About this file

This performance work statement outlines maintenance and sustainment service requirements for an integrated security system. The contractor shall provide maintenance response and repair for critical, major, and minor issues within time thresholds ranging from one hour to sixty hours depending on the priority level and type of failure. Depot-level maintenance shall also be provided, including repair or replacement of equipment through original equipment manufacturers and managing the list of replacement part vendors. The related solicitation seeks proposals for the Force Protection Site Security System Solutions contract to provide the services defined in the performance work statement for the Air Force Materiel Command Lifecycle Management Center located at Hanscom Air Force Base.

FPS4 PWS change page

View the file

Other files for this federal contract opportunity

Other files attached to Force Protection Site Security System Solutions (FPS4) Final Request for Proposal (RFP), newest first.
File Type Posted
RFP_FPS4_Amendment_0005_Cover_Letter.pdf PDF
FA8730-19-R-0005_0005.pdf PDF
FA873019R0005_Amd_0004_Ltr_(correction).pdf PDF
FA8730-19-R-0005_0004.pdf PDF
FA873019R0005_Amd_0004_Ltr.pdf PDF
AMD_0004_Network_Configs_-_change_page.pdf PDF
AMD_0004_Atch_8_Section_L__change_page.pdf PDF
FPS4_CRM_Posting_Number_7.pdf PDF
FPS4_CRM_Posting_Number_6__Final.pdf PDF
FPS4_CRM_Posting_Number_5.pdf PDF
500)_Network_Diagram_-_Update.vsd VSD drawing
400)_Rack_Drawings_-_Update.vsd VSD drawing
FPS4_CRM_Posting___4.pdf PDF
Section_K.pdf PDF
DD254.pdf PDF
SF33.pdf PDF
500)_Network_Diagram_-_Update.pdf PDF
Attachment_6_OCONUS_SPECIFIC_TERMS_AND_CONDITIONS.pdf PDF
AMD_0003_Atch_1_SOW_change_pages.pdf PDF
AMD_0003_Atch_7_PWS_change_pages.pdf PDF
RFP_FA873019R0005_Amendment_0003.pdf PDF
Atch_9_Section_M_Amend_3_change_pages.pdf PDF
FA8730-19-R-0005_0003.pdf PDF
AMD_0003_Atch_8_Section_L_.pdf PDF
Drawings_Package_-_Change_Pages.zip ZIP file
FA873019R0005_A0002.pdf PDF
FPS4_CRM_Final_RFP_FBO_Posting__3.pdf PDF
FPS4_Responses_to_Questions_(Posting__2).pdf PDF
Request_for_Proposal_(RFP)_FPS4_Amendment_0001.pdf PDF
FPS4_Responses_to_Questions_Posting__1.pdf PDF
FPS4_Request_For_Proposal.pdf PDF
FPS4_Model_Contract_FA8730-19-R-0005.pdf PDF
Drawings_Package.zip ZIP file
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Thresholds (Table 1) below and shall restore the system to operations within the Maintenance Repair Thresholds (Table 2) identified below.

TABLE 1. Maintenance Response Time Thresholds*

Failure PL1 PL2 PL3 PL4

Catastrophic Failure (CF) 1 hr. 1 hr. 1 hr. 12 hrs.

Major Malfunction (MF) 1 hr. 1 hr. 12 hrs. 24 hrs.

Partial Failure (PF) 24 hrs. 24 hrs. 24 hrs. 24 hrs.

The contractor shall restore the system/equipment to operational status within repair times identified below. The repair time threshold (Table 2) shall be calculated from the time of the initial telephonic contract with the Government in response to a Government call for assistance.

TABLE 2. Maintenance Repair Time Thresholds*

PL1 PL2 PL3 PL4

Catastrophic Failure (CF) 24 hrs. 24 hrs. 24 hrs. 60 hrs.

Major Malfunction (MF) 24 hrs. 24 hrs. 24 hrs. 48 hrs.

Partial Failure (PF) 48 hrs. to Operation

Status

48 hrs. to Operation

Status

48 hrs. to Operation

Status

48 hrs. to Operation

Status

*Not all PLs may be applicable to this effort. Contractor shall be responsible for meeting response and repair times for PLs applicable to the IDS supported.

3.2.4 Depot Level – The contractor shall manage Depot Level ICS/CLS repair activity and equipment and systems, integrated GFE and contractor provided infrastructure. Depot shall furnish all required serviced labor tools, material and equipment necessary to manage and provide Depot Level ICS/CLS for all contractor furnished and installed level maintenance which shall consist of the activities described below:

a. The contractor shall return failed investment items (e.g. equipment, LRUs, and system replaceable units (SRU)) to the OEM or the Government organic depot for repair or replacement as appropriate.

b. The contractor shall maintain a list of OEM vendors to supply replacement parts and equipment.

ATTACHMENT 7 PERFORMANCE WORK STATEMENT (PWS)
TABLE OF CONTENTS
1.0 INTRODUCTION
2.0 PURPOSE
3.0 CONTRACTOR PERFORMANCE REQUIREMENTS
3.2 Sustainment Services Performance Levels
3.3 Contractor Manpower Reporting:
3.4 Applicable Documents
3.4.1 Government Specifications and Security Documents
3.4.2 Other Government Documents
AF LIFE CYCLE MANAGEMENT CENTER (AFLCMC), HANSCOM AFB
3.4.3 Commercial Standards and Specifications
AIR FORCE
4.0 ACRONYMS