Student_calendar_for_the_2025-26_school_year___Kingman_Unified_School_District_#20.pdf
PDF 240 KB Posted
- Attached to
- Flying Fortress Parkway Phase II
- Solicitation number
- 2026-IFB-003
- Issued by
- Mohave County, Arizona
About this file
This document is a student calendar for the 2025-26 school year issued by Kingman Unified School District #20, located in Kingman, Arizona. The calendar outlines instructional days, holidays, and breaks for students attending district schools during the 2025-26 academic year. The document specifies key dates for the start and end of the school year, along with planned closures for holidays and scheduled breaks. A non-mandatory pre-bid meeting for the related Flying Fortress Parkway Phase II construction project is scheduled for March 12, 2026, at 10:00 a.m. Arizona time with an online Zoom option available. Written questions regarding the construction project must be submitted through the OpenGov procurement portal by 10:00 a.m. Arizona time on Monday, March 16, 2026, with sealed bids due electronically by 10:00 a.m. Arizona time on Tuesday, March 24, 2026.
The City of Kingman is soliciting sealed bids through Invitation for Bids (IFB) 2026-IFB-003 for construction of public roadway and drainage improvements for Flying Fortress Parkway Phase II, with award based on overall cost inclusive of taxes and the contractor's demonstrated ability to complete work within a mandatory 150-calendar-day construction period. The project scope includes pavement installation with Portland Cement Concrete Pavement and Asphalt Concrete options, concrete box culverts, drainage channels, retention basins, riprap and gabion construction, utility conduit installation, traffic control measures, pavement markings, signage, sidewalk and curb construction, and site preparation. Contractors must obtain an Arizona Registrar of Contractors license for public roadway work and a City of Kingman business license where applicable, provide a statutory bid bond, demonstrate previous acceptable experience in similar concrete roadway construction, and perform at least 51 percent of work with their own forces unless written approval for greater subcontracting is obtained. Pre-cast box culvert deliveries are scheduled from March 2026 through June 2026, and failure to complete work within the 150-day contract period will result in liquidated damages per Maricopa Association of Governments Section 108 standards. Contractors are responsible for factoring Transaction Privilege Tax into pricing and for environmental mitigation compliance including AZPDES requirements and stormwater pollution prevention planning. No overall project budget range or award value is specified; the contract will be awarded to the lowest responsible, responsive bidder. Sabrina Hilton serves as the Project Manager and primary point of contact.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STUDENT CALENDAR FOR THE 2025-26 SCHOOL YEAR
1/16/26, 3:06 PM Student calendar for the 2025-26 school year | Kingman Unified School District #20 https://www.kusd.org/article/2243203 2/4
File details come from the government source that posted it. Updated .