This final request for proposal (RFP) solicits solutions for force protection site security systems. Offerors are to provide integrated security solutions for three sample problem areas, including intrusion detection systems, access control, video management systems, and communications infrastructure. Proposals must address technical and management approaches for all aspects of the sample problems, as well as life cycle support plans. The RFP includes attachments outlining sample problem requirements, evaluation criteria, and instructions for preparing and submitting proposals. The closing date for receipt of proposals is listed as September 15, 2022.

The Government is posting the 6th and final FPS4 CRM.

View the file

Other files for this federal contract opportunity

Other files attached to Force Protection Site Security System Solutions (FPS4) Final Request for Proposal (RFP), newest first.
File Type Posted
RFP_FPS4_Amendment_0005_Cover_Letter.pdf PDF
FA8730-19-R-0005_0005.pdf PDF
FA873019R0005_Amd_0004_Ltr_(correction).pdf PDF
FPS4_ICS_CLS_PWS_change_page.pdf PDF
FA8730-19-R-0005_0004.pdf PDF
FA873019R0005_Amd_0004_Ltr.pdf PDF
AMD_0004_Network_Configs_-_change_page.pdf PDF
AMD_0004_Atch_8_Section_L__change_page.pdf PDF
FPS4_CRM_Posting_Number_7.pdf PDF
400)_Rack_Drawings_-_Update.vsd VSD drawing
500)_Network_Diagram_-_Update.vsd VSD drawing
FPS4_CRM_Posting_Number_5.pdf PDF
DD254.pdf PDF
SF33.pdf PDF
Section_K.pdf PDF
FPS4_CRM_Posting___4.pdf PDF
500)_Network_Diagram_-_Update.pdf PDF
Atch_9_Section_M_Amend_3_change_pages.pdf PDF
FA8730-19-R-0005_0003.pdf PDF
AMD_0003_Atch_8_Section_L_.pdf PDF
AMD_0003_Atch_1_SOW_change_pages.pdf PDF
AMD_0003_Atch_7_PWS_change_pages.pdf PDF
RFP_FA873019R0005_Amendment_0003.pdf PDF
Attachment_6_OCONUS_SPECIFIC_TERMS_AND_CONDITIONS.pdf PDF
Drawings_Package_-_Change_Pages.zip ZIP file
FA873019R0005_A0002.pdf PDF
FPS4_CRM_Final_RFP_FBO_Posting__3.pdf PDF
FPS4_Responses_to_Questions_(Posting__2).pdf PDF
Request_for_Proposal_(RFP)_FPS4_Amendment_0001.pdf PDF
FPS4_Responses_to_Questions_Posting__1.pdf PDF
FPS4_Model_Contract_FA8730-19-R-0005.pdf PDF
FPS4_Request_For_Proposal.pdf PDF
Drawings_Package.zip ZIP file
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

No. Reference Pg. # Para. # Contractor Question Government Response

305 3.1.10 Area 1 Power

A 480 VAC 3 phase, 60 Amp. power panel is to be used for all area 1 Sample Problem lighting needs. It is located in building 904 (ECF), room 103. Can this power also be used for the IDS/IVA system? Also is it on generator backup? See Section L, Attachment L-1 Sample Problem paragraph 2.1.11.

306 3.1.10 Area 1 Power

In area 1 is there power available at the five storage bldgs. B922-B914 and Bldg 910? Also will it be on generator backup? Requested power availability information is not provided. See

Section L Paragraph 4.4.1 "Explain in sufficient detail, the rationale for the design including supporting infrastructure …" See Section L, Attachment L-1 Sample Problem paragraph 2.1.11.

307 3.2.7.4 Area 2 Hangar Power Is the power in area 2 Hanger bldg. 700 room 120 on generator backup?

See Section L, Attachment L-1 Sample Problem paragraph 2.1.11.

308 Attachment 8 12 Attachment 3, IMS

In Amendment 3, the Government has now included the requirement for contractors to outline planning, resources, and activity timing for the sample project design phase through installation and verification. Amendment 3 added language stating “…assume no Government vector checks will be required.”

Should the Government’s language in Attachment 8, page 12, Attachment 3 – Integrated Master Schedule (IMS) which states “…assume no government vector checks will be required” be interpreted to imply that the IMS should not include time or resources for design review milestones such as described in SOW section 2.2.3.2.2?

Correct.

309 Attachment 8 12 Attachment 3, IMS

Amendment 3 added the following: “In addition to providing a MS Project file, print a Gantt Chart displaying the following columns: Indicator (notes, information), ID, CWBS, Task Name, Duration, Predecessor, Successor, Start, Finish, Resource, and Timeline.”

May contractors eliminate the ID column between Indicator and CWBS since MS Project automatically prints the schedule’s ID column as the first, far left column?

This will prevent duplication and provide additional schedule spacing.

Section L paragraph 4.4.4, Attachment 3 remains unchanged.

310 Attachment 8 18 Attachment L-1, 2.1

Item #4 strikes the “Construction for the Sample Problem …” replacing it with “The Sample Problem begins ….”

Request the Government provide the Sample Problem award date to support planning and scheduling.

No further information will be provided.

311 Attachment 8 45-46 Attachment L-4

CWBS

Amendment 3 added WBS element 1.5, Verification – System Test and Evaluation with WBS sub-element 1.5.1, Contractor Verification Test & Evaluation (CVT).

On the following page the Government Contract WBS Dictionary outlined the definition for CVT and assigned it as WBS 1.5, but omitted the WBS Dictionary Definition for Verification. In addition, there is no WBS sub-element specified for Government Acceptance Testing.

• Is it the Government’s intent to have contractors develop the definition for element 1.5 Verification?

• Is it the Government’s intent to omit contractor support of Government Acceptance Testing and therefore, essentially end the project at the conclusion of

CVT?

No further information will be provided. See Section L paragraph 4.4.4, Attachment 6.

312 3.2.4 Area 2 Access Control There are 5 doors in the Bldg 700 hangar. Are all 5 doors required to have a maglock device?

The government will not provide information that may give insight into a Sample Problem solution.

1. Would the Government please advise as to how offerors shall access the following documents:

AF LIFE CYCLE MANAGEMENT CENTER (AFLCMC), HANSCOM AFB

IBDSS/ESE Security Classification Guide Integrated Base Defense Security Classification Guide System /Electronic Security Equipment (IBDSS/ESE) Security Classification Guide Classification Guide Nuclear Weapons Security program Classification Guide Non-Nuclear IDSEL Non-Nuclear Intrusion Detection System Equipment List Nuclear IDSEL Nuclear Intrusion Detection System Equipment List Supply Chain Risk Integrated Base Defense Security System Program Supply Chain Risk Management (SCRM) Plan IBDSS SSP Integrated Base Defense Security System Security Plan SF Guide Security Forces Guide to Cybersecurity for IBDSS IDS Performance Specs Intrusion Detection System Performance Specifications TASS Performance Specs Tactical Automated Security System ESE-SIT-0001 Standardized Electronic and Security Equipment Siting and Design Guidance for Permanent Installations FA8730-19-R-0005 0003, Attachment 1, Page 14 (Copies of the above documents are available from Force Protection Division

The listed documents will not be provided because they are not required for completion of the sample problem.

The RFP contains AFFARS clauses 5352.209-9000 (OCT 2010) and (OCT 2010)

– ALTERNATE V (OCT 2010). Those clauses were superseded by Policy Memo 10-C-15). Would the Government please provide the full text of the revised clauses in accordance with the interim change?

Full text of clauses incorporated by reference can be viewed at Acquisition.gov - https://www.acquisition.gov/browse/index/far

Volume III – Contract Documentation requires that offerors provide a signed copy of the SF33 and Sections A through K. A conformed copy of the model contract, Sections A through K was not provided in Amendment 3, rather some revised sections were provided in their entirety, some change pages were issued and some sections were not provided at all. Would the Government please provide a conformed copy of the entire model contract that shall be included in Volume III?

If not, would the Government confirm the following shall be included:

a. Section A SF33 as of Amendment 3

b. Section B as of Amendment 3 (change pages) and Original RFP

c. Section C as of Original RFP

d. Section D as of Original RFP

e. Section E as of Original RFP

f. Section F as of Original RFP

g. Section G as of Original RFP

h. Section H as of Original RFP

i. Section I as of Amendment 3 (change pages) and Original RFP

j. Section J

i. Exhibit A CDRLs as of Original RFP

ii. Attachment 1 SOW as of Amendment 3 (change pages) and Original RFP

iii. Attachment 2 DD254 as of Amendment 3

iv. Attachment 3 Labor Cats as of Original RFP

v. Attachment 4 WBS as of Original RFP

vi. Attachment 5 SB Subcontracting Plan as of Original RFP

vii. Attachment 6, OCONUS specific Ts & Cs as of Amendment 3

viii. Attachment 7, PWS as of Amendment 3 (change pages) and Original RFP

ix. Attachment 8, Section L as of Amendment 3

x. Attachment 9, Section M as of Amendment 3 (change pages) and Original RFP

k. Section K as of Amendment 3

Due to an issue with our Contract Writing System, a conformed copy of the model contract is not available. Unsecured versions of the SF33, Section K and the DD254 were previously posted to FBO. Required proposal submission instructions can be found at RFP attachment 8, Information for Proposal Preparation.

316 3.3

For the purpose of this Sample Problem, the offerors shall assume that all BDOC IDS, IVA, and VMS equipment described in the existing communications topology is NOT usable for the Sample Problem solution.”

Does the Government intend that the existing IDS/IVA/ACS servers/equipment will remain in place and be consolidated into the sample problem Network design?

The government will not provide information that may give insight into a Sample Problem solution.

317 3.3

For the purpose of this Sample Problem, the offerors shall assume that all BDOC IDS, IVA, and VMS equipment described in the existing communications topology is NOT usable for the Sample Problem solution.”

Is all the Network Equipment listed in the network design Drawings to be considered existing and can be used in the sample problem network?

The government will not provide information that may give insight into a Sample Problem solution.

318 SOW PL-2

Existing fence and BLS sensors are on PL-2 approved list: where are the Fence sensor processors located?

The government will not provide information that may give insight into a Sample Problem solution.

319 SOW PL-2

Existing fence and BLS sensors are on PL-2 approved list: Where is the Omnitrax processor located?

The government will not provide information that may give insight into a Sample Problem solution.

320 Attachments Updated Network diagram was provided in PDF format only; will the Government please provide the VISIO files? VISIO files have been posted.

321 Model Contract

Please release a fully conformed RFP in PDF format (does not need to be editable), inclusive of all changes via amendments 1 through 3, for Sections B-I. We request this be released sometime before September 1.

Due to an issue with our Contract Writing System, a conformed copy of the model contract is not available. Unsecured versions of the SF33, Section K and the DD254 were previously posted to

FBO.

Attachment 8 26 3.2

As stated Area 2 is not manned 24 hours, seven days a week. What sensor is being used to secure this Sector for ECP entry, and what FDB does this report to

(FDB1 or FDB6)?

The government will not provide information that may give insight into a Sample Problem solution.

Attachment 8 26 3.2

Funtional IVA system for Area 2 has been removed from the SOW. Is there adequate power available at the FDB level to handle the fixed cameras required around the Area 2 perimeter?

Requested power availability information is not provided. See Section L Paragraph 4.4.1 "Explain in sufficient detail, the rationale for the design including supporting infrastructure…" See Section L, Attachment L-1 Sample Problem paragraph 2.1.11.

Attachment 8 26 3.2

States that Area 2 IDS/IVA system shall annunciate in the BDOC (Room 101 of Building 500). This location is the communications room of Building 500, should this instead be room 100 of Building 500?

A forthcoming Amendment will correct typographical error to correct room number to 100..

325 Attachment 8 32 3.3.2

Statement that the entire building 500 facility has existing backup power of sufficient capacity for all equipment necessary for this sample problem was removed. However, in the chart Section 3.3.4 it states building 500 120VAC1P power is supplied by a standby/emergency generator with sufficient capacity for the projected loads of the new BDOC. Please clarify if backup power is provided at this location, this will affect UPS battery requirements.

Section 3.3.4 is correct as written.

Attachment 8

3.1.6 21

Area 1 Sample Problem requirements in Section 3.1.6 state “Design a communication network interface (only network interface to this building, no

IDS/IVA)”

Does the government require the offer to provide Access control for SCIF Entry or any other part of Building 910?

Section 3.1.6 is correct as written.

327 Attachment L-1 3.1.10 provides new details for an existing power panel in B904 but says it’s to be used for the “… area 1 Sample Problem lighting needs”. There is no mention of how the FDBs or the storage buildings (IDBs) get power. Is this power panel only to be used for the lighting or can it also be used to provide power to the Area 1

FDBs/IDBs? If the panel is to be used for lighting only, where then is the power panel located for the FDB/IDB power?

No further information will be provided. See Section L paragraph 4.4.4, Attachment 6.

328 N/A N/A N/A Requests a 10 day extension to the proposal due date, due to the multiple releases of solicitation updates that must be factored into our proposal response Government will not extend RFP response date.

AFLCMC’s response to

Question #68 provided in Posting #4

In Question #68 offeror requested that specific levels of ICS support and performance objectives be provided to clarify the topic’s to be addressed in the

ICS technical response (section L, Paragraph 4.4.3). The government response to this request was “information forthcoming in Amendment”. However, subsequent Amendment did not make any changes to section L with regards to specific levels of ICS support and/or performance objectives for the Sample Problem. The only changes related to Sustainment/ICS were the deletion of SOW (Attachment 1) and PWS (Attachment 7) which provided the holistic set of sustainment activities under the contract from which requirements the government would select on an individual

DO basis.

Does the Government require the ICS Narrative (section L, Paragraph 4.4.3).)

response to address complete sustainment support including Help Desk, sustainment engineering, spares/warehouse management, system administration, Technical manuals, training and sparing concepts or simply to address our approach for Organizational level onsite maintenance of LRU’s and Depot level Maintenance through management of OEM repair or replacement?

1st Paragraph - See Amendment 0003 Section M revisions.

2nd Paragraph - See Section L para. 4.4.3 for the level of information required for ICS.

330 Attachment L-1 Paragraph 2.2 and 3.1

Attachment L-1, Paragraph 2.2 has been revised to state “For the purpose of the Sample Problem, all “Alarm Panels” depicted in the Government supplied network diagram documentation shall be considered non-compliant for use”. However, Attachment L-1 paragraph 3.1.6 requires offerors to “Design a communication network interface (only network interface to this building, no IDS/IVA) to this

SCIF facility”.

Since the new SCIF network must be integrated with the GFE alarms/IDS/IVA recently installed in the newly constructed SCIF. Please confirm that this GFE is considered compliant for use with the new network design.

Sections 2.2 & 3.1.6 are correct as written. Also see response to previously posted Question Number 72 in Posting 3.

331 Attachment 8 12 4.4.4 What does the government mean by “no vector checks will be required”? Does this refer to network intrusion attempts or some other form of testing?

"no vector checks will be required” as referenced in Section 4.4.4.

Attachment 3 - IMS refers to not needing to include Government verification steps and Government Testing in the IMS

332 Attachment 8 12 4.4.4 Does the government want the IMS to include any other DESIGN & VERIFICATION PHASE deliverables (CDRLs) other than A023? Provide only what is required in CRDL A023.

333 Attachment 8 28 3.2.7.1

This section states, “The offeror shall design a fiber optic cabling communications network as necessary to Field Distribution Boxes (FDB) around the RA perimeter and for building 700 (hangar).” However, in section 3.2.7.2 Area 2 – Available Communication Lines, subsections 3.2.7.2.4 Building 700 (Hangar) and 3.2.7.2.5

Six Perimeter FDBs (FDB 1-6) state that there is available fiber reserved for use in related areas. Our interpretation is that we should use cables in place, and that no fiber optic cabling design or installation is required for Area 2. Is that correct?

The government will not provide information that may give insight into a Sample Problem solution.

334 Attachment 8 22 3.1.5.1 This section states, "The ECF personnel portals shall be Architectural Barriers Act (ABA) Article 404.3 compliant." Our interpretation is that Area 2 and Area 3 are already ADA compliant. Is that correct?

335 Attachment 8 31 3.3

Section 3.3 does not state how many fiber strands are available for use, but the drawings for Building 500 between Comm room 101 and SSO office (room 30) show 12 strands. Our interpretation is that all 12 strands are available for use for this Sample Problem. Is that correct?

The government will not provide information that may give insight into a Sample Problem solution.

336 Attachment 8 19 2.2 Our interpretation is that 256-bit AES encryption strongly preferred--but not required--for all MACSEC links--and that 128 bit would be acceptable if 256 is not available. Is that correct?

The government will not provide information that may give insight into a Sample Problem solution.

337 Attachment 8 11 4.4.4 Our interpretation is that no part of the existing Sample Problem network infrastructure is considered base NIPR. Is that correct?

The government will not provide information that may give insight into a Sample Problem solution.

338 Attachment 8 Dawings Package

The description on the interface to the VMS is shown as WUG-M. Is this the correct description and, if so, what does it stand for? Are there any other services that are included on the attached server?

A forthcoming administrative Amendment will correct typographical error for incorrect labeling. Network Configuration SW-A3-500 G1/0/05 will be corrected to VMS.

339 Attachment 8 31 3.3

This section states, "assume that all BDOC IDS, IVA, and VMS equipment described in the existing communications topology is NOT usable for the sample problem solution." Our interpretation is that the IDS server, SSO IDS server, and

VMS server currently shown in the network architecture drawings are still connected to the interfaces they are currently shown to use in the network drawings and that these servers can still be utilized as part of the solution to the Sample Problem. Is that correct?

The government will not provide information that may give insight into a Sample Problem solution.

340 Attachment 7, PWS (original) 155 of 253 3.2.4

The last sentence in the paragraph appears to be incomplete. It states "Depot shall furnish all required serviced labor tools, material and equipment necessary to manage and provide Depot Level ICS/CLS for all contractor furnished and installed level maintenance shall consist of the activities described below:" Please clarify what is missing between "furnished and installed" and "level maintenance."

A forthcoming administrative Amendment will correct PWS to "...for all contractor furnished and installed equipment, infrastructure and integrated GFE to provide level maintenance which shall consist of the activities described below."

341 Attachment 8, Section L (Amd 003)

Attach 8 pg.

31 3.2.7.5

Revised document has a blue bar in left margin indicating that the PL-2 Hangar (Area 2) Layout drawing changed. Text labels in the drawing consist of "xxxxx" and are not legible. A revised drawing was not provided with the Amendment 003 package. Please confirm that the original Area 2 drawing is still accurate and correct or provide a new drawing file in PDF and Visio formats.

Refer to the Drawings Package.

Section L changed to accurately reflect drawings package.

342 Q&A Responses (round 3) 6 of 21 #172 Response references Table 2.2 of Section L (Attachment 8). No such table found in Attachment 8. Please confirm whether this is intended to be Table 2 under 3.2.7.5.

If not, please clarify reference.

CORRECTION TO Q#172 RESPONSE: The response should have simply stated See forthcoming Amendment. Please disregard previous response to question 172, including references.

The original question (172) referenced Section L Paragraph 4.4.3 and Section M Paragraph 4 (M002 a4). See Amendment 0003 Section M revisions for clarification.

343 Attachment 8, Section L (Amd 003)

Attach 8 pg.

22 3.1.5.1

The opening sentence of the paragraph states to design an Automated Control System (ACS) for personnel at the Entry Control Facility (building 904) that complies with AFI 31-101, Section 7.7 for a PL-1 site. The sentence uses the acronym ACS for Automated Control System is ACS. This creates ambiguity because Attachment L-7 defines the ACS acronym as Access Control System and AFI 31-101 uses the ACS acronym for agile combat support. Furthermore, AFI 31- 101 does not contain any references to Automated Control System. Shall offerors assume that the Automated Control System (ACS) referenced herein (3.1.5.1) that offerors need to design is the same as AECS referenced in AFI 31-101 7.7.1? If not, please clarify requirements.

Reference Acronym Listing (page 52) as Access Control System.

344 Attachment 8, Section L (Amd 003)

Attach 8 pg.

21 3.1.1

First bullet in the paragraph list requires that the IDS conform to AFI 31-101 Section 7.7.1. This section pertains to Implementing Entry and Circulation Control Procedures for Restricted Areas, PL 1 and PL 2 Areas and does not appear to be relevant to IDS. Please clarify requirement.

The government will not provide information that may give insight into a Sample Problem solution.

345 Attachment 8, Section L (Amd 003), Q&A Responses

Attach 8 pg.

25; Q&A

3.1.10, #15, 20, 49, 50, 51, 96

Question 15, 20, 49, 50, 51, and 96 response stated that Area 1 power sources would be clarified in a future amendment. The amendment appears to have only clarified the location of available power for lighting. Please clarify where power (to include service size) for other than lighting is available.

The government will not provide information that may give insight into a Sample Problem solution.

346 Attachment 8, Section L (Amd 003), Q&A Responses

Q&A, Attachment L-

#270. 2.2 Question 270 regarding submittal reviews and review duration does not appear to answered in Amendment 03. Please clarify. See Section L, page 12, Attachment 3.

347 Attachment 8, Section L (Amd 003), Q&A Responses

Q&A, Attachment L-

#270. 2.2 Question 270 regarding submittal reviews and review duration does not appear to answered in Amendment 03. Please clarify. See Section L, page 12, Attachment 3.

348 Attachment 8 3.2.1.1

“Area 2 Detection — RA Boundary LOD (Fence Line/BLS),” the RFP states that “the existing fence sensor system is a fully compliant DeTekion system…”. Which

DeTekion system is being referenced here? There are two DeTekion fence line systems on the AEL.

The government will not provide information that may give insight into a Sample Problem solution.

349 Attachment 8 3.1.12 , “Area 1 IDS, IVA, ACS, and CCDE,” contradicts Section 3.1.5.1, “Area 1 RA Perimeter Access Control.” Should Entry Control personnel have the ability to control portals?

The government will not provide information that may give insight into a Sample Problem solution.

350 18, 22 Attch. 8, 2.1, item 6, and 3.1.6

Offerors are instructed for to follow ICS 705-1 Section G for IDS and ACS for SCIFs. However, para 3.1.6 instructs offerors to only design a communication interface (only network interface to this building, no IDS/IVA). Which statement takes precedence? One statement calls for IDS/ACS etc. but the other only references the network interface.

Clarification for what work needs to be performed.

Sections 2.2 & 3.1.6 are correct as written. Also see response to previously posted Question Number 72 in Posting 3.

351 24 - 25 Attch. 8, 3.1.10

States a 480VAC 3 Phase, 60 amp power panel is to be used for all Area 1 sample problem lighting needs. Does this mean that this panel can only be used for lighting and not for the power network for FDBs around the perimeter as is stated in 3.1.10? What panel can we use for the FDB power network? Is there a 120V panel available in Bldg. 904 ECF?

Clarification on what panels can be used for part of the design and what other panels are available.

No further information will be provided. See Section L paragraph 4.4.4, Attachment 6.

352 26 Attch. 8, 3.2

Is the PL-3 facility in Area 2 Requirements located in Building 700? What sectors are these IVA cameras utilized for? If these cameras are being utilized for IVA at the perimeter boundary or Building 700, is the purpose of this statement to replace the cameras with fixed cameras to provide recorded pre-alarm video?

Verifying if the purpose of these cameras is for actual perimeter IVA or only as surveillance

The government will not provide information that may give insight into a Sample Problem solution.

353 26 Attch. 8, 3.2

Current IDS infrastructure has IVA at the fence line. Can the Government please provide the quantity of cameras, the frame rate, and resolution of the cameras used for IVA?

Specs are needed for video recording since CCDE equipment is obsolete

The government will not provide information that may give insight into a Sample Problem solution.

354 28 Attch. 8, 3.2.7.1

– 3.2.7.6 & 3.2.7.2.7

States “offeror shall design a fiber optic cabling communication network as necessary to FDB and for Bldg. 700 (hangar)” and “Eight manholes with two empty 4” conduits between each.” However, the following paragraphs (3.2.7.2.1 – 3.2.7.2.6) state there is already existing fiber available and for use. Is the statement directing the offeror to install more fiber in the empty conduits or only install fiber if it is needed?

Clarification on what work the Government desires to be accomplished.

355 28 Attch. 8, 3.2.7.2.4

States “the hangar comm. Rm. 101 has a 24 strand single mode run between 700 and Bldg. 698 comm. Rm 101. Two strands have been reserved” Previous

Drawing Package 500) Network Drawing shows there is a 12 strand between 700 Rm. 101 and bldg. 699 Rm. 101

Clarification on what fiber is available and what buildings it lands in.

The government will not provide information that may give insight into a Sample Problem solution.

356 28 Attch. 8, 3.2.7.2.2

Since Bldg. 697 is currently utilizing (1) strand of fiber for the router, does this statement read that (2) fibers are available plus what is currently allocated so a total of 3 fibers. Or does it read that (2) fibers are available minus what is currently allocated, so only 1 fiber is available?

Clarification.

2 strands are available and reserved for use as stated in 3.2.7.2.2 in Section L.

357 31 Attch. 8, 3.3

Area 3 BDOC has 12 strands of fiber between the BDOC and the SSO office. But there is no mention of this fiber in section L. The only place it is referenced is the previous Drawing Package, 500) Network Drawings. If this fiber exists, are there spare strands available for use?

Clarification on what fiber is available and what buildings it lands in.

The Sample Problem is correct as written.

358 33 Attch. 8, 3.3.4

Building 500 has a standby/emergency generator tied into the existing power system for the BDOC. Is there an existing stand-by/emergency generator for Area

1 and 2? AFI 6.3.13 states that IDS will have an alternate power source using stand-by generators and/or batteries. CCTV and lighting do not require battery backup but require stand-by generator backup.

Clarification on the availability of backup power for these sites.

The government will not provide information that may give insight into a Sample Problem solution.

359 27 3.2.1.1 How is the existing DeTeckion and Senstar Omnitrax system zoned? The government will not provide information that may give insight into a Sample Problem solution.

360 27 3.2.1.1 Where are the DeTeckion and Senstar Omnitrax processors located? The government will not provide information that may give insight into a Sample Problem solution.

361 27 3.2.1.1 How much room is in the existing FDBs This information is not necessary to answer the Sample Problem.

362 27 3.2.1.1 How are the gate & turnstile areas sensored The government will not provide information that may give insight into a Sample Problem solution.

363 14 5.1

The requirement currently stated in Section L is to provide the Government-generated documents back to the Government as part of the model contract.

Presently, this would include Section A- K to include Section J Attachments 1-9.

In order to reduce the amount of paperwork submitted to the Government, we recommend the Government only require Offerors to provide the Attachments that require ""fill-ins"" or are to be proposed by the Contractor, is this acceptable?

Required proposal submission instructions will remain unchanged and can be found at RFP attachment 8, Information for Proposal Preparation. Sections A through K do not include Sections L and M.

364 14 5.1

Currently the model contract file includes Section L and M as Section J Attachment 8 and 9, respectively. Section L and M are not part of the awarded contract. Is the government expecting the Offerors to only provide Section J Attachments 1-7 with the Model contract?

Required proposal submission instructions will remain unchanged and can be found at RFP attachment 8, Information for Proposal Preparation. Sections A through K do not include Sections L and M.

365 Attachment 8 25 3.1.10 Is the 480V 3phase 60A power the amount available for this exercise or is that the total capacity of building 904 after derating all existing loads? Please clarify if this service is backed up via generator and if so kVA of that unit?

366 Attachment 8 22, 25 3.1.5.2, 3.1.12

It states that the ECF Entry Controller and BDOC shall have remote capability to arm/disarm each facility independently in section 3.1.5.2 on page 22. But in section 3.1.12 page 25 it states the equipment in building 904 shall serve as a monitoring only service, with no operator input allowed. All area 1 IDS/IVA alarm acknowledgement, ACS control and IVA will be performed at the BDOC in building 500. Do you want Bldg 904 ECF to have the ability to arm/disarm the PL-

1 buildings alarms?

The government will not provide information that may give insight into a Sample Problem solution.

367 3.1.2 Are PL-1 Assets on site in Area 1 while the new fence and IDS solution for the RA is being built?

The government will not provide information that may give insight into a Sample Problem solution.

368 3.2.7.5 Does the rolling accordion door extend beyond the face of the building when opened?

The government will not provide information that may give insight into a Sample Problem solution.

369 3.2.7.5 What is the opening width of the hanger rolling accordion door when it is fully open?

The government will not provide information that may give insight into a Sample Problem solution.

370 Attachment 8 12 Offerors are directed to select equipment from Attachment L-1, Table 3-1. Please provide Table 3-1 or confirm that we are to use Table 6: IDSEL?

A forthcoming administrative Amendment will correct the typographical error to Table 6..

371 2.2 How are the alarm panels (boards) noncompliant? The government will not provide information that may give insight into a Sample Problem solution.

372 2.2 Are the alarm panels (boards) on the IDSEL but the firmware needing to be updated to be compliant?

The government will not provide information that may give insight into a Sample Problem solution.

373 2.2.a How will the network configuration files be evaluated? See Section M

374 Model Contract Will the Government release a fully conformed Solicitation (Sections A-M) in PDF (does not need to be editable)?

Due to an issue with our Contract Writing System, a conformed copy of the model contract is not available. Unsecured versions of the SF33, Section K and the DD254 were previously posted to FBO. Required proposal submission instructions can be found at RFP attachment 8, Information for Proposal Preparation.

375 Model Contract

RFP Section 5.0, Volume III – Contract Documentation requests offerors to fill in all blanks in the Model Contract and Sections A through K, as applicable, and submit with the proposal in order to provide information to the Government for preparing the contract document and supporting file, as a formal contractual offer to the Government.

The RFP Model Contract is protected using a password, and will not allow offerors to fill in the blanks.

In addition, the password protection prevents offerors from incorporating Amendment 0003 Section B change pages to the Model Contract, and the Section B change pages provided in Amendment 3 do not allow for a page by page replacement on the Model Contract due to pagination.

Would the Government please provide offerors a conformed RFP for the Model Contract that incorporates all changes and allows offerors to fill in the blanks as requested?

Due to an issue with our Contract Writing System, a conformed copy of the model contract is not available. Unsecured versions of the SF33, Section K and the DD254 were previously posted to FBO. Required proposal submission instructions can be found at RFP attachment 8, Information for Proposal Preparation.

376 WRT to electronic copies CD/DVDs - are USBs acceptable in lieu of the

CD/DVD

The Government cannot accept/use USBs. Refer to Section L, para 2.2.6.