Atch L9 Total Resources Volume.xlsx

XLSX spreadsheet 524 KB Posted

Attached to
Clear / Cod Upgrade EWR (UEWR)
Solicitation number
HQ0147-11-R-0002
Issued by

About this file

Atch L9 Total Resources Volume

View the file

Other files

File Type Posted
Atch L1 OCI Disclosure Form —
Atch L7 Cost Price Exhibits 2-22-11.xlsx XLSX spreadsheet
Atch 19 - SPDP Cost and Software Data Reporting —
HQ0147-11-R-0002 Clear Cod Solicitation Amendment01_5 Mar 2012.pdf PDF
Atch 17 - Clear Cost and Software Data Reporting —
Atch 16 - Critical Design Review —
Atch 10 - Evaluation Factors for Award -Section M_28 FEB 2012.pdf PDF
Atch 18 - Cod Cost and Software Data Reporting —
Atch 09 - Instructions Conditions and Notices to Offerors - Section L_28 Feb 2012.pdf PDF
Atch 01 - CLIN Pricing Data Entry Sheet_21 Feb 2012.pdf PDF
Atch L6 - Client Authorization Letter.pdf PDF
Exhibit A - Clear CDRLs DD Form 1423-1.pdf PDF
Exhibit B - Cod CDRLs DD Form 1423-1.pdf PDF
Atch L4a Clear Cod PPQ Cover Letter 22 Feb.pdf PDF
Atch L1 - OCI Analysis-Disclosure Form.doc DOC document
Atch L4 - Clear-Cod Past Performance Questionnaire.docx DOCX document
Atch 04 - Government Furnished Property List_06 Feb 2012.pdf PDF
Atch 15 - List of Acronyms_06 Feb 2012.pdf PDF
Atch L2 - Past_Performance Reference List.docx DOCX document
Atch L3 - PAST PERFORMANCE INFORMATION.docx DOCX document
Atch 03 - DOD Contract Security Classification Specification —
Atch 12 - List Instructions for Cod CDRLs ADPs_06 Feb 2012.pdf PDF
Atch 07 - Clear Base Support Requirements List —
Atch 11 - List Instructions for Clear CDRLs ADPs_06 Feb 2012.pdf PDF
Atch L6 - Client Authorization Letter.docx DOCX document
Atch 02 - Scope of Work —
RFP Cover Letter.pdf PDF
Atch 10 - Evaluation Factors for Award - Section M_06 Feb 2012.pdf PDF
Atch L7 - Cost-Price Exhibits 11-18-11.xlsx XLSX spreadsheet
Atch 08 - Cod Base Support Requirements List —
Atch L4a - Clear Cod PPQ Cover Letter.docx DOCX document
Atch 06 - Incentive Fee Plan_06 Feb 2012.pdf PDF
Atch 13 - Air Force Technical Manual Contract Requirements —
Atch 05 - Award Fee Plan.docx DOCX document
Atch 09 - Instructions Conditions and Notices to Offerors - Section L_06 Feb 2012.pdf PDF
Atch L8 - WBS to CLIN To SOW Cross Reference Matrix Final.xlsx XLSX spreadsheet
Atch 01 - CLIN Pricing Data Entry Sheet_06 Feb 2012.pdf PDF
Atch L5 - Subcontractor Consent Letter.docx DOCX document
Atch 14 - MDA Policy Memorandum No. 51 Organization Conflicts of Interest_06 Feb 2012.pdf PDF
HQ0147-11-R-0002 Request for Proposal Clear_Cod Upgrade Solicitation_6Feb12_FINAL.pdf PDF
Clear-Cod Section L 9 DEC 2011.docx DOCX document
Clear-Cod Section M 9 DEC 2011--CLEAN.docx DOCX document
Clear-Cod UEWR SOW-2Ltr Results CLEAN.1 8Dec11.docx DOCX document
Industry Day_1 Q.As 08.31.11.pdf PDF
Attachment 1 Cover Letter Executed.pdf PDF
Attachment 2 RFP HQ0147-11-R-0002.doc DOC document
Attachment 4 Section M.docx DOCX document
Attachment 7 GFE.pdf PDF
Attachment 5 Statement of Work.docx DOCX document
Attachment 3 Section L.docx DOCX document
Show 40 more

Latest 50 of 51 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN0001 BOE Labor Summary

An Employee of:Total all Contractor Fiscal YearsCWBSLabor CategoryBOE ReferenceRadar Hardware/Software Development3.4 Test3.6 Facility Design& Construction/Sustainment5.3 Radar SW/HWWBS Total Hours
3.3.1 Radar Software3.3.2 Radar Hardware3.4.1 Basline Test3.4.2 DT3.4.3 TRR/SRR3.4.4 Ops Test Support3.6.1 Facilities Design3.6.3 ILS3.6.4 CLS5.3.2 Radar HW
3.3.1.2 Clear UEWR SW Upgrade3.3.1.3 VCN Synch Update3.3.2.1 Obsolescence Redesign3.3.2.3 PME&Spares3.3.2.4 Interim Equipment3.3.2.5 Pec&Com Equipment3.3.2.6 PME Dev String3.3.2.7 5 Huntsville Lab3.6.1.2 Clear Fac Design3.6.3.1 Tech Pubs3.6.3.2 Training3.6.3.3 Gov Property & IUID3.6.3.4 LDP3.6.3.5 Provisioning/Supply3.6.3.6 PHS&T5.3.2.5 Huntsville Lab
WBS/Item NumberWBS Description
1.1CLIN0001 Clear Radar Design, Development and Sustainment Rev G
1.1.1Contractor Development Plant
1.1.1.1Prime Mission Product
1.1.1.1.1Receiver/Exciter (REX)
1.1.1.1.1.1REX Hardware
1.1.1.1.1.2REX Software (RES)
1.1.1.1.1.3REX Integration, Assembly, Test, Checkout
1.1.1.1.2Frequency Time Standard (FTS)
1.1.1.1.2.1FTS Hardware
1.1.1.1.2.2FTS Integration, Assembly, Test, Checkout
1.1.1.1.3Cooling Environmental Monitor (CEM)
1.1.1.1.3.1CEM Hardware
