Atch 01 - CLIN Pricing Data Entry Sheet_06 Feb 2012.pdf
PDF 160 KB Posted
- Attached to
- Clear / Cod Upgrade EWR (UEWR)
- Solicitation number
- HQ0147-11-R-0002
- Issued by
-
DOD Missile Defense Agency
About this file
Atch 01 - CLIN Pricing Data Entry Sheet_06 Feb 2012
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section J, Attachment # 1, CLIN Pricing Data Entry Sheet
NOTE: COST AND PRICING DATA ENTERED IN SECTION B SHALL NOT BE CONSIDERED FOR
REVIEW AND SUBSEQUENT CONTRACT AWARD. ALL ENTRIES OF COST/PRICING WILL BE
ENTERED ON THIS ATTACHMENT ONLY
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Clear Radar Design, Dev/Sus, Rev G
FPI
CLEAR Radar Design, Development, Material & Sustainment REV G
Share Ratio below & above target 50/50
Ceiling Price = 120% Target Cost
Maximum Target Profit = 10% of Target Cost
FOB: Destination
This CLIN includes all Clear design, development, hardware purchases and in-plant developmental test activities. All work through Ship Readiness Review.
This CLIN also includes purchase of all support agreements and one year of sustainment activities following operational acceptance of Clear. This CLIN also includes the purchase of the Huntsville UEWR representations for Beale, Clear, and Cape Cod.
TARGET COST
TARGET PROFIT
TOTAL TARGET PRICE
CEILING PRICE
SHARE RATIO ABOVE TARGET
SHARE RATIO BELOW TARGET
CLEAR Integration & Deployment
CPAF
Cost Plus Award Fee - CPAF
CLEAR Radar Integration & Deployment
FOB: Destination
This CLIN includes all work at the site to install and test the UEWR system at
Clear AFS through recalibration, reconfiguration and the final operational acceptance. This CLIN also includes the installation and test of the Huntsville
UEWR representations for Beale, Clear and Cape Cod.
Base Fee shall equal $0.00
ESTIMATED COST
BASE FEE
SUBTOTAL EST COST + BASE
MAX AWARD FEE
TOTAL EST COST + FEE
REVIEW AND SUBSEQUENT CONTRACT AWARD. ALL ENTRIES OF COST/PRICING WILL BE
Award Fee for CLIN 0002
COST
Maximum Award Fee = 12%, no base fee
FOB: Destination
This CLIN only includes award fee invoicing for CLIN 0002. Reference Award
Fee Plan.
Signal Processor/Data Processor (SP/DP)
CPIF
Share Ratio Below 97% of Target Cost = 40/60
Share Ratio Above 103% of Target Cost = 60/40
Target Fee = 3.5% (earned in the cost range of 97% to 103% of Target Cost)
Minimum Fee = 2%
Maximum Fee = 4.5%
FOB: Destination
This CLIN includes all activities to design the replacement of the SP/DP suite.
This CLIN includes all effort in plant through the Ship Readiness Review to the
Consolidated, Integrated Support Facility (CISF) and continues to the point where the first CISF System Programming Agency (SPA) string is fully prepped and approved by the government for the Development Test program. This CLIN also includes the contractor's applicable program management and systems engineering for the work on this CLIN.
*Refer to Section I, FAR 52.216-10, Incentive Fee and also Attachment #6, Section J, Incentive Fee Plan
TARGET FEE
TOTAL TGT COST + FEE
MINIMUM FEE
MAXIMUM FEE
REVIEW AND SUBSEQUENT CONTRACT AWARD. ALL ENTRIES OF COST/PRICING WILL BE
Schedule Incentive Fee for CLIN 0004
COST
Performance/Schedule Incentive Fee for CLIN 0004
Target Fee = 9.0%
Minimum Fee = 0%
Maximum Fee = 10.5%
FOB: Destination
SP/DP Deployment to CISF
CPIF
Share Ratio Below 97% of Target Cost = 40/60
Share Ratio Above 103% of Target Cost = 60/40
Target Fee = 3.5% (earned in the cost range of 97% to 103% of Target Cost)
Minimum Fee = 2%
Maximum Fee = 4.5%
FOB: Destination
This CLIN includes all activities to conduct, correct, and complete the SPA development test for the SP/DP suite proving the system is ready for deployment to Beale. This CLIN includes applicable program management, systems engineering, logistics management and the purchase, installation and check out of the second string.
REVIEW AND SUBSEQUENT CONTRACT AWARD. ALL ENTRIES OF COST/PRICING WILL BE
Sch Incentive Fee for CLIN 0006
COST
Performance/Schedule Incentive Fee for CLIN 0006
Target Fee = 8.0%
Minimum Fee = 0%
SP/DP Deployment to Beale
CPIF
Share Ratio Below 97% of Target Cost = 40/60
Share Ratio Above 103% of Target Cost = 60/40
Target Fee = 3.5% (earned in the cost range of 97% to 103% of Target Cost)
Minimum Fee = 2%
Maximum Fee = 4.5%
FOB: Destination
This CLIN includes all activities to purchase, install, and test the SP/DP suite through operational acceptance of the SP/DP suite at Beale. This CLIN includes the finalization of the site and technical data package that documents the physical configuration, the functional configuration and the logistical/operational manuals for all associated SP/DP hardware and software. This includes sustainment of the deployed assets to Beale until transitioned to USAF sustainment. This CLIN includes the program management and systems engineering support applicable to the work accomplished on this CLIN.
REVIEW AND SUBSEQUENT CONTRACT AWARD. ALL ENTRIES OF COST/PRICING WILL BE
Sch Incentive Fee for CLIN 0008
COST
Performance/Schedule Incentive Fee for CLIN 0008
Target Fee = 9.0%
Minimum Fee = 0%
0010 Hours CLEAR Special Studies (LOE)
CPFF
CLEAR Special Studies
Maximum Fixed Fee = 8%
Composite Fully Burdened Labor Rate based on CLIN 0001 skill mix.
FY12 FY13 FY14 FY15 FY16
Fully Burdened Labor
Rate W/Out Fee ______ ______ ______ ______ ______
Fixed Fee $’s
Per Hour ______ ______ ______ ______ ______
This CLIN includes any Clear Special Studies that may need to be executed via a
Task Instruction with an agreed-to rate inclusive of fee.
FIXED FEE
REVIEW AND SUBSEQUENT CONTRACT AWARD. ALL ENTRIES OF COST/PRICING WILL BE
CLEAR Sys Eng & Prog Mgt
CPIF
Share Ratio below Target 50/50
Share Ratio above Target 50/50
Target Fee no greater than 12%
Minimum Fee = 3%
Maximum Fee = 15%
FOB: Destination
This CLIN includes all the system engineering and program management associated with Clear design, development, integration, deployment and sustainment (CLINs 0001 and 0002).
Cost Plus Incentive Fee - CPIF
CLEAR/COD Data: CDRLs - NSP
This CLIN includes all of the data deliverables that are not separately priced.
CDRLs are applicable to both Basic and Option CLINs
NET AMT
REVIEW AND SUBSEQUENT CONTRACT AWARD. ALL ENTRIES OF COST/PRICING WILL BE
OPTION COD Design & Development
FPI
Share Ratio below & above Target 50/50
Ceiling Price = 120% Target Cost
Target Profit = 10% of Target Cost
FOB: Destination
This CLIN includes all Cape Cod design, development, hardware purchases and in-plant developmental test activities through Ship Readiness Review for Cape
Cod.
TOTAL TARGET PRICE
CEILING PRICE
REVIEW AND SUBSEQUENT CONTRACT AWARD. ALL ENTRIES OF COST/PRICING WILL BE
ITEM NO
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
OPTION COD Radar Integration & Deployment
CPIF
Share Ratio below Target 40/60
Share Ratio above Target 60/40
Target Fee = 12%
Minimum Fee = 3%
Maximum Fee = 15%
FOB: Destination
This CLIN includes all the work at Cape Cod to include shipment receipt, DT&E, OT to include FDE and TP, and final operational acceptance.
REVIEW AND SUBSEQUENT CONTRACT AWARD. ALL ENTRIES OF COST/PRICING WILL BE
OPTION COD Radar Facility Modifications
FPI
Share Ratio below & above Target 50/50
Ceiling Price = 120% Target Cost
Target Profit = 10% of Target Cost
FOB: Destination
This CLIN includes all facility modification at Cape Cod through Beneficial
Occupancy and final recalibration and reconfiguration required per the Facility
Design Documents.
TOTAL TARGET PRICE
CEILING PRICE
REVIEW AND SUBSEQUENT CONTRACT AWARD. ALL ENTRIES OF COST/PRICING WILL BE
OPTION Clear/Cod Radar Sustainment
FPI
Share Ratio below & above Target 50/50
Ceiling Price = 120% Target Cost
Target Profit = 10% of Target Cost
FOB: Destination
This CLIN includes sustainment for Cape Cod radar following the second operational acceptance for three months until transfer to the sustainment contractor. It also includes any Clear sustainment required after completion sustainment in CLIN 0001 through three months following Cape Cod operational acceptance. Additionally, any maintenance, licensing or sustainment agreements bought during Cape Cod development shall also be billed here.
TOTAL TARGET PRICE
CEILING PRICE
0017 1 OPTION COD Long Lead Items
FFP
This CLIN includes the purchase of all the Long Lead Items required for Cape Cod development.
NET AMT
REVIEW AND SUBSEQUENT CONTRACT AWARD. ALL ENTRIES OF COST/PRICING WILL BE
0018 Hours COD Radar Special Studies (LOE)
CPFF
Maximum Fee = 8%
FY12 FY13 FY14 FY15 FY16
Fully Burdened Labor
Rate W/Out Fee ______ ______ ______ ______ ______
Fixed Fee $’s
Per Hour ______ ______ ______ ______ ______
COMPOSITE FULLY BURDENED LABOR RATE BASED ON CLIN 0013
SKILL MIX
This CLIN includes any Cape Cod Special Studies that may need to be turned on via a Task Instruction with an agreed-to rate inclusive of fee.
FIXED FEE
REVIEW AND SUBSEQUENT CONTRACT AWARD. ALL ENTRIES OF COST/PRICING WILL BE
OPTION COD Sys Eng & Prog Eng
CPIF
Share Ratio below Target 50/50
Share Ratio above Target 50/50
Target Fee = 12%
Minimum Fee = 3%
Maximum Fee = 15%
FOB: Destination
This CLIN includes all the system engineering and program management associated with Cape Cod development, integration and test CLINs 0013, 0014, 0015, 0016 and 0017).
File details come from the government source that posted it. Updated .