Atch 17 - Clear Cost and Software Data Reporting
98 KB Posted
- Attached to
- Clear / Cod Upgrade EWR (UEWR)
- Solicitation number
- HQ0147-11-R-0002
- Issued by
-
DOD Missile Defense Agency
About this file
Atch 17 - Clear Cost and Software Data Reporting (CSDR) v3 (13 Dec)
Text of this file
DD Form 2794, Pg 1 (CSDR Plan)
COST AND SOFTWARE DATA REPORTING PLAN Form Approved OMB No. 0704-0188 The public reporting burden for this collection of information is estimated to average 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
PLEASE DO NOT RETURN YOUR COMPLETED FORM TO THE ABOVE ORGANIZATION.
| 1. MAJOR PROGRAM | a. NAME: | Clear UEWR (CLINs 1,2,10,11) | |||||||||||||||
| b. PHASE/MILESTONE | c. PRIME MISSION PRODUCT | 2. WBS SYSTEM TYPE | 3. SUBMISSION TYPE | 4. CURRENT SUBMISSION DATE (YYYYMMDD) | 5. LAST APPROVED PLAN DATE (YYYYMMDD) | ||||||||||||
| Pre-A | x | B | x | C-FRP | Clear UEWR | MIL-STD 881C Appendix B Electronic Systems | x | INITIAL | |||||||||
| A | C-LRIP | x | O&S | CHANGE | n/a | ||||||||||||
| 6a. POINT OF CONTACT (POC) NAME AND ADDRESS (Include ZIP Code) | 6b. TELEPHONE NUMBER (Include Area Code) | 6c. FAX NUMBER (Include Area Code) | 6d. E-MAIL ADDRESS | ||||||||||||||
| TBD | TBD | TBD | TBD | ||||||||||||||
| 7. PLAN TYPE | 8. PREPARING ORGANIZATION | 9a. CONTRACTOR NAME/ADDRESS | 9b. CONTRACT NUMBER | 9c. APPROPRIATION | 10. APPROVED PLAN NUMBER | ||||||||||||
| x | PROGRAM | CONTRACT (PRIME) | i. PERFORMING ORGANIZATION | ii. DIVISION | TBD | x | RDT&E | n/a | |||||||||
| CONTRACT (SUB) | MDA/SNU ESC/HSIG | TBD | TBD | PROCUREMENT | |||||||||||||
| O&M | |||||||||||||||||
| 11. WBS ELEMENT CODE | 12. | ||||||||||||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | ||||||||||||||||
| (X if applicable) | DD 1921-3 (CBDR): | ||||||||||||||||
| a. PROGRAM/ | |||||||||||||||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | ||||||||||||||||
| SUBCONTRACT | a. CWBS | ||||||||||||||||
| DICTIONARY | b. DD 1921 | ||||||||||||||||
| (CDSR) | c. DD 1921-1 | ||||||||||||||||
| (FCHR) | d. DD 1921-2 | ||||||||||||||||
| (PCR) | e. DD 1921-4 | ||||||||||||||||
| (CSR) | f. SRDR |
FORMATS
| 1.1 | CLIN0001 Clear Radar Design, Development and Sustainment Rev G | x | x | x | ||||
| 1.1.1 | Contractor Development Plant | x | x | x | ||||
| 1.1.1.1 | Prime Mission Product | x | x | |||||
| 1.1.1.1.1 | Receiver/Exciter (REX) | x | x | x | ||||
| 1.1.1.1.1.1 | REX Hardware | x | x | x | ||||
| 1.1.1.1.1.2 | REX Software (RES) | x | x | x | ||||
| 1.1.1.1.1.3 | REX Integration, Assembly, Test, Checkout | x | x | x | ||||
| 1.1.1.1.2 | Frequency Time Standard (FTS) | x | x | |||||
| 1.1.1.1.2.1 | FTS Hardware | x | x | |||||
| 1.1.1.1.2.2 | FTS Integration, Assembly, Test, Checkout | x | x | |||||
| 1.1.1.1.3 | Cooling Environmental Monitor (CEM) | x | x | |||||
| 1.1.1.1.3.1 | CEM Hardware | x | x | |||||
| 1.1.1.1.3.2 | CEM Integration, Assembly, Test, Checkout | x | x | |||||
| 1.1.1.1.4 | Receiver Beamformer Network (RBF) | x | x | |||||
| 1.1.1.1.4.1 | RBF Hardware | x | x | |||||
| 1.1.1.1.4.2 | RBF Integration, Assembly, Test, Checkout | x | x | |||||
| 1.1.1.1.5 | Beam Steering Unit (BSU) | x | x | x | ||||
| 1.1.1.1.5.1 | BSU Hardware | x | x | x | ||||
| 1.1.1.1.5.2 | BSU Integration, Assembly, Test, Checkout | x | x | x | ||||
| 1.1.1.1.6 | Signal Processors/Data Processors (SP/DP) | x | x | x | ||||
| 1.1.1.1.6.1 | SP Hardware | x | x | x | ||||
| 1.1.1.1.6.2 | SP Software (SPS) | x | x | x | ||||
| 1.1.1.1.6.3 | SP Integration, Assembly Test, Checkout | x | x | x | ||||
| 1.1.1.1.7 | Data Processor | x | x | x | ||||
| 1.1.1.1.7.1 | DP Hardware | x | x | x | ||||
| 1.1.1.1.7.2 | DP Software | x | x | |||||
| 1.1.1.1.7.2.1 | MAS | x | x | x | ||||
| 1.1.1.1.7.2.2 | STS | x | x | x | ||||
| 1.1.1.1.7.3 | DP Integration, Assembly Test, Checkout | x | x | x | ||||
| 1.1.1.1.8 | Development String Activation/Install | x | x | x | ||||
| 1.1.1.2 | Development String Product Support | x | x | |||||
| 1.1.2 | Clear UEWR | x | x | x | ||||
| 1.1.2.1 | Prime Mission Product | x | x | |||||
| 1.1.2.1.1 | Receiver/Exciter (REX) | x | x | x | ||||
| 1.1.2.1.1.1 | REX Hardware | x | x | x | ||||
| 1.1.2.1.1.2 | REX Software (RES) | x | x | x | ||||
| 1.1.2.1.1.3 | REX Integration, Assembly, Test, Checkout | x | x | x | ||||
| 1.1.2.1.2 | Frequency Time Standard (FTS) | x | x | |||||
| 1.1.2.1.2.1 | FTS Hardware | x | x | |||||
| 1.1.2.1.2.2 | FTS Integration, Assembly, Test, Checkout | x | x | |||||
| 1.1.2.1.3 | Cooling Environmental Monitor (CEM) | x | x | |||||
| 1.1.2.1.3.1 | CEM Hardware | x | x | |||||
| 1.1.2.1.3.2 | CEM Integration, Assembly, Test, Checkout | x | x | |||||
| 1.1.2.1.4 | Receiver Beamformer Network (RBF) | x | x | |||||
| 1.1.2.1.4.1 | RBF Hardware | x | x | |||||
| 11. WBS ELEMENT CODE | 12. | |||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | |||||||
| (X if applicable) | DD 1921-3 (CBDR): | |||||||
| a. PROGRAM/ | ||||||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||||||
| SUBCONTRACT | a. CWBS | |||||||
| DICTIONARY | b. DD 1921 | |||||||
| (CDSR) | c. DD 1921-1 | |||||||
| (FCHR) | d. DD 1921-2 | |||||||
| (PCR) | e. DD 1921-4 | |||||||
| (CSR) | f. SRDR |
FORMATS
| 1.1.2.1.4.2 | RBF Integration, Assembly, Test, Checkout | x | x | |||||
| 1.1.2.1.5 | Beam Steering Unit (BSU) | x | x | x | ||||
| 1.1.2.1.5.1 | BSU Hardware | x | x | x | ||||
| 1.1.2.1.5.2 | BSU Integration, Assembly, Test, Checkout | x | x | x | ||||
| 1.1.2.1.6 | Signal Processors/Data Processors (SP/DP) | x | x | x | ||||
| 1.1.2.1.6.1 | SP Hardware | x | x | x | ||||
| 1.1.2.1.6.2 | SP Software (SPS) | x | x | x | ||||
| 1.1.2.1.6.3 | SP Integration, Assembly, Test, Checkout | x | x | x | ||||
| 1.1.2.1.7 | Data Processor | x | x | x | ||||
| 1.1.2.1.7.1 | DP Hardware | x | x | x | ||||
| 1.1.2.1.7.2 | DP Software | x | x | |||||
| 1.1.2.1.7.2.1 | MAS | x | x | x | ||||
| 1.1.2.1.7.2.2 | STS | x | x | x | ||||
| 1.1.2.1.7.3 | DP Integration, Assembly, Test, Checkout | x | x | x | ||||
| 1.1.2.1.8 | Simulator/Tester (ST) | x | x | |||||
| 1.1.2.1.8.1 | ST Hardware | x | x | |||||
| 1.1.2.1.8.2 | ST Integration Assembly, Test, Checkout | x | x | |||||
| 1.1.2.1.9 | In-plant PME Integration, Assembly, Test, Checkout | x | x | x | ||||
| 1.1.2.2 | Interim Equipment | x | x | |||||
| 1.1.2.3 | Common Support Equipment | x | x | |||||
| 1.1.2.4 | Peculiar Support Equipment | x | x | |||||
| 1.1.2.5 | Spares and Repair Parts | x | x | |||||
| 1.1.2.6 | Product Support | x | x | |||||
| 1.1.2.6.1 | In-plant Support | x | x | |||||
| 1.1.2.6.2 | Post-deployment Sustainment | x | x | |||||
| 1.1.2.7 | Site Activation/Install | x | x | x | ||||
| 1.1.2.7.1 | Facility Design Support | x | x | x | ||||
| 1.1.3 | Huntsville Lab Upgrades | x | x | x | ||||
| 1.1.3.1 | Prime Mission Product | x | x | |||||
| 1.1.3.1.1 | Data Processors | x | x | x | ||||
| 1.1.3.1.1.1 | DP Hardware | x | x | x | ||||
| 1.1.3.1.1.2 | DP Integration, Assembly Test, Checkout | x | x | x | ||||
| 1.1.3.2 | Spares and Repair Parts | x | x | |||||
| 1.1.3.3 | Huntsville Lab Product Support | x | x | |||||
| 1.1.3.4 | Site Activation/Install | x | x | x | ||||
| 1.1.3.4.1 | Facility Design | x | x | x | ||||
| 1.2 | CLIN0002 Clear Radar Integration and Deployment | x | x | x | ||||
| 1.2.1 | Clear UEWR | x | x | x | ||||
| 1.2.1.1 | Prime Mission Product | x | x | |||||
| 1.2.1.1.1 | Receiver/Exciter (REX) | x | x | x | ||||
| 1.2.1.1.1.1 | REX Hardware | x | x | x | ||||
| 1.2.1.1.1.2 | REX Software (RES) | x | x | x | ||||
| 1.2.1.1.2 | Frequency Time Standard (FTS) | x | x | |||||
| 1.2.1.1.2.1 | FTS Hardware | x | x | |||||
| 1.2.1.1.3 | Cooling Environmental Monitor (CEM) | x | x | |||||
| 1.2.1.1.3.1 | CEM Hardware | x | x | |||||
| 1.2.1.1.4 | Receiver Beamformer Network (RBF) | x | x | |||||
| 1.2.1.1.4.1 | RBF Hardware | x | x | |||||
| 1.2.1.1.5 | Beam Steering Unit (BSU) | x | x | |||||
| 1.2.1.1.5.1 | BSU Hardware | x | x | |||||
| 1.2.1.1.6 | Signal Processors/Data Processors (SP/DP) | x | x | x | ||||
| 1.2.1.1.6.1 | SP Hardware | x | x | x | ||||
| 1.2.1.1.6.2 | SP Software | x | x | |||||
| 1.2.1.1.7 | Data Processor | x | x | x | ||||
| 1.2.1.1.7.1 | DP Hardware | x | x | x | ||||
| 1.2.1.1.7.2 | DP Software | x | x | |||||
| 1.2.1.1.8 | Simulator/Tester (ST) | x | x | |||||
| 1.2.1.1.8.1 | ST Hardware | x | x | |||||
| 1.2.1.2 | On-site Activation/Install | x | x | x | ||||
| 1.2.1.2.1 | Facility Design | x | x | x | ||||
| 1.2.1.2.2 | Facility Construction | x | x | x | ||||
| 1.2.1.2.3 | System Assembly, Installation | x | x | x | ||||
| 1.2.1.2.4 | Facility Deinstallation/Remediation | x | x | x | ||||
| 11. WBS ELEMENT CODE | 12. | |||||||
| WBS REPORTING ELEMENTS | 13. REPORTS REQUIRED | |||||||
| (X if applicable) | DD 1921-3 (CBDR): | |||||||
| a. PROGRAM/ | ||||||||
| CONTRACT/ SUBCONTRACT | b. CONTRACT/ | |||||||
| SUBCONTRACT | a. CWBS | |||||||
| DICTIONARY | b. DD 1921 | |||||||
| (CDSR) | c. DD 1921-1 | |||||||
| (FCHR) | d. DD 1921-2 | |||||||
| (PCR) | e. DD 1921-4 | |||||||
| (CSR) | f. SRDR |
FORMATS
| 1.2.1.2.5 | Radar Recalibration/Reconfiguration | x | x | x |
| 1.2.1.3 | On-Site Test and Evaluation | x | x | x |
| 1.2.1.4 | Product Support | x | x | |
| 1.2.1.4.1 | Preoperational Support | x | x | |
| 1.2.2 | Huntsville Lab Upgrades | x | x | x |
| 1.2.2.1 | Prime Mission Product | x | x | |
| 1.2.2.1.1 | Data Processor | x | x | x |
| 1.2.2.1.1.1 | DP Hardware | x | x | x |
| 1.2.2.1.1.2 | DP Software | x | x | |
| 1.2.2.2 | Product Support | x | x | |
| 1.2.2.3 | On Site Activation/Install | x | x | x |
| 1.2.2.3.1 | Facility Design | x | x | x |
| 1.2.2.3.2 | Facility Construction | x | x | x |
| 1.2.2.3.3 | System Assembly, Installation | x | x | x |
| 1.6 | CLIN0010 Clear Radar Special Studies | x | x | |
| 1.6.1 | Clear UEWR | x | x | |
| 1.7 | CLIN0011 Clear SE/PM | x | x | x |
| 1.7.1 | Clear UEWR | x | x | x |
| 1.7.1.1 | Program Management | x | x | x |
| 1.7.1.2 | Systems Engineering | x | x | x |
| 1.7.1.2.1 | Specialty Engineering | x | ||
| 1.7.1.2.2 | Systems Requirments Allocation | x | ||
| 1.7.1.2.3 | Risk Management | x | ||
| 1.7.1.2.4 | Safety, Quality, Mission Assurance | x | ||
| 1.7.1.2.5 | Configuration Management | x | ||
| 1.7.1.2.6 | Information Assurance | x |
&L&"Arial,Bold"DD FORM 2794, MAY 2011
DD Form 2794, Pg 2 (CSDR Plan)
| 14. CSDR SUBMISSION DATES | ||||||
| a. | ||||||
| SUBMISSION | b. | |||||
| FORM(S) | c. | |||||
| EVENT | d. AS OF DATE | e. DUE DATE | ||||
| (YYYYMMDD) | (YYYYMMDD) | |||||
| 1 | CWBS Dictionary, 1921, 1921-1 | 60 days post IBR | ||||
| 2 | 1921, 1921-1 | 60 days post Clear UEWR Operational Acceptance | ||||
| 3 | 1921, 1921-1 | 30 days post Contract Period of Performance Conclusion | ||||
| 15. REMARKS | ||||||
| DD FORM 2794 (PAGE 2), MAY 2011 | PREVIOUS EDITION IS OBSOLETE |
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file