetary records, and in facilitating the timely payment of submitted invoices.

The support contractors are prohibited from obtaining proprietary information to which their employees will have access in the performance of their responsibilities, and are required to promptly notify the contracting officer of any breach of their employees' non-disclosure obligations. Each of the contractor employees has also been required to execute a non-disclosure agreement which acknowledges their responsibilities to only use proprietary information in performance of the above tasks and for no other reason; that they will not share proprietary information with their employers; that they will not use such information for personal or other benefit; and that they will promptly notify their employers of any breaches of their responsibilities.

G-14 AWARD FEE (Nov 2010)

This contract provides for the payment of the Award Fee as described in the Award Fee Plan contained in Attachment 4. The table below provides a summary of the maximum award fee; award fee pool allocations by period and fee earned by period.

Period Date Pool Allocation Fee Earned Cumulative Fee Unearned Fee % of FDO

Earned

Determination for AF

Period 1

(date to date)

Period 2

(date to date) Section H - Special Contract Requirements

CLAUSES INCORPORATED BY REFERENCE

52.234-4
Earned Value Management System
JUL 2006
252.208-7000
Intent To Furnish Precious Metals As Government--Furnished Material
DEC 1991
252.215-7002
Cost Estimating System Requirements
MAY 2011
252.234-7002
Earned Value Management System
MAY 2011
252.242-7004
Material Management And Accounting System
MAY 2011

H-02 LEVEL OF EFFORT / CLINS 0006 and 0013 (APR 2009)

a. In the performance of this contract, the Contractor shall provide Direct Productive Labor Hours (DPLH) level of effort as set forth in Section B above within the time period as set forth in Section F hereof:

b. Direct Productive Labor Hours are defined as actual PRIME AND SUBCONTRACTOR (INCLUDING CONSULTANTS) work hours exclusive of vacation, holiday, sick leave and other absences.

c. In accordance with FAR 16.306(d)(2), entitlement to the total fixed fee is subject to certification by the contractor to the Contracting Officer that he has exerted the total DPLH level of effort, has provided the reports called for, and the effort performed and reports provided are considered satisfactory by the Government.

d. The contractor may include in provisional vouchers fixed fee based on the percentage of level of effort hours exerted to the total level of effort hours stipulated in Section B, subject to the withholding reserve of the contract clause titled "Fixed Fee."

e. Nothing in this provision shall be construed to constitute authorization for the work not in accordance with the LIMITATION OF FUNDS provision of the contract.

H-06 INSURANCE (Apr 2009)

In accordance with FAR Part 28.307-2, the Contractor shall maintain the types of insurance and coverage listed below:

TYPES OF INSURANCE

MINIMUM AMOUNT

Workmen's Compensation and all occupational disease As required by Federal and State law

Employer's Liability including all occupational disease $100,000 per accident when not covered by Workmen's Compensation above

General Liability (Comprehensive) Bodily Injury

$500,000 per occurrence

Automobile Liability (Comprehensive)

Bodily Injury per person

$200,000

Bodily Injury per accident

$500,000

Property Damage per accident

$ 20,000

H-08

PUBLIC RELEASE OF INFORMATION (APR 2009)

a. The policies and procedures outlined herein apply to information submitted by the Contractor and his subcontractors for approval for public release. Prior to public release, all information shall be cleared as shown in the “National Industrial Security Program Operations Manual” (DoD 5220.22-M). At a minimum, these materials may be technical papers, presentations, articles for publication and speeches or mass media material, such as press releases, photographs, fact sheets, advertising, posters, compact discs, videos, etc.

b. All materials which relate to the work performed by the contractor under this contract shall be submitted to MDA for review and approval prior to release to the public. Subcontractor public information materials shall be submitted for approval through the prime contractor to MDA.

c. The MDA review and approval process for contractors working under an MDA contract starts with the contracting officer’s representative (COR).

(1) The contractor shall request a copy of MDA form “Security and Policy Review Worksheet for Public Release Review” (.pdf format) or any superseding form from the MDA.

(2) The contractor shall complete Blocks 1, 2, 3 and 6 of Worksheet (or comply with the instructions of any superseding form) and submit it with materials to be cleared to the COR (see paragraph j. below). If the information was previously cleared, provide the Public Release Case Number if available and a copy of the previous document highlighting the updated information.

(3) The COR may affirm “public releaseability” by signing the Statement of Certification in Block 7 of the Worksheet.

(4) The COR will forward the Worksheet with the materials to be cleared to the MDA designated point of contact for Block 8 approval and submission of package to MDA/PA.

(5) The COR will notify the contractor of the agency’s final decision regarding the status of the request.

d. The contractor shall submit the following to the COR at least 60 days in advance of the proposed release date:

(1) Security and Policy Review Worksheet and one (1) electronic copy of the material to be reviewed..

(2) Written statement, including:

(a) To whom the material is to be released

(b) Desired date for public release

(c) Statement that the material has been reviewed and approved by officials of the contractor or the subcontractor, for public release, and

(d) The contract number.

e. The items submitted must be complete. Photographs shall have captions.

f. Outlines, rough drafts, marked-up copy (with handwritten notes), incorrect distribution statements, FOUO information, export controlled or ITAR information will not be accepted or cleared.

g. Abstracts or abbreviated materials may be submitted if the intent is to determine the feasibility of going further in preparing a complete paper for clearance. However, clearance of abstracts or abbreviated materials does not satisfy the requirement for clearance of the entire paper.

h. The MDA Director of Public Affairs (MDA/PA) is responsible for coordinating the public release review. MDA/PA will work directly with the COR if there are questions or concerns regarding submissions. MDA/PA will not work with contractors who have not gone through their COR.

i. Once information has been cleared for public release, it is in the public domain and shall always be used in its originally cleared context and format. Information previously cleared for public release but containing new, modified or further developed information must be submitted again for public release following the steps outlined in items a. through h. above.

j. Due to time and screening constraints, it is recommended that all “public release” packages submitted to MDA be forwarded by a commercial overnight delivery service, addressed as follows:

Missile Defense Agency/DACX

Attn: COR To Be Determined (TBD)

COR Mailing Adress: TBD

City, State, Zip code H-09 ORGANIZATIONAL CONFLICT OF INTEREST (Mar 2010)

a. Purpose: The primary purpose of this clause is to aid in ensuring that:

(1) the Contractor's objectivity and judgment are not biased because of its present or planned interests which relate to work under this contract;

(2) the Contractor does not obtain unfair competitive advantage by virtue of its access to non-public information regarding the Government's program plans and actual or anticipated resources; and

(3) the Contractor does not obtain unfair competitive advantage by virtue of its access to proprietary information belonging to others.

b. Scope: Organizational Conflict of Interest (OCI) rules, procedures and responsibilities as described in FAR Subpart 9.5 shall be applicable to this contract and any resulting subcontracts.

(1) The general rules in FAR 9.505-1 through 9.505-4 and the restrictions described herein shall apply to performance or participation by the Contractor and any of its affiliates or their successors-in-interest (hereinafter collectively referred to as "Contractor") in the activities covered by this contract as prime Contractor, subcontractor, co-sponsor, joint venturer, consultant, or in any similar capacity.

(2) The Missile Defense Agency’s OCI policy is in Attachment 7 of this contract.

c. Access to and Use of Government Information: If the Contractor, in performance of this contract, obtains access to Government information, or other program related information, such as plans, policies, reports, studies, financial plans, or data which has not been released or otherwise made available to the public, the Contractor agrees that without prior written approval of the Contracting Officer, it shall not:

(1) use such information for any private purpose;

(2) compete for work based on such information until one year after such information is released or otherwise made available to the public;

(3) submit an unsolicited proposal to the Government based on such information;

(4) release such information.

d. Access to and Protection of Proprietary Information: The Contractor agrees to treat proprietary data in accordance with the provisions of FAR 9.505-4. The Contractor shall enter into a written agreement for the protection of the proprietary data of others and exercise diligent effort to protect such proprietary data from unauthorized use or disclosure.

e. Subcontracts: The Contractor shall include this clause in consulting agreements, teaming agreements, subcontracts, or other arrangements for provision of services or supplies of any tier. The terms "contract", "Contractor", and "Contracting Officer" shall be appropriately modified to preserve the Government's rights.

f. Representations and Disclosures:

(1) The Contractor represents that it has disclosed to the Contracting Officer, prior to award, all facts relevant to the existence or potential existence of organizational conflicts of interest as that term is used in FAR Subpart 9.5. To facilitate disclosure and Contracting Officer approval, the Contractor shall complete an OCI Analysis/Disclosure Form for each MDA, Ballistic Missile Defense (BMD), and BMD-related contract or subcontract ( form shall be requested from the Procuring Contracting Officer).

(2) The Contractor represents that if it discovers an organizational conflict of interest or potential conflict of interest after award, a prompt and full disclosure shall be made in writing to the Contracting Officer. This disclosure shall include a description of the action the Contractor has taken or proposes to take in order to avoid or mitigate such conflicts.

g. Remedies and Waiver:

(1) For breach of any of the above restrictions or for non-disclosure or misrepresentation of any relevant facts required to be disclosed concerning this contract, the Government may terminate this contract for default, disqualify the Contractor from subsequent related contractual efforts, and pursue such other remedies as may be permitted by law or this contract. If, however, in compliance with this clause, the Contractor discovers and promptly reports an organizational conflict of interest (or the potential thereof) subsequent to contract award, the Contracting Officer may terminate this contract for convenience if such termination is deemed to be in the best interest of the Government or take other appropriate actions.

(2) The parties recognize that this clause has potential effects which will survive the performance of this contract and that it is impossible to foresee each circumstance to which it might be applied in the future. Accordingly, the Contractor may at any time seek a waiver from the Director, MDA, (via the Contracting Officer) by submitting a full written description of the requested waiver and the reasons in support thereof.

h. Government Indemnity: The Contractor shall hold the Government harmless and indemnify the Government as to any cost or loss resulting from the unauthorized use or disclosure of third party information data or software by the Contractor, its employees, subcontractors or agents.

CLAUSES INCORPORATED BY FULL TEXT

H-10

ENABLING CLAUSE FOR BMD INTERFACE SUPPORT (APR 2009)

a. It is anticipated that, during the performance of this contract, the Contractor will be required to support Technical Interface/Integration Meetings (TIMS) with other Ballistic Missile Defense (BMD) Contractors and other Government agencies. Appropriate organizational conflicts of interest clauses and additional costs, if any, will be negotiated as needed to protect the rights of the Contractor and the Government.

b. Interface support deals with activities associated with the integration of the requirements of this contract into BMD system plans and the support of key Missile Defense Agency (MDA) program reviews.

c. The Contractor agrees to cooperate with BMD Contractors by providing access to technical matters, provided, however, the Contractor will not be required to provide proprietary information to non-Government entities or personnel in the absence of a non-disclosure agreement between the Contractor and such entities.

d. The Contractor further agrees to include a clause in each subcontract requiring compliance with paragraph c. above, subject to coordination with the Contractor. This agreement does not relieve the Contractor of its responsibility to manage its subcontracts effectively, nor is it intended to establish privity of contract between the Government and such subcontractors.

e. Personnel from BMD Contractors or other Government agencies or Contractors are not authorized to direct the Contractor in any manner.

f. This clause shall not prejudice the Contractor or its subcontractors from negotiating separate organizational conflict of interest agreements with BMD Contractors; however, these agreements shall not restrict any of the Government's rights established pursuant to this clause or any other contract.

H-11

MDA VISIT AUTHORIZATION PROCEDURES (APR 2011)

a. The Contractor shall submit all required visit clearances in accordance with current NISPOM regulations. Visit clearances shall identifythe contract number.

For Visit Requests to the Hanscom AFB send to:

JPAS SMO Code: LK1MFNLG

Missile Defense Agency

Attn: Peter Rivera

11 Barksdale Street, Phase II

Hanscom AFB, MA 01731-2120

781-225-0360

Peter.Rivera@hanscom.af.mil

For Visit Requests to Huntsville, AL send to:

Missile Defense Agency, JPAS SMO Code: DDAAU4

Attn: Visitor Control

Bldg 5222 Martin Road

Redstone Arsenal, AL 35898

256-313-9505

256-450-3222 VAR FAX

256-450-3214 / 3215 VAR voice confirmation

MDAAccessControlHSV@MDA.mil

b. The COR is authorized to approve visit requests for the Contracting Officer.

COR to be determined at time of award.

H-12

CONTROL OF ACCESS TO MDA SPACES AND INFORMATION SYSTEMS (APR 2011)

a. To maintain the security of the MDA spaces and information systems, the Contractor shall notify the COR in writing whenever a prime or subcontractor employee included on the current Visit Authorization Request/Letter no longer supports this contract. This requirement shall apply to both Contractor and employee initiated termination of services and to temporary suspension of services.

b. The contractor will cooperate with COR in taking the following actions (facilitating the employee’s return of all badges, keycards, and passes). Specifically, upon notification, the COR will work with the organization’s Security Operations Center and the MDA Service Desk to ensure timely action to:

(1) remove the employee from the current Visit Authorization Request/Letter;

(2) cancel the MDA badge, keycard and Pentagon Pass issued pursuant to the Visit Authorization Request/Letter; and

(3) terminate the MDA LAN account/access privileges.

c. The contractor shall identify the reason for and date of termination or expected period of suspension and submit the notification to the COR within five (5) working days prior to service discontinuation. For unplanned termination or suspension of services, notification shall be made on the same working day as the termination/suspension action.

H-14

PERSONNEL QUALIFICATIONS (MAY 2005)

a. The Contractor shall promptly notify the Contracting Officer and Contracting Officer’s Representative prior to making any changes in key staff. If replacing key staff the Contractor shall adhere to the following: (1) replacement person’s qualifications are equal to or better than the qualifications of the person being replaced; or (2) the added person’s qualifications are equal to or better than the core capabilities of this contract. Key staff positions are defined as:

· Program Manager

· Business Manager

· Financial Manager

· Chief Engineer

· IPT Leads

· IA Lead

b. All Contractor notifications must provide the name and departure date for the incumbent leaving, a complete resume for the proposed substitute, and any other pertinent information requested by the Contracting Officer. The Government shall be provided the opportunity to review the proposed substitution regarding qualifications, security matters or any other concerns which could, in its opinion, affect performance under this contract.

c. This clause does not, in any way, abrogate the contractor’s authority to hire or assign personnel as it sees fit, or its responsibility to fill key positions with qualified personnel.

H-15

EXERCISE OF OPTIONS (MAY 2005)

Any option under this contract shall be exercised by a unilateral contract modification signed by the Contracting Officer. Specific contract line items or sub-line items delineating a description of the supplies or services, quantity requirements, and a corresponding delivery schedule for the exercised options shall be identified in the unilateral contract modification. The Government may exercise from time to time, either in whole or in part, some or all the option line items. An option shall be exercised by issuance, within 60 days after contract award, of a unilateral modification for the subsequent option requirements.

CLAUSES INCORPORATED BY FULL TEXT

H-20

SENSITIVE INFORMATION TECHNOLOGY WORK (APR 2009)

a. DoD 5200.2-R, DoD Personnel Security Program, requires Contractor personnel, who perform work on sensitive Information Technology (IT)/Automated Data Processing (ADP) systems (hereafter referred to as IT), to be assigned to positions which are designated at one of three sensitivity levels (IT-I, IT-II or IT-III). These designations equate to Critical Sensitive, Non-Critical Sensitive, and Non-Sensitive. Working On-Site in any MDA Facility requires a minimum Sensitivity of IT-II. The following investigations are required:

IT-I designated positions require a Single Scope Background Investigation (SSBI).

IT-II designated positions require a National Agency Check with Law and Credit (NACLC).

