Atch 19 - SPDP Cost and Software Data Reporting (CSDR) v2 (6 Dec)
Text of this file
DD Form 2794, Pg 1 (CSDR Plan)
COST AND SOFTWARE DATA REPORTING PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
| 1. MAJOR PROGRAM | a. NAME: | SP/DP Rehost, CISF, and Beale UEWR (CLINs 4,6,8) | |||||||||||||||
| b. PHASE/MILESTONE | c. PRIME MISSION PRODUCT | 2. WBS SYSTEM TYPE | 3. SUBMISSION TYPE | 4. CURRENT SUBMISSION DATE (YYYYMMDD) | 5. LAST APPROVED PLAN DATE (YYYYMMDD) | ||||||||||||
| Pre-A | x | B | x | C-FRP | SP/DP Rehost, CISF, and Beale UEWR | MIL-STD 881C Appendix B Electronic Systems | x | INITIAL | |||||||||
| A | C-LRIP | x | O&S | CHANGE | n/a | ||||||||||||
| 6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code) | 6b. TELEPHONE NUMBER (Include Area Code) | 6c. FAX NUMBER (Include Area Code) | 6d. E-MAIL ADDRESS | ||||||||||||||
| TBD | TBD | TBD | TBD | ||||||||||||||
| 7. PLAN TYPE | 8. PREPARING ORGANIZATION | 9a. CONTRACTOR NAME/ADDRESS | 9b. CONTRACT NUMBER | 9c. APPROPRIATION | 10. APPROVED PLAN NUMBER | ||||||||||||
| x | PROGRAM | CONTRACT (PRIME) | i. PERFORMING ORGANIZATION | ii. DIVISION | TBD | RDT&E | n/a | ||||||||||
| CONTRACT (SUB) | MDA/SNU ESC/HSIG | TBD | TBD | x | PROCUREMENT | ||||||||||||
| O&M | |||||||||||||||||
| 11. WBS ELEMENT CODE | 12. | ||||||||||||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | ||||||||||||||||
| (X if applicable) | DD 1921-3 (CBDR): | ||||||||||||||||
| a. PROGRAM/ | |||||||||||||||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | ||||||||||||||||
| SUBCONTRACT | a. CWBS | ||||||||||||||||
| DICTIONARY | b. DD 1921 | ||||||||||||||||
| (CDSR) | c. DD 1921-1 | ||||||||||||||||
| (FCHR) | d. DD 1921-2 | ||||||||||||||||
| (PCR) | e. DD 1921-4 | ||||||||||||||||
| (CSR) | f. SRDR |
FORMATS
| 1.3 | CLIN0004 Signal Processor/Data Processor (SP/DP) Rehost | x | x | x | ||||
| 1.3.1 | Contractor Development Plant | x | x | x | ||||
| 1.3.1.1 | Program Management | x | x | x | ||||
| 1.3.1.2 | Prime Mission Product | x | x | |||||
| 1.3.1.2.1 | Signal Processor | x | x | x | ||||
| 1.3.1.2.1.1 | SP Hardware | x | x | x | ||||
| 1.3.1.2.1.2 | SP Software (SPS) | x | x | x | ||||
| 1.3.1.2.1.3 | SP Integration, Assembly, Test, Checkout | x | x | x | ||||
| 1.3.1.2.2 | Data Processor | x | x | x | ||||
| 1.3.1.2.2.1 | DP Hardware | x | x | x | ||||
| 1.3.1.2.2.2 | DP Software | x | x | |||||
| 1.3.1.2.2.2.1 | MAS | x | x | x | ||||
| 1.3.1.2.2.2.2 | STS | x | x | x | ||||
| 1.3.1.2.2.3 | DP Integration, Assembly Test, Checkout | x | x | x | ||||
| 1.3.1.2.3 | In-plant PME Integration, Assembly, Test, Checkout | x | x | x | ||||
| 1.3.1.3 | Interim Equipment | x | x | |||||
| 1.3.1.4 | Common Support Equipment | x | x | |||||
| 1.3.1.5 | Peculiar Support Equipment | x | x | |||||
| 1.3.1.6 | Spares and Repair Parts | x | x | |||||
| 1.3.1.7 | Systems Engineering | x | x | x | ||||
| 1.3.1.7.1 | Specialty Engineering | x | ||||||
| 1.3.1.7.2 | Systems Requirments Allocation | x | ||||||
| 1.3.1.7.3 | Risk Management | x | ||||||
| 1.3.1.7.4 | Safety, Quality, Mission Assurance | x | ||||||
| 1.3.1.7.5 | Configuration Management | x | ||||||
| 1.3.1.7.6 | Information Assurance | x | ||||||
| 1.3.1.8 | Product Support | x | x | |||||
| 1.3.1.8.1 | In-plant Support | x | x | |||||
| 1.3.1.9 | Development String Activation/Install | x | x | x | ||||
| 1.3.2 | CISF | x | x | x | ||||
| 1.3.2.1 | Program Management | x | x | x | ||||
| 1.3.2.2 | Systems Engineering | x | x | x | ||||
| 1.3.2.3 | Prime Mission Product | x | x | x | ||||
| 1.3.2.4 | Site Activation/Install | x | x | x | ||||
| 1.3.2.4.1 | System Assembly, Installation, Test, Checkout | x | x | x | ||||
| 1.3.2.5 | Product Support | x | x | |||||
| 1.3.2.5.1 | Preoperational Support | x | x | |||||
| 1.4 | CLIN0006 SP/DP Deployment to CISF | x | x | x | ||||
| 1.4.1 | CISF | x | x | x | ||||
| 1.4.1.1 | Program Management | x | x | x | ||||
| 1.4.1.2 | Prime Mission Product | x | x | |||||
| 1.4.1.2.1 | Signal Processors | x | x | x | ||||
| 1.4.1.2.1.1 | SP Hardware | x | x | x | ||||
| 1.4.1.2.1.2 | SP Software | x | x | x | ||||
| 1.4.1.2.2 | Data Processor | x | x | x | ||||
| 1.4.1.2.2.1 | DP Hardware | x | x | x | ||||
| 11. WBS ELEMENT CODE | 12. | |||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | |||||||
| (X if applicable) | DD 1921-3 (CBDR): | |||||||
| a. PROGRAM/ | ||||||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||||||
| SUBCONTRACT | a. CWBS | |||||||
| DICTIONARY | b. DD 1921 | |||||||
| (CDSR) | c. DD 1921-1 | |||||||
| (FCHR) | d. DD 1921-2 | |||||||
| (PCR) | e. DD 1921-4 | |||||||
| (CSR) | f. SRDR |
FORMATS
| 1.4.1.2.2.2 | DP Software | x | x | x |
| 1.4.1.3 | Spares and Repair Parts | x | x | |
| 1.4.1.4 | Systems Engineering | x | x | x |
| 1.4.1.4.1 | Specialty Engineering | x | ||
| 1.4.1.4.2 | Systems Requirments Allocation | x | ||
| 1.4.1.4.3 | Risk Management | x | ||
| 1.4.1.4.4 | Safety, Quality, Mission Assurance | x | ||
| 1.4.1.4.5 | Configuration Management | x | ||
| 1.4.1.4.6 | Information Assurance | x | ||
| 1.4.1.5 | Product Support | x | ||
| 1.4.1.5.1 | Preoperational Support | x | x | |
| 1.4.1.5.2 | Post-operational Support | x | x | |
| 1.4.1.6 | Site Activation/Install | x | x | |
| 1.4.1.6.1 | System Assembly, Installation, Test, Checkout | x | x | x |
| 1.5 | CLIN0008 SP/DP Deployment to Beale | x | x | x |
| 1.5.1 | Beale UEWR | x | x | x |
| 1.5.1.1 | Program Management | x | x | x |
| 1.5.1.2 | Prime Mission Product | x | x | |
| 1.5.1.2.1 | Signal Processors | x | x | x |
| 1.5.1.2.1.1 | SP Hardware | x | x | x |
| 1.5.1.2.1.2 | SP Software | x | x | x |
| 1.5.1.2.1.3 | SP Integration, Assembly Test, Checkout | x | x | x |
| 1.5.1.2.2 | Data Processor | x | x | x |
| 1.5.1.2.2.1 | DP Hardware | x | x | x |
| 1.5.1.2.2.2 | DP Software | x | x | x |
| 1.5.1.2.2.3 | DP Integration, Assembly Test, Checkout | x | x | x |
| 1.5.1.3 | Interim Equipment | x | x | |
| 1.5.1.4 | Common Support Equipment | x | x | |
| 1.5.1.5 | Peculiar Support Equipment | x | x | |
| 1.5.1.6 | Spares and Repair Parts | x | x | |
| 1.5.1.7 | Systems Engineering | x | x | x |
| 1.5.1.7.1 | Specialty Engineering | x | ||
| 1.5.1.7.2 | Systems Requirments Allocation | x | ||
| 1.5.1.7.3 | Risk Management | x | ||
| 1.5.1.7.4 | Safety, Quality, Mission Assurance | x | ||
| 1.5.1.7.5 | Configuration Management | x | ||
| 1.5.1.7.6 | Information Assurance | x | ||
| 1.5.1.8 | Product Support | x | x | |
| 1.5.1.8.1 | Preoperational Support | x | x | |
| 1.5.1.8.2 | Post-deployment Sustainment | x | x | |
| 1.5.1.9 | Site Activation/Install | x | x | x |
| 1.5.1.9.1 | Facility Design | x | x | x |
| 1.5.1.9.2 | Facility Construction | x | x | x |
| 1.5.1.9.3 | System Assembly, Installation | x | x | x |
| 1.5.1.9.4 | Facility Deinstallation/Remediation | x | x | x |
| 1.5.1.9.5 | Radar Recalibration/Reconfiguration | x | x | x |
| 1.5.1.10 | On-Site Test and Evaluation | x | x | x |
&L&"Arial,Bold"DD FORM 2794, MAY 2011
DD Form 2794, Pg 2 (CSDR Plan)
| 14. CSDR SUBMISSION DATES | ||||||
| a. | ||||||
| SUBMISSION | b. | |||||
| FORM(S) | c. | |||||
| EVENT | d. AS OF DATE | e. DUE DATE | ||||
| (YYYYMMDD) | (YYYYMMDD) | |||||
| 1 | CWBS Dictionary, 1921, 1921-1 | 60 days post IBR | ||||
| 2 | 1921, 1921-1 | 60 days post Beale Operational Acceptance | ||||
| 3 | 1921, 1921-1 | 30 days post Contract Period of Performance Conclusion | ||||
| 15. REMARKS | ||||||
| DD FORM 2794 (PAGE 2), MAY 2011 | PREVIOUS EDITION IS OBSOLETE |
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .