Atch L9 Total Resources Volume.xlsx
XLSX spreadsheet 524 KB Posted
- Attached to
- Clear / Cod Upgrade EWR (UEWR)
- Solicitation number
- HQ0147-11-R-0002
- Issued by
-
DOD Missile Defense Agency
About this file
Atch L9 Total Resources Volume
View the file
Other files
Show 40 more
Latest 50 of 51 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN0001 BOE Labor Summary
| An Employee of: | Total all Contractor Fiscal Years | CWBS | Labor Category | BOE Reference | Radar Hardware/Software Development | 3.4 Test | 3.6 Facility Design& Construction/Sustainment | 5.3 Radar SW/HW | WBS Total Hours | |||||||||||||||||
| 3.3.1 Radar Software | 3.3.2 Radar Hardware | 3.4.1 Basline Test | 3.4.2 DT | 3.4.3 TRR/SRR | 3.4.4 Ops Test Support | 3.6.1 Facilities Design | 3.6.3 ILS | 3.6.4 CLS | 5.3.2 Radar HW | |||||||||||||||||
| 3.3.1.2 Clear UEWR SW Upgrade | 3.3.1.3 VCN Synch Update | 3.3.2.1 Obsolescence Redesign | 3.3.2.3 PME&Spares | 3.3.2.4 Interim Equipment | 3.3.2.5 Pec&Com Equipment | 3.3.2.6 PME Dev String | 3.3.2.7 5 Huntsville Lab | 3.6.1.2 Clear Fac Design | 3.6.3.1 Tech Pubs | 3.6.3.2 Training | 3.6.3.3 Gov Property & IUID | 3.6.3.4 LDP | 3.6.3.5 Provisioning/Supply | 3.6.3.6 PHS&T | 5.3.2.5 Huntsville Lab | |||||||||||
| WBS/Item Number | WBS Description | |||||||||||||||||||||||||
| 1.1 | CLIN0001 Clear Radar Design, Development and Sustainment Rev G | |||||||||||||||||||||||||
| 1.1.1 | Contractor Development Plant | |||||||||||||||||||||||||
| 1.1.1.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.1.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||
| 1.1.1.1.1.1 | REX Hardware | |||||||||||||||||||||||||
| 1.1.1.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||
| 1.1.1.1.1.3 | REX Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||
| 1.1.1.1.2.1 | FTS Hardware | |||||||||||||||||||||||||
| 1.1.1.1.2.2 | FTS Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||
| 1.1.1.1.3.1 | CEM Hardware | |||||||||||||||||||||||||
| 1.1.1.1.3.2 | CEM Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||
| 1.1.1.1.4.1 | RBF Hardware | |||||||||||||||||||||||||
| 1.1.1.1.4.2 | RBF Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||
| 1.1.1.1.5.1 | BSU Hardware | |||||||||||||||||||||||||
| 1.1.1.1.5.2 | BSU Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.6 | Signal Processor | |||||||||||||||||||||||||
| 1.1.1.1.6.1 | SP Hardware | |||||||||||||||||||||||||
| 1.1.1.1.6.2 | SP Software (SPS) | |||||||||||||||||||||||||
| 1.1.1.1.6.3 | SP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.7 | Data Processor | |||||||||||||||||||||||||
| 1.1.1.1.7.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.1.1.7.2 | DP Software | |||||||||||||||||||||||||
| 1.1.1.1.7.2.1 | MAS | |||||||||||||||||||||||||
| 1.1.1.1.7.2.2 | STS | |||||||||||||||||||||||||
| 1.1.1.1.7.3 | DP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.8 | Development String Activation/Install | |||||||||||||||||||||||||
| 1.1.1.2 | Development String Product Support | |||||||||||||||||||||||||
| 1.1.2 | Clear UEWR | |||||||||||||||||||||||||
| 1.1.2.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.2.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||
| 1.1.2.1.1.1 | REX Hardware | |||||||||||||||||||||||||
| 1.1.2.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||
| 1.1.2.1.1.3 | REX Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||
| 1.1.2.1.2.1 | FTS Hardware | |||||||||||||||||||||||||
| 1.1.2.1.2.2 | FTS Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||
| 1.1.2.1.3.1 | CEM Hardware | |||||||||||||||||||||||||
| 1.1.2.1.3.2 | CEM Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||
| 1.1.2.1.4.1 | RBF Hardware | |||||||||||||||||||||||||
| 1.1.2.1.4.2 | RBF Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||
| 1.1.2.1.5.1 | BSU Hardware | |||||||||||||||||||||||||
| 1.1.2.1.5.2 | BSU Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.6 | Signal Processor | |||||||||||||||||||||||||
| 1.1.2.1.6.1 | SP Hardware | |||||||||||||||||||||||||
| 1.1.2.1.6.2 | SP Software (SPS) | |||||||||||||||||||||||||
| 1.1.2.1.6.3 | SP Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.7 | Data Processor | |||||||||||||||||||||||||
| 1.1.2.1.7.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.2.1.7.2 | DP Software | |||||||||||||||||||||||||
| 1.1.2.1.7.2.1 | MAS | |||||||||||||||||||||||||
| 1.1.2.1.7.2.2 | STS | |||||||||||||||||||||||||
| 1.1.2.1.7.3 | DP Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.8 | Simulator/Tester (ST) | |||||||||||||||||||||||||
| 1.1.2.1.8.1 | ST Hardware | |||||||||||||||||||||||||
| 1.1.2.1.8.2 | ST Integration Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.9 | In-plant PME Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.2 | Interim Equipment | |||||||||||||||||||||||||
| 1.1.2.3 | Common Support Equipment | |||||||||||||||||||||||||
| 1.1.2.4 | Peculiar Support Equipment | |||||||||||||||||||||||||
| 1.1.2.5 | Spares and Repair Parts | |||||||||||||||||||||||||
| 1.1.2.6 | Product Support | |||||||||||||||||||||||||
| 1.1.2.6.1 | In-plant Support | |||||||||||||||||||||||||
| 1.1.2.6.2 | Post-deployment Sustainment | |||||||||||||||||||||||||
| 1.1.2.7 | Site Activation/Install | |||||||||||||||||||||||||
| 1.1.2.7.1 | Facility Design Support | |||||||||||||||||||||||||
| 1.1.3 | Huntsville Lab Upgrades | |||||||||||||||||||||||||
| 1.1.3.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.3.1.1 | Data Processor | |||||||||||||||||||||||||
| 1.1.3.1.1.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.3.1.1.2 | DP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.3.2 | Spares and Repair Parts | |||||||||||||||||||||||||
| 1.1.3.3 | Huntsville Lab Product Support | |||||||||||||||||||||||||
| 1.1.3.4 | Site Activation/Install | |||||||||||||||||||||||||
| 1.1.3.4.1 | Facility Design |
| An Employee of: | Contractor Fiscal Year 1 | CWBS | Labor Category | BOE Reference | Radar Hardware/Software Development | 3.4 Test | 3.6 Facility Design& Construction/Sustainment | 5.3 Radar SW/HW | WBS Total Hours | |||||||||||||||||
| 3.3.1 Radar Software | 3.3.2 Radar Hardware | 3.4.1 Basline Test | 3.4.2 DT | 3.4.3 TRR/SRR | 3.4.4 Ops Test Support | 3.6.1 Facilities Design | 3.6.3 ILS | 3.6.4 CLS | 5.3.2 Radar HW | |||||||||||||||||
| 3.3.1.2 Clear UEWR SW Upgrade | 3.3.1.3 VCN Synch Update | 3.3.2.1 Obsolescence Redesign | 3.3.2.3 PME&Spares | 3.3.2.4 Interim Equipment | 3.3.2.5 Pec&Com Equipment | 3.3.2.6 PME Dev String | 3.3.2.7 5 Huntsville Lab | 3.6.1.2 Clear Fac Design | 3.6.3.1 Tech Pubs | 3.6.3.2 Training | 3.6.3.3 Gov Property & IUID | 3.6.3.4 LDP | 3.6.3.5 Provisioning/Supply | 3.6.3.6 PHS&T | 5.3.2.5 Huntsville Lab | |||||||||||
| WBS/Item Number | WBS Description | |||||||||||||||||||||||||
| 1.1 | CLIN0001 Clear Radar Design, Development and Sustainment Rev G | |||||||||||||||||||||||||
| 1.1.1 | Contractor Development Plant | |||||||||||||||||||||||||
| 1.1.1.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.1.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||
| 1.1.1.1.1.1 | REX Hardware | |||||||||||||||||||||||||
| 1.1.1.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||
| 1.1.1.1.1.3 | REX Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||
| 1.1.1.1.2.1 | FTS Hardware | |||||||||||||||||||||||||
| 1.1.1.1.2.2 | FTS Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||
| 1.1.1.1.3.1 | CEM Hardware | |||||||||||||||||||||||||
| 1.1.1.1.3.2 | CEM Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||
| 1.1.1.1.4.1 | RBF Hardware | |||||||||||||||||||||||||
| 1.1.1.1.4.2 | RBF Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||
| 1.1.1.1.5.1 | BSU Hardware | |||||||||||||||||||||||||
| 1.1.1.1.5.2 | BSU Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.6 | Signal Processor | |||||||||||||||||||||||||
| 1.1.1.1.6.1 | SP Hardware | |||||||||||||||||||||||||
| 1.1.1.1.6.2 | SP Software (SPS) | |||||||||||||||||||||||||
| 1.1.1.1.6.3 | SP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.7 | Data Processor | |||||||||||||||||||||||||
| 1.1.1.1.7.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.1.1.7.2 | DP Software | |||||||||||||||||||||||||
| 1.1.1.1.7.2.1 | MAS | |||||||||||||||||||||||||
| 1.1.1.1.7.2.2 | STS | |||||||||||||||||||||||||
| 1.1.1.1.7.3 | DP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.8 | Development String Activation/Install | |||||||||||||||||||||||||
| 1.1.1.2 | Development String Product Support | |||||||||||||||||||||||||
| 1.1.2 | Clear UEWR | |||||||||||||||||||||||||
| 1.1.2.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.2.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||
| 1.1.2.1.1.1 | REX Hardware | |||||||||||||||||||||||||
| 1.1.2.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||
| 1.1.2.1.1.3 | REX Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||
| 1.1.2.1.2.1 | FTS Hardware | |||||||||||||||||||||||||
| 1.1.2.1.2.2 | FTS Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||
| 1.1.2.1.3.1 | CEM Hardware | |||||||||||||||||||||||||
| 1.1.2.1.3.2 | CEM Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||
| 1.1.2.1.4.1 | RBF Hardware | |||||||||||||||||||||||||
| 1.1.2.1.4.2 | RBF Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||
| 1.1.2.1.5.1 | BSU Hardware | |||||||||||||||||||||||||
| 1.1.2.1.5.2 | BSU Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.6 | Signal Processor | |||||||||||||||||||||||||
| 1.1.2.1.6.1 | SP Hardware | |||||||||||||||||||||||||
| 1.1.2.1.6.2 | SP Software (SPS) | |||||||||||||||||||||||||
| 1.1.2.1.6.3 | SP Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.7 | Data Processor | |||||||||||||||||||||||||
| 1.1.2.1.7.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.2.1.7.2 | DP Software | |||||||||||||||||||||||||
| 1.1.2.1.7.2.1 | MAS | |||||||||||||||||||||||||
| 1.1.2.1.7.2.2 | STS | |||||||||||||||||||||||||
| 1.1.2.1.7.3 | DP Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.8 | Simulator/Tester (ST) | |||||||||||||||||||||||||
| 1.1.2.1.8.1 | ST Hardware | |||||||||||||||||||||||||
| 1.1.2.1.8.2 | ST Integration Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.9 | In-plant PME Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.2 | Interim Equipment | |||||||||||||||||||||||||
| 1.1.2.3 | Common Support Equipment | |||||||||||||||||||||||||
| 1.1.2.4 | Peculiar Support Equipment | |||||||||||||||||||||||||
| 1.1.2.5 | Spares and Repair Parts | |||||||||||||||||||||||||
| 1.1.2.6 | Product Support | |||||||||||||||||||||||||
| 1.1.2.6.1 | In-plant Support | |||||||||||||||||||||||||
| 1.1.2.6.2 | Post-deployment Sustainment | |||||||||||||||||||||||||
| 1.1.2.7 | Site Activation/Install | |||||||||||||||||||||||||
| 1.1.2.7.1 | Facility Design Support | |||||||||||||||||||||||||
| 1.1.3 | Huntsville Lab Upgrades | |||||||||||||||||||||||||
| 1.1.3.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.3.1.1 | Data Processor | |||||||||||||||||||||||||
| 1.1.3.1.1.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.3.1.1.2 | DP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.3.2 | Spares and Repair Parts | |||||||||||||||||||||||||
| 1.1.3.3 | Huntsville Lab Product Support | |||||||||||||||||||||||||
| 1.1.3.4 | Site Activation/Install | |||||||||||||||||||||||||
| 1.1.3.4.1 | Facility Design |
| An Employee of: | Contractor Fiscal Year 2 | CWBS | Labor Category | BOE Reference | Radar Hardware/Software Development | 3.4 Test | 3.6 Facility Design& Construction/Sustainment | 5.3 Radar SW/HW | WBS Total Hours | |||||||||||||||||
| 3.3.1 Radar Software | 3.3.2 Radar Hardware | 3.4.1 Basline Test | 3.4.2 DT | 3.4.3 TRR/SRR | 3.4.4 Ops Test Support | 3.6.1 Facilities Design | 3.6.3 ILS | 3.6.4 CLS | 5.3.2 Radar HW | |||||||||||||||||
| 3.3.1.2 Clear UEWR SW Upgrade | 3.3.1.3 VCN Synch Update | 3.3.2.1 Obsolescence Redesign | 3.3.2.3 PME&Spares | 3.3.2.4 Interim Equipment | 3.3.2.5 Pec&Com Equipment | 3.3.2.6 PME Dev String | 3.3.2.7 5 Huntsville Lab | 3.6.1.2 Clear Fac Design | 3.6.3.1 Tech Pubs | 3.6.3.2 Training | 3.6.3.3 Gov Property & IUID | 3.6.3.4 LDP | 3.6.3.5 Provisioning/Supply | 3.6.3.6 PHS&T | 5.3.2.5 Huntsville Lab | |||||||||||
| WBS/Item Number | WBS Description | |||||||||||||||||||||||||
| 1.1 | CLIN0001 Clear Radar Design, Development and Sustainment Rev G | |||||||||||||||||||||||||
| 1.1.1 | Contractor Development Plant | |||||||||||||||||||||||||
| 1.1.1.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.1.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||
| 1.1.1.1.1.1 | REX Hardware | |||||||||||||||||||||||||
| 1.1.1.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||
| 1.1.1.1.1.3 | REX Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||
| 1.1.1.1.2.1 | FTS Hardware | |||||||||||||||||||||||||
| 1.1.1.1.2.2 | FTS Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||
| 1.1.1.1.3.1 | CEM Hardware | |||||||||||||||||||||||||
| 1.1.1.1.3.2 | CEM Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||
| 1.1.1.1.4.1 | RBF Hardware | |||||||||||||||||||||||||
| 1.1.1.1.4.2 | RBF Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||
| 1.1.1.1.5.1 | BSU Hardware | |||||||||||||||||||||||||
| 1.1.1.1.5.2 | BSU Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.6 | Signal Processor | |||||||||||||||||||||||||
| 1.1.1.1.6.1 | SP Hardware | |||||||||||||||||||||||||
| 1.1.1.1.6.2 | SP Software (SPS) | |||||||||||||||||||||||||
| 1.1.1.1.6.3 | SP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.7 | Data Processor | |||||||||||||||||||||||||
| 1.1.1.1.7.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.1.1.7.2 | DP Software | |||||||||||||||||||||||||
| 1.1.1.1.7.2.1 | MAS | |||||||||||||||||||||||||
| 1.1.1.1.7.2.2 | STS | |||||||||||||||||||||||||
| 1.1.1.1.7.3 | DP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.8 | Development String Activation/Install | |||||||||||||||||||||||||
| 1.1.1.2 | Development String Product Support | |||||||||||||||||||||||||
| 1.1.2 | Clear UEWR | |||||||||||||||||||||||||
| 1.1.2.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.2.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||
| 1.1.2.1.1.1 | REX Hardware | |||||||||||||||||||||||||
| 1.1.2.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||
| 1.1.2.1.1.3 | REX Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||
| 1.1.2.1.2.1 | FTS Hardware | |||||||||||||||||||||||||
| 1.1.2.1.2.2 | FTS Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||
| 1.1.2.1.3.1 | CEM Hardware | |||||||||||||||||||||||||
| 1.1.2.1.3.2 | CEM Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||
| 1.1.2.1.4.1 | RBF Hardware | |||||||||||||||||||||||||
| 1.1.2.1.4.2 | RBF Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||
| 1.1.2.1.5.1 | BSU Hardware | |||||||||||||||||||||||||
| 1.1.2.1.5.2 | BSU Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.6 | Signal Processor | |||||||||||||||||||||||||
| 1.1.2.1.6.1 | SP Hardware | |||||||||||||||||||||||||
| 1.1.2.1.6.2 | SP Software (SPS) | |||||||||||||||||||||||||
| 1.1.2.1.6.3 | SP Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.7 | Data Processor | |||||||||||||||||||||||||
| 1.1.2.1.7.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.2.1.7.2 | DP Software | |||||||||||||||||||||||||
| 1.1.2.1.7.2.1 | MAS | |||||||||||||||||||||||||
| 1.1.2.1.7.2.2 | STS | |||||||||||||||||||||||||
| 1.1.2.1.7.3 | DP Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.8 | Simulator/Tester (ST) | |||||||||||||||||||||||||
| 1.1.2.1.8.1 | ST Hardware | |||||||||||||||||||||||||
| 1.1.2.1.8.2 | ST Integration Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.9 | In-plant PME Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.2 | Interim Equipment | |||||||||||||||||||||||||
| 1.1.2.3 | Common Support Equipment | |||||||||||||||||||||||||
| 1.1.2.4 | Peculiar Support Equipment | |||||||||||||||||||||||||
| 1.1.2.5 | Spares and Repair Parts | |||||||||||||||||||||||||
| 1.1.2.6 | Product Support | |||||||||||||||||||||||||
| 1.1.2.6.1 | In-plant Support | |||||||||||||||||||||||||
| 1.1.2.6.2 | Post-deployment Sustainment | |||||||||||||||||||||||||
| 1.1.2.7 | Site Activation/Install | |||||||||||||||||||||||||
| 1.1.2.7.1 | Facility Design Support | |||||||||||||||||||||||||
| 1.1.3 | Huntsville Lab Upgrades | |||||||||||||||||||||||||
| 1.1.3.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.3.1.1 | Data Processor | |||||||||||||||||||||||||
| 1.1.3.1.1.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.3.1.1.2 | DP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.3.2 | Spares and Repair Parts | |||||||||||||||||||||||||
| 1.1.3.3 | Huntsville Lab Product Support | |||||||||||||||||||||||||
| 1.1.3.4 | Site Activation/Install | |||||||||||||||||||||||||
| 1.1.3.4.1 | Facility Design |
| An Employee of: | Contractor Fiscal Year 3 | CWBS | Labor Category | BOE Reference | Radar Hardware/Software Development | 3.4 Test | 3.6 Facility Design& Construction/Sustainment | 5.3 Radar SW/HW | WBS Total Hours | |||||||||||||||||
| 3.3.1 Radar Software | 3.3.2 Radar Hardware | 3.4.1 Basline Test | 3.4.2 DT | 3.4.3 TRR/SRR | 3.4.4 Ops Test Support | 3.6.1 Facilities Design | 3.6.3 ILS | 3.6.4 CLS | 5.3.2 Radar HW | |||||||||||||||||
| 3.3.1.2 Clear UEWR SW Upgrade | 3.3.1.3 VCN Synch Update | 3.3.2.1 Obsolescence Redesign | 3.3.2.3 PME&Spares | 3.3.2.4 Interim Equipment | 3.3.2.5 Pec&Com Equipment | 3.3.2.6 PME Dev String | 3.3.2.7 5 Huntsville Lab | 3.6.1.2 Clear Fac Design | 3.6.3.1 Tech Pubs | 3.6.3.2 Training | 3.6.3.3 Gov Property & IUID | 3.6.3.4 LDP | 3.6.3.5 Provisioning/Supply | 3.6.3.6 PHS&T | 5.3.2.5 Huntsville Lab | |||||||||||
| WBS/Item Number | WBS Description | |||||||||||||||||||||||||
| 1.1 | CLIN0001 Clear Radar Design, Development and Sustainment Rev G | |||||||||||||||||||||||||
| 1.1.1 | Contractor Development Plant | |||||||||||||||||||||||||
| 1.1.1.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.1.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||
| 1.1.1.1.1.1 | REX Hardware | |||||||||||||||||||||||||
| 1.1.1.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||
| 1.1.1.1.1.3 | REX Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||
| 1.1.1.1.2.1 | FTS Hardware | |||||||||||||||||||||||||
| 1.1.1.1.2.2 | FTS Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||
| 1.1.1.1.3.1 | CEM Hardware | |||||||||||||||||||||||||
| 1.1.1.1.3.2 | CEM Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||
| 1.1.1.1.4.1 | RBF Hardware | |||||||||||||||||||||||||
| 1.1.1.1.4.2 | RBF Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||
| 1.1.1.1.5.1 | BSU Hardware | |||||||||||||||||||||||||
| 1.1.1.1.5.2 | BSU Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.6 | Signal Processor | |||||||||||||||||||||||||
| 1.1.1.1.6.1 | SP Hardware | |||||||||||||||||||||||||
| 1.1.1.1.6.2 | SP Software (SPS) | |||||||||||||||||||||||||
| 1.1.1.1.6.3 | SP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.7 | Data Processor | |||||||||||||||||||||||||
| 1.1.1.1.7.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.1.1.7.2 | DP Software | |||||||||||||||||||||||||
| 1.1.1.1.7.2.1 | MAS | |||||||||||||||||||||||||
| 1.1.1.1.7.2.2 | STS | |||||||||||||||||||||||||
| 1.1.1.1.7.3 | DP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.8 | Development String Activation/Install | |||||||||||||||||||||||||
| 1.1.1.2 | Development String Product Support | |||||||||||||||||||||||||
| 1.1.2 | Clear UEWR | |||||||||||||||||||||||||
| 1.1.2.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.2.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||
| 1.1.2.1.1.1 | REX Hardware | |||||||||||||||||||||||||
| 1.1.2.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||
| 1.1.2.1.1.3 | REX Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||
| 1.1.2.1.2.1 | FTS Hardware | |||||||||||||||||||||||||
| 1.1.2.1.2.2 | FTS Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||
| 1.1.2.1.3.1 | CEM Hardware | |||||||||||||||||||||||||
| 1.1.2.1.3.2 | CEM Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||
| 1.1.2.1.4.1 | RBF Hardware | |||||||||||||||||||||||||
| 1.1.2.1.4.2 | RBF Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||
| 1.1.2.1.5.1 | BSU Hardware | |||||||||||||||||||||||||
| 1.1.2.1.5.2 | BSU Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.6 | Signal Processor | |||||||||||||||||||||||||
| 1.1.2.1.6.1 | SP Hardware | |||||||||||||||||||||||||
| 1.1.2.1.6.2 | SP Software (SPS) | |||||||||||||||||||||||||
| 1.1.2.1.6.3 | SP Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.7 | Data Processor | |||||||||||||||||||||||||
| 1.1.2.1.7.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.2.1.7.2 | DP Software | |||||||||||||||||||||||||
| 1.1.2.1.7.2.1 | MAS | |||||||||||||||||||||||||
| 1.1.2.1.7.2.2 | STS | |||||||||||||||||||||||||
| 1.1.2.1.7.3 | DP Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.8 | Simulator/Tester (ST) | |||||||||||||||||||||||||
| 1.1.2.1.8.1 | ST Hardware | |||||||||||||||||||||||||
| 1.1.2.1.8.2 | ST Integration Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.9 | In-plant PME Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.2 | Interim Equipment | |||||||||||||||||||||||||
| 1.1.2.3 | Common Support Equipment | |||||||||||||||||||||||||
| 1.1.2.4 | Peculiar Support Equipment | |||||||||||||||||||||||||
| 1.1.2.5 | Spares and Repair Parts | |||||||||||||||||||||||||
| 1.1.2.6 | Product Support | |||||||||||||||||||||||||
| 1.1.2.6.1 | In-plant Support | |||||||||||||||||||||||||
| 1.1.2.6.2 | Post-deployment Sustainment | |||||||||||||||||||||||||
| 1.1.2.7 | Site Activation/Install | |||||||||||||||||||||||||
| 1.1.2.7.1 | Facility Design Support | |||||||||||||||||||||||||
| 1.1.3 | Huntsville Lab Upgrades | |||||||||||||||||||||||||
| 1.1.3.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.3.1.1 | Data Processor | |||||||||||||||||||||||||
| 1.1.3.1.1.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.3.1.1.2 | DP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.3.2 | Spares and Repair Parts | |||||||||||||||||||||||||
| 1.1.3.3 | Huntsville Lab Product Support | |||||||||||||||||||||||||
| 1.1.3.4 | Site Activation/Install | |||||||||||||||||||||||||
| 1.1.3.4.1 | Facility Design |
| An Employee of: | Contractor Fiscal Year 4 | CWBS | Labor Category | BOE Reference | Radar Hardware/Software Development | 3.4 Test | 3.6 Facility Design& Construction/Sustainment | 5.3 Radar SW/HW | WBS Total Hours | |||||||||||||||||
| 3.3.1 Radar Software | 3.3.2 Radar Hardware | 3.4.1 Basline Test | 3.4.2 DT | 3.4.3 TRR/SRR | 3.4.4 Ops Test Support | 3.6.1 Facilities Design | 3.6.3 ILS | 3.6.4 CLS | 5.3.2 Radar HW | |||||||||||||||||
| 3.3.1.2 Clear UEWR SW Upgrade | 3.3.1.3 VCN Synch Update | 3.3.2.1 Obsolescence Redesign | 3.3.2.3 PME&Spares | 3.3.2.4 Interim Equipment | 3.3.2.5 Pec&Com Equipment | 3.3.2.6 PME Dev String | 3.3.2.7 5 Huntsville Lab | 3.6.1.2 Clear Fac Design | 3.6.3.1 Tech Pubs | 3.6.3.2 Training | 3.6.3.3 Gov Property & IUID | 3.6.3.4 LDP | 3.6.3.5 Provisioning/Supply | 3.6.3.6 PHS&T | 5.3.2.5 Huntsville Lab | |||||||||||
| WBS/Item Number | WBS Description | |||||||||||||||||||||||||
| 1.1 | CLIN0001 Clear Radar Design, Development and Sustainment Rev G | |||||||||||||||||||||||||
| 1.1.1 | Contractor Development Plant | |||||||||||||||||||||||||
| 1.1.1.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.1.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||
| 1.1.1.1.1.1 | REX Hardware | |||||||||||||||||||||||||
| 1.1.1.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||
| 1.1.1.1.1.3 | REX Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||
| 1.1.1.1.2.1 | FTS Hardware | |||||||||||||||||||||||||
| 1.1.1.1.2.2 | FTS Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||
| 1.1.1.1.3.1 | CEM Hardware | |||||||||||||||||||||||||
| 1.1.1.1.3.2 | CEM Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||
| 1.1.1.1.4.1 | RBF Hardware | |||||||||||||||||||||||||
| 1.1.1.1.4.2 | RBF Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||
| 1.1.1.1.5.1 | BSU Hardware | |||||||||||||||||||||||||
| 1.1.1.1.5.2 | BSU Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.6 | Signal Processor | |||||||||||||||||||||||||
| 1.1.1.1.6.1 | SP Hardware | |||||||||||||||||||||||||
| 1.1.1.1.6.2 | SP Software (SPS) | |||||||||||||||||||||||||
| 1.1.1.1.6.3 | SP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.7 | Data Processor | |||||||||||||||||||||||||
| 1.1.1.1.7.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.1.1.7.2 | DP Software | |||||||||||||||||||||||||
| 1.1.1.1.7.2.1 | MAS | |||||||||||||||||||||||||
| 1.1.1.1.7.2.2 | STS | |||||||||||||||||||||||||
| 1.1.1.1.7.3 | DP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.8 | Development String Activation/Install | |||||||||||||||||||||||||
| 1.1.1.2 | Development String Product Support | |||||||||||||||||||||||||
| 1.1.2 | Clear UEWR | |||||||||||||||||||||||||
| 1.1.2.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.2.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||
| 1.1.2.1.1.1 | REX Hardware | |||||||||||||||||||||||||
| 1.1.2.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||
| 1.1.2.1.1.3 | REX Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||
| 1.1.2.1.2.1 | FTS Hardware | |||||||||||||||||||||||||
| 1.1.2.1.2.2 | FTS Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||
| 1.1.2.1.3.1 | CEM Hardware | |||||||||||||||||||||||||
| 1.1.2.1.3.2 | CEM Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||
| 1.1.2.1.4.1 | RBF Hardware | |||||||||||||||||||||||||
| 1.1.2.1.4.2 | RBF Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||
| 1.1.2.1.5.1 | BSU Hardware | |||||||||||||||||||||||||
| 1.1.2.1.5.2 | BSU Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.6 | Signal Processor | |||||||||||||||||||||||||
| 1.1.2.1.6.1 | SP Hardware | |||||||||||||||||||||||||
| 1.1.2.1.6.2 | SP Software (SPS) | |||||||||||||||||||||||||
| 1.1.2.1.6.3 | SP Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.7 | Data Processor | |||||||||||||||||||||||||
| 1.1.2.1.7.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.2.1.7.2 | DP Software | |||||||||||||||||||||||||
| 1.1.2.1.7.2.1 | MAS | |||||||||||||||||||||||||
| 1.1.2.1.7.2.2 | STS | |||||||||||||||||||||||||
| 1.1.2.1.7.3 | DP Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.8 | Simulator/Tester (ST) | |||||||||||||||||||||||||
| 1.1.2.1.8.1 | ST Hardware | |||||||||||||||||||||||||
| 1.1.2.1.8.2 | ST Integration Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.9 | In-plant PME Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.2 | Interim Equipment | |||||||||||||||||||||||||
| 1.1.2.3 | Common Support Equipment | |||||||||||||||||||||||||
| 1.1.2.4 | Peculiar Support Equipment | |||||||||||||||||||||||||
| 1.1.2.5 | Spares and Repair Parts | |||||||||||||||||||||||||
| 1.1.2.6 | Product Support | |||||||||||||||||||||||||
| 1.1.2.6.1 | In-plant Support | |||||||||||||||||||||||||
| 1.1.2.6.2 | Post-deployment Sustainment | |||||||||||||||||||||||||
| 1.1.2.7 | Site Activation/Install | |||||||||||||||||||||||||
| 1.1.2.7.1 | Facility Design Support | |||||||||||||||||||||||||
| 1.1.3 | Huntsville Lab Upgrades | |||||||||||||||||||||||||
| 1.1.3.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.3.1.1 | Data Processor | |||||||||||||||||||||||||
| 1.1.3.1.1.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.3.1.1.2 | DP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.3.2 | Spares and Repair Parts | |||||||||||||||||||||||||
| 1.1.3.3 | Huntsville Lab Product Support | |||||||||||||||||||||||||
| 1.1.3.4 | Site Activation/Install | |||||||||||||||||||||||||
| 1.1.3.4.1 | Facility Design |
| An Employee of: | Contractor Fiscal Year 5 | CWBS | Labor Category | BOE Reference | Radar Hardware/Software Development | 3.4 Test | 3.6 Facility Design& Construction/Sustainment | 5.3 Radar SW/HW | WBS Total Hours | |||||||||||||||||
| 3.3.1 Radar Software | 3.3.2 Radar Hardware | 3.4.1 Basline Test | 3.4.2 DT | 3.4.3 TRR/SRR | 3.4.4 Ops Test Support | 3.6.1 Facilities Design | 3.6.3 ILS | 3.6.4 CLS | 5.3.2 Radar HW | |||||||||||||||||
| 3.3.1.2 Clear UEWR SW Upgrade | 3.3.1.3 VCN Synch Update | 3.3.2.1 Obsolescence Redesign | 3.3.2.3 PME&Spares | 3.3.2.4 Interim Equipment | 3.3.2.5 Pec&Com Equipment | 3.3.2.6 PME Dev String | 3.3.2.7 5 Huntsville Lab | 3.6.1.2 Clear Fac Design | 3.6.3.1 Tech Pubs | 3.6.3.2 Training | 3.6.3.3 Gov Property & IUID | 3.6.3.4 LDP | 3.6.3.5 Provisioning/Supply | 3.6.3.6 PHS&T | 5.3.2.5 Huntsville Lab | |||||||||||
| WBS/Item Number | WBS Description | |||||||||||||||||||||||||
| 1.1 | CLIN0001 Clear Radar Design, Development and Sustainment Rev G | |||||||||||||||||||||||||
| 1.1.1 | Contractor Development Plant | |||||||||||||||||||||||||
| 1.1.1.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.1.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||
| 1.1.1.1.1.1 | REX Hardware | |||||||||||||||||||||||||
| 1.1.1.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||
| 1.1.1.1.1.3 | REX Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||
| 1.1.1.1.2.1 | FTS Hardware | |||||||||||||||||||||||||
| 1.1.1.1.2.2 | FTS Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||
| 1.1.1.1.3.1 | CEM Hardware | |||||||||||||||||||||||||
| 1.1.1.1.3.2 | CEM Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||
| 1.1.1.1.4.1 | RBF Hardware | |||||||||||||||||||||||||
| 1.1.1.1.4.2 | RBF Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||
| 1.1.1.1.5.1 | BSU Hardware | |||||||||||||||||||||||||
| 1.1.1.1.5.2 | BSU Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.6 | Signal Processor | |||||||||||||||||||||||||
| 1.1.1.1.6.1 | SP Hardware | |||||||||||||||||||||||||
| 1.1.1.1.6.2 | SP Software (SPS) | |||||||||||||||||||||||||
| 1.1.1.1.6.3 | SP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.7 | Data Processor | |||||||||||||||||||||||||
| 1.1.1.1.7.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.1.1.7.2 | DP Software | |||||||||||||||||||||||||
| 1.1.1.1.7.2.1 | MAS | |||||||||||||||||||||||||
| 1.1.1.1.7.2.2 | STS | |||||||||||||||||||||||||
| 1.1.1.1.7.3 | DP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.8 | Development String Activation/Install | |||||||||||||||||||||||||
| 1.1.1.2 | Development String Product Support | |||||||||||||||||||||||||
| 1.1.2 | Clear UEWR | |||||||||||||||||||||||||
| 1.1.2.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.2.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||
| 1.1.2.1.1.1 | REX Hardware | |||||||||||||||||||||||||
| 1.1.2.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||
| 1.1.2.1.1.3 | REX Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||
| 1.1.2.1.2.1 | FTS Hardware | |||||||||||||||||||||||||
| 1.1.2.1.2.2 | FTS Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||
| 1.1.2.1.3.1 | CEM Hardware | |||||||||||||||||||||||||
| 1.1.2.1.3.2 | CEM Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||
| 1.1.2.1.4.1 | RBF Hardware | |||||||||||||||||||||||||
| 1.1.2.1.4.2 | RBF Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||
| 1.1.2.1.5.1 | BSU Hardware | |||||||||||||||||||||||||
| 1.1.2.1.5.2 | BSU Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.6 | Signal Processor | |||||||||||||||||||||||||
| 1.1.2.1.6.1 | SP Hardware | |||||||||||||||||||||||||
| 1.1.2.1.6.2 | SP Software (SPS) | |||||||||||||||||||||||||
| 1.1.2.1.6.3 | SP Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.7 | Data Processor | |||||||||||||||||||||||||
| 1.1.2.1.7.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.2.1.7.2 | DP Software | |||||||||||||||||||||||||
| 1.1.2.1.7.2.1 | MAS | |||||||||||||||||||||||||
| 1.1.2.1.7.2.2 | STS | |||||||||||||||||||||||||
| 1.1.2.1.7.3 | DP Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.8 | Simulator/Tester (ST) | |||||||||||||||||||||||||
| 1.1.2.1.8.1 | ST Hardware | |||||||||||||||||||||||||
| 1.1.2.1.8.2 | ST Integration Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.9 | In-plant PME Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.2 | Interim Equipment | |||||||||||||||||||||||||
| 1.1.2.3 | Common Support Equipment | |||||||||||||||||||||||||
| 1.1.2.4 | Peculiar Support Equipment | |||||||||||||||||||||||||
| 1.1.2.5 | Spares and Repair Parts | |||||||||||||||||||||||||
| 1.1.2.6 | Product Support | |||||||||||||||||||||||||
| 1.1.2.6.1 | In-plant Support | |||||||||||||||||||||||||
| 1.1.2.6.2 | Post-deployment Sustainment | |||||||||||||||||||||||||
| 1.1.2.7 | Site Activation/Install | |||||||||||||||||||||||||
| 1.1.2.7.1 | Facility Design Support | |||||||||||||||||||||||||
| 1.1.3 | Huntsville Lab Upgrades | |||||||||||||||||||||||||
| 1.1.3.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.3.1.1 | Data Processor | |||||||||||||||||||||||||
| 1.1.3.1.1.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.3.1.1.2 | DP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.3.2 | Spares and Repair Parts | |||||||||||||||||||||||||
| 1.1.3.3 | Huntsville Lab Product Support | |||||||||||||||||||||||||
| 1.1.3.4 | Site Activation/Install | |||||||||||||||||||||||||
| 1.1.3.4.1 | Facility Design |
| An Employee of: | Contractor Fiscal Year 6 | CWBS | Labor Category | BOE Reference | Radar Hardware/Software Development | 3.4 Test | 3.6 Facility Design& Construction/Sustainment | 5.3 Radar SW/HW | WBS Total Hours | |||||||||||||||||
| 3.3.1 Radar Software | 3.3.2 Radar Hardware | 3.4.1 Basline Test | 3.4.2 DT | 3.4.3 TRR/SRR | 3.4.4 Ops Test Support | 3.6.1 Facilities Design | 3.6.3 ILS | 3.6.4 CLS | 5.3.2 Radar HW | |||||||||||||||||
| 3.3.1.2 Clear UEWR SW Upgrade | 3.3.1.3 VCN Synch Update | 3.3.2.1 Obsolescence Redesign | 3.3.2.3 PME&Spares | 3.3.2.4 Interim Equipment | 3.3.2.5 Pec&Com Equipment | 3.3.2.6 PME Dev String | 3.3.2.7 5 Huntsville Lab | 3.6.1.2 Clear Fac Design | 3.6.3.1 Tech Pubs | 3.6.3.2 Training | 3.6.3.3 Gov Property & IUID | 3.6.3.4 LDP | 3.6.3.5 Provisioning/Supply | 3.6.3.6 PHS&T | 5.3.2.5 Huntsville Lab | |||||||||||
| WBS/Item Number | WBS Description | |||||||||||||||||||||||||
| 1.1 | CLIN0001 Clear Radar Design, Development and Sustainment Rev G | |||||||||||||||||||||||||
| 1.1.1 | Contractor Development Plant | |||||||||||||||||||||||||
| 1.1.1.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.1.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||
| 1.1.1.1.1.1 | REX Hardware | |||||||||||||||||||||||||
| 1.1.1.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||
| 1.1.1.1.1.3 | REX Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||
| 1.1.1.1.2.1 | FTS Hardware | |||||||||||||||||||||||||
| 1.1.1.1.2.2 | FTS Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||
| 1.1.1.1.3.1 | CEM Hardware | |||||||||||||||||||||||||
| 1.1.1.1.3.2 | CEM Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||
| 1.1.1.1.4.1 | RBF Hardware | |||||||||||||||||||||||||
| 1.1.1.1.4.2 | RBF Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||
| 1.1.1.1.5.1 | BSU Hardware | |||||||||||||||||||||||||
| 1.1.1.1.5.2 | BSU Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.6 | Signal Processor | |||||||||||||||||||||||||
| 1.1.1.1.6.1 | SP Hardware | |||||||||||||||||||||||||
| 1.1.1.1.6.2 | SP Software (SPS) | |||||||||||||||||||||||||
| 1.1.1.1.6.3 | SP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.7 | Data Processor | |||||||||||||||||||||||||
| 1.1.1.1.7.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.1.1.7.2 | DP Software | |||||||||||||||||||||||||
| 1.1.1.1.7.2.1 | MAS | |||||||||||||||||||||||||
| 1.1.1.1.7.2.2 | STS | |||||||||||||||||||||||||
| 1.1.1.1.7.3 | DP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.1.1.8 | Development String Activation/Install | |||||||||||||||||||||||||
| 1.1.1.2 | Development String Product Support | |||||||||||||||||||||||||
| 1.1.2 | Clear UEWR | |||||||||||||||||||||||||
| 1.1.2.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.2.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||
| 1.1.2.1.1.1 | REX Hardware | |||||||||||||||||||||||||
| 1.1.2.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||
| 1.1.2.1.1.3 | REX Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||
| 1.1.2.1.2.1 | FTS Hardware | |||||||||||||||||||||||||
| 1.1.2.1.2.2 | FTS Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||
| 1.1.2.1.3.1 | CEM Hardware | |||||||||||||||||||||||||
| 1.1.2.1.3.2 | CEM Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||
| 1.1.2.1.4.1 | RBF Hardware | |||||||||||||||||||||||||
| 1.1.2.1.4.2 | RBF Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||
| 1.1.2.1.5.1 | BSU Hardware | |||||||||||||||||||||||||
| 1.1.2.1.5.2 | BSU Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.6 | Signal Processor | |||||||||||||||||||||||||
| 1.1.2.1.6.1 | SP Hardware | |||||||||||||||||||||||||
| 1.1.2.1.6.2 | SP Software (SPS) | |||||||||||||||||||||||||
| 1.1.2.1.6.3 | SP Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.7 | Data Processor | |||||||||||||||||||||||||
| 1.1.2.1.7.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.2.1.7.2 | DP Software | |||||||||||||||||||||||||
| 1.1.2.1.7.2.1 | MAS | |||||||||||||||||||||||||
| 1.1.2.1.7.2.2 | STS | |||||||||||||||||||||||||
| 1.1.2.1.7.3 | DP Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.8 | Simulator/Tester (ST) | |||||||||||||||||||||||||
| 1.1.2.1.8.1 | ST Hardware | |||||||||||||||||||||||||
| 1.1.2.1.8.2 | ST Integration Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.1.9 | In-plant PME Integration, Assembly, Test, Checkout | |||||||||||||||||||||||||
| 1.1.2.2 | Interim Equipment | |||||||||||||||||||||||||
| 1.1.2.3 | Common Support Equipment | |||||||||||||||||||||||||
| 1.1.2.4 | Peculiar Support Equipment | |||||||||||||||||||||||||
| 1.1.2.5 | Spares and Repair Parts | |||||||||||||||||||||||||
| 1.1.2.6 | Product Support | |||||||||||||||||||||||||
| 1.1.2.6.1 | In-plant Support | |||||||||||||||||||||||||
| 1.1.2.6.2 | Post-deployment Sustainment | |||||||||||||||||||||||||
| 1.1.2.7 | Site Activation/Install | |||||||||||||||||||||||||
| 1.1.2.7.1 | Facility Design Support | |||||||||||||||||||||||||
| 1.1.3 | Huntsville Lab Upgrades | |||||||||||||||||||||||||
| 1.1.3.1 | Prime Mission Product | |||||||||||||||||||||||||
| 1.1.3.1.1 | Data Processor | |||||||||||||||||||||||||
| 1.1.3.1.1.1 | DP Hardware | |||||||||||||||||||||||||
| 1.1.3.1.1.2 | DP Integration, Assembly Test, Checkout | |||||||||||||||||||||||||
| 1.1.3.2 | Spares and Repair Parts | |||||||||||||||||||||||||
| 1.1.3.3 | Huntsville Lab Product Support | |||||||||||||||||||||||||
| 1.1.3.4 | Site Activation/Install | |||||||||||||||||||||||||
| 1.1.3.4.1 | Facility Design |
CLIN0001 BOE Material Summary Offeror's are required to provide a Material BOE summary that clearly lists the Types and Quantities of Material resources proposed regardless of source (prime and subcontractors) by the SOW and CWBS time phased by Contractor Fiscal Year. Since the Technical and Management Evaluators will be primarily concerned with soundness of an offeror’s approach including the realism and reasonableness of the types & quantities of materials, proposed unit prices and extended cost should not be included in Volume V. Therefore, this summary should be a sanitized version of the Priced Bill of Material, which offerors must provide in Volume IV Cost/Price. This summary must be provided in Excel to simplify manipulation of the data during evaluation. Otherwise contractor format is acceptable.
CLIN0001 BOE Travel Summary Offeror's are required to provide a Travel BOE summary that clearly explains proposed travel by the prime and subcontractors by the SOW and CWBS. This summary matches the travel proposed by the offeror and the proposed subcontractors in Volume IV Cost/Price when combined. This summary must be provided in Excel to simplify manipulation of the data during evaluation. Otherwise contractor format is acceptable.
CLIN0002 BOE Labor Summary
| An Employee of: | Total all Contractor Fiscal Years | CWBS | Labor Category | BOE Reference | 3.4 Test | 3.6 Facility Design& Construction/Sustainment | 5.3 Radar SW/HW | WBS Total Hours | ||||||||||||||||||||
| 3.3.1 Radar Software | 3.3.2 Radar Hardware | 3.4.1 Basline Test | 3.4.2 DT | 3.4.3 TRR/SRR | 3.4.4 Ops Test Support | 3.6.1 Facilities Design | 3.6.2 Post Op Activities | 3.6.3 ILS | 3.6.4 CLS | 5.3.2 Radar HW | ||||||||||||||||||
| 3.3.1.2 Clear UEWR SW Upgrade | 3.3.1.3 VCN Synch Update | 3.3.2.1 Obsolescence Redesign | 3.3.2.3 PME&Spares | 3.3.2.4 Interim Equipment | 3.3.2.5 Pec&Com Equipment | 3.3.2.6 PME Dev String | 3.3.2.7 Huntsville Lab | 3.6.1.2 Clear Fac Design | 3.6.1.3 Clear Site Construction | 3.6.3.1 Tech Pubs | 3.6.3.2 Training | 3.6.3.3 Gov Property & IUID | 3.6.3.4 LDP | 3.6.3.5 Provisioning/Supply | 3.6.3.6 PHS&T | 5.3.2.5 Huntsville Lab | ||||||||||||
| WBS/Item Number | WBS Description | |||||||||||||||||||||||||||
| 1.2 | CLIN0002 Clear Radar Integration and Deployment | |||||||||||||||||||||||||||
| 1.2.1 | Clear UEWR | |||||||||||||||||||||||||||
| 1.2.1.1 | Prime Mission Product | |||||||||||||||||||||||||||
| 1.2.1.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||||
| 1.2.1.1.1.1 | REX Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||||
| 1.2.1.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||||
| 1.2.1.1.2.1 | FTS Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||||
| 1.2.1.1.3.1 | CEM Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||||
| 1.2.1.1.4.1 | RBF Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||||
| 1.2.1.1.5.1 | BSU Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.6 | Signal Processor | |||||||||||||||||||||||||||
| 1.2.1.1.6.1 | SP Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.6.2 | SP Software | |||||||||||||||||||||||||||
| 1.2.1.1.7 | Data Processor | |||||||||||||||||||||||||||
| 1.2.1.1.7.1 | DP Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.7.2 | DP Software | |||||||||||||||||||||||||||
| 1.2.1.1.8 | Simulator/Tester (ST) | |||||||||||||||||||||||||||
| 1.2.1.1.8.1 | ST Hardware | |||||||||||||||||||||||||||
| 1.2.1.2 | On-site Activation/Install | |||||||||||||||||||||||||||
| 1.2.1.2.1 | Facility Design | |||||||||||||||||||||||||||
| 1.2.1.2.2 | Facility Construction | |||||||||||||||||||||||||||
| 1.2.1.2.3 | System Assembly, Installation | |||||||||||||||||||||||||||
| 1.2.1.2.4 | Facility Deinstallation/Remediation | |||||||||||||||||||||||||||
| 1.2.1.2.5 | Radar Recalibration/Reconfiguration | |||||||||||||||||||||||||||
| 1.2.1.3 | On-Site Test and Evaluation | |||||||||||||||||||||||||||
| 1.2.1.4 | Product Support | |||||||||||||||||||||||||||
| 1.2.1.4.1 | Preoperational Support | |||||||||||||||||||||||||||
| 1.2.2 | Huntsville Lab Upgrades | |||||||||||||||||||||||||||
| 1.2.2.1 | Prime Mission Product | |||||||||||||||||||||||||||
| 1.2.2.1.1 | Data Processor | |||||||||||||||||||||||||||
| 1.2.2.1.1.1 | DP Hardware | |||||||||||||||||||||||||||
| 1.2.2.1.1.2 | DP Software | |||||||||||||||||||||||||||
| 1.2.2.2 | Product Support | |||||||||||||||||||||||||||
| 1.2.2.3 | On Site Activation/Install | |||||||||||||||||||||||||||
| 1.2.2.3.1 | Facility Design | |||||||||||||||||||||||||||
| 1.2.2.3.2 | Facility Construction | |||||||||||||||||||||||||||
| 1.2.2.3.3 | System Assembly, Installation |
| An Employee of: | Contractor Fiscal Year 1 | CWBS | Labor Category | BOE Reference | 3.4 Test | 3.6 Facility Design& Construction/Sustainment | 5.3 Radar SW/HW | WBS Total Hours | ||||||||||||||||||||
| 3.3.1 Radar Software | 3.3.2 Radar Hardware | 3.4.1 Basline Test | 3.4.2 DT | 3.4.3 TRR/SRR | 3.4.4 Ops Test Support | 3.6.1 Facilities Design | 3.6.2 Post Op Activities | 3.6.3 ILS | 3.6.4 CLS | 5.3.2 Radar HW | ||||||||||||||||||
| 3.3.1.2 Clear UEWR SW Upgrade | 3.3.1.3 VCN Synch Update | 3.3.2.1 Obsolescence Redesign | 3.3.2.3 PME&Spares | 3.3.2.4 Interim Equipment | 3.3.2.5 Pec&Com Equipment | 3.3.2.6 PME Dev String | 3.3.2.7 Huntsville Lab | 3.6.1.2 Clear Fac Design | 3.6.1.3 Clear Site Construction | 3.6.3.1 Tech Pubs | 3.6.3.2 Training | 3.6.3.3 Gov Property & IUID | 3.6.3.4 LDP | 3.6.3.5 Provisioning/Supply | 3.6.3.6 PHS&T | 5.3.2.5 Huntsville Lab | ||||||||||||
| WBS/Item Number | WBS Description | |||||||||||||||||||||||||||
| 1.2 | CLIN0002 Clear Radar Integration and Deployment | |||||||||||||||||||||||||||
| 1.2.1 | Clear UEWR | |||||||||||||||||||||||||||
| 1.2.1.1 | Prime Mission Product | |||||||||||||||||||||||||||
| 1.2.1.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||||
| 1.2.1.1.1.1 | REX Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||||
| 1.2.1.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||||
| 1.2.1.1.2.1 | FTS Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||||
