Cross_Sections_from_AECOM.pdf
PDF 36 MB Posted
- Attached to
- Flying Fortress Parkway Phase II
- Solicitation number
- 2026-IFB-003
- Issued by
- Mohave County, Arizona
About this file
This file contains cross-sectional engineering drawings prepared by AECOM for the Flying Fortress Parkway Phase II project in Kingman, Arizona. The 105-page document comprises detailed cross-section diagrams that illustrate the roadway and drainage infrastructure design specifications for the public improvement project. These cross-sections depict pavement layers, drainage channel configurations, utility conduit locations, and structural details necessary for construction implementation. The drawings serve as technical reference materials supporting the Invitation for Bids (IFB) 2026-IFB-003, with a non-mandatory pre-bid meeting scheduled for March 12, 2026, at 10:00 a.m. Arizona time. Written questions regarding the project must be submitted through the OpenGov procurement portal by 10:00 a.m. Arizona time on Monday, March 16, 2026, and sealed bids are due electronically by 10:00 a.m. Arizona time on Tuesday, March 24, 2026. The project requires completion within a mandatory 150-calendar-day construction period, with pre-cast box culvert deliveries anticipated from March 2026 through June 2026.
The cross-sectional drawings provide the engineering basis for bidders to develop accurate cost estimates and construction methodologies for the roadway and drainage improvements. Contractors must perform at least 51 percent of the work with their own forces unless written approval for greater subcontracting is obtained from the City. Bidders are responsible for incorporating Transaction Privilege Tax (TPT) into their overall pricing, as the City is not exempt from applicable Arizona taxes. Award will be made to the lowest responsible, responsive bidder demonstrating previous acceptable experience in similar concrete roadway construction and the demonstrated ability to meet the 150-day construction schedule. The successful contractor will not commence billable work until receiving a purchase order from the City of Kingman, with Project Manager Sabrina Hilton serving as the primary point of contact.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .