Atch L8 - WBS to CLIN To SOW Cross Reference Matrix Final.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
Clear / Cod Upgrade EWR (UEWR)
Solicitation number
HQ0147-11-R-0002
Issued by

About this file

Atch L8 - WBS to CLIN To SOW Cross Reference Matrix Final

View the file

Other files

File Type Posted
Atch L1 OCI Disclosure Form —
Atch L7 Cost Price Exhibits 2-22-11.xlsx XLSX spreadsheet
Atch 19 - SPDP Cost and Software Data Reporting —
HQ0147-11-R-0002 Clear Cod Solicitation Amendment01_5 Mar 2012.pdf PDF
Atch 17 - Clear Cost and Software Data Reporting —
Atch 16 - Critical Design Review —
Atch 10 - Evaluation Factors for Award -Section M_28 FEB 2012.pdf PDF
Atch 18 - Cod Cost and Software Data Reporting —
Atch 09 - Instructions Conditions and Notices to Offerors - Section L_28 Feb 2012.pdf PDF
Atch 01 - CLIN Pricing Data Entry Sheet_21 Feb 2012.pdf PDF
Atch L6 - Client Authorization Letter.pdf PDF
Atch L9 Total Resources Volume.xlsx XLSX spreadsheet
Exhibit A - Clear CDRLs DD Form 1423-1.pdf PDF
Exhibit B - Cod CDRLs DD Form 1423-1.pdf PDF
Atch L4a Clear Cod PPQ Cover Letter 22 Feb.pdf PDF
Atch L1 - OCI Analysis-Disclosure Form.doc DOC document
Atch L4 - Clear-Cod Past Performance Questionnaire.docx DOCX document
Atch 04 - Government Furnished Property List_06 Feb 2012.pdf PDF
Atch 15 - List of Acronyms_06 Feb 2012.pdf PDF
Atch L2 - Past_Performance Reference List.docx DOCX document
Atch L3 - PAST PERFORMANCE INFORMATION.docx DOCX document
Atch 03 - DOD Contract Security Classification Specification —
Atch 12 - List Instructions for Cod CDRLs ADPs_06 Feb 2012.pdf PDF
Atch 07 - Clear Base Support Requirements List —
Atch 11 - List Instructions for Clear CDRLs ADPs_06 Feb 2012.pdf PDF
Atch L6 - Client Authorization Letter.docx DOCX document
Atch 02 - Scope of Work —
RFP Cover Letter.pdf PDF
Atch 10 - Evaluation Factors for Award - Section M_06 Feb 2012.pdf PDF
Atch L7 - Cost-Price Exhibits 11-18-11.xlsx XLSX spreadsheet
Atch 08 - Cod Base Support Requirements List —
Atch L4a - Clear Cod PPQ Cover Letter.docx DOCX document
Atch 06 - Incentive Fee Plan_06 Feb 2012.pdf PDF
Atch 13 - Air Force Technical Manual Contract Requirements —
Atch 05 - Award Fee Plan.docx DOCX document
Atch 09 - Instructions Conditions and Notices to Offerors - Section L_06 Feb 2012.pdf PDF
Atch 01 - CLIN Pricing Data Entry Sheet_06 Feb 2012.pdf PDF
Atch L5 - Subcontractor Consent Letter.docx DOCX document
Atch 14 - MDA Policy Memorandum No. 51 Organization Conflicts of Interest_06 Feb 2012.pdf PDF
HQ0147-11-R-0002 Request for Proposal Clear_Cod Upgrade Solicitation_6Feb12_FINAL.pdf PDF
Clear-Cod Section L 9 DEC 2011.docx DOCX document
Clear-Cod Section M 9 DEC 2011--CLEAN.docx DOCX document
Clear-Cod UEWR SOW-2Ltr Results CLEAN.1 8Dec11.docx DOCX document
