This document is a Technical Exhibit (A03 - Estimated Workloads) that provides estimated labor hours, quantities, and costs for various facility support services under a larger Performance Work Statement (PWS) for a federal contract opportunity.
The key details include:
- Services required: Facility operations and maintenance, custodial, solid waste, grounds maintenance, and pest control services at two U.S. Army Garrison - Miami sites in Doral, FL and Homestead, FL
- Pricing: Firm-fixed-price (FFP) and cost-plus-fixed-fee (CPFF) labor categories and materials/other costs
- Contract structure: 1-year base period with four 1-year option periods
- Set-aside: 8(a) Small Business under NAICS code 561210
- Solicitation number: W91QEX-24-R-0002
- Site visits scheduled for 7-8 March 2024 with RSVP required by 27 February 2024.
View the file
Other files
Show 40 more
Latest 50 of 78 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USAG-Miami FSS, Annex A (Overarching Facility Support Services PWS) Technical Exhibit A03 – Estimated Workloads.
A03. Estimated Workloads
A03-A. Estimated Workloads, Annex A (Overarching Work Management)
A03.A.1. Work Management (FFP)
CLIN(s) Description Quantity Hours/Year
Facility Manager 1.00 2,080 Contract/Project Manager, Asst 1.00 2,080 Production Clerk 0.60 1,248 General Clerk III 0.40 832 General Clerk II 1.00 2,080
Total: 4.00 8,320
A03-D. Estimated Workloads, Annex D (Custodial)
A03-D.1. Custodial, Recurring ABS & ARS Scheduled Services (FFP).
A03.D.1.1. Doral/SOUTHCOM (Includes Doral/LRC Site)
0003AA
0003AB
0003AC
0003AE
Janitor (w/ Clearance), Supv 1.00 2,080
Janitor (w/ Clearance), Floor 0.00 0
Janitor (w/ Clearance), Shift 0.00 0
Janitor (w/ Clearance) 8.00 16,640
Janitor (w/o Clearance), Floor 2.00 4,160
Janitor (w/o Clearance), Shift 2.00 4,160
Janitor (w/o Clearance) 3.00 6,240
Total: 16.00 29,120
A03-D.1.2. Homestead/SOCSOUTH Site.
0003AA
0003AD
Janitor (w/ Clearance), Supv 1.00 2,080
Janitor (w/ Clearance), Floor 2.00 4,160
Janitor (w/ Clearance), Shift 0.00 0
Janitor (w/ Clearance) 0.00 0
Janitor (w/o Clearance), Floor 0.00 0
Janitor (w/o Clearance), Shift 0.00 0
Janitor (w/o Clearance) 1.00 3,328
Total: 4.00 9,568
A03-D.2. Custodial, OWO Special Event Services (CPFF)
A03.D.2.1. Custodial, OWO Special Event Services, Labor (CPFF)
Janitor (w/ Clearance), Supv 0.02 42
Janitor (w/ Clearance) 0.06 125
Total: 0.08 167
* Estimated Annual Level of Effort
A03-D.2.2. Custodial, OWO Special Event Services, Materials (COST).
CLIN Description Estimated Annual Cost*
0005 Material, Equipment and Other Non-Labor Costs $6,360.00
Total: $6,360.00
* Estimated Annual Level of Effort
A03-D.3. Custodial, OWO Projects (IDIQ).
CLIN(s) Description Annual Capacity*
0023 Special Custodial Projects $50,000.00
Total: $50,000.00
* Estimated amount that may be requested by the government (not constraining) for unique non-recurring work (eg. Exterior Window Cleaning above 1st Floor, etc) within the overall ID/IQ capacity (CLIN 0023).
A03-E. Estimated Workload, Annex E (Solid Waste).
A03-E.1. Solid Waste, Recurring ABS Scheduled Services (FFP).
A03-E.1.1. Doral/SOUTHCOM Site (Includes 1 Pick-Up Location/Facility).
CLIN(s) Item Description Quantity Tips/Year
0006AA
0007AA
Container, 8CY, Mixed Municipal Waste 2 520
Container, 8CY, Mixed Municipal Recyclables 2 520
Total: 4 520
A03-E.1.2. Doral/LRC Site (Includes 1 Pick-Up Location/Facility)
CLIN(6) Item Description Quantity Tips/Year
0006AB
0007AB
Container, 8CY, Mixed Municipal Waste 1 260
Container, 8CY, Mixed Municipal Recyclables 0 0
Total: 1 260
A03-E.1.3. Homestead/SOCSOUTH Site (Includes 3 Pick-Up Locations/Facilities).
CLIN(s) Item Description Quantity Tips/Year
0006AC
0007AC
Container, 8CY, Mixed Municipal Waste 3 260
Container, 8CY, Mixed Municipal Recyclables 3 260
Total: 6 520
A03-E.2. Solid Waste, OWO Unscheduled Services (CPFF)
A03-E.2.1. Solid Waste, OWO Unscheduled Services, Labor (CPFF)
0008 Refuse Collector 0.01 24
Total: 0.01 24
* Estimated Annual Level of Effort Based on Delivery/Removal/Disposal of 6 x 30CY Bulk Roll-Off Containers per year (total for both Doral/SOUTHCOM and Homestead/SOCSOUTH sites combined)
A03-E.2.2. Solid Waste, OWO Unscheduled Services, Materials (COST).
0009 Material, Equipment and Other Non-Labor Costs $2,900.00
Total: $2,900.00
* Estimated Annual Level of Effort Based on Delivery/Removal/Disposal of 6 x 30CY Bulk Roll-Off
Containers per year (total for both Doral/SOUTHCOM and Homestead/SOCSOUTH sites combined)
A03-E.3. Solid Waste, OWO Projects (IDIQ)
CLIN Description Annual Capacity*
0023 Special Solid Waste Projects $50,000.00
Total: $50,000.00
* Estimated amount that may be requested by the government (not constraining) for unique non-recurring work (eg. Debris Removal After a Storm, etc) within the overall ID/IQ capacity (CLIN 0023).
A03-F. Estimated Workloads, Annex F (Grounds Maintenance).
A03-F.1. Grounds – Grass ONLY*, Recurring ABS Scheduled Services (FFP).
* Provided by Government Mandatory Source (Ability ONE).
A03-F.1.1. Improved Grounds – Grass ONLY.
A03-F.1.1.1. Doral/SOUTHCOM Site.
0010AA
Grounds PM [AbilityONE] 0.17 354 Grounds Labor [AbilityONE], Supv 0.88 1,830 Grounds Labor [AbilityONE] (SCW) 1.57 3,266
Total: 2.62 5,450
A03-F.1.1.2. Homestead/SOCSOUTH Site.
0010AB
Grounds PM [AbilityONE] 0.18 374 Grounds Labor [AbilityONE], Supv 0.92 1,914 Grounds Labor [AbilityONE] (SCW) 1.64 3,411
Total: 2.74 5,699
A03-F.1.2. Semi-Improved Grounds – Grass ONLY.
A03-F.1.2.1. Doral/SOUTHCOM Site.
0011AA
Grounds PM [AbilityONE] 0.01 21 Grounds Labor [AbilityONE], Supv 0.05 104 Grounds Labor [AbilityONE] (SCW) 0.08 166
Total: 0.14 291
A03-F.1.2.2. Homestead/SOCSOUTH Site.
0011AB
Grounds PM [AbilityONE] 0.01 21 Grounds Labor [AbilityONE], Supv 0.05 104 Grounds Labor [AbilityONE] (SCW) 0.09 187
Total: 0.15 312
A03-F.2. Grounds Maintenance, OWO Unscheduled Services (CPFF)
A03.F.2.1. Grounds Maintenance, OWO Unscheduled Services, Labor (CPFF)
Grounds Labor, Supv 0.05 104 Grounds Labor 0.35 728
Total: 0.40 832
* Estimated Annual Level of Effort for Minor Clean-Up and Grounds Police prior to special events, emergency tree/shrub pruning for safety purposes, etc.
A03-F.2.2. Grounds Maintenance, OWO Unscheduled Services, Materials (COST)
0013 Material, Equipment and Other Non-Labor Costs $49,720.00
Total: $49,720.00
A03-F.3. Grounds Maintenance OWOs, IDIQ Task Orders.
0023 Special Grounds Maintenance Projects $100,000.00
Total: $100,000.00
* Estimated annual amount that may be requested by the government (not constraining) for Non-Grass Cutting Grounds Maintenance work (eg. Tree/Shrub Pruning, Re-Mulching, Fertilization, Re-Sodding, Tree Removal/Replacement, etc) within the overall ID/IQ capacity (CLIN 0023).
A03-H. Estimated Workloads, Annex H (Vertical Maintenance)
A03-H.1. Vertical Maintenance, Preventative Maintenance (FFP).
0014AA
0014AB
Electrician, Lead 0.50 1,040 Electrician 1.00 2,080 HVAC Mechanic, Lead 0.50 1,040 HVAC Mechanic 1.00 2,080 General Maintenance Worker 1.50 3,120 Carpenter / Mason* 0.30 624 Appliance Maintenance Technician* 0.10 208 Fire Alarm Technician* 0.30 624 Elevator Maintenance Technician* 0.35 728 Locksmith* 0.35 728 Painter* 0.25 520 Plumber* 0.45 936 Mechanical Technician* 0.40 832
Total: 7.00 14,560
* Do not generate fulltime specialty requirements.
A03-H.2. Vertical Maintenance, DMO and PWO (CPFF)
A03-H.2.1. Vertical Maintenance, DMO and PWO, Labor (CPFF)
Electrician, Lead 0.50 1,040 Electrician 1.00 2,080 HVAC Mechanic, Lead 0.50 1,040 HVAC Mechanic 1.00 2,080 General Maintenance Worker 1.50 3,120 Carpenter / Mason* 0.40 832 Appliance Maintenance Technician* 0.15 312 Fire Alarm Technician* 0.40 832 Elevator Maintenance Technician* 0.50 1,040 Locksmith* 0.50 1,080 Painter* 0.40 832 Plumber* 0.60 1,248
Mechanical Technician* 0.55 1,144
Total: 8.00 16,640
* Do not generate fulltime specialty requirements.
A03-H.2.2. Vertical Maintenance, DMO and PWO, Material (COST)
0016 Material, Equipment and Other Non-Labor* Costs $1,407,130.00
Total: $1,407,130.00
* Includes Sub-Contractor Costs
A03-H.3. Vertical Maintenance, PWO Projects (IDIQ)
0023 Facility Vertical Maintenance Projects $2,300,000.00
Total: $2,300,000.00
* Estimated annual amount that may be requested by the government (not constraining) for Facility Vertical Maintenance work (eg. Lifecycle Maintenance Projects, Repair Projects, Minor Facility Alterations/Improvement Projects) within the overall ID/IQ capacity (CLIN 0023).
A03-J. Estimated Workloads, Annex J (Horizontal Maintenance).
A03-J.1. Horizontal Maintenance, Preventative Maintenance. NOT USED.
A03-J.2. Horizontal Maintenance, DMO & PWO (CPFF).
A03-J.2.1. Horizontal Maintenance, DMO & PWO, Labor (CPFF)
General Maintenance Worker* 0.45 936 Carpenter / Mason* 0.10 104
Total: 0.50 1,040
* Do not generate fulltime specialty requirements.
A03-J.2.2. Horizontal Maintenance, DMO & PWO, Material (COST)
0018 Material, Equipment and Other Non-Labor* Costs $74,060.00
Total: $74,060.00
* Includes Sub-Contractor Costs.
A03-J.3. Horizontal Maintenance, PWO Projects (IDIQ).
0023 Facility Vertical Maintenance Projects $500,000.00
Total: $500,000.00
* Estimated annual amount that may be requested by the government (not constraining) for Facility Vertical Maintenance work (eg. Lifecycle Maintenance Projects, Repair Projects, Minor Facility Alterations/Improvement Projects) within the overall ID/IQ capacity (CLIN 0023).
A03-K. Estimated Workloads, Annex K (Heating & Cooling)
A03-K.1. Heating & Cooling, Recurring Plant Operations (FFP)
0019 HVAC Mechanic, Lead 0.05 104
HVAC Mechanic 0.30 624
HVAC Controls Technician* 0.05 104
Total: 0.40 832
* Does not generate fulltime specialty requirements.
A03-K.2. Heating & Cooling, OWO Unscheduled Services (CPFF). NOT USED.
A03-K.3. Heating & Cooling, OWO Projects (IDIQ). NOT USED.
A03-M. Estimated Workloads, Annex M (Pest Management).
A03-M.1. Pest Control, Preventative Inspections &Services (FFP)
0008 Pest Controller 0.10 208
Total: 0.10 208
A03-M.2. Pest Control, OWO Unscheduled Services (CPFF)
A03-M.2.1. Pest Control, OWO Unscheduled Services, Labor (CPFF)
0008 Pest Controller* 0.02 42
Total: 0.02 42
* Does not generate fulltime specialty requirements.
A03-M.2.2. Pest Control, OWO Unscheduled Services, Materials (COST).
0009 Material, Equipment and Other Non-Labor Costs $2,450.00
Total: $2,450.00
* Estimated Annual Level of Effort for Unscheduled Pest Control Treatments and Services.
A03-M.3. Pest Control, OWO Projects (IDIQ). NOT USED.
File details come from the government source that posted it. Updated .