| 1.2.1.1.3.1 | CEM Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||||
| 1.2.1.1.4.1 | RBF Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||||
| 1.2.1.1.5.1 | BSU Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.6 | Signal Processor | |||||||||||||||||||||||||||
| 1.2.1.1.6.1 | SP Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.6.2 | SP Software | |||||||||||||||||||||||||||
| 1.2.1.1.7 | Data Processor | |||||||||||||||||||||||||||
| 1.2.1.1.7.1 | DP Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.7.2 | DP Software | |||||||||||||||||||||||||||
| 1.2.1.1.8 | Simulator/Tester (ST) | |||||||||||||||||||||||||||
| 1.2.1.1.8.1 | ST Hardware | |||||||||||||||||||||||||||
| 1.2.1.2 | On-site Activation/Install | |||||||||||||||||||||||||||
| 1.2.1.2.1 | Facility Design | |||||||||||||||||||||||||||
| 1.2.1.2.2 | Facility Construction | |||||||||||||||||||||||||||
| 1.2.1.2.3 | System Assembly, Installation | |||||||||||||||||||||||||||
| 1.2.1.2.4 | Facility Deinstallation/Remediation | |||||||||||||||||||||||||||
| 1.2.1.2.5 | Radar Recalibration/Reconfiguration | |||||||||||||||||||||||||||
| 1.2.1.3 | On-Site Test and Evaluation | |||||||||||||||||||||||||||
| 1.2.1.4 | Product Support | |||||||||||||||||||||||||||
| 1.2.1.4.1 | Preoperational Support | |||||||||||||||||||||||||||
| 1.2.2 | Huntsville Lab Upgrades | |||||||||||||||||||||||||||
| 1.2.2.1 | Prime Mission Product | |||||||||||||||||||||||||||
| 1.2.2.1.1 | Data Processor | |||||||||||||||||||||||||||
| 1.2.2.1.1.1 | DP Hardware | |||||||||||||||||||||||||||
| 1.2.2.1.1.2 | DP Software | |||||||||||||||||||||||||||
| 1.2.2.2 | Product Support | |||||||||||||||||||||||||||
| 1.2.2.3 | On Site Activation/Install | |||||||||||||||||||||||||||
| 1.2.2.3.1 | Facility Design | |||||||||||||||||||||||||||
| 1.2.2.3.2 | Facility Construction | |||||||||||||||||||||||||||
| 1.2.2.3.3 | System Assembly, Installation |
| An Employee of: | Contractor Fiscal Year 2 | CWBS | Labor Category | BOE Reference | 3.4 Test | 3.6 Facility Design& Construction/Sustainment | 5.3 Radar SW/HW | WBS Total Hours | ||||||||||||||||||||
| 3.3.1 Radar Software | 3.3.2 Radar Hardware | 3.4.1 Basline Test | 3.4.2 DT | 3.4.3 TRR/SRR | 3.4.4 Ops Test Support | 3.6.1 Facilities Design | 3.6.2 Post Op Activities | 3.6.3 ILS | 3.6.4 CLS | 5.3.2 Radar HW | ||||||||||||||||||
| 3.3.1.2 Clear UEWR SW Upgrade | 3.3.1.3 VCN Synch Update | 3.3.2.1 Obsolescence Redesign | 3.3.2.3 PME&Spares | 3.3.2.4 Interim Equipment | 3.3.2.5 Pec&Com Equipment | 3.3.2.6 PME Dev String | 3.3.2.7 Huntsville Lab | 3.6.1.2 Clear Fac Design | 3.6.1.3 Clear Site Construction | 3.6.3.1 Tech Pubs | 3.6.3.2 Training | 3.6.3.3 Gov Property & IUID | 3.6.3.4 LDP | 3.6.3.5 Provisioning/Supply | 3.6.3.6 PHS&T | 5.3.2.5 Huntsville Lab | ||||||||||||
| WBS/Item Number | WBS Description | |||||||||||||||||||||||||||
| 1.2 | CLIN0002 Clear Radar Integration and Deployment | |||||||||||||||||||||||||||
| 1.2.1 | Clear UEWR | |||||||||||||||||||||||||||
| 1.2.1.1 | Prime Mission Product | |||||||||||||||||||||||||||
| 1.2.1.1.1 | Receiver/Exciter (REX) | |||||||||||||||||||||||||||
| 1.2.1.1.1.1 | REX Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.1.2 | REX Software (RES) | |||||||||||||||||||||||||||
| 1.2.1.1.2 | Frequency Time Standard (FTS) | |||||||||||||||||||||||||||
| 1.2.1.1.2.1 | FTS Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.3 | Cooling Environmental Monitor (CEM) | |||||||||||||||||||||||||||
| 1.2.1.1.3.1 | CEM Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.4 | Receiver Beamformer Network (RBF) | |||||||||||||||||||||||||||
| 1.2.1.1.4.1 | RBF Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.5 | Beam Steering Unit (BSU) | |||||||||||||||||||||||||||
| 1.2.1.1.5.1 | BSU Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.6 | Signal Processor | |||||||||||||||||||||||||||
| 1.2.1.1.6.1 | SP Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.6.2 | SP Software | |||||||||||||||||||||||||||
| 1.2.1.1.7 | Data Processor | |||||||||||||||||||||||||||
| 1.2.1.1.7.1 | DP Hardware | |||||||||||||||||||||||||||
| 1.2.1.1.7.2 | DP Software | |||||||||||||||||||||||||||
| 1.2.1.1.8 | Simulator/Tester (ST) | |||||||||||||||||||||||||||
| 1.2.1.1.8.1 | ST Hardware | |||||||||||||||||||||||||||
| 1.2.1.2 | On-site Activation/Install | |||||||||||||||||||||||||||
| 1.2.1.2.1 | Facility Design | |||||||||||||||||||||||||||
| 1.2.1.2.2 | Facility Construction | |||||||||||||||||||||||||||
| 1.2.1.2.3 | System Assembly, Installation | |||||||||||||||||||||||||||
| 1.2.1.2.4 | Facility Deinstallation/Remediation | |||||||||||||||||||||||||||
| 1.2.1.2.5 | Radar Recalibration/Reconfiguration | |||||||||||||||||||||||||||
| 1.2.1.3 | On-Site Test and Evaluation | |||||||||||||||||||||||||||
| 1.2.1.4 | Product Support | |||||||||||||||||||||||||||
| 1.2.1.4.1 | Preoperational Support | |||||||||||||||||||||||||||
| 1.2.2 | Huntsville Lab Upgrades | |||||||||||||||||||||||||||
| 1.2.2.1 | Prime Mission Product | |||||||||||||||||||||||||||
| 1.2.2.1.1 | Data Processor | |||||||||||||||||||||||||||
| 1.2.2.1.1.1 | DP Hardware | |||||||||||||||||||||||||||
| 1.2.2.1.1.2 | DP Software |