FFP-Airway_100%_Sealed_Plans_02-20-2026.pdf

PDF 37 MB Posted

Attached to
Flying Fortress Parkway Phase II
Solicitation number
2026-IFB-003
Issued by
Mohave County, Arizona

About this file

This is a sealed plans document for the City of Kingman Public Works Department related to the Airway Avenue Extension project (Project No. ENG18-0052), located in Township 21 North, Range 16 West, Sections 3 and 10 in Mohave County, Arizona. The project encompasses the design and construction of roadway and drainage improvements, including concrete box culverts, drainage channels, retention basins, typical roadway sections, utility coordination, and traffic control measures. The sealed plans package, dated December 2025, contains 25 sheets of detailed design specifications covering plan and profile views for multiple stations along Airway Avenue (STA 104+00 to STA 128+00), an access road, and associated drainage infrastructure. Key structural components include reinforced concrete box culvert details with specified quantities (1,583 pounds of steel and 10 cubic yards of concrete for the primary structure, plus additional materials for inlet and outlet wingwalls) and channel construction details. The project requires contractors to complete all work within a mandatory 150-calendar-day construction period, with pre-cast box culvert deliveries scheduled between March 2026 and June 2026. A non-mandatory pre-bid meeting is scheduled for March 12, 2026, at 10:00 a.m. Arizona time with a Zoom option, and sealed bids are due electronically by 10:00 a.m. Arizona time on Tuesday, March 24, 2026, through the City of Kingman's procurement portal.

The project evaluation will prioritize overall cost inclusive of taxes and the contractor's demonstrated ability to meet the 150-day construction schedule. Contractors must obtain an Arizona Registrar of Contractors (ROC) license for public roadway work and secure a City of Kingman business license where applicable. A statutory bid bond with notarized contract agreements for both pavement options (Portland Cement Concrete Pavement and Asphalt Concrete) is required. Contractors must perform at least 51 percent of the work with their own forces unless written approval for greater subcontracting is obtained from the City. Bidders are responsible for factoring Transaction Privilege Tax (TPT) into overall pricing, as the City is not exempt from applicable taxes under Arizona Department of Revenue guidelines. The solicitation does not specify an overall project budget range; the contract will be awarded to the lowest responsible, responsive bidder meeting all prescribed requirements. The project is subject to Arizona Pollutant Discharge Elimination System (AZPDES) requirements, making contractors responsible for environmental mitigation including invasive species prevention and stormwater pollution prevention planning. Failure to complete work within the 150-day contract period will result in liquidated damages as specified in the Maricopa Association of Governments (MAG) Section 108 standards. Sabrina Hilton, Project Manager, serves as the primary point of contact.

View the file

Other files

File Type Posted
Flying_Fortress_Parkway_Phase_II_(Addendum_#2_Revision).pdf PDF
Pre-Bid_Attendees.pdf PDF
Airway_Avenue_Geotech_Eval_Rpt_3-22-19.pdf PDF
Rinker's_Precast_Box_Culvert_Shop_Drawing.pdf PDF
FFP-Airway_100%_Sealed_Specs_02-24-2026.pdf PDF
ENG25-0079_Sheet22of32_Dibble.pdf PDF
Proctor_for_Earthwork_(stockpile).pdf PDF
Proctor_for_Earthwork_(stockpile).pdf PDF
RSFP_TI_Final_Geotech_Roadway_Report.pdf PDF
FFP-Airway_100%_Sealed_Specs_02-24-2026.pdf PDF
Airway_Avenue_Geotech_Eval_Rpt_3-22-19.pdf PDF
Student_calendar_for_the_2025-26_school_year___Kingman_Unified_School_District_#20.pdf PDF
Student_calendar_for_the_2026-27_school_year_Kingman_Unified_School_District_#20.pdf PDF
Student_calendar_for_the_2025-26_school_year___Kingman_Unified_School_District_#20.pdf PDF
RSFP_TI_Final_Geotech_Roadway_Report.pdf PDF
Cross_Sections_from_AECOM.pdf PDF
Flying_Fortress_Parkway_Phase_II_(Addendum_#1_Revision).pdf PDF
Flying_Fortress_Parkway_Phase_II.pdf PDF
AD91304_jnl.pdf PDF
Proctor_for_Earthwork_(stockpile).pdf PDF
RSFP_TI_Final_Geotech_Roadway_Report.pdf PDF
Airway_Avenue_Geotech_Eval_Rpt_3-22-19.pdf PDF
FFP-Airway_100%_Sealed_Plans_02-20-2026.pdf PDF
FFP-Airway_100%_Sealed_Specs_02-24-2026.pdf PDF
Student_calendar_for_the_2025-26_school_year___Kingman_Unified_School_District_#20.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF KINGMAN

AIRWAY AVENUE EXTENSION

RELATED TO RANCHO SANTA FE PARKWAY

DESIGN & CONSTRUCTION

PROJECT NO. ENG18-0052

DECEMBER 2025

LOCATION MAP

NTS

TOWNSHIP 21 NORTH, RANGE 16 WEST, SECTIONS 3 AND 10

MAYOR

COUNCIL

SHEET INDEX

PROJECT BENCHMARK

CONTACT INFORMATION

MANAGER

UTILITY COORDINATION

AS-BUILT CERTIFICATION

APPROVALS

VICE MAYOR

DESIGN DATA

LENGTH OF PROJECT

PUBLIC WORKS DEPARTMENT

ENGINEER'S GENERAL NOTES CITY OF KINGMAN GENERAL NOTES

MOHAVE COUNTY STORMWATER NOTES

STANDARD ABBREVIATIONS & LEGEND

EXISTING NEW

EXISTING NEW

AIRWAY AVENUE EXTENSION

PUBLIC WORKS DEPARTMENT

TYPICAL SECTIONS

TYPICAL SECTIONS

PUBLIC WORKS DEPARTMENT

ROADWAY DETAILS

A

PUBLIC WORKS DEPARTMENT

REINFORCED CONCRETE

BOX CULVERT DETAIL

STA 111+28.89

CAST-IN-PLACE

CBC QUANTITIES STEEL (LB) CONCRETE (CY)

BOX CULVERT

(4' EACH SIDE) 1,583 10

INLET WINGWALLS 596 8

OUTLET WINGWALLS 972 13

PUBLIC WORKS DEPARTMENT

KEY MAP & SURVEY CONTROL

SURVEY NOTES

LEGEND

PR

O

SP

EC

TO

R

S

TR

EE

T

REMOVAL NOTES

CONSTRUCTION NOTES

AIRWAY AVENUE EXTENSION

CITY OF KINGMAN

PUBLIC WORKS DEPARTMENT

AIRWAY AVENUE

REFERENCE NOTES

AIRWAY AVENUE PLAN SHEET

STA 104+00 TO ST 109+00

PUBLIC WORKS DEPARTMENT

AIRWAY AVENUE PROFILE SHEET

STA 104+00 TO STA 109+00

REMOVAL NOTES

CONSTRUCTION NOTES

REFERENCE NOTES

AIRWAY AVENUE EXTENSION

CITY OF KINGMAN

PUBLIC WORKS DEPARTMENT

AIRWAY AVENUE PLAN SHEET

STA 109+00 TO STA 114+00

AIRWAY AVENUE

PUBLIC WORKS DEPARTMENT

STA 109+00 TO STA 114+00

AIRWAY AVENUE EXTENSION

CITY OF KINGMAN

PUBLIC WORKS DEPARTMENT

AIRWAY AVENUE PLAN SHEET

STA 114+00 TO STA 119+00

PUBLIC WORKS DEPARTMENT

STA 114+00 TO STA 119+00

AIRWAY AVENUE EXTENSION

CITY OF KINGMAN

PUBLIC WORKS DEPARTMENT

AIRWAY AVENUE PLAN SHEET

STA 119+00 TO STA 124+00

PUBLIC WORKS DEPARTMENT

STA #+00 TO STA ##+00

CITY OF KINGMAN

PUBLIC WORKS DEPARTMENT

AIRWAY AVENUE PLAN & PROFILE SHEET

STA 124+00 TO STA 128+00

AIRWAY AVENUE

DEMOLITION NOTES

REFERENCE NOTES

PUBLIC WORKS DEPARTMENT

STA #+00 TO STA ##+12.50

ACCESS ROAD

CONSTRUCTION NOTES

AIRWAY AVENUE EXTENSION

CITY OF KINGMAN

PUBLIC WORKS DEPARTMENT

ACCESS ROAD PLAN SHEET

SECTION A-A

NEW CHANNEL

CONSTRUCTION NOTES

REFERENCE NOTES

AIRWAY AVENUE EXTENSION

CITY OF KINGMAN

PUBLIC WORKS DEPARTMENT

DRAINAGE CHANNEL PLAN & PROFILE

STA 10+50 TO STA 15+50

AI

RW

AY

A

VE

NU

E

NEW CHANNEL

CITY OF KINGMAN

PUBLIC WORKS DEPARTMENT

EXST RAPID INFILTRATION

RETENTION BASIN

DRAINAGE CHANNEL PLAN & PROFILE

STA 15+50 TO STA 20+50

CHANNEL DETAILS

PR

O

SP

EC

TO

R

ST

R

EE

T

CONSTRUCTION NOTES

AIRWAY AVENUE EXTENSION

CITY OF KINGMAN

PUBLIC WORKS DEPARTMENT

SIGNING & MARKING

STA 104+00 TO STA 114+00

AIRWAY AVENUE

STRIPING LEGEND

PUBLIC WORKS DEPARTMENT

SIGNING & MARKING

STA 114+00 TO STA 124+00

AIRWAY AVENUE

PUBLIC WORKS DEPARTMENT

SIGNING & MARKING

STA 124+00 TO STA 126+23

1-ENG25-0079 FFP-Airway Sealed Plans
2-ENG25-0079 FFP-Airway Sealed Plans Traffic for Submittal 22x34
3-Dibble_Airway_Avenue
1 COVER
2 GENERAL NOTES
3 STANDARD ABBREVIATIONS & LEGEND
4 TYPICAL SECTIONS
5 TYPICAL SECTIONS
6 ROADWAY DETAILS
8 KEY MAP & SURVEY CONTROL
9 AIRWAY AVENUE PLAN SHEET
10 AIRWAY AVENUE PROFILE SHEET
11 AIRWAY AVENUE PLAN SHEET
12 AIRWAY AVENUE PROFILE SHEET
13 AIRWAY AVENUE PLAN SHEET
14 AIRWAY AVENUE PROFILE SHEET
15 AIRWAY AVENUE PLAN SHEET
16 AIRWAY AVENUE PROFILE SHEET
17 AIRWAY AVENUE PLAN & PROFILE SHEET
18 AIRWAY AVENUE PROFILE SHEET
19 ACCESS ROAD PLAN SHEET
20 DRAINAGE CHANNEL PLAN & PROFILE
21 DRAINAGE CHANNEL PLAN & PROFILE
22 CHANNEL DETAILS
23 SIGNING & MARKING
24 SIGNING & MARKING
25 SIGNING & MARKING