1.1.1.1.3.2CEM Integration, Assembly, Test, Checkout
1.1.1.1.4Receiver Beamformer Network (RBF)
1.1.1.1.4.1RBF Hardware
1.1.1.1.4.2RBF Integration, Assembly, Test, Checkout
1.1.1.1.5Beam Steering Unit (BSU)
1.1.1.1.5.1BSU Hardware
1.1.1.1.5.2BSU Integration, Assembly, Test, Checkout
1.1.1.1.6Signal Processor
1.1.1.1.6.1SP Hardware
1.1.1.1.6.2SP Software (SPS)
1.1.1.1.6.3SP Integration, Assembly Test, Checkout
1.1.1.1.7Data Processor
1.1.1.1.7.1DP Hardware
1.1.1.1.7.2DP Software
1.1.1.1.7.2.1MAS
1.1.1.1.7.2.2STS
1.1.1.1.7.3DP Integration, Assembly Test, Checkout
1.1.1.1.8Development String Activation/Install
1.1.1.2Development String Product Support
1.1.2Clear UEWR
1.1.2.1Prime Mission Product
1.1.2.1.1Receiver/Exciter (REX)
1.1.2.1.1.1REX Hardware
1.1.2.1.1.2REX Software (RES)
1.1.2.1.1.3REX Integration, Assembly, Test, Checkout
1.1.2.1.2Frequency Time Standard (FTS)
1.1.2.1.2.1FTS Hardware
1.1.2.1.2.2FTS Integration, Assembly, Test, Checkout
1.1.2.1.3Cooling Environmental Monitor (CEM)
1.1.2.1.3.1CEM Hardware
1.1.2.1.3.2CEM Integration, Assembly, Test, Checkout
1.1.2.1.4Receiver Beamformer Network (RBF)
1.1.2.1.4.1RBF Hardware
1.1.2.1.4.2RBF Integration, Assembly, Test, Checkout
1.1.2.1.5Beam Steering Unit (BSU)
1.1.2.1.5.1BSU Hardware
1.1.2.1.5.2BSU Integration, Assembly, Test, Checkout
1.1.2.1.6Signal Processor
1.1.2.1.6.1SP Hardware
1.1.2.1.6.2SP Software (SPS)
1.1.2.1.6.3SP Integration, Assembly, Test, Checkout
1.1.2.1.7Data Processor
1.1.2.1.7.1DP Hardware
1.1.2.1.7.2DP Software
1.1.2.1.7.2.1MAS
1.1.2.1.7.2.2STS
1.1.2.1.7.3DP Integration, Assembly, Test, Checkout
1.1.2.1.8Simulator/Tester (ST)
1.1.2.1.8.1ST Hardware
1.1.2.1.8.2ST Integration Assembly, Test, Checkout
1.1.2.1.9In-plant PME Integration, Assembly, Test, Checkout
1.1.2.2Interim Equipment
1.1.2.3Common Support Equipment
1.1.2.4Peculiar Support Equipment
1.1.2.5Spares and Repair Parts
1.1.2.6Product Support
1.1.2.6.1In-plant Support
1.1.2.6.2Post-deployment Sustainment
1.1.2.7Site Activation/Install
1.1.2.7.1Facility Design Support
1.1.3Huntsville Lab Upgrades
1.1.3.1Prime Mission Product
1.1.3.1.1Data Processor
1.1.3.1.1.1DP Hardware
1.1.3.1.1.2DP Integration, Assembly Test, Checkout
1.1.3.2Spares and Repair Parts
1.1.3.3Huntsville Lab Product Support
1.1.3.4Site Activation/Install
1.1.3.4.1Facility Design
An Employee of:Contractor Fiscal Year 1CWBSLabor CategoryBOE ReferenceRadar Hardware/Software Development3.4 Test3.6 Facility Design& Construction/Sustainment5.3 Radar SW/HWWBS Total Hours
3.3.1 Radar Software3.3.2 Radar Hardware3.4.1 Basline Test3.4.2 DT3.4.3 TRR/SRR3.4.4 Ops Test Support3.6.1 Facilities Design3.6.3 ILS3.6.4 CLS5.3.2 Radar HW
3.3.1.2 Clear UEWR SW Upgrade3.3.1.3 VCN Synch Update3.3.2.1 Obsolescence Redesign3.3.2.3 PME&Spares3.3.2.4 Interim Equipment3.3.2.5 Pec&Com Equipment3.3.2.6 PME Dev String3.3.2.7 5 Huntsville Lab3.6.1.2 Clear Fac Design3.6.3.1 Tech Pubs3.6.3.2 Training3.6.3.3 Gov Property & IUID3.6.3.4 LDP3.6.3.5 Provisioning/Supply3.6.3.6 PHS&T5.3.2.5 Huntsville Lab
WBS/Item NumberWBS Description
1.1CLIN0001 Clear Radar Design, Development and Sustainment Rev G
1.1.1Contractor Development Plant
1.1.1.1Prime Mission Product
1.1.1.1.1Receiver/Exciter (REX)
1.1.1.1.1.1REX Hardware
1.1.1.1.1.2REX Software (RES)
1.1.1.1.1.3REX Integration, Assembly, Test, Checkout
1.1.1.1.2Frequency Time Standard (FTS)
1.1.1.1.2.1FTS Hardware
1.1.1.1.2.2FTS Integration, Assembly, Test, Checkout
1.1.1.1.3Cooling Environmental Monitor (CEM)
1.1.1.1.3.1CEM Hardware
1.1.1.1.3.2CEM Integration, Assembly, Test, Checkout
1.1.1.1.4Receiver Beamformer Network (RBF)
1.1.1.1.4.1RBF Hardware
1.1.1.1.4.2RBF Integration, Assembly, Test, Checkout
1.1.1.1.5Beam Steering Unit (BSU)
1.1.1.1.5.1BSU Hardware
1.1.1.1.5.2BSU Integration, Assembly, Test, Checkout
1.1.1.1.6Signal Processor
1.1.1.1.6.1SP Hardware
1.1.1.1.6.2SP Software (SPS)
1.1.1.1.6.3SP Integration, Assembly Test, Checkout
1.1.1.1.7Data Processor
1.1.1.1.7.1DP Hardware
1.1.1.1.7.2DP Software
1.1.1.1.7.2.1MAS
1.1.1.1.7.2.2STS
1.1.1.1.7.3DP Integration, Assembly Test, Checkout
1.1.1.1.8Development String Activation/Install
1.1.1.2Development String Product Support
1.1.2Clear UEWR
1.1.2.1Prime Mission Product
1.1.2.1.1Receiver/Exciter (REX)
1.1.2.1.1.1REX Hardware
1.1.2.1.1.2REX Software (RES)
1.1.2.1.1.3REX Integration, Assembly, Test, Checkout
1.1.2.1.2Frequency Time Standard (FTS)
1.1.2.1.2.1FTS Hardware
1.1.2.1.2.2FTS Integration, Assembly, Test, Checkout
1.1.2.1.3Cooling Environmental Monitor (CEM)
1.1.2.1.3.1CEM Hardware
1.1.2.1.3.2CEM Integration, Assembly, Test, Checkout
1.1.2.1.4Receiver Beamformer Network (RBF)
1.1.2.1.4.1RBF Hardware
1.1.2.1.4.2RBF Integration, Assembly, Test, Checkout
1.1.2.1.5Beam Steering Unit (BSU)
1.1.2.1.5.1BSU Hardware
1.1.2.1.5.2BSU Integration, Assembly, Test, Checkout
1.1.2.1.6Signal Processor
1.1.2.1.6.1SP Hardware
1.1.2.1.6.2SP Software (SPS)
1.1.2.1.6.3SP Integration, Assembly, Test, Checkout
1.1.2.1.7Data Processor
1.1.2.1.7.1DP Hardware
1.1.2.1.7.2DP Software
1.1.2.1.7.2.1MAS
1.1.2.1.7.2.2STS
1.1.2.1.7.3DP Integration, Assembly, Test, Checkout
1.1.2.1.8Simulator/Tester (ST)
1.1.2.1.8.1ST Hardware
1.1.2.1.8.2ST Integration Assembly, Test, Checkout
1.1.2.1.9In-plant PME Integration, Assembly, Test, Checkout
1.1.2.2Interim Equipment
1.1.2.3Common Support Equipment
1.1.2.4Peculiar Support Equipment
1.1.2.5Spares and Repair Parts
1.1.2.6Product Support
1.1.2.6.1In-plant Support
1.1.2.6.2Post-deployment Sustainment
1.1.2.7Site Activation/Install
1.1.2.7.1Facility Design Support
1.1.3Huntsville Lab Upgrades
1.1.3.1Prime Mission Product
1.1.3.1.1Data Processor
1.1.3.1.1.1DP Hardware
1.1.3.1.1.2DP Integration, Assembly Test, Checkout
1.1.3.2Spares and Repair Parts
1.1.3.3Huntsville Lab Product Support
1.1.3.4Site Activation/Install
1.1.3.4.1Facility Design
An Employee of:Contractor Fiscal Year 2CWBSLabor CategoryBOE ReferenceRadar Hardware/Software Development3.4 Test3.6 Facility Design& Construction/Sustainment5.3 Radar SW/HWWBS Total Hours
3.3.1 Radar Software3.3.2 Radar Hardware3.4.1 Basline Test3.4.2 DT3.4.3 TRR/SRR3.4.4 Ops Test Support3.6.1 Facilities Design3.6.3 ILS3.6.4 CLS5.3.2 Radar HW
3.3.1.2 Clear UEWR SW Upgrade3.3.1.3 VCN Synch Update3.3.2.1 Obsolescence Redesign3.3.2.3 PME&Spares3.3.2.4 Interim Equipment3.3.2.5 Pec&Com Equipment3.3.2.6 PME Dev String3.3.2.7 5 Huntsville Lab3.6.1.2 Clear Fac Design3.6.3.1 Tech Pubs3.6.3.2 Training3.6.3.3 Gov Property & IUID3.6.3.4 LDP3.6.3.5 Provisioning/Supply3.6.3.6 PHS&T5.3.2.5 Huntsville Lab
WBS/Item NumberWBS Description
1.1CLIN0001 Clear Radar Design, Development and Sustainment Rev G
1.1.1Contractor Development Plant
1.1.1.1Prime Mission Product
1.1.1.1.1Receiver/Exciter (REX)
1.1.1.1.1.1REX Hardware
1.1.1.1.1.2REX Software (RES)
1.1.1.1.1.3REX Integration, Assembly, Test, Checkout
1.1.1.1.2Frequency Time Standard (FTS)
1.1.1.1.2.1FTS Hardware
1.1.1.1.2.2FTS Integration, Assembly, Test, Checkout
1.1.1.1.3Cooling Environmental Monitor (CEM)
1.1.1.1.3.1CEM Hardware
1.1.1.1.3.2CEM Integration, Assembly, Test, Checkout
1.1.1.1.4Receiver Beamformer Network (RBF)
1.1.1.1.4.1RBF Hardware
1.1.1.1.4.2RBF Integration, Assembly, Test, Checkout
1.1.1.1.5Beam Steering Unit (BSU)
1.1.1.1.5.1BSU Hardware
1.1.1.1.5.2BSU Integration, Assembly, Test, Checkout
1.1.1.1.6Signal Processor
1.1.1.1.6.1SP Hardware
1.1.1.1.6.2SP Software (SPS)
1.1.1.1.6.3SP Integration, Assembly Test, Checkout
1.1.1.1.7Data Processor
1.1.1.1.7.1DP Hardware
1.1.1.1.7.2DP Software
1.1.1.1.7.2.1MAS
1.1.1.1.7.2.2STS
1.1.1.1.7.3DP Integration, Assembly Test, Checkout
1.1.1.1.8Development String Activation/Install
1.1.1.2Development String Product Support
1.1.2Clear UEWR
1.1.2.1Prime Mission Product
1.1.2.1.1Receiver/Exciter (REX)
1.1.2.1.1.1REX Hardware
1.1.2.1.1.2REX Software (RES)
1.1.2.1.1.3REX Integration, Assembly, Test, Checkout
1.1.2.1.2Frequency Time Standard (FTS)
1.1.2.1.2.1FTS Hardware
1.1.2.1.2.2FTS Integration, Assembly, Test, Checkout
1.1.2.1.3Cooling Environmental Monitor (CEM)
1.1.2.1.3.1CEM Hardware
1.1.2.1.3.2CEM Integration, Assembly, Test, Checkout
1.1.2.1.4Receiver Beamformer Network (RBF)
1.1.2.1.4.1RBF Hardware
1.1.2.1.4.2RBF Integration, Assembly, Test, Checkout
1.1.2.1.5Beam Steering Unit (BSU)
1.1.2.1.5.1BSU Hardware
1.1.2.1.5.2BSU Integration, Assembly, Test, Checkout
1.1.2.1.6Signal Processor
1.1.2.1.6.1SP Hardware
1.1.2.1.6.2SP Software (SPS)
1.1.2.1.6.3SP Integration, Assembly, Test, Checkout
1.1.2.1.7Data Processor
1.1.2.1.7.1DP Hardware
1.1.2.1.7.2DP Software
1.1.2.1.7.2.1MAS
1.1.2.1.7.2.2STS
1.1.2.1.7.3DP Integration, Assembly, Test, Checkout
1.1.2.1.8Simulator/Tester (ST)
1.1.2.1.8.1ST Hardware
1.1.2.1.8.2ST Integration Assembly, Test, Checkout
1.1.2.1.9In-plant PME Integration, Assembly, Test, Checkout
1.1.2.2Interim Equipment
1.1.2.3Common Support Equipment
1.1.2.4Peculiar Support Equipment
1.1.2.5Spares and Repair Parts
1.1.2.6Product Support
1.1.2.6.1In-plant Support
1.1.2.6.2Post-deployment Sustainment
1.1.2.7Site Activation/Install
1.1.2.7.1Facility Design Support
1.1.3Huntsville Lab Upgrades
1.1.3.1Prime Mission Product
1.1.3.1.1Data Processor
1.1.3.1.1.1DP Hardware
1.1.3.1.1.2DP Integration, Assembly Test, Checkout
1.1.3.2Spares and Repair Parts
1.1.3.3Huntsville Lab Product Support
1.1.3.4Site Activation/Install
1.1.3.4.1Facility Design
An Employee of:Contractor Fiscal Year 3CWBSLabor CategoryBOE ReferenceRadar Hardware/Software Development3.4 Test3.6 Facility Design& Construction/Sustainment5.3 Radar SW/HWWBS Total Hours
3.3.1 Radar Software3.3.2 Radar Hardware3.4.1 Basline Test3.4.2 DT3.4.3 TRR/SRR3.4.4 Ops Test Support3.6.1 Facilities Design3.6.3 ILS3.6.4 CLS5.3.2 Radar HW
3.3.1.2 Clear UEWR SW Upgrade3.3.1.3 VCN Synch Update3.3.2.1 Obsolescence Redesign3.3.2.3 PME&Spares3.3.2.4 Interim Equipment3.3.2.5 Pec&Com Equipment3.3.2.6 PME Dev String3.3.2.7 5 Huntsville Lab3.6.1.2 Clear Fac Design3.6.3.1 Tech Pubs3.6.3.2 Training3.6.3.3 Gov Property & IUID3.6.3.4 LDP3.6.3.5 Provisioning/Supply3.6.3.6 PHS&T5.3.2.5 Huntsville Lab
WBS/Item NumberWBS Description
1.1CLIN0001 Clear Radar Design, Development and Sustainment Rev G
1.1.1Contractor Development Plant
1.1.1.1Prime Mission Product
1.1.1.1.1Receiver/Exciter (REX)
1.1.1.1.1.1REX Hardware
1.1.1.1.1.2REX Software (RES)
1.1.1.1.1.3REX Integration, Assembly, Test, Checkout
1.1.1.1.2Frequency Time Standard (FTS)
1.1.1.1.2.1FTS Hardware
1.1.1.1.2.2FTS Integration, Assembly, Test, Checkout
1.1.1.1.3Cooling Environmental Monitor (CEM)
1.1.1.1.3.1CEM Hardware
1.1.1.1.3.2CEM Integration, Assembly, Test, Checkout
1.1.1.1.4Receiver Beamformer Network (RBF)
1.1.1.1.4.1RBF Hardware
1.1.1.1.4.2RBF Integration, Assembly, Test, Checkout
1.1.1.1.5Beam Steering Unit (BSU)
1.1.1.1.5.1BSU Hardware
1.1.1.1.5.2BSU Integration, Assembly, Test, Checkout
1.1.1.1.6Signal Processor
1.1.1.1.6.1SP Hardware
1.1.1.1.6.2SP Software (SPS)
1.1.1.1.6.3SP Integration, Assembly Test, Checkout
1.1.1.1.7Data Processor
1.1.1.1.7.1DP Hardware
1.1.1.1.7.2DP Software
1.1.1.1.7.2.1MAS
1.1.1.1.7.2.2STS
1.1.1.1.7.3DP Integration, Assembly Test, Checkout
1.1.1.1.8Development String Activation/Install
1.1.1.2Development String Product Support
1.1.2Clear UEWR
1.1.2.1Prime Mission Product
1.1.2.1.1Receiver/Exciter (REX)
1.1.2.1.1.1REX Hardware
1.1.2.1.1.2REX Software (RES)
1.1.2.1.1.3REX Integration, Assembly, Test, Checkout
1.1.2.1.2Frequency Time Standard (FTS)
1.1.2.1.2.1FTS Hardware
1.1.2.1.2.2FTS Integration, Assembly, Test, Checkout
1.1.2.1.3Cooling Environmental Monitor (CEM)
1.1.2.1.3.1CEM Hardware
1.1.2.1.3.2CEM Integration, Assembly, Test, Checkout
1.1.2.1.4Receiver Beamformer Network (RBF)
1.1.2.1.4.1RBF Hardware
1.1.2.1.4.2RBF Integration, Assembly, Test, Checkout
1.1.2.1.5Beam Steering Unit (BSU)
1.1.2.1.5.1BSU Hardware
1.1.2.1.5.2BSU Integration, Assembly, Test, Checkout
1.1.2.1.6Signal Processor
1.1.2.1.6.1SP Hardware
1.1.2.1.6.2SP Software (SPS)
1.1.2.1.6.3SP Integration, Assembly, Test, Checkout
1.1.2.1.7Data Processor
1.1.2.1.7.1DP Hardware
1.1.2.1.7.2DP Software
1.1.2.1.7.2.1MAS
1.1.2.1.7.2.2STS
1.1.2.1.7.3DP Integration, Assembly, Test, Checkout
1.1.2.1.8Simulator/Tester (ST)
1.1.2.1.8.1ST Hardware
1.1.2.1.8.2ST Integration Assembly, Test, Checkout
1.1.2.1.9In-plant PME Integration, Assembly, Test, Checkout
1.1.2.2Interim Equipment
1.1.2.3Common Support Equipment
1.1.2.4Peculiar Support Equipment
1.1.2.5Spares and Repair Parts
1.1.2.6Product Support
1.1.2.6.1In-plant Support
1.1.2.6.2Post-deployment Sustainment
1.1.2.7Site Activation/Install
1.1.2.7.1Facility Design Support
1.1.3Huntsville Lab Upgrades
1.1.3.1Prime Mission Product
1.1.3.1.1Data Processor
1.1.3.1.1.1DP Hardware
1.1.3.1.1.2DP Integration, Assembly Test, Checkout
1.1.3.2Spares and Repair Parts
1.1.3.3Huntsville Lab Product Support
1.1.3.4Site Activation/Install
1.1.3.4.1Facility Design
An Employee of:Contractor Fiscal Year 4CWBSLabor CategoryBOE ReferenceRadar Hardware/Software Development3.4 Test3.6 Facility Design& Construction/Sustainment5.3 Radar SW/HWWBS Total Hours
3.3.1 Radar Software3.3.2 Radar Hardware3.4.1 Basline Test3.4.2 DT3.4.3 TRR/SRR3.4.4 Ops Test Support3.6.1 Facilities Design3.6.3 ILS3.6.4 CLS5.3.2 Radar HW
3.3.1.2 Clear UEWR SW Upgrade3.3.1.3 VCN Synch Update3.3.2.1 Obsolescence Redesign3.3.2.3 PME&Spares3.3.2.4 Interim Equipment3.3.2.5 Pec&Com Equipment3.3.2.6 PME Dev String3.3.2.7 5 Huntsville Lab3.6.1.2 Clear Fac Design3.6.3.1 Tech Pubs3.6.3.2 Training3.6.3.3 Gov Property & IUID3.6.3.4 LDP3.6.3.5 Provisioning/Supply3.6.3.6 PHS&T5.3.2.5 Huntsville Lab
WBS/Item NumberWBS Description
1.1CLIN0001 Clear Radar Design, Development and Sustainment Rev G
1.1.1Contractor Development Plant
1.1.1.1Prime Mission Product
1.1.1.1.1Receiver/Exciter (REX)
1.1.1.1.1.1REX Hardware
1.1.1.1.1.2REX Software (RES)
1.1.1.1.1.3REX Integration, Assembly, Test, Checkout
1.1.1.1.2Frequency Time Standard (FTS)
1.1.1.1.2.1FTS Hardware
1.1.1.1.2.2FTS Integration, Assembly, Test, Checkout
1.1.1.1.3Cooling Environmental Monitor (CEM)
1.1.1.1.3.1CEM Hardware
1.1.1.1.3.2CEM Integration, Assembly, Test, Checkout
1.1.1.1.4Receiver Beamformer Network (RBF)
1.1.1.1.4.1RBF Hardware
1.1.1.1.4.2RBF Integration, Assembly, Test, Checkout
1.1.1.1.5Beam Steering Unit (BSU)
1.1.1.1.5.1BSU Hardware
1.1.1.1.5.2BSU Integration, Assembly, Test, Checkout
1.1.1.1.6Signal Processor
1.1.1.1.6.1SP Hardware
1.1.1.1.6.2SP Software (SPS)
1.1.1.1.6.3SP Integration, Assembly Test, Checkout
1.1.1.1.7Data Processor
1.1.1.1.7.1DP Hardware
1.1.1.1.7.2DP Software
1.1.1.1.7.2.1MAS
1.1.1.1.7.2.2STS
1.1.1.1.7.3DP Integration, Assembly Test, Checkout
1.1.1.1.8Development String Activation/Install
1.1.1.2Development String Product Support
1.1.2Clear UEWR
1.1.2.1Prime Mission Product
1.1.2.1.1Receiver/Exciter (REX)
1.1.2.1.1.1REX Hardware
1.1.2.1.1.2REX Software (RES)
1.1.2.1.1.3REX Integration, Assembly, Test, Checkout
1.1.2.1.2Frequency Time Standard (FTS)
1.1.2.1.2.1FTS Hardware
1.1.2.1.2.2FTS Integration, Assembly, Test, Checkout
1.1.2.1.3Cooling Environmental Monitor (CEM)
1.1.2.1.3.1CEM Hardware
1.1.2.1.3.2CEM Integration, Assembly, Test, Checkout
1.1.2.1.4Receiver Beamformer Network (RBF)
1.1.2.1.4.1RBF Hardware
1.1.2.1.4.2RBF Integration, Assembly, Test, Checkout
1.1.2.1.5Beam Steering Unit (BSU)
1.1.2.1.5.1BSU Hardware
1.1.2.1.5.2BSU Integration, Assembly, Test, Checkout
1.1.2.1.6Signal Processor
1.1.2.1.6.1SP Hardware
1.1.2.1.6.2SP Software (SPS)
1.1.2.1.6.3SP Integration, Assembly, Test, Checkout
1.1.2.1.7Data Processor
1.1.2.1.7.1DP Hardware
1.1.2.1.7.2DP Software
1.1.2.1.7.2.1MAS
1.1.2.1.7.2.2STS
1.1.2.1.7.3DP Integration, Assembly, Test, Checkout
1.1.2.1.8Simulator/Tester (ST)
1.1.2.1.8.1ST Hardware
1.1.2.1.8.2ST Integration Assembly, Test, Checkout
1.1.2.1.9In-plant PME Integration, Assembly, Test, Checkout
1.1.2.2Interim Equipment
1.1.2.3Common Support Equipment
1.1.2.4Peculiar Support Equipment
1.1.2.5Spares and Repair Parts
1.1.2.6Product Support
1.1.2.6.1In-plant Support
1.1.2.6.2Post-deployment Sustainment
1.1.2.7Site Activation/Install
1.1.2.7.1Facility Design Support
1.1.3Huntsville Lab Upgrades
1.1.3.1Prime Mission Product
1.1.3.1.1Data Processor
1.1.3.1.1.1DP Hardware
1.1.3.1.1.2DP Integration, Assembly Test, Checkout
1.1.3.2Spares and Repair Parts
1.1.3.3Huntsville Lab Product Support
1.1.3.4Site Activation/Install
1.1.3.4.1Facility Design
An Employee of:Contractor Fiscal Year 5CWBSLabor CategoryBOE ReferenceRadar Hardware/Software Development3.4 Test3.6 Facility Design& Construction/Sustainment5.3 Radar SW/HWWBS Total Hours
3.3.1 Radar Software3.3.2 Radar Hardware3.4.1 Basline Test3.4.2 DT3.4.3 TRR/SRR3.4.4 Ops Test Support3.6.1 Facilities Design3.6.3 ILS3.6.4 CLS5.3.2 Radar HW
3.3.1.2 Clear UEWR SW Upgrade3.3.1.3 VCN Synch Update3.3.2.1 Obsolescence Redesign3.3.2.3 PME&Spares3.3.2.4 Interim Equipment3.3.2.5 Pec&Com Equipment3.3.2.6 PME Dev String3.3.2.7 5 Huntsville Lab3.6.1.2 Clear Fac Design3.6.3.1 Tech Pubs3.6.3.2 Training3.6.3.3 Gov Property & IUID3.6.3.4 LDP3.6.3.5 Provisioning/Supply3.6.3.6 PHS&T5.3.2.5 Huntsville Lab
WBS/Item NumberWBS Description
1.1CLIN0001 Clear Radar Design, Development and Sustainment Rev G
1.1.1Contractor Development Plant
1.1.1.1Prime Mission Product
1.1.1.1.1Receiver/Exciter (REX)
1.1.1.1.1.1REX Hardware
1.1.1.1.1.2REX Software (RES)
1.1.1.1.1.3REX Integration, Assembly, Test, Checkout
1.1.1.1.2Frequency Time Standard (FTS)
1.1.1.1.2.1FTS Hardware
