FSS-PWS-K-TE-K04(ChillerDailyLog).pdf

PDF 100 KB Posted

Attached to
Facility Support Services (Consolidated)
Solicitation number
W91QEX-24-R-0002
Issued by

About this file

This solicitation seeks proposals for facility support services at two U.S. Army Garrison sites in Miami, Florida. Services include facility operations and maintenance, custodial work, solid waste management, groundskeeping, and pest control. The requirement is set aside for 8(a) small businesses and covers a one-year base period plus four one-year options. The 410th Contracting Support Brigade will hold site visits on March 7-8, 2023 beginning at 8:00 AM EST with a limit of two attendees per firm. Interested firms must submit attendee names and complete personnel security checks by February 27, 2023. Technical questions will be addressed after the site visit concludes. Proposals are due by the date specified in the solicitation.

View the file

Other files

File Type Posted
W91QEX-24-R-0002-0005 Extend Submission (Conformed).pdf PDF
W91QEX-24-R-0002-0005 Extend Submission (KO).pdf PDF
FSS-PWS-A-TE-A03-A03-D.1.2(EstWkLd-Hmstd)20240409.pdf PDF
W91QEX-24-R-0002-0004 Update FAR Clauses (KO).pdf PDF
W91QEX-24-R-0002-0004 Update FAR Clauses (Conformed).pdf PDF
MiamiFSS-PWS-A-TE-A03.03(EstWkLd-CPFF-OWO)20240327.pdf PDF
W91QEX-24-R-0002-0003 Gvt Responses_Update Exhib.pdf PDF
MiamiFSS-PWS-A-TE-A05.01(ContractorSpace-Doral)20240327.pdf PDF
MiamiFSS-PWS-A-TE-A05.02(ContractorSpace-Hmstd)20240327.pdf PDF
MiamiFSS-PWS-D-TE-D02.02ARS(SOCSOUTH ARS Bldg736)20240327.pdf PDF
MiamiFSS-PWS-A-TE-A03.01(EstWkLd-FFP-PMO)20240327.pdf PDF
MiamiFSS-PWS-D-TE-D00(BaselineServiceLevels)20240327.pdf PDF
MiamiFSS-PWS-A-TE-A03(EstWkLd)20240327.pdf PDF
MiamiFSS-PWS-A-TE-A06 (Deliverables)20240327.pdf PDF
MiamiFSS-PWS-A-TE-A03.04(EstWkLd-IDIQ-OWO+PWO)20240327.pdf PDF
W91QEX-24-R-0002-0003 Gvt Responses_Exhib (conformed).pdf PDF
MiamiFSS-PWS-A-TE-A03.02(EstWkLd-CPFF-DMO+PMO)20240327.pdf PDF
MiamiFSS-PWS-F-3.0 (404-Grds)20240327.pdf PDF
W91QEX-24-R-0002-0002 Extend Due Date_Update POP (conformed).pdf PDF
W91QEX-24-R-0002-0002 Extend Due Date_Update POP.pdf PDF
W91QEX-24-R-0002-0001 Extend Submission_Add WD (Conformed).pdf PDF
W91QEX-24-R-0002-0001 Extend Submission_Add WD.pdf PDF
Performance Assessment Questionnaire.pdf PDF
W91QEX-24-R-0002 Facility Support Services.pdf PDF
FSS-PWS-D-TE-D01.03(Doral-Bldg3).pdf PDF
FSS-PWS-F-TE-F02.02 (GrdsWkLd-Hmstd).pdf PDF
FSS-PWS-H-TE-H08.02(StormWater-Hmstd).pdf PDF
FSS-PWS-A-TE-A02.01 (PMChecklist).pdf PDF
FSS-PWS-D-TE-D01.01ARS(SOUTHCOM ARS Bldg1).pdf PDF
HSPD12.pdf PDF
FSS-PWS-D-TE-D02.03(Hmstd-Bldg741).pdf PDF
FSS-PWS-H-TE-H02.01(PMEqpList-Doral).pdf PDF
FSS-PWS-K-TE-K01.01(FacilityList-Doral).pdf PDF
FSS-PWS-H-TE-H01.01(FacilityList-Doral).pdf PDF
FSS-PWS-D-TE-D00(BaselineServiceLevels).pdf PDF
FSS-PWS-F-TE-F01.04 (GrdsIrrSyst-Doral).pdf PDF
FSS-PWS-D-TE-D02.02ARS(SOCSOUTH ARS Bldg736).pdf PDF
FSS-PWS-H-TE-H07.01(ExteriorLighting-DoralSite).pdf PDF
FSS-PWS-D-TE-D02.03ARS(SOCSOUTH ARS Bldg741).pdf PDF
FSS-PWS-H-TE-H08.01(StormWater-Doral).pdf PDF
FSS-PWS-D-TE-D02.02(Hmstd-Bldg736).pdf PDF
FSS-PWS-H-TE-H05(BUILDER-References).pdf PDF
FSS-PWS-F-TE-F01.01 (GrdsMap-Doral).pdf PDF
FSS-PWS-K-TE-K01.02(FacilityList-Hmstd).pdf PDF
FSS-PWS-D-TE-D02.01ARS(SOCSOUTH ARS Bldg600).pdf PDF
FSS-PWS-F-TE-F02.01 (GrdsMap-Hmstd).pdf PDF
FSS-PWS-H-TE-H03(PMChecklist).pdf PDF
FSS-PWS-F-TE-F01.03 (GrdsSpecs-Doral).pdf PDF
FSS-PWS-D-TE-D01.06(Doral-LRC).pdf PDF
FSS-PWS-A-TE-A04.01 (DD254-Doral).pdf PDF
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USAG-Miami FSS, Annex K (Heating and Cooling Services) Technical Exhibit K03 (AC Plant Chiller Operation Log, Daily)

Equipment IDs

Chiller Unit Number:

Purifier Purge Monitor:

DATE / TIME OF REPORT

Operational Parameters

Recorded Measurement Remarks

Chiller Supply Water Temperature:

Return Water Temperature:

Compressor Suction Pressure:

Discharge Pressure:

Evaporator Refrigerant

Pressure:

Branch Line Control Pressure:

Condenser Pressure Drop (Measured):

Supply Water Temperature:

Return Water

Pump Pressure:

Temperature (In Bearings):

Temperature

(In Sump):

Pump Motor

Amperage:

Environmental Conditions Outdoor

Temperature:

Outdoor Relative

Humidity:

Any Other Abnormalities:

USAG-Miami FSS, Annex K (Heating and Cooling Services) Technical Exhibit K03 (AC Plant Chiller Operation Log, Daily)

File details come from the government source that posted it. Updated .