IT-III positions associated with MDA are found only at contractor’s facilities. See below for requirement.

b. The required investigation will be completed prior to the assignment of individuals to sensitive duties associated with the position.

c. For IT-III positions at the Contractor’s facility, the Contractor will forward their employee information (completed SF 85P, Questionnaire for Positions of Public Trust), and two (2) DD Forms 258 (Fingerprint cards) either electronically or on magnetic media to: Missile Defense Agency, Security and Program Protection (MDA/DSS); ATTN: Personnel Security, 7100 Defense Pentagon, Washington, DC 20301-7100.

d. MDA retains the right to request removal of Contractor personnel, regardless of prior clearance or adjudication status, whose actions, while assigned to this contract, clearly conflict with the interests of the Government. The reason for removal will be fully documented in writing by the Contracting Officer. When and if such removal occurs, the Contractor will within 30 working days assign qualified personnel to any vacancy(ies) thus created.

H-23

CONTRACTOR EMPLOYEE OUT-PROCESSING (MAY 2005)

Prior to the departure of on-site contractor employees, the departing employee shall complete an out-processing checklist for MDA on-site contractor employees as required by MDA Directive Number 5000.01, and return the completed checklist, with all required signatures, to the cognizant Contracting Officer’s Representative (COR). The COR will provide the completed form to the Contracting Officer to be retained in the official contract file by the Contracting Officer.

H-24 SECURITY CERTIFICATION AND ACCREDITATION SUPPORT (Dec 2010)

a. Security support shall include the development, implementation, and maintenance of all security documents, procedures, and agreements necessary to effect type and site accreditation at all operating locations in accordance with the Department of Defense Information Assurance Certification and Accreditation Process (DIACAP DODI 8510.01) and the MDA Information Assurance Program Plan (MDA Plan 8500.02-P).

b. The contractor shall be responsible for all the certification and accreditation functions assigned to the Certification Authority, Program Manager, and Developer/Integrator as outlined in DoDI 8510.01.

c. The contractor shall be responsible for Information Assurance Training, Certification, and Workforce Management in accordance with DODD 8570.01 and DOD 8570.01-M Information Assurance Workforce Improvement Program.

H-25

ACQUISITION OMBUDSMAN (APR 2009)

The MDA Acquisition Ombudsman is the Executive Director of the Agency. Government and contractor personnel may directly contact the Acquisition Ombudsman to ask that he inquire into any acquisition integrity issue and resolve it appropriately. The Acquisition Ombudsman will assist in handling integrity, fairness or other issues associated with individual contracts, source selections, award fee recommendations, and negotiations. His objective is to help MDA ensure that our processes, and their implementation, are fair, unbiased and consistent. You may contact the Acquisition Ombudsman at 703-697-7691, or by mail at Missile Defense Agency/DX, 7100 Defense Pentagon, Washington, D.C. 20307-7100.

CLAUSES INCORPORATED BY FULL TEXT

H-27 FOREIGN PERSONS (Jun 2010)

1. "Foreign National" (also known as Foreign Persons) as used in this clause means any person who is NOT:

a. a citizen or national of the United States; or

b. a lawful permanent resident; or

c. a protected individual as defined by 8 U.S.C.1324b(a)(3).

"Lawful permanent resident" is a person having the status of having been lawfully accorded the privilege of residing permanently in the United States as an immigrant in accordance with the immigration laws and such status not having changed.

"Protected individual" is an alien who is lawfully admitted for permanent residence, is granted the status of an alien lawfully admitted for temporary residence under 8 U.S.C.1160(a) or 8 U.S.C.1255a(a)(1), is admitted as a refugee under 8 U.S.C.1157, or is granted asylum under section 8 U.S.C.1158; but does not include (i) an alien who fails to apply for naturalization within six months of the date the alien first becomes eligible (by virtue of period of lawful permanent residence) to apply for naturalization or, if later, within six months after November 6, 1986, and (ii) an alien who has applied on a timely basis, but has not been naturalized as a citizen within 2 years after the date of the application, unless the alien can establish that the alien is actively pursuing naturalization, except that time consumed in the Service's processing the application shall not be counted toward the 2-year period.”

2. Prior to contract award, the contractor shall identify any lawful U.S. permanent residents and foreign nationals expected to be involved on this project as a direct employee, subcontractor or consultant. For these individuals, in addition to resumes, please specify their country of origin, the type of visa or work permit under which they are performing and an explanation of their anticipated level of involvement on this project. You may be asked to provide additional information during negotiations in order to verify the foreign citizen’s eligibility to participate on a contract. Supplemental information provided in response to this clause will be protected in accordance with Privacy Act (5 U.S.C. 552a), if applicable, and the Freedom of Information Act (5 U.S.C. 552(b)(6)). After award of the contract, the Contractor shall promptly notify the Contracting Officer and Contracting Officer's Representative with the information above prior to making any personnel changes involving foreign persons. No changes involving foreign persons will be allowed without prior approval from the Contracting Officer. This clause does not remove any liability from the contractor to comply with applicable ITAR and EAR export control obligations and restrictions. This clause shall be included in any subcontract."

CLAUSES INCORPORATED BY FULL TEXT

H-28 DISTRIBUTION CONTROL OF TECHNICAL INFORMATION (Apr 2011)

a. The following terms applicable to this clause are defined as follows:

1. Technical Document. Any recorded information (including software) that conveys scientific and technical information or technical data.

2. Scientific and Technical Information. Communicable knowledge or information resulting from or pertaining to the conduct or management of effort under this contract. (Includes programmatic information).

3. Technical Data. Recorded information related to experimental, developmental, or engineering works that can be used to define an engineering or manufacturing process or to design, procure, produce, support, maintain, operate, repair, or overhaul material. The data may be graphic or pictorial delineations in media such as drawings or photographs, text in specifications or related performance or design type documents, or computer printouts. Examples of technical data include research and engineering data, engineering drawings, and associated lists, specifications, standards, process sheets, manuals, technical reports, catalog item identifications, and related information and computer software documentation.

b. Except as otherwise set forth in the Contract Data Requirements List (CDRL), DD Form 1423, or paragraph e. below, the distribution of any technical documents prepared under this contract, in any stage of development or completion, is prohibited outside of the contractor and applicable subcontractors under this contract unless expressly authorized/directed by the Contracting Officer in writing

c. Except as otherwise set forth in the CDRL or otherwise directed by the government (e.g., paragraph d. below) all technical documents prepared under this contract shall be marked with the appropriate distribution statement, warning, and destruction notice in accordance with all marking references as specified in the DD Form 254.

H-29

COMMERCIAL COMPUTER SOFTWARE LICENSE (JUN 2010)

a. Unless otherwise approved by the PCO, commercial computer software licenses shall designate the U.S. Government as a contingent licensee, able to replace the Contractor as the primary licensee upon notifying the licensor. A copy of the negotiated license shall be furnished to the PCO. Per DFARS 227.7202, the terms of the licenses cannot be inconsistent with Federal procurement law and must satisfy user needs. This includes the Contractor's / subcontractor's needs for the software to perform this contract and the Government's needs for the software to accomplish the Government's ultimate objectives. At a minimum, this shall include the rights to make an archive copy of the software, to relocate the computer on which the software resides, to re-host the software on a different computer, to permit access by support contractors, and to permit the Government to transfer the license to another contractor.

b. Nothing in this clause shall take precedence over any other clause or provision of this contract. Government concurrence, as defined in paragraph a above, does not in any way affect the Government's technical data rights as established by the terms and conditions of this contract.

H-30 CONTRACTUAL TERMS & CONDITIONS (Jun 2010)

The terms and conditions herein constitute the entire contract and understanding of the parties and shall supersede all other communications, negotiations, arrangements and agreements, either oral or written, with respect to the subject matter hereof. All proposal documentation including, but not limited to, red line contract terms and conditions, red line statements of work and/or ground rules and assumptions are hereby void and carry no force or affect as it pertains to the interpretation or operation of the language of the instant contract nor should such language be used to provide meaning to any of the terms or conditions contained herein.

H-33 PROGRAM SYNCHRONIZATION (Nov 2010)

a. The Missile Defense Agency (MDA) requires the synchronized integration of platforms, sensors, and other components of the BMDS which were or are under separate development by multiple contractors. MDA uses the concept of End-to-End (EtE) performance to serve as the organizing principle that aligns and synchronizes these efforts to achieve the desired operational end-state for the BDMS.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .