CDRL 19 v2.pdf
PDF 474 KB Posted
- Attached to
- Research and Development Integrated Space Experiments (RISE) Federal contract opportunity
- Solicitation number
- FA9453-18-R-0003
About this file
This document provides details regarding a federal contract opportunity for Research and Development Integrated Space Experiments (RISE). The Air Force Research Laboratory Space Vehicles Directorate will host an industry day on August 18, 2017 at Kirtland Air Force Base to provide information on the RISE acquisition and allow potential offerors to ask questions. Draft requirements documents are attached for review. Interested parties must submit a visit request form and Kirtland AFB visitor pass request by August 4 and may bring up to two personnel. An in-person briefing and facility tour will be provided, and electronic devices are prohibited on the tour. Advance questions are due by August 23. While this announcement provides planning information, it does not constitute a formal RFP. The RISE effort aims to facilitate collaboration and teaming arrangements between government and industry partners.
CDRL
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Government_Response_to_Industry_Comments_-_DRFP.xlsx | XLSX spreadsheet | |
| RISE_Questions_and_Answers_Final.pdf | ||
| KAFB_Visitor_Pass_Form_18_August_17.pdf | ||
| Map_-_KAFB_West_Side.pdf | ||
| CDRL 13 v1.pdf | ||
| CDRL 9 v2.pdf | ||
| CDRL 18 v2.pdf | ||
| RISE_TO_0005_AGT.pdf | ||
| CDRL 21 v1.pdf | ||
| CDRL 15 v1.pdf | ||
| RISE_TO_0003_UNP.pdf | ||
| CDRL 16 v1.pdf | ||
| CDRL 3 v1.pdf | ||
| CDRL 20 v1.pdf | ||
| RISE_TO_0002_SSP.pdf | ||
| DD254_RISE_20170724.pdf | ||
| Kirtland_AFB_Visitor_Pass_Request_-_Attach_2.pdf | ||
| CDRL 4 v1.pdf | ||
| RISE_TO_0004_NTS3.pdf | ||
| CDRL 17 v2.pdf | ||
| CDRL 7 v1.pdf | ||
| CDRL 14 v1.pdf | ||
| CDRL 2 v2.pdf | ||
| CDRL 8 v1.pdf | ||
| CDRL 5 v1.pdf | ||
| CDRL 12 v1.pdf | ||
| CDRL 11 v1.pdf | ||
| RISE_Basic_SOW_v3.pdf | ||
| CDRL 1 v1.pdf | ||
| AFRL_VISIT_REQUEST_JAN_2016_-_Attach_1.pdf | ||
| RISE_TO_0001_AIT.pdf | ||
| CDRL 10 v1.pdf | ||
| Map_-_KAFB_West_Side.pdf | ||
| CDRL 6 v1.pdf |
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (1 Data Item) Form Approval OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
D. SYSTEM/ITEM: R&D Integrated Space Experiments (RISE)
A. CONTRACT LINE ITEM NO.: 0002
B. EXHIBIT....................................: C
C. CATEGORY..............................: OTHER - IDIQ Contract
E. CONTRACT/PR NO.:
F. CONTRACTOR.........:
1. DATA ITEM NO........................: A019
2. TITLE OF DATA ITEM............: Systems Engineering Management Plan (SEMP)
3. SUBTITLE..................................:
4. AUTHORITY.............................: DI-SESS-81785A
5. CONTRACT REFERENCE......: Task Order Specific
6. REQUIRING OFFICE..............: AFRL/RVE 9. DIST. STATEMENT REQUIRED......: See Blk 16 12. DATE OF FIRST SUBMISSION: See Blk 16
7. DD250 REQ................................: Lt 10. FREQUENCY.....................: As Required 13. DATE OF SUBSEQUENT SUBM.: N/A
8. APP CODE.................................: No 11. AS OF DATE......................: Contract Award
14. DISTRIBUTION
Refer to Block 16 and Task Orders of the RISE contract for additional distribution instructions. Instructions vary per Task Order and provide additional guidance in regard to the requirements for Blocks 14A and 14B of this CDRL.
A. ADDRESSEES
B. COPIES
DRAFT FINAL
ACO 0 LT
PCO 0 LT
AFRL/RVE COR 0 1
RVE TASK MGR 0 1
15. TOTAL: 0 2,LT
16. REMARKS
Blk 4: The contractor shall provide a Systems Engineering Management Plan (SEMP) as described in DI-SESS-81785A but tailored to the mission assurance/risk class and level of complexity of the specific flight experiment effort as indicated in the task order.
Blk 9: The SEMP shall be marked IAW DoDD 5230.24 and AFI 61-204 with the following distribution statement: “DISTRIBUTION STATEMENT D. Distribution authorized to DoD and U.S. DoD contractors only; Critical Technology; [contractor fill in date of report]. Other requests for this document shall be referred to Air Force Research Laboratory/RVE, 3550 Aberdeen Ave SE, Kirtland AFB, NM 87117-5776”.
EXPORT CONTROL WARNING: All technical data shall be marked as follows: “WARNING — This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, U.S.C. Sec. 2751, et seq.) or the Export Administration Act of 1979, as amended, Title 50, U.S.C. App 2401 et seq. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD Directive 5230.25.”
All technical data (including electronic media) shall be marked with the following statement: “DESTRUCTION NOTICE—For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.”
Blk 10-13: As agreed to between Government and Contractor
Contractor Format is acceptable.
Submission via unencrypted or unsecure email is not permitted.
17. PRICE GROUP: 18. ESTIMATED TOTAL PRICE:
G. PREPARED BY: Richard K. de Jonckheere, AFRL/RVE I. APPROVED BY: , AFRL/RVKC H. DATE: 23 Feb 2017 J. DATE:
DD Form 1423-1, SEP 97 (EG) (Computer Generated) PREVIOUS EDITIONS ARE OBSOLETE Page 1 of 1 Pages
DRAFT
File details come from the government source that posted it. Updated .