1.1.1.1.2.2FTS Integration, Assembly, Test, Checkout
1.1.1.1.3Cooling Environmental Monitor (CEM)
1.1.1.1.3.1CEM Hardware
1.1.1.1.3.2CEM Integration, Assembly, Test, Checkout
1.1.1.1.4Receiver Beamformer Network (RBF)
1.1.1.1.4.1RBF Hardware
1.1.1.1.4.2RBF Integration, Assembly, Test, Checkout
1.1.1.1.5Beam Steering Unit (BSU)
1.1.1.1.5.1BSU Hardware
1.1.1.1.5.2BSU Integration, Assembly, Test, Checkout
1.1.1.1.6Signal Processor
1.1.1.1.6.1SP Hardware
1.1.1.1.6.2SP Software (SPS)
1.1.1.1.6.3SP Integration, Assembly Test, Checkout
1.1.1.1.7Data Processor
1.1.1.1.7.1DP Hardware
1.1.1.1.7.2DP Software
1.1.1.1.7.2.1MAS
1.1.1.1.7.2.2STS
1.1.1.1.7.3DP Integration, Assembly Test, Checkout
1.1.1.1.8Development String Activation/Install
1.1.1.2Development String Product Support
1.1.2Clear UEWR
1.1.2.1Prime Mission Product
1.1.2.1.1Receiver/Exciter (REX)
1.1.2.1.1.1REX Hardware
1.1.2.1.1.2REX Software (RES)
1.1.2.1.1.3REX Integration, Assembly, Test, Checkout
1.1.2.1.2Frequency Time Standard (FTS)
1.1.2.1.2.1FTS Hardware
1.1.2.1.2.2FTS Integration, Assembly, Test, Checkout
1.1.2.1.3Cooling Environmental Monitor (CEM)
1.1.2.1.3.1CEM Hardware
1.1.2.1.3.2CEM Integration, Assembly, Test, Checkout
1.1.2.1.4Receiver Beamformer Network (RBF)
1.1.2.1.4.1RBF Hardware
1.1.2.1.4.2RBF Integration, Assembly, Test, Checkout
1.1.2.1.5Beam Steering Unit (BSU)
1.1.2.1.5.1BSU Hardware
1.1.2.1.5.2BSU Integration, Assembly, Test, Checkout
1.1.2.1.6Signal Processor
1.1.2.1.6.1SP Hardware
1.1.2.1.6.2SP Software (SPS)
1.1.2.1.6.3SP Integration, Assembly, Test, Checkout
1.1.2.1.7Data Processor
1.1.2.1.7.1DP Hardware
1.1.2.1.7.2DP Software
1.1.2.1.7.2.1MAS
1.1.2.1.7.2.2STS
1.1.2.1.7.3DP Integration, Assembly, Test, Checkout
1.1.2.1.8Simulator/Tester (ST)
1.1.2.1.8.1ST Hardware
1.1.2.1.8.2ST Integration Assembly, Test, Checkout
1.1.2.1.9In-plant PME Integration, Assembly, Test, Checkout
1.1.2.2Interim Equipment
1.1.2.3Common Support Equipment
1.1.2.4Peculiar Support Equipment
1.1.2.5Spares and Repair Parts
1.1.2.6Product Support
1.1.2.6.1In-plant Support
1.1.2.6.2Post-deployment Sustainment
1.1.2.7Site Activation/Install
1.1.2.7.1Facility Design Support
1.1.3Huntsville Lab Upgrades
1.1.3.1Prime Mission Product
1.1.3.1.1Data Processor
1.1.3.1.1.1DP Hardware
1.1.3.1.1.2DP Integration, Assembly Test, Checkout
1.1.3.2Spares and Repair Parts
1.1.3.3Huntsville Lab Product Support
1.1.3.4Site Activation/Install
1.1.3.4.1Facility Design
An Employee of:Contractor Fiscal Year 6CWBSLabor CategoryBOE ReferenceRadar Hardware/Software Development3.4 Test3.6 Facility Design& Construction/Sustainment5.3 Radar SW/HWWBS Total Hours
3.3.1 Radar Software3.3.2 Radar Hardware3.4.1 Basline Test3.4.2 DT3.4.3 TRR/SRR3.4.4 Ops Test Support3.6.1 Facilities Design3.6.3 ILS3.6.4 CLS5.3.2 Radar HW
3.3.1.2 Clear UEWR SW Upgrade3.3.1.3 VCN Synch Update3.3.2.1 Obsolescence Redesign3.3.2.3 PME&Spares3.3.2.4 Interim Equipment3.3.2.5 Pec&Com Equipment3.3.2.6 PME Dev String3.3.2.7 5 Huntsville Lab3.6.1.2 Clear Fac Design3.6.3.1 Tech Pubs3.6.3.2 Training3.6.3.3 Gov Property & IUID3.6.3.4 LDP3.6.3.5 Provisioning/Supply3.6.3.6 PHS&T5.3.2.5 Huntsville Lab
WBS/Item NumberWBS Description
1.1CLIN0001 Clear Radar Design, Development and Sustainment Rev G
1.1.1Contractor Development Plant
1.1.1.1Prime Mission Product
1.1.1.1.1Receiver/Exciter (REX)
1.1.1.1.1.1REX Hardware
1.1.1.1.1.2REX Software (RES)
1.1.1.1.1.3REX Integration, Assembly, Test, Checkout
1.1.1.1.2Frequency Time Standard (FTS)
1.1.1.1.2.1FTS Hardware
1.1.1.1.2.2FTS Integration, Assembly, Test, Checkout
1.1.1.1.3Cooling Environmental Monitor (CEM)
1.1.1.1.3.1CEM Hardware
1.1.1.1.3.2CEM Integration, Assembly, Test, Checkout
1.1.1.1.4Receiver Beamformer Network (RBF)
1.1.1.1.4.1RBF Hardware
1.1.1.1.4.2RBF Integration, Assembly, Test, Checkout
1.1.1.1.5Beam Steering Unit (BSU)
1.1.1.1.5.1BSU Hardware
1.1.1.1.5.2BSU Integration, Assembly, Test, Checkout
1.1.1.1.6Signal Processor
1.1.1.1.6.1SP Hardware
1.1.1.1.6.2SP Software (SPS)
1.1.1.1.6.3SP Integration, Assembly Test, Checkout
1.1.1.1.7Data Processor
1.1.1.1.7.1DP Hardware
1.1.1.1.7.2DP Software
1.1.1.1.7.2.1MAS
1.1.1.1.7.2.2STS
1.1.1.1.7.3DP Integration, Assembly Test, Checkout
1.1.1.1.8Development String Activation/Install
1.1.1.2Development String Product Support
1.1.2Clear UEWR
1.1.2.1Prime Mission Product
1.1.2.1.1Receiver/Exciter (REX)
1.1.2.1.1.1REX Hardware
1.1.2.1.1.2REX Software (RES)
1.1.2.1.1.3REX Integration, Assembly, Test, Checkout
1.1.2.1.2Frequency Time Standard (FTS)
1.1.2.1.2.1FTS Hardware
1.1.2.1.2.2FTS Integration, Assembly, Test, Checkout
1.1.2.1.3Cooling Environmental Monitor (CEM)
1.1.2.1.3.1CEM Hardware
1.1.2.1.3.2CEM Integration, Assembly, Test, Checkout
1.1.2.1.4Receiver Beamformer Network (RBF)
1.1.2.1.4.1RBF Hardware
1.1.2.1.4.2RBF Integration, Assembly, Test, Checkout
1.1.2.1.5Beam Steering Unit (BSU)
1.1.2.1.5.1BSU Hardware
1.1.2.1.5.2BSU Integration, Assembly, Test, Checkout
1.1.2.1.6Signal Processor
1.1.2.1.6.1SP Hardware
1.1.2.1.6.2SP Software (SPS)
1.1.2.1.6.3SP Integration, Assembly, Test, Checkout
1.1.2.1.7Data Processor
1.1.2.1.7.1DP Hardware
1.1.2.1.7.2DP Software
1.1.2.1.7.2.1MAS
1.1.2.1.7.2.2STS
1.1.2.1.7.3DP Integration, Assembly, Test, Checkout
1.1.2.1.8Simulator/Tester (ST)
1.1.2.1.8.1ST Hardware
1.1.2.1.8.2ST Integration Assembly, Test, Checkout
1.1.2.1.9In-plant PME Integration, Assembly, Test, Checkout
1.1.2.2Interim Equipment
1.1.2.3Common Support Equipment
1.1.2.4Peculiar Support Equipment
1.1.2.5Spares and Repair Parts
1.1.2.6Product Support
1.1.2.6.1In-plant Support
1.1.2.6.2Post-deployment Sustainment
1.1.2.7Site Activation/Install
1.1.2.7.1Facility Design Support
1.1.3Huntsville Lab Upgrades
1.1.3.1Prime Mission Product
1.1.3.1.1Data Processor
1.1.3.1.1.1DP Hardware
1.1.3.1.1.2DP Integration, Assembly Test, Checkout
1.1.3.2Spares and Repair Parts
1.1.3.3Huntsville Lab Product Support
1.1.3.4Site Activation/Install
1.1.3.4.1Facility Design

CLIN0001 BOE Material Summary Offeror's are required to provide a Material BOE summary that clearly lists the Types and Quantities of Material resources proposed regardless of source (prime and subcontractors) by the SOW and CWBS time phased by Contractor Fiscal Year. Since the Technical and Management Evaluators will be primarily concerned with soundness of an offeror’s approach including the realism and reasonableness of the types & quantities of materials, proposed unit prices and extended cost should not be included in Volume V. Therefore, this summary should be a sanitized version of the Priced Bill of Material, which offerors must provide in Volume IV Cost/Price. This summary must be provided in Excel to simplify manipulation of the data during evaluation. Otherwise contractor format is acceptable.

CLIN0001 BOE Travel Summary Offeror's are required to provide a Travel BOE summary that clearly explains proposed travel by the prime and subcontractors by the SOW and CWBS. This summary matches the travel proposed by the offeror and the proposed subcontractors in Volume IV Cost/Price when combined. This summary must be provided in Excel to simplify manipulation of the data during evaluation. Otherwise contractor format is acceptable.

CLIN0002 BOE Labor Summary

An Employee of:Total all Contractor Fiscal YearsCWBSLabor CategoryBOE Reference3.4 Test3.6 Facility Design& Construction/Sustainment5.3 Radar SW/HWWBS Total Hours
3.3.1 Radar Software3.3.2 Radar Hardware3.4.1 Basline Test3.4.2 DT3.4.3 TRR/SRR3.4.4 Ops Test Support3.6.1 Facilities Design3.6.2 Post Op Activities3.6.3 ILS3.6.4 CLS5.3.2 Radar HW
3.3.1.2 Clear UEWR SW Upgrade3.3.1.3 VCN Synch Update3.3.2.1 Obsolescence Redesign3.3.2.3 PME&Spares3.3.2.4 Interim Equipment3.3.2.5 Pec&Com Equipment3.3.2.6 PME Dev String3.3.2.7 Huntsville Lab3.6.1.2 Clear Fac Design3.6.1.3 Clear Site Construction3.6.3.1 Tech Pubs3.6.3.2 Training3.6.3.3 Gov Property & IUID3.6.3.4 LDP3.6.3.5 Provisioning/Supply3.6.3.6 PHS&T5.3.2.5 Huntsville Lab
WBS/Item NumberWBS Description
1.2CLIN0002 Clear Radar Integration and Deployment
1.2.1Clear UEWR
1.2.1.1Prime Mission Product
1.2.1.1.1Receiver/Exciter (REX)
1.2.1.1.1.1REX Hardware
1.2.1.1.1.2REX Software (RES)
1.2.1.1.2Frequency Time Standard (FTS)
1.2.1.1.2.1FTS Hardware
1.2.1.1.3Cooling Environmental Monitor (CEM)
1.2.1.1.3.1CEM Hardware
1.2.1.1.4Receiver Beamformer Network (RBF)
1.2.1.1.4.1RBF Hardware
1.2.1.1.5Beam Steering Unit (BSU)
1.2.1.1.5.1BSU Hardware
1.2.1.1.6Signal Processor
1.2.1.1.6.1SP Hardware
1.2.1.1.6.2SP Software
1.2.1.1.7Data Processor
1.2.1.1.7.1DP Hardware
1.2.1.1.7.2DP Software
1.2.1.1.8Simulator/Tester (ST)
1.2.1.1.8.1ST Hardware
1.2.1.2On-site Activation/Install
1.2.1.2.1Facility Design
1.2.1.2.2Facility Construction
1.2.1.2.3System Assembly, Installation
1.2.1.2.4Facility Deinstallation/Remediation
1.2.1.2.5Radar Recalibration/Reconfiguration
1.2.1.3On-Site Test and Evaluation
1.2.1.4Product Support
1.2.1.4.1Preoperational Support
1.2.2Huntsville Lab Upgrades
1.2.2.1Prime Mission Product
1.2.2.1.1Data Processor
1.2.2.1.1.1DP Hardware
1.2.2.1.1.2DP Software
1.2.2.2Product Support
1.2.2.3On Site Activation/Install
1.2.2.3.1Facility Design
1.2.2.3.2Facility Construction
1.2.2.3.3System Assembly, Installation
An Employee of:Contractor Fiscal Year 1CWBSLabor CategoryBOE Reference3.4 Test3.6 Facility Design& Construction/Sustainment5.3 Radar SW/HWWBS Total Hours
3.3.1 Radar Software3.3.2 Radar Hardware3.4.1 Basline Test3.4.2 DT3.4.3 TRR/SRR3.4.4 Ops Test Support3.6.1 Facilities Design3.6.2 Post Op Activities3.6.3 ILS3.6.4 CLS5.3.2 Radar HW
3.3.1.2 Clear UEWR SW Upgrade3.3.1.3 VCN Synch Update3.3.2.1 Obsolescence Redesign3.3.2.3 PME&Spares3.3.2.4 Interim Equipment3.3.2.5 Pec&Com Equipment3.3.2.6 PME Dev String3.3.2.7 Huntsville Lab3.6.1.2 Clear Fac Design3.6.1.3 Clear Site Construction3.6.3.1 Tech Pubs3.6.3.2 Training3.6.3.3 Gov Property & IUID3.6.3.4 LDP3.6.3.5 Provisioning/Supply3.6.3.6 PHS&T5.3.2.5 Huntsville Lab
WBS/Item NumberWBS Description
1.2CLIN0002 Clear Radar Integration and Deployment
1.2.1Clear UEWR
1.2.1.1Prime Mission Product
1.2.1.1.1Receiver/Exciter (REX)
1.2.1.1.1.1REX Hardware
1.2.1.1.1.2REX Software (RES)
1.2.1.1.2Frequency Time Standard (FTS)
1.2.1.1.2.1FTS Hardware
1.2.1.1.3Cooling Environmental Monitor (CEM)
1.2.1.1.3.1CEM Hardware
1.2.1.1.4Receiver Beamformer Network (RBF)
1.2.1.1.4.1RBF Hardware
1.2.1.1.5Beam Steering Unit (BSU)
1.2.1.1.5.1BSU Hardware
1.2.1.1.6Signal Processor
1.2.1.1.6.1SP Hardware
1.2.1.1.6.2SP Software
1.2.1.1.7Data Processor
1.2.1.1.7.1DP Hardware
1.2.1.1.7.2DP Software
1.2.1.1.8Simulator/Tester (ST)
1.2.1.1.8.1ST Hardware
1.2.1.2On-site Activation/Install
1.2.1.2.1Facility Design
1.2.1.2.2Facility Construction
1.2.1.2.3System Assembly, Installation
1.2.1.2.4Facility Deinstallation/Remediation
1.2.1.2.5Radar Recalibration/Reconfiguration
1.2.1.3On-Site Test and Evaluation
1.2.1.4Product Support
1.2.1.4.1Preoperational Support
1.2.2Huntsville Lab Upgrades
1.2.2.1Prime Mission Product
1.2.2.1.1Data Processor
1.2.2.1.1.1DP Hardware
1.2.2.1.1.2DP Software
1.2.2.2Product Support
1.2.2.3On Site Activation/Install
1.2.2.3.1Facility Design
1.2.2.3.2Facility Construction
1.2.2.3.3System Assembly, Installation
An Employee of:Contractor Fiscal Year 2CWBSLabor CategoryBOE Reference3.4 Test3.6 Facility Design& Construction/Sustainment5.3 Radar SW/HWWBS Total Hours
3.3.1 Radar Software3.3.2 Radar Hardware3.4.1 Basline Test3.4.2 DT3.4.3 TRR/SRR3.4.4 Ops Test Support3.6.1 Facilities Design3.6.2 Post Op Activities3.6.3 ILS3.6.4 CLS5.3.2 Radar HW
3.3.1.2 Clear UEWR SW Upgrade3.3.1.3 VCN Synch Update3.3.2.1 Obsolescence Redesign3.3.2.3 PME&Spares3.3.2.4 Interim Equipment3.3.2.5 Pec&Com Equipment3.3.2.6 PME Dev String3.3.2.7 Huntsville Lab3.6.1.2 Clear Fac Design3.6.1.3 Clear Site Construction3.6.3.1 Tech Pubs3.6.3.2 Training3.6.3.3 Gov Property & IUID3.6.3.4 LDP3.6.3.5 Provisioning/Supply3.6.3.6 PHS&T5.3.2.5 Huntsville Lab
WBS/Item NumberWBS Description
1.2CLIN0002 Clear Radar Integration and Deployment
1.2.1Clear UEWR
1.2.1.1Prime Mission Product
1.2.1.1.1Receiver/Exciter (REX)
1.2.1.1.1.1REX Hardware
1.2.1.1.1.2REX Software (RES)
1.2.1.1.2Frequency Time Standard (FTS)
1.2.1.1.2.1FTS Hardware
1.2.1.1.3Cooling Environmental Monitor (CEM)
1.2.1.1.3.1CEM Hardware
1.2.1.1.4Receiver Beamformer Network (RBF)
1.2.1.1.4.1RBF Hardware
1.2.1.1.5Beam Steering Unit (BSU)
1.2.1.1.5.1BSU Hardware
1.2.1.1.6Signal Processor
1.2.1.1.6.1SP Hardware
1.2.1.1.6.2SP Software
1.2.1.1.7Data Processor
1.2.1.1.7.1DP Hardware
1.2.1.1.7.2DP Software
1.2.1.1.8Simulator/Tester (ST)
1.2.1.1.8.1ST Hardware
1.2.1.2On-site Activation/Install
1.2.1.2.1Facility Design
1.2.1.2.2Facility Construction
1.2.1.2.3System Assembly, Installation
1.2.1.2.4Facility Deinstallation/Remediation
1.2.1.2.5Radar Recalibration/Reconfiguration
1.2.1.3On-Site Test and Evaluation
1.2.1.4Product Support
1.2.1.4.1Preoperational Support
1.2.2Huntsville Lab Upgrades
1.2.2.1Prime Mission Product
1.2.2.1.1Data Processor
1.2.2.1.1.1DP Hardware
1.2.2.1.1.2DP Software

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .