MiamiFSS-PWS-A-TE-A06 (Deliverables)20240327.pdf

PDF 148 KB Posted

Attached to
Facility Support Services (Consolidated)
Solicitation number
W91QEX-24-R-0002
Issued by

About this file

This document is a Performance Work Statement (PWS) Technical Exhibit A06 that outlines the deliverables schedule for a federal contract opportunity for Facility Support Services at two U.S. Army Garrison Miami sites.

The key deliverables include a Contingency Plan for Manual Operation, various security training plans, a Safety Plan, Certifications and Licenses, Material Content Certifications, Safety Data Sheets, Spill Plan, Contingency Coordinator Designation, Disaster Contingency Plan, Labor Contingency Plan, Quality Control Plan, Service Plan, equipment maintenance and inspection reports, and pest control documentation. The deliverables have specific due dates, frequency requirements, format, and submission instructions.

The related federal contract opportunity is a solicitation (W91QEX-24-R-0002) for Facility Support Services, including Facility Operations and Maintenance, Custodial, Solid Waste, Grounds Maintenance, and Pest Control at the two U.S. Army Garrison Miami sites. This is an 8(a) Small Business set-aside with a 12-month base period and four 12-month option periods. Site visits are scheduled for March 7-8, 2024.

View the file

Other files

File Type Posted
W91QEX-24-R-0002-0005 Extend Submission (Conformed).pdf PDF
W91QEX-24-R-0002-0005 Extend Submission (KO).pdf PDF
FSS-PWS-A-TE-A03-A03-D.1.2(EstWkLd-Hmstd)20240409.pdf PDF
W91QEX-24-R-0002-0004 Update FAR Clauses (KO).pdf PDF
W91QEX-24-R-0002-0004 Update FAR Clauses (Conformed).pdf PDF
MiamiFSS-PWS-A-TE-A03.03(EstWkLd-CPFF-OWO)20240327.pdf PDF
W91QEX-24-R-0002-0003 Gvt Responses_Update Exhib.pdf PDF
MiamiFSS-PWS-A-TE-A05.01(ContractorSpace-Doral)20240327.pdf PDF
MiamiFSS-PWS-A-TE-A05.02(ContractorSpace-Hmstd)20240327.pdf PDF
MiamiFSS-PWS-D-TE-D02.02ARS(SOCSOUTH ARS Bldg736)20240327.pdf PDF
MiamiFSS-PWS-A-TE-A03.01(EstWkLd-FFP-PMO)20240327.pdf PDF
MiamiFSS-PWS-D-TE-D00(BaselineServiceLevels)20240327.pdf PDF
MiamiFSS-PWS-A-TE-A03(EstWkLd)20240327.pdf PDF
MiamiFSS-PWS-A-TE-A03.04(EstWkLd-IDIQ-OWO+PWO)20240327.pdf PDF
W91QEX-24-R-0002-0003 Gvt Responses_Exhib (conformed).pdf PDF
MiamiFSS-PWS-A-TE-A03.02(EstWkLd-CPFF-DMO+PMO)20240327.pdf PDF
MiamiFSS-PWS-F-3.0 (404-Grds)20240327.pdf PDF
W91QEX-24-R-0002-0002 Extend Due Date_Update POP (conformed).pdf PDF
W91QEX-24-R-0002-0002 Extend Due Date_Update POP.pdf PDF
W91QEX-24-R-0002-0001 Extend Submission_Add WD (Conformed).pdf PDF
W91QEX-24-R-0002-0001 Extend Submission_Add WD.pdf PDF
Performance Assessment Questionnaire.pdf PDF
W91QEX-24-R-0002 Facility Support Services.pdf PDF
FSS-PWS-D-TE-D01.03(Doral-Bldg3).pdf PDF
FSS-PWS-F-TE-F02.02 (GrdsWkLd-Hmstd).pdf PDF
FSS-PWS-H-TE-H08.02(StormWater-Hmstd).pdf PDF
FSS-PWS-A-TE-A02.01 (PMChecklist).pdf PDF
FSS-PWS-D-TE-D01.01ARS(SOUTHCOM ARS Bldg1).pdf PDF
HSPD12.pdf PDF
FSS-PWS-D-TE-D02.03(Hmstd-Bldg741).pdf PDF
FSS-PWS-H-TE-H02.01(PMEqpList-Doral).pdf PDF
FSS-PWS-K-TE-K01.01(FacilityList-Doral).pdf PDF
FSS-PWS-H-TE-H01.01(FacilityList-Doral).pdf PDF
FSS-PWS-D-TE-D00(BaselineServiceLevels).pdf PDF
FSS-PWS-F-TE-F01.04 (GrdsIrrSyst-Doral).pdf PDF
FSS-PWS-D-TE-D02.02ARS(SOCSOUTH ARS Bldg736).pdf PDF
FSS-PWS-H-TE-H07.01(ExteriorLighting-DoralSite).pdf PDF
FSS-PWS-D-TE-D02.03ARS(SOCSOUTH ARS Bldg741).pdf PDF
FSS-PWS-H-TE-H08.01(StormWater-Doral).pdf PDF
FSS-PWS-D-TE-D02.02(Hmstd-Bldg736).pdf PDF
FSS-PWS-H-TE-H05(BUILDER-References).pdf PDF
FSS-PWS-F-TE-F01.01 (GrdsMap-Doral).pdf PDF
FSS-PWS-K-TE-K01.02(FacilityList-Hmstd).pdf PDF
FSS-PWS-D-TE-D02.01ARS(SOCSOUTH ARS Bldg600).pdf PDF
FSS-PWS-F-TE-F02.01 (GrdsMap-Hmstd).pdf PDF
FSS-PWS-H-TE-H03(PMChecklist).pdf PDF
FSS-PWS-F-TE-F01.03 (GrdsSpecs-Doral).pdf PDF
FSS-PWS-D-TE-D01.06(Doral-LRC).pdf PDF
FSS-PWS-A-TE-A04.01 (DD254-Doral).pdf PDF
FSS-PWS-E-TE-E02 (SolidWaste-Hmstd).pdf PDF
Show 40 more

Latest 50 of 78 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USAG-Miami FSS, Annex A (Overarching Facility Support Services PWS) Technical Exhibit A06 (Deliverables Schedule)

Deliverables Schedule

DELIVERABLE FREQUENCY # COPIES MEDIUM/FORMAT SUBMIT TO

Contingency Plan for Manual Operation

PWS A-2.1.13

Within 90 days of contract award; all changes within 5 days.

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR and KO

Security Training iWATCH

PWS A-2.5.2.1

Within 30 days of contract award, within 5 days for New Employees.

1 Electronic file by email as an Adobe PDF attachment

COR

Security Training AT Level 1

PWS A-2.5.2.2

Within 30 days of contract award, within 5 days for New Employees;

and annually thereafter

1 Electronic file by email as an Adobe PDF attachment

COR

Security Training

OPSEC

PWS A-2.5.2.3

Within 30 days of contract award, within 5 days for New Employees;

and annually thereafter

1 Electronic file by email as an Adobe PDF attachment

COR

Security Training DoD Cybersecurity

PWS A-2.5.2.4

Within 30 days of contract award, within 5 days for New Employees;

and annually thereafter

1 Electronic file by email as an Adobe PDF attachment

COR

Safety Plan

PWS A-2.5.3.1

Within 10 days of commencement of work; all changes no less than 5-days prior to effective date.

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR and KO

Contractor and Employee Certifications and Licenses.

PWS A-2.5.4.1

Within 30 days of contract award, within 5 days for New Employees or Expiration of existing Certifications or Licenses

1 Electronic file by email as an Adobe PDF attachment

COR

Certification and Estimate of Percentage of Recovered Material Content for EPA Designated Items

PWS 2.5.5.2

Annually, NLT than 30 days after the end of each period of performance beginning with the end of the base period of performance

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR and KO

Safety Data Sheets (SDS) for approval on all materials.

PWS 2.5.5.3

NLT five (5) days before delivery of the material;

and as requested by the COR when required for Government mandated inspection and reporting requirements

1 Electronic file by email as an Adobe PDF attachment

COR

Spill Plan

PWS A-2.5.5.4

Within thirty (30) days from contract award

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR and KO

Contingency Coordinator Designation

PWS A-2.5.6.1

Within 30 days of contact award;

proposed changes NLT 5 days prior to effective date.

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR

Disaster Contingency Plan

PWS A-2.5.6.3,5

Within 30 days of contact award;

proposed changes NLT 30 days prior to effective date.

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR

Labor Contingency Plan

PWS A-2.5.6.4,5

At contact award;

proposed changes NLT 30 days prior to effective date.

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR and KO

Quality Control Plan (QCP)

PWS A-3.3

PWS H-1.3.1.2

Within 30 days of contact award;

proposed changes NLT 5 days prior to effective date.

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR and KO

Service Plan, High Risk Utilities Plan

PWS H-1.3.1.1

Within 30 days of contact award;

proposed changes NLT 5 days prior to effective date.

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR

BUILDER Task Report

PWS H-2.1.4

Monthly, NLT the 5th day of the month* *N/A Pending Government Implementation of

BUILDER

1 Electronic file by email as a Microsoft Excell attachment

COR

PM Task List Updates

PWS H-2.3

Quarterly, beginning with the end of the first quarter in the Base Period of Performance.

1 Electronic file by email as a Microsoft Excell attachment

COR

Building Equipment Inventory Update

PWS H-2.3.1.2

Semi-Annually (every 6 months), beginning with the end of the 2nd Quarter of the Base Period of Performance

1 Electronic file by email as a Microsoft Excell attachment

COR

Chiller Chemical Treatment Records

PWS H-2.3.3

Upon Request by the COR

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR

Grease Trap Inspection Report

PWS 2.10.6.3

Monthly, NLT the 5th day of the month

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR

Emergency Stand- By Generator PM Plan

PWS H-2.19.1

Within 15 days of contact award;

proposed changes NLT 5 days prior to effective date.

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR

GPS, LPS and CPS Inspection Reports

PWS H-2.20.6

Annually, NLT 30-days prior to the end of the Base period of performance and each subsequent option period

1 Electronic file by email as a Microsoft Word or Adobe PDF

Preventative Maintenance Schedule PWS H-2.22.1.2.a

Within 15-days of the end of Phase-In

1 Electronic file by email as a Microsoft Excell attachment

COR

Elevator Inspection, Testing, Maintenance, Repair and Certification Schedule

PWS H-2.25.1.1

Within 30 days of contact award;

proposed changes NLT 5 days prior to effective date.

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR

Elevator Annual Inspections and Testing Report

PWS H-2.25.3.1

Annually, NLT 90-days prior to current Miami- Dade County Certificates of Operation

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR

Exterior Security & Parking Lighting Preventative Maintenance Plan

PWS H-9.3

Within 30 days of contact award;

proposed changes NLT 5 days prior to effective date.

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR

Storm Water Systems Inspection Report

PWS H-15.2

Annually, in NLT 31 October of each calendar year.

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR

Quarterly Buildings and Structures Pest Inspection Report

PWS 1.2.2

Monthly, NLT the 5th of each month

1 Electronic file by email as a Microsoft Word or Adobe PDF attachment

COR

Pest Control Permits, Mandatory Notification Requirements, Mandatory Reports, and Proof of Compliance Actions

PWS M-1.3

As Requested by the Installation Pest Control Coordinator

1 Electronic file by email as a Microsoft Word or Adobe PDF

File details come from the government source that posted it. Updated .