About this file

This is a Soil and Aggregate Test Report prepared by Western Technologies Inc. for Pulice Construction, Inc. related to the Kingman-Ash Fork Highway (I-40) project in Arizona, with testing conducted on native soil samples from the I-40 west corridor near Kingman, Arizona. The report documents proctor compaction testing and soil classification analysis for earthwork and stockpile materials intended for highway ramp construction. Three soil samples were collected and tested from stations 2956+92, 2967+76, and 2974+20 along the project corridor between January 15 and January 24, 2025. All samples were classified as silty sand with gravel or variations thereof (SC-SM group symbol under ASTM D2487), with testing performed using standard AASHTO and ASTM methodologies including sieve analysis, liquid and plastic limit determination, water content analysis, and Los Angeles abrasion testing. The samples exhibited dry unit weights ranging from approximately 120.5 to 122.0 pounds per cubic foot with water content values between 9.1 and 11.8 percent, demonstrating consistency across the test locations.

The report provides detailed geotechnical parameters essential for earthwork design and quality control during construction, including plasticity indices, swell test data, expansion indices, and laboratory compaction characteristics. Testing specifications referenced AASHTO R58 for dry preparation methodology and AASHTO T89 Method B for compaction analysis, with manual rammer application at standardized effort levels. The soil samples showed fines content (material passing the No. 200 sieve) ranging from 17 to 20 percent and various gradation results across multiple sieve sizes. pH determination, salinity analysis including sulfate and chloride testing, and resistivity measurements were conducted to assess potential deleterious effects on concrete structures. The report explicitly notes that testing results relate only to the observed conditions and samples tested at the specified time and location, with no warranty extended regarding source material confirmation or other conditions not directly tested.

View the file

Other files

File Type Posted
Flying_Fortress_Parkway_Phase_II_(Addendum_#2_Revision).pdf PDF
Pre-Bid_Attendees.pdf PDF
Airway_Avenue_Geotech_Eval_Rpt_3-22-19.pdf PDF
Rinker's_Precast_Box_Culvert_Shop_Drawing.pdf PDF
FFP-Airway_100%_Sealed_Specs_02-24-2026.pdf PDF
ENG25-0079_Sheet22of32_Dibble.pdf PDF
Proctor_for_Earthwork_(stockpile).pdf PDF
RSFP_TI_Final_Geotech_Roadway_Report.pdf PDF
FFP-Airway_100%_Sealed_Specs_02-24-2026.pdf PDF
Airway_Avenue_Geotech_Eval_Rpt_3-22-19.pdf PDF
Student_calendar_for_the_2025-26_school_year___Kingman_Unified_School_District_#20.pdf PDF
Student_calendar_for_the_2026-27_school_year_Kingman_Unified_School_District_#20.pdf PDF
Student_calendar_for_the_2025-26_school_year___Kingman_Unified_School_District_#20.pdf PDF
RSFP_TI_Final_Geotech_Roadway_Report.pdf PDF
Cross_Sections_from_AECOM.pdf PDF
Flying_Fortress_Parkway_Phase_II_(Addendum_#1_Revision).pdf PDF
Flying_Fortress_Parkway_Phase_II.pdf PDF
AD91304_jnl.pdf PDF
Proctor_for_Earthwork_(stockpile).pdf PDF
RSFP_TI_Final_Geotech_Roadway_Report.pdf PDF
Airway_Avenue_Geotech_Eval_Rpt_3-22-19.pdf PDF
FFP-Airway_100%_Sealed_Plans_02-20-2026.pdf PDF
FFP-Airway_100%_Sealed_Specs_02-24-2026.pdf PDF
Student_calendar_for_the_2025-26_school_year___Kingman_Unified_School_District_#20.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Soil / Aggregate Test Report

Comments:

425 © 10/01/22 WT

Client Page of

Lab No.

Date Date

Project Project Address Material Description Material Use Material Source Sample Location Special Instructions

Sieve analysis Finer Than No. 200

Sieve Accumulative % passing Specification Sample Preparation

Rammer Used

Oversize Aggregate

Liquid Limit, Plastic Limit & Plasticity Index

Preparation method

Processing method

Liquid Limit LL

Plastic Limit PL

Plasticity Index PI

Water Content % dry weight

Swell Test Surcharge psf Expansion, %

Compacted to approximately of ASTM Method

Initial water content % Dry unit weight lbf/ft3

Organic Matter %

Unified Soil Classification

Group Symbol: Name:

Result Specs. Result Specs.

Gradingrev., % loss
Gradingrev., % loss

Fractured Faces By Weight One or more, % Two or more, %

Total Salts (Solubility) %

Sulfates %

Chlorides pH Determination pH

Minimum Resistivity ohm-cm

Expansion Index of Soil EI

Initial dry unit weight, lbf/ft3

Initial degree of saturation

Initial water content, % Final water content, %

Water content, %

D ry u ni t w ei gh t, lb f/ ft

Laboratory compaction characteristics Method

Los Angeles (LA) Abrasion

The services referred to herein were performed in accordance with the standard of care practiced locally for the referenced method(s) and relate only to the condition(s) observed or sample(s) tested at the time and place stated herein. Western Technologies Inc. (WT) makes no other warranty or representation, express or implied, and has not confirmed information including source of materials submitted by others. This report shall not be reproduced, except in full, without the prior written approval of WT.

Reviewed By

ARIZ 248 #1

3 in.

1/4 in.

1 in.

No. 10

J. VAN VLIET

Assumed bulk specific gravity

Silty Clayey Sand with Gravel

No. 40

1.0

6 in.

NATIVE ON THE WEST SIDE OF THE I-40

AASHTO R58, Dry Preparation

25-424473-0

01/15/25

ADOT 040 MO 055 H681401C KINGMAN – ASH FORK HWY (I-40)

ARIZ 248 #1

1.5

Steve Campbell

Brian Dean, Project Manager

2 in.

HWY RAMPS

ASTM D2487

3/4 in.

No. 16

Oven-dried

AASHTO T90

2.60

ARIZ 221

No. 4

No. 50

No. 100

1-40 west, Kingman, AZ

J. VAN VLIET

JUAN W/ PULICE

120.5

01/24/25

D

SCOTTSDALE, AZ 85255

8660 E. HARTFORD DRIVE

SUITE 305

PULICE CONSTRUCTION, INC.

3/8 in.

AASHTO T89, Method B 26

01/15/25

Moist

AASHTO T89

No. 200

No. 8

SC-SM

4 in.

10.5

01/15/25

1-1/2 in.

SILTY SAND WITH GRAVEL

1/2 in.

No. 30

01/15/25

Manual

27441

STA 2956+92

ASTM D2216, Method A

Assumed absorption, %

425 © 10/01/22 WT

Client Page of

Lab No.

Date

Project Address Material Description Material Use Material Source Sample Location Special Instructions

Sieve analysis Finer Than No. 200

Sieve Accumulative

Processing method

Liquid Limit LL

Plastic Limit PL

Plasticity Index PI

Water Content % dry weight

Swell Test Surcharge psf Expansion, %

Compacted to approximately of ASTM Method

Initial water content % Dry unit weight lbf/ft3

Organic Matter %

Unified Soil Classification

Group Symbol: Name:

Result Specs. Result Specs.

Gradingrev., % loss
Gradingrev., % loss

Fractured Faces By Weight One or more, % Two or more, %

Total Salts (Solubility) %

Sulfates %

Chlorides pH Determination pH

Minimum Resistivity ohm-cm

Expansion Index of Soil EI

Initial dry unit weight, lbf/ft3

Initial degree of saturation

Initial water content, % Final water content, %

Water content, %

D ry u ni t w ei gh t, lb f/ ft

Laboratory compaction characteristics Method

Los Angeles (LA) Abrasion

The services referred to herein were performed in accordance with the standard of care practiced locally for the referenced method(s) and relate only to the condition(s) observed or sample(s) tested at the time and place stated herein. Western Technologies Inc. (WT) makes no other warranty or representation, express or implied, and has not confirmed information including source of materials submitted by others. This report shall not be reproduced, except in full, without the prior written approval of WT.

Reviewed By

ARIZ 248 #1

3 in.

1/4 in.

1 in.

No. 10

B. VEGAS

Assumed bulk specific gravity

Silty Clayey Sand with Gravel

No. 40

1.0

6 in.

STA 2967+76

AASHTO R58, Dry Preparation

25-424473-0

01/15/25

ADOT 040 MO 055 H681401C KINGMAN – ASH FORK HWY (I-40)

ARIZ 248 #3

1.0

Steve Campbell

Brian Dean, Project Manager

2 in.

HWY RAMPS

ASTM D2487

3/4 in.

No. 16

Oven-dried

AASHTO T90

2.60

ARIZ 221

No. 4

No. 50

No. 100

1-40 west - Kingman, AZ

J. VAN VLIET

J. VAN VLIET

121.3

01/24/25

8.5

D

SCOTTSDALE, AZ 85255

8660 E. HARTFORD DRIVE

SUITE 305

PULICE CONSTRUCTION, INC.

Corrected optimum water content, %

3/8 in.

AASHTO T89, Method B 24

01/15/25

Moist

AASHTO T89

No. 200

No. 8

SC-SM

4 in.

9.1

01/15/25

1-1/2 in.

123.5

SILTY SAND AND GRAVEL

1/2 in.

No. 30

01/15/25

Corrected maximum density, lbf/ft³

Oversize Correction: ASTM D4718

Manual

27442

STA 2967+76 WEST AND EAST OF HWY NATIVE

425 © 10/01/22 WT

Client Page of

Lab No.

Date

Project Address Material Description Material Use Material Source Sample Location Special Instructions

Sieve analysis Finer Than No. 200

Sieve Accumulative

Processing method

Liquid Limit LL

Plastic Limit PL

Plasticity Index PI

Water Content % dry weight

Swell Test Surcharge psf Expansion, %

Compacted to approximately of ASTM Method

Initial water content % Dry unit weight lbf/ft3

Organic Matter %

Unified Soil Classification

Group Symbol: Name:

Result Specs. Result Specs.

Gradingrev., % loss
Gradingrev., % loss

Fractured Faces By Weight One or more, % Two or more, %

Total Salts (Solubility) %

Sulfates %

Chlorides pH Determination pH

Minimum Resistivity ohm-cm

Expansion Index of Soil EI

Initial dry unit weight, lbf/ft3

Initial degree of saturation

Initial water content, % Final water content, %

Water content, %

D ry u ni t w ei gh t, lb f/ ft

Laboratory compaction characteristics Method

Los Angeles (LA) Abrasion

The services referred to herein were performed in accordance with the standard of care practiced locally for the referenced method(s) and relate only to the condition(s) observed or sample(s) tested at the time and place stated herein. Western Technologies Inc. (WT) makes no other warranty or representation, express or implied, and has not confirmed information including source of materials submitted by others. This report shall not be reproduced, except in full, without the prior written approval of WT.

Reviewed By

ARIZ 248 #1

3 in.

1/4 in.

1 in.

No. 10

Assumed bulk specific gravity

Silty Clayey Sand

No. 40

1.0

6 in.

WEST AND EAST HWY NATIVE

AASHTO R58, Dry Preparation

25-424473-0

ADOT 040 MO 055 H681401C KINGMAN – ASH FORK HWY (I-40)

ARIZ 248 #1

1.6

Steve Campbell

Brian Dean, Project Manager

2 in.

HWY RAMPS

ASTM D2487

3/4 in.

No. 16

Oven-dried

AASHTO T90

2.60

ARIZ 221

No. 4

No. 50

No. 100

1-40 west - Kingman, AZ

122.0

01/24/25

D

SCOTTSDALE, AZ 85255

8660 E. HARTFORD DRIVE

SUITE 305

PULICE CONSTRUCTION, INC.

3/8 in.

AASHTO T89, Method B 21

Moist

AASHTO T89

No. 200

No. 8

SC-SM

4 in.

11.8

01/15/25

1-1/2 in.

SILTY SAND GRAVEL

1/2 in.

No. 30

01/15/25

Manual

27443

STA 2974+20