FPS4_CRM_Final_RFP_FBO_Posting__3.pdf
PDF 208 KB Posted
- Attached to
- Force Protection Site Security System Solutions (FPS4) Final Request for Proposal (RFP) Federal contract opportunity
- Solicitation number
- FA8730-19-R-0005
About this file
This final solicitation requests proposals for the Force Protection Site Security Systems contract. Offerors are to provide site security solutions including intrusion detection, access control, and video assessment at Air Force facilities. The solicitation provides attachments outlining sample problem requirements, evaluation criteria, applicable standards and an acquisition plan. Offerors must meet small business participation goals and are evaluated based on technical factors such as detection capabilities, infrastructure design, and security management approach. Proposals are due by July 2019 and award is expected in early 2020.
The Government is posting the third and final round of responses.
View the file
Other files for this federal contract opportunity
Show all 33
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
No. Reference Pg. # Para # Contractor Question Government Response
60 Attachment 8 25 3.2.3 What is the make and model of the existing PTZ cameras? See forthcoming Amendment.
67 Attachment L-1
Attachment L-1
1.1 Sample Problem Response Content and Format The offeror shall submit the responses to the sample problem IAW Section L paragraph 2.0 (General Instructions), paragraph 3.0 (Volume 1 – Executive Summary), and paragraph 4.0 (Volume II – Technical).
4.2 Format and Specific Content
Your proposed technical approach for accomplishing/satisfying all technical requirements and objectives shall be presented in the Technical Volume. In this volume, your proposed approach shall map to the Technical Factor identified in Section M.
M002 Evaluation Factors
a. Evaluation Factors The following evaluation factor will be used to evaluate each proposal.
Factor 1: Technical
• Sub-factor 1: Detection
• Sub-factor 2: Infrastructure
• Sub-factor 3: Entry Control
• Sub-factor 4: Management It appears that Section L instructions does not clearly align to the Section M Evaluation Factors, since Section L does not mention the Sub factors of Section M. Could the government clarify if offerors are to map our response as detailed in Section L or M?
Clarification will be in forthcoming Amendment.
RFP: Technical Rating Factors, (IFPP, Section
M, Attachment 4 –
Evaluation Factors, b.
Technical Rating
Factors, 4.
Management)
M002 b.4
M002 b4 states, “The ICS approach will be evaluated for traceability to the Sample Problem Requirements ……”. However, the Sample Problem Instructions (Attachment L-1) makes no reference to ICS requirements.
Furthermore, Section L (Attachment 8), paragraph 4.3, only requires a discussion of the offeror’s approach to organizational and depot level support including a discussion of how OEM and subcontractor relationships will be established to ensure robust organizational and depot level maintenance is provided. However, the PWS for FPS4 (Attachment 7) does provide ICS requirements including organizational level, help desk, on-site repair and maintenance, depot level and ICS/CLS spares and repair parts. Attachment 7 paragraph 3.1 also states that the specific level of support and performance objectives will be identified in the applicable DO PWS. Please provide the specific level of support and performance objectives required by the Sample Problem so that offerors responses may provide the desired traceability to those requirements.
Information forthcoming in Amendment.
Statement of Work
(Section J, Attachment 1)
20 4.2.4
Sustainment Support: “Cybersecurity certification” is noted as a “specific sustainment function.” What does this relate to exactly? Training or certification of contractors? Does “cybersecurity certification” refer to training or certification of contractors?
Cybersecurity certification under sustainment support relates to cybersecurity of the system.
72 Attachment 8 17 and 21 2.1 Line 5 and 3.1.6
Section 2.1 Line 5 states: “All IDS/ACS (for the purposes of solicitation, the terms ACS and AECS are used synonymously) work performed at Sensitive Compartmented Information Facilities (SCIFS) shall adhere to IAW ICS 705- 1 Section G”. Section 3.1.6 states: “Design a communication network interface (only network interface to this building, no IDS/IVA) to this SCIF facility. The secure area within this building comprises of rooms 200 & 201 only.”
If any work performed at the SCIF shall adhere to IAW ICS 705-1 Section G, please confirm which statement takes precedence with regards to designing ACS/IDS to this SCIF facility.
There is no precedence issue. The requirement is accurately stated in 3.1.6.
75 Section L Attachment 8, Section L Para 4.4.4
Section L Para 4.4.4 Attachment 2 LOE, Does the Government want the four sources of equipment sorted and reported as IDSEL, DISA APL, Ancillary, and Reused GFE? Or does the Government want two categories:
IDSEL and Other (inclusive of DISA APL, Ancillary, and GFE)? Clarification of instructions.
Refer to Section 4.4.4. attachment 2. "The LOE shall separate equipment items selected from the IDSEL and other equipment proposed in the sample problem solution"
87 Section L Attachment 8, Section L Para 3.3.1.2
Section L, Sample Problem Para 3.3.1.2, Are the two fiber strands listed as available from BDOC to Area 1 already terminated and in a GFE patch panel? Clarification of existing features.
Clarification will be in forthcoming Amendment.
88 Section L Attachment 8, Section L Para 3.3.1.2
Section L, Sample Problem Para 3.3.1.2, Are the two fiber strands listed as available from BDOC to Area 2 already terminated and in a GFE patch panel? Clarification of existing features.
Clarification will be in forthcoming Amendment.
Attachment 8, CDRL A023
Attachment L-5, Sample Problem CDRL A023 contains N/A in the first submittal and subsequent submittal fields. What is the government's intent for this CDRL in the Sample Problem? Clarification of requirements.
Question unclear as to "submittal fields" meaning. Blocks are marked N/A where do not require specific information.
95 Section L Attachment 8, Section L Para 3.1.8.1
Section L, Sample Problem Para 3.1.8.1, What is the type and model of Interface device used to connect to edge devices in the FDBs for connectivity to Area 2 IDS sensors? Clarification of existing features.
Question unclear. The Government will not provide information that will lead to a Sample Problem solution. Refer to network diagram.
122 Section L Attachment 8, L-4
Should the Contractor WBS include Interim Contractor Support (ICS) for the installed system? Full understanding of Sample Task requirements. Clarification will be in forthcoming Amendment.
124 Section L
4.4.4 /
Attachment 1
The instructions ask for descriptions of network topology and that offerors identify and describe compatibility issues in this section, which is titled Site Design, Install & Network Configuration Drawings”. Understanding that CDRL A023 governs format for this data, do the overall proposal format requirements adhere to this section, if so?
Question is unclear. Refer to 4.4.4 for instructions "to include sufficient detail in both the technical volume and installation drawings…"
127 Section L Attachment 8-1
2.2(b) Please clarify that this is to be included in the Attachment 1 - Drawings section of the proposal.
Clarification will be in forthcoming Amendment.
128 Section L Attachment 8-1
2.2(c)
Please clarify into which section of the proposal this is to be provided.
With only 20 pages for the entire technical volume, describing this in detail would leave little room for much else. If to be included in technical volume, consider eliminating page limit.
Clarification will be in forthcoming Amendment.
129 Section L Attachment 8-1
2.2(e)
Please clarify into which section of the proposal this is to be provided.
With only 20 pages for the entire technical volume, describing this in detail would leave little room for much else. If to be included in technical volume, consider eliminating page limit.
130 Section L Attachment 8-1
2.2(g) Please clarify that this is to be included in the Attachment 1 - Drawings section of the proposal.
Clarification will be in forthcoming Ammndment.
131 Section L Attachment 8-1
2.2(h) Please clarify that this is to be included in the Attachment 1 - Drawings section of the proposal.
Clarification will be in forthcoming Ammndment.
132 Section L Attachment 8-1
2.2(i) Please clarify that this is to be included in the Attachment 1 - Drawings section of the proposal.
Clarification will be in forthcoming Ammndment.
133 Section L Attachment 8-1
2.2(k) Please clarify that this is to be included in the Attachment 1 - Drawings section of the proposal.
Clarification will be in forthcoming Ammndment.
134 Section L Attachment 8-1
2.2(l) Please clarify that this is to be included in the Attachment 1 - Drawings section of the proposal.
Clarification will be in forthcoming Ammndment.
135 Section L Attachment 8-1
2.2(n) Please clarify that this is to be included in the Attachment 1 - Drawings section of the proposal.
Clarification will be in forthcoming Ammndment.
136 Section L Attachment 8-1 2.2(o) through
(x)
Please clarify into which section of the proposal this is to be provided.
With only 20 pages for the entire technical volume, describing this in detail would leave little room for much else. If to be included in technical volume, consider eliminating page limit.
Clarification will be in forthcoming Ammndment.
FPS4_FA8730-19-R-
0005_Model Contract.pdf
Attachment 8, Section L, Attachment L-1:
Sample
Problem
Pages 188 and 190 of 253 (Attachment 8 Pages 22 and 24)
Area 1: Section L.3.1.8.2.1 (page 22) states, “There is 48-strand single mode cable ran from this bldg. (904) to bldg. 500 (BDOC).” However, Table 2-1 (page 24) states, “There is fiber connection in bldg. 918 to BDOC.” Please clarify which of these are correct, or if both are correct.
Clarification will be in forthcoming Amcndment.
FPS4_FA8730-19-R-
0005_Model Contract.pdf
Attachment 8, Section L, Attachment L-1:
Sample
Problem
Page 190 of 253, (Attachment 8, Page
24, Table 2-1)
In Table 2-1, the Communications Conduit/Infrastructure row states “There is a fiber connection in Building 918 to the BDOC communications room”, however, section 3.1.8.2.1 says that the existing fiber to the BDOC comes from the ECF (Building 904). Please clarify.
Clarification will be in forthcoming Amcndment.
155 Attachment 8 - Section L 21 3.1.5.2
This paragraph states that the ECF shall have the ability to arm/disarm the bldgs. within the PL1 area, however in paragraph 3.1.12, it states that Bldg. 904 will have monitoring only service, and no operator input will be allowed. Which paragraph is correct?
Sample Problem is correct as written.
159 Attachment 8 - Section L 25 Drawing
Drawing shows Bldg. 904 (ECF) as having 2 turnstiles. Are both located at the fence or is one at the bldg. exit? Need to understand the traffic flow for the area. It appears both turnstiles are used for the inbound personnel.
If that is correct how are personnel out processing from the area.
No further information will be provided.
160 Attachment 8 - Section L 25 Drawing
Is there any kind of personnel separation for entering and existing personnel in the personnel entrapment area? Clarification to determine what work is required within the ECP No further information will be provided.
161 Attachment 8 - Section L 25 Drawing
How do the SF personnel get in and out of the personnel entrapment are to do RAMs and personnel searches? Can the government provide a personnel flow diagram to show how personnel move into and out of the area.
No further information will be provided.
162 Attachment 8 - Section L 25 3.2.1.2
This paragraph states that we can either upgrade existing sensor or install new sensors. What sensors are currently installed? Further clarification will be provided in amendment.
163 Attachment 8 - Section L 25 3.2.3 Where are the existing cameras displayed and controlled from.
Further clarification will be provided in amendment.
164 Attachment 8 - Section L General
Can the government provide a list of all GFE so that we can make sure they are listed in the LOM for the proposal? Allow contractor to determine if product is upgradable or requires replacement. Also, to ensure we have a complete list of material used.
Sufficient information is supplied in the Sample Problem.
165 Attachment 8 - Section L General
What data is the government requiring for resource loading? T&M rates does not separate prime, subs or OEM. Rates are not required in this solicitation.
Also see Section 4.4.4, Attachment 3 in Section L Attachment 8 and Attachment L-3.
166 Attachment 8, Section L Section L.2.2.1.f., page
"2.2.1.f Sample Problem Attachments (minus Attachment 6 which has a one-page limit") -- did the Government intend to reference Attachment 7 (Small Business Participation Description)?
Correct. See forthcoming Amendment
167 Attachment 8, Section L Section 5.1.6 - Section J - List of Attachments
"Attachment 6 – Section L – Instructions for Proposal Preparation" – should the correct reference be "Attachment 8"? Correct. See forthcoming Amendment
168 Attachment 8, Section L Section 5.1.6 - Section J - List of Attachments
"Attachment 7 – Section M – Evaluation Factors for Award" – should the correct reference be "Attachment 9"? Correct. See forthcoming Amendment
Attachment 2, DD Form
Block 1b and
Continuation Pages
The DD Form 254 requires SECRET Safeguarding (Block 1b); however, within the Continuation Pages it states the safeguarding of classified information will not be required for all Delivery Orders. Would the Government consider removing the requirement for SECRET safeguarding on this DD Form 254 (at the IDIQ level), and apply it only on subsequent DD Form 254 for Delivery Orders under which safeguarding actually will be required?
When DOs are issued the contractor will be required to fill out a DD254 which will reflect the level of safeguarding when appropriate.
Attachment 2, DD Form
Blocks 10a, 11c, 11h, and Continuation
Pages
Could the Government please clarify the type and volume of classified material that may be required for secure storage att the contractor facility (e.g., documents, equipment, hardware, COMSEC/CCI materials)?
When DOs are issued the contractor will be required to fill out a DD254 which will reflect the level of safeguarding when appropriate.
FPS4_FA8730-19-R-
0005_Model Contract.pdf
Attachment 8, Section L, Attachment L-1:
Sample
Problem
Page 191 of 253, (Attachment 8, Page
25, 3.2)
In section 3.2, 2nd paragraph, it states “While the existing IDS sensors are approved for use, the existing sensor system processors are obsolete and not approved for current use at Air Force facilities.”
Does “the existing sensor system processors” refer to the control panels that the existing buried line sensor and fence sensor cables connect to or an existing obsolete alarm panel to which the sensor control panels provide alarm outputs?
FPS4_FA8730-19-R-
0005_Model Contract.pdf
Attachment 8, Section L
Attachment 9, Section M
(Attachment 8, Page
11)
Section L Paragraph 4.4.3 Interim Contractor Support (ICS) Approach states “Provide a description of the proposed approach to provide organizational & depot level support of the Sample Problem system for three years after system turnover. Include a discussion of how OEM and sub-contractor relationships will be established to ensure robust organizational and depot level maintenance is provided.” However, there are no specific ICS tasks itemized in the sample task instructions, nor does the WBS in Attachment 8, Page 43 make mention of the appropriate work elements.
Section M, Paragraph 4. Management then goes on to state that “The ICS approach will be evaluated for traceability to the Sample Problem requirements, organizational level sustainment plan, depot level sustainment plan, and Original Equipment Manufacturer (OEM)/sub-contractor sustainment plan”.
Is it the Government’s intention to provide these plans? If so, where will they be posted and when? If no, is the Government requesting that the Contractor develop and submit these plans as part of the RFP response? If so, within what section and what page limitations apply?
Yes it is anticipated that the contractor will provide these plans, further clarification will be provided in forthcoming Amendment.
See Table 2.2 of Section L (Attachment 8).
FPS4_FA8730-19-R-
0005_Model Contract.pdf
Attachment 8, Section L, Attachment L-1:
Sample
Problem
Page 226 of 253.
(Attachment 9, Page 9, 4. Management)
In section 3.2 [Area 2 Requirements], 3rd paragraph, it states “A fully functional and approved IVA camera system is currently installed at the RA fence line that reports video to the BDOC.” However, in section 3.3 [Area 3
– BDOC] it states, “Assume that there is no existing IDS/IVA equipment at this installation”. Please clarify how the video feeds from the Area 2 perimeter are to be accessed at the BDOC.
Further clarification will be provided in Amendment.
500) Network Diagram.vsd
500) Network Diagram.vsd
FPS4_FA8730-19-R-
0005_Model Contract.pdf
Attachment 8, Section L, Attachment L-1:
Sample
Problem
Attachment 8 Drawing
On Drawing “500) Network Diagram”, page 4, the architecture shows VMS and IDS servers, but in section 3.3 [Area 3 – BDOC] it states, “Assume that there is no existing IDS/IVA equipment at this installation”.
Is the network diagram showing existing systems that cannot be reused or is it showing how the new IDS and VMS devices should be connected?
Further clarification will be provided in Amendment.
175 FPS4 Solicitation
As part of our proposal, we are to identify the Government Offices:
- Provide the mailing address, telephone and fax numbers and facility codes for the cognizant:
o Contract Administration Office o Defense Contract Audit Agency (DCAA) o Government Paying Office.
- Provide the name and telephone and fax number for the Administrative Contracting Officer (ACO).”
Could you please provide some guidance on this section? I’m not sure where to locate this info
Clarification will be in forthcoming Amendment.
176 Section L Section L, 2.2, 2.2.1
In Attachment 8 (Section L), 2.2.1, the RFP states that the Sample Problem Attachments are excluded from page count (minus Attachment 6, which has a one page limit); however, previously in Section L, 2.2, it states that Sample Problem Attachments 1-6 do not have a page count. The Attachment 7 (Small Business Participation Description listed in Attachment 8, page 13) is the only section of Volume II that has a one-page count. Does the Government mean that Attachments 1-6 are excluded from page count, and that Attachment 7 is included in the 20-page count for Volume II Technical?
Clarification will be in forthcoming Amendment to fix inconsistency.
Attachment 6 is a 1-page maximun
177 Section L Section L, 3.1.2
In Attachment 8 (Section L), 3.1.2, the RFP states that the existing RA Fence does not meet A1 chain link fence standards but does not clearly state whether the design of the replacement of the fence is a part of the sample problem scope. Is it the intent that the Type A1 fence design be included in the scope of the sample problem?
Further clarification will not be provided
178 Section L Section L, 3.1.10
In Attachment 8 (Section L), 3.1.10, is there existing 120VAC power for the sample problem in Area 1 and if so can these locations be identified for each interior building?
Clarification will be in forthcoming Amendment.
179 Section L Section L, 3.2
In Attachment 8 (Section L), 3.2, the RFP states that there is an existing IVA camera system that currently reports video to the BDOC but does not reference how many cameras exist on this system. Can you please provide the number of existing cameras on the Area 2 perimeter to be used to determine licensing and storage requirements for Area 3 BDOC?
Clarification will be in forthcoming Amendment.
Attachment L-1 Sample Problem Instructions/
Attachment 8 Pg. 17
2.1 General Notes, Assumption &
Requirements #4
“Construction for the Sample Problem begins 1 October 2020.”
With the use of the word “Construction” in this notes, assumption & requirements statement it appears to imply that the “100% As for Construction” design product and associated work has been completed.
Request confirmation that it is Government’s intent that the Sample Problem’s Design Phase has been completed.
Correct Clarification will be in forthcoming Amendment.
181 Attachment 8, Section L
Area 1 Detection
Requirements Section 3.1.1, page 20
Will Buildings 914, 916, 918, 920 and 922 contain hazardous/explosive material? Clarification will be in forthcoming Amendment.
182 Attachment 8, Section L Area 1
Delay/Denial Requirements
Section 3.1.2, page 20 Can the existing fence around Area 1 be repaired to meet A1 specification or do we need to build a new fence? Further clarification will not be provided
183 Attachment 8, Section L Area 1
Delay/Denial Requirements
Section 3.1.2, page 20 Will PL-1 protected resources be stored in buildings 914, 916, 918, 920 and/or 922 during the Area-1 construction phase? Further clarification will not be provided
184 Attachment 8, Section L;
Area 1
Delay/Denial Requirements;
Section 3.1.2, page 20
a) Do the ECF and vehicle gate fences currently exist?
B) If they do exist, do they need to be repaired or replaced? Further clarification will not be provided
185 Attachment 8, Section L Area 1
Delay/Denial Requirements
Section 3.1.3, page 20 Will new Area-1 IVA cameras be integrated into the existing VMS or are we required to provide a new VMS? Further clarification will not be provided
186 Attachment 8, Section L
Area 1 Delay/Denial
Requirements;
100) Area 1-
Overall Drawing Section 3.1.5.1, pages
20 - 21
Drawing package shows 2 turnstiles and a single door for the current Area- 1 ECF pedestrian entrance/exit portals. There is a reference to the exterior turnstile, "X2." And, there is a reference to the single door, "NON ACS Door."
a) Is the requirement to install a dual turnstile at each turnstile location?
b) Are we required to establish two lanes of travel to separate entry and exit?
c) Verify that ACS is not required at the single door location, only on the turnstiles.
The government will not provide information that may give insight into a Sample Problem solution. See Section L Attachment 1 Para. 3.1.5.1
187 Attachment 8, Section L
Area 1 RA SCIF, Building 910, COM Entryway Section 3.1.6, page 21
Does OSP conduit building 910 come up through the concrete floor or are we required to install a building entryway and connect to OSP conduit stub out?
Further clarification will not be provided
188 Attachment 8, Section L
Area 1 COM Infrastructure Section 3.1.8.1, page
Does OSP conduit at building 914, 916, 918, 920, and 922 come up through the concrete floor or are we required to install a building entryway and connect to OSP conduit stub out?
Further clarification will not be provided
189 Attachment 8, Section L
Area 1 Power
Section 3.1.10, page
Do buildings 914, 916, 918, 920, and 922 currently have electrical power?
If yes, what is the capacity of each buildings power distribution main circuit? Further clarification will not be provided
190 Attachment 8, Section L Area 1 Power Section 3.1.10, page
What is the capacity versus the load for the ECF power distribution panel?
Clarification will be in forthcoming Amendment.
191 Attachment 8, Section L Area 1 Power Section 3.1.10, page
Where is the electrical transformer servicing Area 1 located and what is its capacity versus the load? Clarification will be in forthcoming Amendment.
192 Attachment 8, Section L Area 2 Hangar
Power Section 3.2.7.4, page
What is the capacity versus the load for the Area 2 Hangar main power panel?
Further clarification will not be provided. Refer to section L attachment L-1 para 3.2.7.4
193 Attachment 8, Section L
Electronic Offers
Section 2.2.6, page 10
Would the Government please verify that all files in our electronic copies of the proposal may be submitted in Adobe Acrobat DC, with the exception of files for the Basis of Estimate (BOE) and for the CDRL A023 Network Interconnection documentation, which must be in MS Excel 2016 format.
Correct, refer to Section 2.2.6 for all acceptable document format types
Attachment 2, DD Form
Safeguarding Requirement Block 1b
When is an Offeror required to possess an Active Secret Safeguarding Level (e.g., upon contract award)? Prior to bidding on a DO requiring Active Secret Safeguarding
Attachment 2, DD Form
Safeguarding Requirement
Blocks 1b, 11h, 11l, 15, and Continuation
Pages
The DD Form 254 requires SECRET Safeguarding (Block 1b), and in the Continuation Pages (Ref Block 11h - COMSEC/Cryptographic) it states, "Safeguarding requirements apply." However, in Block 15 (Ref Block 11l) it states, "Contractor performance will occur at various military installations.
DSS is relieved of all inspection responsibilities for contractor performance on the installation. The local servicing security activity will maintain security oversite." Will safeguarding be required at the Contractor site?
The nature of the DO and safeguarding requirements will be determined at time of issuance. When DOs are issued the contractor will be required to fill out a DD254 which will reflect the level of safeguarding when appropriate.
197 Attachment 8, Section L
Basis of Estimate /
Pricing Section 4.4.4, Page 11, Attachments to
Sample Problem
Would the Government please confirm they are neither seeking nor requiring any specific pricing for labor or materials in our list of equipment (LOE), basis of estimate (BOE), or elsewhere within the proposal? Correct. No pricing required for labor or materials.
Work Breakdown
Structure 4.4.4
Technical Volume II- Sample Problem, Attachments to Sample Problem (IFPP, Section L, Attachment 6 - Contract Work
Breakdown Structure
(CWBS)
Attachment 6 states that offerors will adhere to the PWBS structure when developing a proposed CWBS and that beyond the summary PWBS, offerors have the flexibility based on the proposed implementation approach. It further states that when the offeror extends the CWBS below levels identified in attachment L-4, the offeror must amend the WBS dictionary to provide definitions at the lower levels. Since the L-4 dictionary does not provide definitions at the level 3 PWBS, we assume the flexibility to extend the PWBS includes adding level 3 tasks as well as levels below level 3 (levels 4 and 5). Please note that allowing the level 3 PWBS to be extended to include additional level 3 tasks will significantly reduce the size of the CWBS as well as the corresponding IMS and BOEs, easing Government review requirements substantially. For example under “1.1 PL-1 Restricted Area” adding 1.1.14 Management at Level 3 reduces the size of the CWBS because it would be very repetitive at the 4th level WBS. Please confirm that contractors have the flexibility to add tasks at the PWBS level 3, as well as adding tasks at the CWBS levels 4 and 5 if needed.
Yes, per Section L, Section 4.4.4 Attachment 6, offerors have flexibility in modifying the provided PWBS as long as rationale for the change is provided and that the CWBS format directly correlates with BOEs
199 3.2
In Area 2 the sample problem states "while the existing IDS sensors are approved for use, the existing sensor system processors are obsolete and not approved for current use at Air Force facilities" What fence sensor model and fence sensor processor model is currently being used? Is the current fence sensor acceptable? Also what BLS sensor model is being used currently?
Information forthcoming in Amendment
200 3.2
States a "fully functional and approved IVA system is installed..." which IVA system is currently installed? Is it analog or IP cameras?
Clarification will be in forthcoming Amendment.
Network diagram.pdf p.1,3 and 4
The network diagram depicts an IDS and VMS server as part of the current CCDE system. What CCDE system is this, i.e., which IDS and VMS systems are being used? How many cameras can the current VMS system store? No further information will be provided.
202 3.2.4
The paragraph states “The Area 2 hangar facility will require AECS as necessary”. Do any of the entrances require AECS?
203 Table 6: IDSEL
The G-Fence 600Z is listed twice, once with a "not for use in Northern tier" disclaimer and again without the disclaimer. Which one is correct? Please clarify whether the G-Fence is acceptable for use in the sample problem solution. Clarification will be in forthcoming Amendment.
204 3.1.10 Area 1 Power
States a power network is to be installed, however no source location for this power is shown. Where does the power for Area 1 originate?
Clarification will be in forthcoming Amendment.
205 3.3.4
Table 5 shows BDOC in room 100 and comm room is room 101, but Figure "PL3 BDOC layout" shows BDOC room is 101 and the comm room is
103. All of the other text in that section agrees with Table 5. Which is correct Table 5 or the PL3 BDOC Layout figure? Clarification will be in forthcoming Amendment.
206 2.1 p.183 General notes
Note 6 says "Unless otherwise specified , all existing GFE Squadron Comm cabinets and racks are to be considered full and new equipment cannot be added. But "rack Drawings.pdf shows spaces are available. Does that mean we can use those spaces for this project? Please refer to note 6
207 2.1
All IDS/ACS work performed at Sensitive Compartmented Information Facilities (SCIFS) shall adhere to IAW ICS 705-1 Section G. Section G requires ACS and IDS at every SCIF. No IDS or ACS is being requested for either SCIF. Is an IDS/ACS required at the SCIF? Please refer to Section L para 3.1.6
208 3.2
What lock is currently on each door in Area 2? (no lock, cypher lock, key lock, electric strike, mag lock)
Clarification will be in forthcoming Amendment.
209 3
Card readers are not included in the supplied AEL. Are they to be considered part of the CCDE system?
Attachment 4 Model Contract; Attachment 8, Section L (Attachment L-
4)
The Work Breakdown Structure (WBS) described in the Sample Problem (Attachment L-4) is inconsistent with the WBS presented in the Sample Contract and seems incomplete (e.g., it does not include any program management, ICS, etc.). We believe it would better suit the Government’s interests if the Sample Problem WBS was consistent with the Sample Contract for clarity, completeness, efficiency, and continuity, as well as providing a more realistic evaluation basis. We request the Government revise the Sample Problem requirements such that the WBS developed for it is consistent with the Sample Contract.
Clarification will be in forthcoming Amendment.
211 Sample Problem
What is the maximum number of WBS levels to be used in the Sample Problem and its associated IMS. The maximum number of levels on the IMS is 5. Refer to Section 4.4.4
Attachment 3. There is no limit to the number of levels on the CWBS.
212 Attachment 8 11 4.4.1 Given this direction, what level of detail is required in the design/parts list? For example, should offerors provide the following:
Further clarification will not be provided
213 Attachment 8 11 4.4.1 Cable lengths, sizes, etc.? Further clarification will not be provided
214 Attachment 8 11 4.4.1 Conduit lengths and sizes? Further clarification will not be provided
215 Attachment 8 11 4.4.1 Quantity and type(s) of fittings, junction boxes? Further clarification will not be provided
216 Attachment 8 11 4.4.1 Details on buried conduit system e.g., conduit depths, encasement, hand-hole types.
Further clarification will not be provided
217 Attachment 8 11 4.4.1 Level of details required for the Area 1 generator system? Further clarification will not be provided
221 Attachment 8, section 3.1.6
The RFP states: “Design a communication network interface (only network interface to this building, no IDS/IVA)”. Does the government require the offeror to provide Access Control for SCIF Entry or any other part of Building 910?
222 Section L para 3.1.14 PL-1 Restricted Area (Area
1) Assumptions and
Layout, TABLE 2-1: PL- 1 Restricted Area (RA)
Assumptions
Regarding the warehouse building 918 and those two strands of dark fibers: "There is a fiber connection in Building 918 to the BDOC communications room (Building 500) with two dark fibers (single mode) available to this project that have been reserved and certified for use."
Will the government please describe the secure location within building 918 where the referenced two dark fibers terminate.
Clarification will be in forthcoming Amendment.
223 Section L
Section L para 5.2.2
Section L requires the bidder to identify the "Government Payment Office." Will this be defined on a per task order basis, or is this the bidder's primary DFAS office for the CAGE code of the bidder? Please clarify what information is required from the bidder for "Government Payment Office."
Clarification will be in forthcoming Amendment
224 Attachment 8 Page 28 3.2.7.4 Is the power source identified in para 3.2.7.4 for Perimeter Fence security solution?
Clarification will be in forthcoming Amendment.
225 Attachment 8 Page 28 3.2.7.4 If the power source is identified in para 3.2.7.4 for Perimeter Fence, is the power available for the existing FDBs?
Clarification will be in forthcoming Amendment.
Attachment 8, ATTACHMENT L-1
Page 36 & 37
Protech 600Z is not approved for use in Northern tier on Table 6 Page 36, then on page 37 it is listed as an approved solution. Will the Gov clarify if approved for Northern tier site?
Clarification will be in forthcoming Amendment.
227 Attachment 8 Page 25 3.2.3 In the PL-2 area please provide us the make/model of the current IVA cameras as well as the PTZ cameras on the hangar?
Clarification will be in forthcoming Amendment.
228 Attachment 8 Page 25 3.2 The Sample Problem instructions state "A fully functional and approved IVA camera system is currently installed at the RA fence line that reports video to the BDOC." Does the IVA camera system also currently provide IVA of the existing BLS across the taxiway gap?
Clarification will be in forthcoming Amendment.
229 Attachment 8 3.2 There is no rationale as to why there are 5 sectors on the taxiway gap drawing. Is the offeror limited to providing a solution for the sectors as laid out in the sample problem for the taxiway gap?
Further clarification will not be provided
230 Attachment 8 3.2 Para 3.2 identifies the processor as obsolete and the IDS as approved for use. Who is the manufacture of the BLS and FDS in relation to the obsolete processors?
Clarification will be in forthcoming Amendment.
231 Attachment 8 3.2.1.1 In para 3.2 IVA is approved and functional, Para 3.2.1.1 you reference a requirement to design or upgrade IDS/IVA. These two paragraphs conflict with each other. Please clarify which paragraph applies?
Clarification will be in forthcoming Amendment.
232 Attachment 8 3.1.6 & 3.2.7.2.2 Are the SCIFs in the PL-1 and PL-2 areas occupied 24/7? Further clarification will not be provided
233 Attachment 8 Page 25 In Area 1 sample problem: Do the SCIFs alarms display at the Entry Control Facility, 910 and BDOC?
Further clarification will not be provided
234 Attachment 8 Page 26 Area 2: Does the government want the Offeror to provide a solution for IDS/ACS for the SCIF?
Please refer to Section L para 3.1.6
235 Attachment 8 Page 26 Area 2: Does the government want the Offeror to provide a solution for IDS/ACS for Building 698?
Further clarification will not be provided
236 Attachment 8 3.2
Area 2: 3.2 states “This SCIF facility has an appropriate communications interface with base communication infrastructure.” Please define the word “appropriate”. Do we need to redesign the communications interface?
ATTACHMENT L-1
The primary entrance to Bldg. 700 in Area 2 is not defined in the Sample Problem requirements. Will the government provide where there is a main access point to the hangar and the location of that access point?
Further clarification will not be provided
Attachment 8, ATTACHMENT L-1
Page 29 What hardware is currently installed on the Bldg. 700 personnel doors?
Clarification will be in forthcoming Amendment.
Attachment 8, ATTACHMENT L-1
Para 3.3 "Assume that there is no existing IDS/IVA equipment at this installation and there will be sufficient space and cooling capacity in all areas where IDS/IVA equipment is to be installed." Please clarify the use of the words IDS/IVA. Was it your intention to use the word CCDE, as you state in Table 5?
Further clarification will not be provided
240 AFI 31-101 7.12.4
Per AFI 31-101 Section 7.12.4 AECS should use Level III for entry to a PL-1 area boundary. 31-101 and supporting documents do not define the egress level. What is the egress level required for a PL-1RA?
Further clarification will not be provided
241 Attachment 8 3.1.14 What is the existing door hardware for all doors in all Buildings? Clarification will be in forthcoming Amendment.
Attachment 8 PL-1 Area
Layout
What is the source and sizing of the main power distribution for PL-1 restricted area?
Clarification will be in forthcoming Amendment.
243 Attachment 8 3.1.1
The Sample Problem requirements in Section 3.1.1 state “The offeror shall design a lighting system around the perimeter of the RA IAW ESE-SIT-0001, section 7 in support of IVA.” ESE-SIT-0001 states in section 7.2.1 “The design, acquisition, and installation of perimeter lighting systems are the functions of the civil engineering organization at the base receiving the sensor and CCTV subsystems.
Therefore, lighting requirements for the CCTV subsystems are identified to the base by the IBDSS siting engineer as support construction to be provided by the base. Perimeter lighting systems are not provided or installed under the IBDSS Program.” Do we disregard 7.2.1 and provide a lighting design for the proposal?
Refer to Sample Problem instructions and para 3.1.11
244 Attachment 8 3.1.5.1
3.1.5.1 states “The motorized vehicle gate located next to the ECF will only be operated by the EC without AECS.” Does the word “The” reference both the inner and outer gates located in the PL-1 sample problem?
Further clarification will not be provided
245 Attachment 8 3.1.2
3.1.5.1 states “The motorized vehicle gate located next to the ECF will only be operated by the EC without AECS.” Does the word “The” reference both the inner and outer gates located in the PL-1 sample problem?
Duplicate. See question 244
246 Attachment 8 3.1.2 Area 1: 3.1.2 states "The offeror is required to describe how they plan to maintain the RA security during construction". Can the government clarify what is meant by “maintaining the RA security”?
Further clarification will not be provided
247 Attachment 8 2.2.2
Instructions for Page Size and Format states “Tracking, kerning, and leading values shall not be changed from the default values of the word processing or page layout software.” Default values do not provide proper spacing for all styles. May we set standardized styles with single spacing for paragraphs and headings?
Please refer to 2.2.2 for required instruction on page and format
ATTACHMENT L-1
2.1.9.d
In Attachment L-4 instructions, it states that drawings “Be created no larger than D size in native format and be provided in PDF format (with up to 50% reduction for incorporation into an 8 ½ x 11 hard copy package).” Can we print drawings on 11x17 size paper which is 50% reduction of D size?
Clarification forthcoming in amendment
Attachment 8, Sample
Problem, Attachment 3
There are many columns required to be added into the IMS in addition to printing a full Gantt chart to display the schedule information requested in the instructions. Can we generate the IMS’ PDF on D size layout and reduce to print at 50% reduction on 11x17 size paper?
Clarification forthcoming in amendment
Attachment 1, Section
3.0 Applicable
Documents
Two documents listed in 3.0 Applicable Documents were not found on the referenced website. Please provide the proper link for the following standards and specifications: ICS 705-2 Intelligence Community Standard and IC Tech Spec-ICD/ICS 705 Sensitive Compartmented Information Facility (SCIF) for ICD/ICS 705 Security Guidance
Incorrect link. Should be https://www.dni.gov/index.php/ncsc-home
Clarification will be in forthcoming Amendment.
Attachment 8, Section
4.4.4
“Also, when the offeror extends the CWBS below levels identified in Attachment L-4, the offeror must amend the WBS dictionary to provide definitions at these lower levels.” The Tech Vol Section L instructs Offerors to amend the WBS dictionary to provide definition at extended lower levels of the PWBS. Should the amended Section J: Attachment 6 CWBS dictionary be included in VOL III Contract Documents in addition to including the extended WBS Dictionary in VOL II Sample Problem Attachment 4 WBS?
Sample Problem WBS is only applicable to the Sample Problem and not to be included in VOL III Contract Documents
254 Attachment 8, 5.1 Page 14
The instructions state to “Fill in all blanks in the Model Contract and in Sections A through K with either specific information or with “N/A” as applicable.” Should blanks be filled in for Sections that are not applicable until DOs are issued? For example, does “N/A” need to be added to all blanks in Section B?
Clarification will be in forthcoming Amendment.
255 Attachment 8, 4.4.4 Page 13 States “Also, when the offeror extends the CWBS below levels identified in Attachment L-4, the offeror must amend the WBS dictionary to provide definitions at these lower levels.” WBS Dictionary definition are not provided for PWBS level 3. Should the offeror provide definitions for PWBS level 3 and all other levels added to the PWBS?
Clarification forthcoming in amendment
256 Attachment 8, 3.0 Page 10 Executive Summary Instructions state “In the Executive Summary volume, the offeror shall provide a master table of contents and a summary of the offeror.” Was this meant to say summary of the offer or summary of the offeror, e.g. company capabilities?
Correct as written; asking for summary of offeror.
257 Attachment 8 3.1.6
Area 1 Sample Problem requirements in Section 3.1.6 state “Design a communication network interface (only network interface to this building, no IDS/IVA)” Does the government require the offer to provide Access control for SCIF Entry or any other part of Building 910?
The Government will not provide information that may give insight into a Sample Problem solution. See Section L Attachment 1 Para. 3.1.6
Attachment 8 PL-1
Area Layout
Area 1: Does the government require additional Access control for the inner Turnstile? Will the inner turnstile be only controlled by the guards as the Vehicle gates are?
The Government will not provide information that may give insight into a Sample Problem solution. See Section L Attachment 1 Para. 3.1.5.1
259 Attachment 8 2.1. 2
Sample Problem assumptions in Section 2.1 provides average seasonal storm precipitation but does not provide the environmental temperature range. Can you please provide the temperature range required for sample problems?
Temperature range not necessary to answer Sample Problem.
Attachment L-1 Sample Problems
Instructions and FPS4 Responses to
Questions Posting 1
L-1 Paragraph 2.2 and Question 26 response
Attachment L-1 and the response to Question 26 appear to indicate a requirement to actually configure a network switch and use that configured switch to produce a configuration file. Does that accurately represent the requirement?
The Government will not provide further information
261 Attach L-1 Paragraph 3.1.2 Is a replacement fence required? If so, are any components of the existing fence re-usable?
The Government will not provide information that may give insight into a Sample Problem solution. See Section L Attachment 1 Para. 3.1.5.1
262 Attach L-1 Paragraph 3.1.5 Is the IDS system required to be fully independent of the AECS? The Government will not provide information that may give insight into a Sample Problem solution.
263 Attach L-1 Paragraph 4.4.2 Will the systems proposed inherit any security controls from any existing system security plans and, if so, what are those controls?
The Government will not provide further information
264 Attach L-1 Paragraph 2.2 Does every network segment require encryption? The Government will not provide information that may give insight into a Sample Problem solution.
265 Attach L-1 Paragraph 2.2 What encryption algorithms are acceptable? The Government will not provide information that may give insight into a Sample Problem solution.
266 Drawings Drawing 500 What is the name and management IP information for the IE-4000 switch located in Area 2-IDB 697?
Refer to respective drawings
267 Drawings Drawing 500 What is the name and management IP information for the IE-4000 switch located in Area 3Building 500, Room 30?
Refer to respective drawings
268 Attach L-1 Paragraph 2.2 What is the required security categorization for these systems? Unclear question
269 Attach L-1 Paragraph 2.2 Is the offeror required to include RMF activities in the proposed sample task plan and, if so, what are the durations of required USAF reviews?
No RMF activity is required for the sample problem
270 Attach L-1 Paragraph 2.2 What USAF reviews are required for design submittals and what are their durations?
Information forthcoming in Amendment.
Network Configs.docx, RT-A3-500
RT-A2-697
interface GigabitEthernet0/0/1
The VPN1-IN access-list is referenced on both RT-A3-500 and RT-A2-697, on the physical interfaces for the tunnel, but the access-list is not defined. The exact command this question is referencing is "ip access-group VPN1-IN in load-interval 30". We respectfully request that the Government provide the requisite VPN1 access-list configuration.
Requested information is contained in the config file.
400) Rack Drawings, BUILDING 500, BDOC, BADGING
Communication Racks (BOM table)
The BOM provided in the Rack Drawing package lists the model of SW-A3- 500 only as WS-C3850-48 but does not specify the full part number; thus, we do not have information as to which Feature Set is running on the switch. Will the Government please specify the Feature Set [IP Base (-S), IP Services (-E)] for this switch?
Information will be provided in forthcoming Amendment
Network Configs.docx, A3-IDB-500
Interface Configurations:
GigabitEthernet1/1 GigabitEthernet1/5
On switch A3-IDB-500, interface GigabitEthernet1/5, the description is listed as "link to RT-A3-500," but the drawing shows that G1/1 is the link to router and G1/5 s the link to the Alarm board. Please confirm that the drawing, not the interface description in the network configuration, shows the correct connectivity for GigabitEthernet1/1 and GigabitEthernet1/5 on switch A3-IDB-500.
Information will be provided in forthcoming Amendment
Network Configs.docx, A2-IDB-697
Interface Configurations:
GigabitEthernet1/1 GigabitEthernet1/5
On switch A2-IDB-697, interface GigabitEthernet1/5, the description is listed as "link to RT-A2-697," but the drawing shows that G1/1 is the link to router and G1/5 as the link to the Alarm board. Please confirm that the drawing, not the interface description in the network configuration, shows the correct connectivity for GigabitEthernet1/1 and GigabitEthernet1/5.
Information will be provided in forthcoming Amendment
Network Configs.docx, A2-IDB-697
A3-IDB-500
NTP Section On switches A2-IDB-697 and A3-IDB-500, within the NTP configuration section, the following statement is included: "ntp access-group peer 11";
however, no access-list 11 defined. Please provide the access-list 11 configurations for both switches.
Information will be provided in forthcoming Amendment
Network Configs.docx, RT-A3-500
GE 0/0/3
Area 3: The network configuration for the RT-A3-500 shows only GE 0/0/0, GE 0/0/1, and GE 0/0/2. GE 0/0/3 is not shown in the configuration file, but the drawings show a connection to the SSO IDS server on GE 0/0/3.
Please confirm that GE 0/0/3 should be included, connected to the SSO IDS server.
Information will be provided in forthcoming Amendment
278 Section 3.2 paragraph 1 Area 2: In section 3.2, first paragraph, Building 500 is discussed as being a part of Area 2. Please confirm that this is a typo and should reference Building 700 (Hangar).
Clarification will be in forthcoming Amendment.
Small Business
Subcontracting Plan 5.2.4
The successful offeror will be required to provide reports on subcontractor participation in accordance with FAR clause 52.219-25 in Section I of the contract. FAR Clause 52.219-25 is obsolete and no longer a requirement.
Can the government remove this clause from Section L 5.2.4?
See Forthcoming Amendment.
Small Business
Subcontracting Plan 5.2.4
Basis for subcontracting plan goals. Per FAR 52.219-9 (d)(2) offeror’s are to provide a statement of total dollars planned for each small business category in addition to goal percentages. As there is no pricing for this proposal, can the government provide an estimated contract value so offerors have a basis for subcontracting dollar goals?
See Section L para. 1.1 Table 1.
Attachment 8, Page 10
Attachment 8, Page 17
Attachment 9
Section L Para 4.2
M002 a.
Section L, Para 4.2 refers to the Format and Specific Content for the submission, and indicates that “In this volume, your proposed approach shall map to the Technical Factor identified in Section M”. However, the instructions outlined beginning in Attachment L-1 (Sample Problem Instructions) do not directly follow the Evaluation Factor outline presented in M002. Does the Government’s use of the word “map” indicate that the volume structure should directly follow the structure of the outline in M002 to facilitate the Government’s evaluation process, or does “map” refer only cross-referencing to M002 within our response? – i.e. can the Technical Volume Outline follow the CWBS structure with references to the M?
Clarification will be in forthcoming Amendment.
Section 7 of ESE-SIT-
Section 7 of ESE-SIT-0001 calls out 6 types of lighting, all of which are obsolete for the Sample Problem requirements. Will the government accept using Light Emitting Diode (LED) technology? All light forms are permitted unless otherwise prohibited by AFI 31-101
FBO.gov FPS4 Opportunity page
The following statement was posted on FBO.gov on June 28 with the first posting of responses to questions: “The Government has determined the deadline for all questions submitted will be NLT Friday, 05 July 2019 1600
EST.” Will bidders be afforded the opportunity to ask questions arising from future Amendments and final responses to questions? Significant changes in proposal requirements may require further clarification or request for due date extension.
Clarification will be in forthcoming Amendment.
FBO Posting: FPS4 Responses to Questions
(Posting #1), Jun 28, 2019 2:27pm
Given the revised RFP has not yet been released, does the government intend to extend the deadline for questions? Industry is unable to review the revised RFP before questions are due.
Clarification will be in forthcoming Amendment.
286 Sample Problem How many cameras are presently located at area 2 for the sizing of NVR? Clarification will be in forthcoming Amendment.
287 Sample Problem What is the total FDB (field distribution box) alarm point count at area 2?