AMD_0004_Atch_8_Section_L__change_page.pdf

PDF 104 KB Posted

Attached to
Force Protection Site Security System Solutions (FPS4) Final Request for Proposal (RFP) Federal contract opportunity
Solicitation number
FA8730-19-R-0005
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

About this file

This final request for proposal solicits solutions for force protection site security systems. Offerors are to provide details on intrusion detection and visual assessment equipment to be installed, including sensor coverage areas, camera fields of view, and access control system components. The proposal must include a list of equipment, integrated master schedule, and network diagrams depicting all new and existing communication infrastructure and paths. The solicitation seeks to improve security at two areas, including bringing a hangar facility to protection level two. The Department of the Air Force Materiel Command Lifecycle Management Center is the issuing agency, with proposals due on unspecified dates.

FPS4 Section L Change pages

View the file

Other files for this federal contract opportunity

Other files attached to Force Protection Site Security System Solutions (FPS4) Final Request for Proposal (RFP), newest first.
File Type Posted
RFP_FPS4_Amendment_0005_Cover_Letter.pdf PDF
FA8730-19-R-0005_0005.pdf PDF
FA873019R0005_Amd_0004_Ltr_(correction).pdf PDF
FPS4_ICS_CLS_PWS_change_page.pdf PDF
FA8730-19-R-0005_0004.pdf PDF
FA873019R0005_Amd_0004_Ltr.pdf PDF
AMD_0004_Network_Configs_-_change_page.pdf PDF
FPS4_CRM_Posting_Number_7.pdf PDF
FPS4_CRM_Posting_Number_6__Final.pdf PDF
500)_Network_Diagram_-_Update.vsd VSD drawing
FPS4_CRM_Posting_Number_5.pdf PDF
400)_Rack_Drawings_-_Update.vsd VSD drawing
Section_K.pdf PDF
FPS4_CRM_Posting___4.pdf PDF
DD254.pdf PDF
SF33.pdf PDF
500)_Network_Diagram_-_Update.pdf PDF
AMD_0003_Atch_1_SOW_change_pages.pdf PDF
AMD_0003_Atch_7_PWS_change_pages.pdf PDF
RFP_FA873019R0005_Amendment_0003.pdf PDF
Attachment_6_OCONUS_SPECIFIC_TERMS_AND_CONDITIONS.pdf PDF
Atch_9_Section_M_Amend_3_change_pages.pdf PDF
FA8730-19-R-0005_0003.pdf PDF
AMD_0003_Atch_8_Section_L_.pdf PDF
Drawings_Package_-_Change_Pages.zip ZIP file
FA873019R0005_A0002.pdf PDF
FPS4_CRM_Final_RFP_FBO_Posting__3.pdf PDF
FPS4_Responses_to_Questions_(Posting__2).pdf PDF
Request_for_Proposal_(RFP)_FPS4_Amendment_0001.pdf PDF
FPS4_Responses_to_Questions_Posting__1.pdf PDF
FPS4_Request_For_Proposal.pdf PDF
FPS4_Model_Contract_FA8730-19-R-0005.pdf PDF
Drawings_Package.zip ZIP file
Show all 33

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8730-19-R-0005 0003, Attachment 8, Page 12

Include sufficient detail in both the Technical Volume and Installation Drawings that describe the following:

• Type, location, and orientation of all IDS / Immediate Visual Assessment (IVA) equipment to be installed.

• IDS sensor coverage areas and IVA / Surveillance camera Field of View (FOV) areas.

• Type, location and compliance details for all ACS equipment to be installed.

• All system integrations with GFE.

• All system communication infrastructure and configuration (new and GFE) shall:

o Identify critical new communication network components.

o Identify all existing communication infrastructure components.

o Identify all communication paths as to locations and mediums.

o Identify any and all new and existing communication interfaces.

o Identify and describe any and all network compatibility issues between system and existing networks and recommended fix actions.

o Describe network topology IAW Sample Problem CDRL A023 (Attachment L-5) instructions.

o Include a Network Interconnections spreadsheet IAW Sample Problem CDRL A023

(Attachment L-5) instructions.

o Include additional general communication requirements as described in Attachment L-1, section 2.2.

Attachment 2 – List of Equipment (LOE)

Provide a LOE that will be used in the solution to the Sample Problem. The LOE shall include the make, model and quantity of each new piece of equipment. The offeror shall not include equipment costs on the LOE. IDS sensor, CCDE, IVA assessment and camera equipment items in this list of must be selected from the IDSEL (Attachment L-1, Table 6).

The LOE shall separate equipment items selected from the IDSEL and other equipment proposed in the Sample Problem solution.

Network equipment is not on the IDSEL. All network equipment selected by the offeror shall be pre-certified, Joint Interoperability Testing Center (JITC) approved (reference DoDI 8100.04). The offeror shall ensure that all network equipment (switches, routers, etc.) is selected from the Defense Information Systems Agency (DISA) Approved Products List (APL) (https://aplits.disa.mil/processAPList) and is approved for its proposed use.

Attachment 3 – Integrated Master Schedule (IMS)

Provide an Integrated Master Schedule (IMS) (in Microsoft (MS) Project 2016 format) for the Sample Problem design, install, integration, and verification work (exclude ICS). The IMS shall be defined to no more than five (5) levels of detail to which the offeror plans to manage the execution of the Sample Problem work to successfully meet the requirements of the Sample Problem. The IMS shall depict the critical path, major milestones, each task’s duration, and its relationships with other tasks (predecessors and successors). Furthermore, the IMS shall be resource-loaded using labor categories from Attachment L-3.

Tie the lowest levels of detail in the IMS to the appropriate corresponding CWBS elements.

For the purpose of this sample problem, assume no government vector checks will be required.

Refer to Section 2.2.2 for formatting. In addition to providing a MS Project file, print a Gantt Chart displaying the following columns: Indicator (notes, information), ID, CWBS, Task Name, Duration, Predecessor, Successor, Start, Finish, Resource, and Timeline. Reduce timeline scale in order to show Offeror’s project on 11 by 17 inch paper in landscape orientation when printed.

https://aplits.disa.mil/processAPList

FA8730-19-R-0005, Attachment 8, Page 27

There is also an existing SCIF located within area 2 at building 697. The protected secured area within this building consists of rooms 200 and 201 only. This SCIF facility has a fully compliant communications interface with base communication infrastructure.

The Area 2 IDS/IVA system shall annunciate in the BDOC (room 100 of building 500).

3.2.1 Area 2 Detection

3.2.1.1 Area 2 Detection – RA Boundary LOD (Fence Line / BLS)

The existing fence sensor system is a fully compliant DeTekion system, and the BLS system is a fully compliant Senstar Omnitrax system (existing CCDE equipment is obsolete).

The existing perimeter fence shall be considered to be in excellent condition and can be considered as a satisfactory GFE sensor platform.

3.2.1.2 Area 2 Detection - Hangar

The offeror shall design a new IDS/IVA system to bring the hangar facility to a PL-2 protection level as defined by AFI 31-101 section 6 and ESE-SIT-0001 Section 2.3.

3.2.2 Area 2 Delay / Denial

The Area 2 perimeter has an existing grade A1 fence line and may be used as GFE.

3.2.3 Area 2 Assessment / Surveillance

Area 2 has 4 existing PTZ cameras (Bosch Auto Dome 7000) located at the outside outermost corners as shown in the Area 2 map. These shall be integrated into the Sample Problem as GFE for surveillance. These cameras display in, and are to be controlled from, the BDOC.

3.2.4 Area 2 Access Control

There are no additional access control requirements for the Area 2 perimeter fence line. The hangar facility will require ACS IAW AFI31-101 chapter 6 and ESE-SIT-0001. There are no existing ACS systems in place at the hanger facility.

In order to simplify the selection of ACS equipment in an area that may utilize many different types of door locking hardware, all offerors shall utilize an electromagnetic, or “maglock” type of access control device in the Sample Problem solution for the hanger area.

3.2.5 Area 2 CCDE

Area 2 has no requirements for any additional CCDE equipment. All area 2 sensors, IVA and surveillance equipment will be annunciate and display at the BDOC.

3.2.6 Area 2 Lighting

There are no additional lighting requirements for area 2. Assume adequate lighting at the perimeter and within the hangar bay.

3.2.7 Area 2 Infrastructure

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
CONTRACT DATA REQUIREMENTS LIST
OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the tine for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
C. CATEGORY
B. EXHIBIT
A. CONTRACT LINE ITEM NO.
F. CONTRACTOR
E. CONTRACT/PR NO.
D. SYSTEM/ITEM
3. SUBTITLE
2. TITLE OF DATA ITEM
1. DATA ITEM NO.
6. REQUIRING OFFICE
5. CONTRACT REFERENCE
4. AUTHORITY (Data Acquisition Document No.)
14. DISTRIBUTION
12. DATE OF FIRST SUBMISSION
10. FREQUENCY
9. DIST STATEMENT REQUIRED
7. DD 250 REQ
b. COPIES
Final
13. DATE OF SUBSEQUENT SUBMISSION
11. AS OF DATE
8. APP CODE
Draft
Repro
Reg
16. REMARKS
15. TOTAL
J. DATE
(1 Data Item)
I. APPROVED BY
H. DATE
G. PREPARED BY
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page __1__ of __2__ Pages
DD FORM 1423-1, FEB 2001 PREVIOUS EDITIONS MAY BE USED. Page __2__ of __2__ Pages

File details come from the government source that posted it. Updated .