Grounds Maintenance - Delta Weigh Stations East West Bound - 7-.pdf

PDF 498 KB Posted

Attached to
DOTD GROUNDS MAINTENANCE Bid Cancelled: 08/13/2025 - THIS RFX IS BEING CANCELLED DUE TO REVISED SPECIFICATION AND WILL BE R State and local contract opportunity
Solicitation number
3000025165
Issued by
Vernon Parish, Louisiana

About this file

This document is a set of specifications for grounds maintenance services issued by the Louisiana Department of Transportation and Development (DOTD) for two weigh stations located in Delta, LA. The contract covers year-round maintenance for the East Bound Delta Weigh Station (836 I-20 East) and West Bound Delta Weigh Station (312 I-20 West), with services to be performed on weekdays between 8:00 AM and 4:30 PM, excluding state holidays and emergency situations. The maintenance schedule differs seasonally, with weekly services from March 1 to October 30 and monthly services from November 1 to February 28, including tasks such as debris pickup, grass mowing, weed eating, edging, and blowing cut grass from surfaces.

The contractor will be responsible for providing all necessary labor, equipment, and supplies, with specific requirements for employee conduct, safety, and performance. Invoicing will occur monthly, referencing the purchase order number, and covering only services performed during the billing cycle. The contract includes provisions for non-performance documentation and potential default, with the state reserving the right to terminate the contract for repeated unsatisfactory performance or failure to comply with contract terms. No specific pricing information is provided in the document, and the contract does not include pest or weed control services.

View the file

Other files for this state and local contract opportunity

Other files attached to DOTD GROUNDS MAINTENANCE Bid Cancelled: 08/13/2025 - THIS RFX IS BEING CANCELLED DUE TO REVISED SPECIFICATION AND WILL BE R, newest first.
File Type Posted
Grounds Maintenance - Delta Weigh Stations East West Bound - 7-.pdf PDF
Grounds Maintenance - Kentwood Weigh Stations North South Bound.pdf PDF
Grounds Maintenance - Starks Weigh Station West Bound - 7-2-25 P.pdf PDF
JobSite Visit Baptist.pdf PDF
JobSite Visit Kentwood.pdf PDF
Jobsite Visit Toomey.pdf PDF
3000025165-1.pdf PDF
Grounds Maintenance - Baptist Weigh Stations East West Bound -.pdf PDF
Grounds Maintenance - Toomey Weigh Stations East West Bound - 7.pdf PDF
Insurance Requirements.pdf PDF
JobSite Visit Delta.pdf PDF
JobSite Visit Starks.pdf PDF
Insurance Requirements.pdf PDF
Grounds Maintenance - Baptist Weigh Stations East West Bound -.pdf PDF
Grounds Maintenance - Starks Weigh Station West Bound - 7-2-25 P.pdf PDF
JobSite Visit Delta.pdf PDF
JobSite Visit Starks.pdf PDF
Grounds Maintenance - Kentwood Weigh Stations North South Bound.pdf PDF
JobSite Visit Baptist.pdf PDF
JobSite Visit Kentwood.pdf PDF
Jobsite Visit Toomey.pdf PDF
3000025165.pdf PDF
Grounds Maintenance - Toomey Weigh Stations East West Bound - 7.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised: 7/2/25

STATE OF LOUISIANA

DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT

SPECIFICATIONS

GROUNDS MAINTENANCE

EAST & WEST BOUND DELTA WEIGH STATIONS

DELTA, LA

SCOPE OF WORK

This specification sets forth the requirements for a year round grounds maintenance program at two (2) weigh stations in Delta, LA, East Bound Delta Weigh Station located at 836 I-20 East and

West Bound Delta Weigh Station located at 312 I-20 West. Services shall be provided on a weekday between 8:00 AM and 4:30 PM in accordance with the Maintenance Schedule specified herein. Services shall not be performed during State holidays, weekends, nor times of disaster.

Contractor shall be responsible for providing all supervision, labor, training, materials, equipment and supplies necessary to perform grounds maintenance services as specified in the Maintenance

Schedule and aerial photographs. See Figure 1. Grounds maintenance includes but is not limited to debris pickup, mowing of grass areas, weed eating, etc.

NOTE: Contract DOES NOT include pest nor weed control. Spraying and/or dispersal of any chemicals is strictly prohibited.

DEPARTMENT POINT OF CONTACTS

The Department Point of Contact (POC) for the both the East Bound and West Bound Delta Weigh

Stations is as follows:

Lt. Freddie Blair

Phone: 318-434-1432

Email: Freddie.Blair@la.gov

MAINTENANCE SCHEDULE

Services shall not be performed on a State holiday, both those observed in accordance with

Louisiana Revised Statute 1:55 and those that are proclaimed throughout the year by the Governor.

Per Louisiana Revised Statute 1:55, the State observes the following holidays:

New Year’s Day – January 1st

Martin Luther King, Jr.’s Birthday – 3rd Monday in January

Mardi Gras – Tuesday before Ash Wednesday

Good Friday – Friday before Easter

Juneteenth – Approximately June 17th

Independence Day – July 4th

Labor Day – 1st Monday in September

Veterans Day – November 11th mailto:Freddie.Blair@la.gov

Thanksgiving Day – 4th Thursday in November

Christmas Day – December 25th

It is the Contractor’s responsibility to communicate with the Department POC as to whether the

Governor has proclaimed a State holiday. As well, during times of severe weather or emergency situations, the Contractor must contact the POC to verify that services are to proceed as scheduled or will be postponed.

March 1 – October 30: Weekly Service

Contractor shall perform the following services from March through October, approximately every seven (7) days, on a once per week basis:

Pick-up debris on grounds including parking lots and drives

Mow the grass areas as identified in the aerial photographs

Weed eat around buildings, trees, hedges and all other obstacles

Edge sidewalks and curbs

Blow off cut grass from sidewalks, parking lots and drives

November 1 – February 28: Monthly Service

Contractor shall perform the following services from November through February, during the last week of each month, approximately every four (4) weeks, on a once per month basis:

Pick-up debris on grounds including parking lots and drives

Mow the grass areas as identified in the aerial photographs

Weed eat around buildings, trees, hedges and all other obstacles

Edge sidewalks and curbs

Blow off cut grass from sidewalks, parking lots and drives

CONTRACTOR REQUIREMENTS

General

Contractor assumes responsibility for its personnel providing services described herein. The Contractor shall be solely responsible for his supplies and equipment. The Department shall not be held liable for the destruction or theft of the Contractors property through vandalism or any other cause.

Safety

Grounds maintenance technicians shall, while performing services, wear a name badge and/or uniform that clearly indicates both their name and the Contractor’s company name and a safety vest with hi visibility reflective material.

Employee Conduct

All Contractor personnel are expected to work in a manner that will maintain the security and best interests of the Department. The Department reserves the right to require the Contractor to dismiss any employee deemed incompetent, careless, insubordinate or otherwise objectionable or any person whose actions are deemed to be contrary to public interests or inconsistent with the best interest of the Department. The Contractor agrees that employees will conduct themselves in a careful and prudent manner and will not permit the facility placed at his disposal to be used for purposes other than those specified herein.

The Contractor shall not allow any person less than 18 years of age or any person that is not on the

Contractor's payroll into or on the grounds of the facility at any time. The Contractor will be responsible for compliance with all Department policies, security measures, and vehicle regulations and will be directly responsible for any and all damages to Department property including but not limited to vehicles, buildings and/or their contents caused by Contractor employees.

Contractor shall be responsible for maintaining satisfactory standards of employee competency, conduct, appearance, and integrity. The Contractor is also responsible for ensuring employees do not remove personal items, disturb papers on desks, open desk drawers, or cabinets, or use

Department computers, fax machines, telephones, copy machines, including any and all State owned property, materials, or supplies except as authorized.

INVOICES AND DOCUMENTATION

Invoices shall be supplied to the Department on a monthly basis and must reference to the

Purchase Order Number on which service was made. Invoices shall cover only services performed during the monthly billing cycle. No additional charges allowed.

NON-PERFORMANCE

Documentation of non-performance issues and any attempts made by Department or Contractor to resolve the issue(s) will be submitted to DOTD Procurement. The DOTD Procurement Office will notify the Contractor of the reported performance issue(s) as submitted. The Contractor will be given an allotted amount of time to respond. Response must be submitted to the DOTD

Procurement Office in writing, and detail how and when the Contractor intends to resolve the deficiency. The Contractor’s failure to respond or failure to respond satisfactorily to the deficiencies within the required time period as specified in the notice(s) will constitute grounds for placing Contractor in default.

Repeated incidents of unsatisfactory performance, failure to supply required documentation, and/or failure to comply with the terms of the contract will constitute placing the Contractor in default and may, at the State’s discretion, result in contract termination.

FIGURE 1

File details come from the government source that posted it. Updated .