Industry Day_1 Q.As 08.31.11.pdf PDF
Attachment 1 Cover Letter Executed.pdf PDF
Attachment 2 RFP HQ0147-11-R-0002.doc DOC document
Attachment 4 Section M.docx DOCX document
Attachment 7 GFE.pdf PDF
Attachment 5 Statement of Work.docx DOCX document
Attachment 3 Section L.docx DOCX document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WBS

WBS/Item NumberWBS Indent LevelWBS/CES DescriptionSOW Paragraphs
11Clear/Cod UEWR
1.12CLIN0001 Clear Radar Design, Development and Sustainment Rev G
1.1.13Contractor Development Plant
1.1.1.14Prime Mission Product
1.1.1.1.15Receiver/Exciter (REX)
1.1.1.1.1.16REX Hardware3.3.2.63.3.2.1
1.1.1.1.1.26REX Software (RES)3.3.1.23.3.1.3
1.1.1.1.1.36REX Integration, Assembly, Test, Checkout3.3.2.6
1.1.1.1.25Frequency Time Standard (FTS)
1.1.1.1.2.16FTS Hardware3.3.2.63.3.2.1
1.1.1.1.2.26FTS Integration, Assembly, Test, Checkout3.3.2.6
1.1.1.1.35Cooling Environmental Monitor (CEM)
1.1.1.1.3.16CEM Hardware3.3.2.63.3.2.1
1.1.1.1.3.26CEM Integration, Assembly, Test, Checkout3.3.2.6
1.1.1.1.45Receiver Beamformer Network (RBF)
1.1.1.1.4.16RBF Hardware3.3.2.63.3.2.1
1.1.1.1.4.26RBF Integration, Assembly, Test, Checkout3.3.2.6
1.1.1.1.55Beam Steering Unit (BSU)
1.1.1.1.5.16BSU Hardware3.3.2.63.3.2.1
1.1.1.1.5.26BSU Integration, Assembly, Test, Checkout3.3.2.6
1.1.1.1.65Signal Processor
1.1.1.1.6.16SP Hardware3.3.2.6
1.1.1.1.6.26SP Software (SPS)3.3.1.23.3.1.3
1.1.1.1.6.36SP Integration, Assembly Test, Checkout3.3.2.6
1.1.1.1.75Data Processor
1.1.1.1.7.16DP Hardware3.3.2.6
1.1.1.1.7.26DP Software
1.1.1.1.7.2.17MAS3.3.1.23.3.1.3
1.1.1.1.7.2.27STS3.3.1.23.3.1.3
1.1.1.1.7.36DP Integration, Assembly Test, Checkout3.3.2.6
1.1.1.1.85Development String Activation/Install3.3.2.6
1.1.1.24Development String Product Support3.6.3
1.1.23Clear UEWR
1.1.2.14Prime Mission Product
1.1.2.1.15Receiver/Exciter (REX)
1.1.2.1.1.16REX Hardware3.3.2.3
1.1.2.1.1.26REX Software (RES)
1.1.2.1.1.36REX Integration, Assembly, Test, Checkout3.3.2.3
1.1.2.1.25Frequency Time Standard (FTS)
1.1.2.1.2.16FTS Hardware3.3.2.3
1.1.2.1.2.26FTS Integration, Assembly, Test, Checkout3.3.2.3
1.1.2.1.35Cooling Environmental Monitor (CEM)
1.1.2.1.3.16CEM Hardware3.3.2.3
1.1.2.1.3.26CEM Integration, Assembly, Test, Checkout3.3.2.3
1.1.2.1.45Receiver Beamformer Network (RBF)
1.1.2.1.4.16RBF Hardware3.3.2.3
1.1.2.1.4.26RBF Integration, Assembly, Test, Checkout3.3.2.3
1.1.2.1.55Beam Steering Unit (BSU)
1.1.2.1.5.16BSU Hardware3.3.2.3
1.1.2.1.5.26BSU Integration, Assembly, Test, Checkout3.3.2.3
1.1.2.1.65Signal Processor
1.1.2.1.6.16SP Hardware3.3.2.3
1.1.2.1.6.26SP Software (SPS)
1.1.2.1.6.36SP Integration, Assembly, Test, Checkout3.3.2.3
1.1.2.1.75Data Processor
1.1.2.1.7.16DP Hardware3.3.2.3
1.1.2.1.7.26DP Software
1.1.2.1.7.2.17MAS
1.1.2.1.7.2.27STS
1.1.2.1.7.36DP Integration, Assembly, Test, Checkout3.3.2.3
1.1.2.1.85Simulator/Tester (ST)
1.1.2.1.8.16ST Hardware3.3.2.3
1.1.2.1.8.26ST Integration Assembly, Test, Checkout3.3.2.3
1.1.2.1.95In-plant PME Integration, Assembly, Test, Checkout3.4.23.4.3
1.1.2.24Interim Equipment3.3.2.4
1.1.2.34Common Support Equipment3.3.2.5
1.1.2.44Peculiar Support Equipment3.3.2.5
1.1.2.54Spares and Repair Parts3.3.2.33.6.3
1.1.2.64Product Support
1.1.2.6.15In-plant Support3.6.3
1.1.2.6.25Post-deployment Sustainment3.6.4
1.1.2.74Site Activation/Install
1.1.2.7.15Facility Design Support3.6.1.2
1.1.33Huntsville Lab Upgrades
1.1.3.14Prime Mission Product
1.1.3.1.15Data Processor
1.1.3.1.1.16DP Hardware3.3.2.75.3.2.5
1.1.3.1.1.26DP Integration, Assembly Test, Checkout3.3.2.75.3.2.5
1.1.3.24Spares and Repair Parts3.3.2.75.3.2.5
1.1.3.34Huntsville Lab Product Support3.6.3
1.1.3.44Site Activation/Install
1.1.3.4.15Facility Design3.3.2.7
1.22CLIN0002 Clear Radar Integration and Deployment
1.2.13Clear UEWR
1.2.1.14Prime Mission Product
1.2.1.1.15Receiver/Exciter (REX)
1.2.1.1.1.16REX Hardware3.3.2.3
1.2.1.1.1.26REX Software (RES)3.3.1
1.2.1.1.25Frequency Time Standard (FTS)
1.2.1.1.2.16FTS Hardware3.3.2.3
1.2.1.1.35Cooling Environmental Monitor (CEM)
1.2.1.1.3.16CEM Hardware3.3.2.3
1.2.1.1.45Receiver Beamformer Network (RBF)
1.2.1.1.4.16RBF Hardware3.3.2.3
1.2.1.1.55Beam Steering Unit (BSU)
1.2.1.1.5.16BSU Hardware3.3.2.3
1.2.1.1.65Signal Processor
1.2.1.1.6.16SP Hardware3.3.2.3
1.2.1.1.6.26SP Software3.3.1
1.2.1.1.75Data Processor
1.2.1.1.7.16DP Hardware3.3.2.3
1.2.1.1.7.26DP Software3.3.1
1.2.1.1.85Simulator/Tester (ST)
1.2.1.1.8.16ST Hardware3.3.2.3
1.2.1.24On-site Activation/Install
1.2.1.2.15Facility Design3.6.1.2
1.2.1.2.25Facility Construction3.6.1.3
1.2.1.2.35System Assembly, Installation3.3.13.3.2.3
1.2.1.2.45Facility Deinstallation/Remediation3.6.2
1.2.1.2.55Radar Recalibration/Reconfiguration3.6.2
1.2.1.34On-Site Test and Evaluation3.4.13.4.23.4.4
1.2.1.44Product Support
1.2.1.4.15Preoperational Support3.6.3
1.2.23Huntsville Lab Upgrades
1.2.2.14Prime Mission Product
1.2.2.1.15Data Processor
1.2.2.1.1.16DP Hardware3.3.2.75.3.2.5
1.2.2.1.1.26DP Software3.3.2.75.3.2.5
1.2.2.24Product Support3.6.3
1.2.2.34On Site Activation/Install
1.2.2.3.15Facility Design3.3.2.7
1.2.2.3.25Facility Construction3.3.2.7
1.2.2.3.35System Assembly, Installation3.3.2.7
1.32CLIN0004 Signal Processor/Data Processor (SP/DP) Rehost
1.3.13Contractor Development Plant
1.3.1.14Program Management3.1
1.3.1.24Prime Mission Product
1.3.1.2.15Signal Processor
1.3.1.2.1.16SP Hardware3.3.2.2
1.3.1.2.1.26SP Software (SPS)3.3.1.1
1.3.1.2.1.36SP Integration, Assembly, Test, Checkout3.3.1.13.3.2.2
1.3.1.2.25Data Processor
1.3.1.2.2.16DP Hardware3.3.2.2
1.3.1.2.2.26DP Software
1.3.1.2.2.2.17MAS3.3.1.1
1.3.1.2.2.2.27STS3.3.1.1
1.3.1.2.2.36DP Integration, Assembly Test, Checkout3.3.1.13.3.2.2
1.3.1.2.35In-plant PME Integration, Assembly, Test, Checkout3.3.1.13.3.2.23.4.3
1.3.1.34Interim Equipment3.3.2.4
1.3.1.44Common Support Equipment3.3.2.5
1.3.1.54Peculiar Support Equipment3.3.2.5
1.3.1.64Spares and Repair Parts3.3.2.3
1.3.1.74Systems Engineering3.2
1.3.1.7.15Specialty Engineering3.2.1
1.3.1.7.25Systems Requirements Allocation3.2.2
1.3.1.7.35Risk Management3.2.3
1.3.1.7.45Safety, Quality, Mission Assurance3.2.4
1.3.1.7.55Configuration Management3.2.5
1.3.1.7.65Information Assurance3.2.6
1.3.1.84Product Support
1.3.1.8.15In-plant Support3.6.3
1.3.1.94Development String Activation/Install3.4.2
1.3.23CISF
1.3.2.14Program Management3.1
1.3.2.24Systems Engineering3.2
1.3.2.34Prime Mission Product3.3.1.13.3.2.23.3.2.3
1.3.2.44Site Activation/Install
1.3.2.4.15System Assembly, Installation, Test, Checkout3.3.1.13.3.2.2
1.3.2.54Product Support
1.3.2.5.15Preoperational Support3.6.3
1.42CLIN0006 SP/DP Deployment to CISF
1.4.13CISF
1.4.1.14Program Management3.1
1.4.1.24Prime Mission Product
1.4.1.2.15Signal Processor
1.4.1.2.1.16SP Hardware3.3.2.2
1.4.1.2.1.26SP Software3.3.1.1
1.4.1.2.25Data Processor
1.4.1.2.2.16DP Hardware3.3.2.2
1.4.1.2.2.26DP Software3.3.1.1
1.4.1.34Spares and Repair Parts3.3.2.3
1.4.1.44Systems Engineering3.2
1.4.1.4.15Specialty Engineering3.2.1
1.4.1.4.25Systems Requirements Allocation3.2.2
1.4.1.4.35Risk Management3.2.3
1.4.1.4.45Safety, Quality, Mission Assurance3.2.4
1.4.1.4.55Configuration Management3.2.5
1.4.1.4.65Information Assurance3.2.6
1.4.1.54Product Support
1.4.1.5.15Preoperational Support3.6.3
1.4.1.5.25Post-operational Support3.3.2.2
1.4.1.64Site Activation/Install
1.4.1.6.15System Assembly, Installation, Test, Checkout3.3.1.13.3.2.2
1.52CLIN0008 SP/DP Deployment to Beale
1.5.13Beale UEWR
1.5.1.14Program Management3.1
1.5.1.24Prime Mission Product
1.5.1.2.15Signal Processor
1.5.1.2.1.16SP Hardware3.3.2.2
1.5.1.2.1.26SP Software3.3.1.1
1.5.1.2.1.36SP Integration, Assembly Test, Checkout3.3.1.13.3.2.2
1.5.1.2.25Data Processor
1.5.1.2.2.16DP Hardware3.3.2.2
1.5.1.2.2.26DP Software3.3.1.1
1.5.1.2.2.36DP Integration, Assembly Test, Checkout3.3.1.13.3.2.2
1.5.1.34Interim Equipment3.3.2.4
1.5.1.44Common Support Equipment3.3.2.5
1.5.1.54Peculiar Support Equipment3.3.2.5
1.5.1.64Spares and Repair Parts3.3.2.3
1.5.1.74Systems Engineering3.2
1.5.1.7.15Specialty Engineering3.2.1
1.5.1.7.25Systems Requirements Allocation3.2.2
1.5.1.7.35Risk Management3.2.3
1.5.1.7.45Safety, Quality, Mission Assurance3.2.4
1.5.1.7.55Configuration Management3.2.5
1.5.1.7.65Information Assurance3.2.6
1.5.1.84Product Support
1.5.1.8.15Preoperational Support3.6.3
1.5.1.8.25Post-deployment Sustainment3.6.4
1.5.1.94Site Activation/Install
1.5.1.9.15Facility Design3.6.1.1
1.5.1.9.25Facility Construction3.6.1.1
1.5.1.9.35System Assembly, Installation3.3.1.13.3.2.2
1.5.1.9.45Facility Deinstallation/Remediation3.6.2
1.5.1.9.55Radar Recalibration/Reconfiguration3.6.2
1.5.1.104On-Site Test and Evaluation3.4.13.4.23.4.43.3.1.13.3.2.2
1.62CLIN0010 Clear Radar Special Studies
1.6.13Clear UEWR3.5
1.72CLIN0011 Clear SE/PM
1.7.13Clear UEWR
1.7.1.14Program Management3.1
1.7.1.24Systems Engineering3.2
1.7.1.2.15Specialty Engineering3.2.1
1.7.1.2.25Systems Requirements Allocation3.2.2
1.7.1.2.35Risk Management3.2.3
1.7.1.2.45Safety, Quality, Mission Assurance3.2.4
1.7.1.2.55Configuration Management3.2.5
1.7.1.2.65Information Assurance3.2.6
1.82CLIN 0013 Cod Radar Design and Development CLIN 0013
1.8.13Contractor Development Plant
1.8.1.14Prime Mission Product
1.8.1.1.15Receiver/Exciter (REX)
1.8.1.1.1.16REX Hardware5.3.2.4
1.8.1.1.1.26REX Software (RES)5.3.1
1.8.1.1.1.36REX Integration, Assembly, Test, Checkout5.3.15.3.2.4
1.8.1.1.25Frequency Time Standard (FTS)
1.8.1.1.2.16FTS Hardware5.3.2.4
1.8.1.1.2.26FTS Integration, Assembly, Test, Checkout5.3.2.4
1.8.1.1.35Cooling Environmental Monitor (CEM)
1.8.1.1.3.16CEM Hardware5.3.2.4
1.8.1.1.3.26CEM Integration, Assembly, Test, Checkout5.3.2.4
1.8.1.1.45Receiver Beamformer Network (RBF)
1.8.1.1.4.16RBF Hardware5.3.2.4
1.8.1.1.4.26RBF Integration, Assembly, Test, Checkout5.3.2.4
1.8.1.1.55Beam Steering Unit (BSU)
1.8.1.1.5.16BSU Hardware5.3.2.4
1.8.1.1.5.26BSU Integration, Assembly, Test, Checkout5.3.2.4
1.8.1.1.65Signal Processor
1.8.1.1.6.16SP Hardware5.3.2.4
1.8.1.1.6.26SP Software (SPS)5.3.1
1.8.1.1.6.36SP Integration, Assembly Test, Checkout5.3.15.3.2.4
1.8.1.1.75Data Processor
1.8.1.1.7.16DP Hardware5.3.2.4
1.8.1.1.7.26DP Software
1.8.1.1.7.2.17MAS5.3.1
1.8.1.1.7.2.27STS5.3.1
1.8.1.1.7.36DP Integration, Assembly Test, Checkout5.3.15.3.2.4
1.8.1.1.85Simulator/Tester (ST)
1.8.1.1.8.16ST Hardware5.3.2.4
1.8.1.1.8.26ST Integration Assembly, Test, Checkout5.3.2.4
1.8.1.24Development String Product Support5.7
1.8.23Cape Cod UEWR
1.8.2.14Prime Mission Product
1.8.2.1.15Receiver/Exciter (REX)
1.8.2.1.1.16REX Hardware5.3.2.1
1.8.2.1.1.26REX Software (RES)
1.8.2.1.1.36REX Integration, Assembly, Test, Checkout5.3.15.3.2.1
1.8.2.1.25Frequency Time Standard (FTS)
1.8.2.1.2.16FTS Hardware5.3.2.1
1.8.2.1.2.26FTS Integration, Assembly, Test, Checkout5.3.15.3.2.1
1.8.2.1.35Cooling Environmental Monitor (CEM)
1.8.2.1.3.16CEM Hardware5.3.2.1
1.8.2.1.3.26CEM Integration, Assembly, Test, Checkout5.3.15.3.2.1
1.8.2.1.45Receiver Beamformer Network (RBF)
1.8.2.1.4.16RBF Hardware5.3.2.1
1.8.2.1.4.26RBF Integration, Assembly, Test, Checkout5.3.2.1
1.8.2.1.55Beam Steering Unit (BSU)
1.8.2.1.5.16BSU Hardware5.3.2.1
1.8.2.1.5.26BSU Integration, Assembly, Test, Checkout5.3.2.1
1.8.2.1.65Signal Processor
1.8.2.1.6.16SP Hardware5.3.2.1
1.8.2.1.6.26SP Software (SPS)
1.8.2.1.6.36SP Integration, Assembly Test, Checkout5.3.2.1
1.8.2.1.75Data Processor
1.8.2.1.7.16DP Hardware5.3.2.1
1.8.2.1.7.26DP Software
1.8.2.1.7.2.17MAS
1.8.2.1.7.2.27STS
1.8.2.1.7.36DP Integration, Assembly Test, Checkout5.3.2.1
1.8.2.1.85Simulator/Tester (ST)
1.8.2.1.8.16ST Hardware5.3.2.1
1.8.2.1.8.26ST Integration Assembly, Test, Checkout5.3.15.3.2.1
1.8.2.1.95In-plant System Integration, Assembly, Test, Checkout5.4.25.4.3
1.8.2.24Interim Equipment5.3.2.2
1.8.2.34Common Support Equipment5.3.2.3
1.8.2.44Peculiar Support Equipment5.3.2.3
1.8.2.54Spares and Repair Parts5.3.2.15.7
1.8.2.64Product Support
1.8.2.6.15In-plant Support5.7
1.92CLIN0014 Cod Radar Integration and Deployment
1.9.13Cape Cod UEWR
1.9.1.14Prime Mission Product
1.9.1.1.15Receiver/Exciter (REX)
1.9.1.1.1.16REX Hardware5.3.2.1
1.9.1.1.1.26REX Software5.3.1
1.9.1.1.25Frequency Time Standard (FTS)
1.9.1.1.2.16FTS Hardware5.3.2.1
1.9.1.1.35Cooling Environmental Monitor (CEM)
1.9.1.1.3.16CEM Hardware5.3.2.1
1.9.1.1.45Receiver Beamformer Network (RBF)
1.9.1.1.4.16RBF Hardware5.3.2.1
1.9.1.1.55Beam Steering Unit (BSU)
1.9.1.1.5.16BSU Hardware5.3.2.1
1.9.1.1.65Signal Processor
1.9.1.1.6.16SP Hardware5.3.2.1
1.9.1.1.6.26SP Software5.3.1
1.9.1.1.75Data Processor
1.9.1.1.7.16DP Hardware5.3.2.1
1.9.1.1.7.26DP Software5.3.1
1.9.1.1.85Simulator/Tester (ST)
1.9.1.1.8.16ST Hardware5.3.2.1
1.9.1.24On Site Activation/Install
1.9.1.2.15System Assembly, Installation5.3.15.3.2.1
1.9.1.34On-Site Test and Evaluation5.4.15.4.25.4.4
1.9.1.44Product Support
1.9.1.4.15Preoperational Support5.7
1.12CLIN0015 Cape Cod Radar Facility Modifications
1.10.13Cape Cod UEWR
1.10.1.14Facility Design5.6.1
1.10.1.24Facility Construction5.6.2
1.10.1.34Facility Deinstallation/Remediation5.6.25.6.3
1.10.1.44Radar Recalibration/Reconfiguration5.6.2
1.112CLIN0016 Radar Sustainment
1.11.13Cape Cod UEWR
1.11.1.14Product Support
1.11.1.1.15Post-Deployment Sustainment5.8
1.11.23Clear UEWR
1.11.2.14Product Support
1.11.2.1.15Post-Deployment Sutainment5.8
1.122CLIN0017 Cape Cod Long Lead Items
1.12.13Cape Cod UEWR
1.12.1.14Prime Mission Product4
1.12.1.24Interim Equipment4
1.12.1.34Common Support Equipment4
1.12.1.44Peculiar Support Equipment4
1.12.1.54Spares and Repair Parts4
1.132CLIN0018 Cape Cod Radar Special Studies
1.13.13Cape Cod UEWR5.5
1.142CLIN0019 Cape Cod SE/PM
1.14.13Cape Cod UEWR
1.14.1.14Program Management5.1
1.14.1.24Systems Engineering5.2
1.14.1.2.15Specialty Engineering5.2.1
1.14.1.2.25Systems Requirements Allocation5.2.2
1.14.1.2.35Risk Management5.2.3
1.14.1.2.45Safety, Quality, Mission Assurance5.2.4
1.14.1.2.55Configuration Management5.2.5
1.14.1.2.65Information Assurance5.2.6