h_Attachment_8_(L-8)_AMENDMENT_1_-_FPS3_Sample_Problem_1_Drawing_13_Jan_14.pdf

PDF 33 KB Posted

Attached to
FPS3 SolicitationFA8730-14-R-0004 Federal contract opportunity
Solicitation number
FA8730-14-R-0004
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

About this file

Updated Attachment 8 (L-8) - Sample Drawing 1 PDF

View the file

Other files for this federal contract opportunity

Other files attached to FPS3 SolicitationFA8730-14-R-0004, newest first.
File Type Posted
FA8730-14-R-0004_0002_signature.pdf PDF
FA8730-14-R-0004_0002.pdf PDF
FPS3_RFP_Amendment_2_Cover_Letter__29_Jan_2014.pdf PDF
Questions_Answers_FPS3_RFP_23_Jan_2014.docx DOCX document
Questions_Answers_FPS3_RFP_17_Jan_2014.docx DOCX document
FA8730-14-R-0004_CONFORMED.docx DOCX document
Questions_Answers_FPS3_RFP_14_Jan_2014.docx DOCX document
FPS3_Status_Update_for_Industry_13_Jan_14.pdf PDF
c_Exhibit_B_AMENDMENT_1_-_FPS3_B-Tables_TM_Labor_Rates_(To_Be_Proposed)_13_Jan_14.xlsx XLSX spreadsheet
d_Attachment_6_AMENDMENT_1_-_FPS3_OCONUS_Location_Specific_Terms_and_Conditions_13_Jan_14.docx DOCX document
Signed_SF30_cover_page_13_Jan_14.pdf PDF
g_Attachment_8_(L-7)_AMENDMENT_1_-_FPS3_Cost_Formats_13_Jan_14.xlsx XLSX spreadsheet
f_Attachment_8_AMENDMENT_1-_FPS3_Section_L_13_Jan_14.docx DOCX document
e_Attachment_7_-_FPS3_Work_Breakdown_Structure_(WBS)_13_Jan_14.docx DOCX document
b_FA8730-14-R-0004_0001.pdf PDF
i_Attachment_8_(L-8)_AMENDMENT_1_-_FPS3_Sample_Problem_1_Drawing_13_Jan_14.dwg DWG drawing
Questions_Answers_FPS3_RFP_10_Jan_2014.docx DOCX document
FPS3_Status_Update_for_Industry_10_Jan_14.pdf PDF
FPS3_Status_Update_for_Industry_8_Jan_14.pdf PDF
Questions_Answers_FPS3_RFP_8_Jan_14.docx DOCX document
FPS3_Status_Update_for_Industry_6_Jan_14.pdf PDF
Questions_Answers_FPS3_RFP_20_Dec_2013.docx DOCX document
Industry_Update_Q A_Cover_Letter_20_Dec_2013.pdf PDF
Attachment_8_(L-8)_-_FPS3_Sample_Problem_1_Drawing_05_Dec_13.dwg DWG drawing
Attachment_7_-_FPS3_Work_Breakdown_Structure_(WBS)_05_Dec_13.docx DOCX document
Attachment_8_(L-8)_-_FPS3_Sample_Problem_2_Drawing_05_Dec_13.ppt PPT presentation
Attachment_2_-_FPS3_PWS_05_Dec_13.docx DOCX document
Attachment_4_-_FPS3_Small_Business_Subcontracting_Plan_(To_Be_Proposed)_05_Dec_13.docx DOCX document
Exhibit_B_-_FPS3_B-Tables_T M_Labor_Rates_(To_Be_Proposed)_05_Dec_13.xlsx XLSX spreadsheet
Attachment_3_-_FPS3_DD254_(To_Be_Proposed)_05_Dec_13.pdf PDF
Exhibit_A_-_FPS3_Represenative_CDRL_listing_05_Dec_13.docx DOCX document
Attachment_8_(L-7)_-_FPS3_Cost_Formats_05_Dec_13_Letter_Size.xlsx XLSX spreadsheet
Attachment_9_-_FPS3_Section_M_05_Dec_13.doc DOC document
Attachment_6_-_FPS3_OCONUS_Location_Specific_Terms_and_Conditions_5_Dec_13.docx DOCX document
Attachment_8_-_FPS3_-_Section_L_05_Dec_13.docx DOCX document
Attachment_5_-_FPS3_Labor_Categories_05_Dec_13.docx DOCX document
FA8730-14-R-0004_05_Dec_13.pdf PDF
Attachment_1_-_FPS3_SOW_05_Dec_13.docx DOCX document
FPS3_RFP_cover_letter_5_Dec_13.pdf PDF
Attachment_8_(L-8)_-_FPS3_Sample_Problem_1_Drawing_05_Dec_13.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TAXIWAY B

TAXIWAY A

KEY

AIRCRAFT

BUILDINGS

FENCE

GATES

TURNSTILE

TAXI LINES

NOTES

1. THERE IS A 5' WIDE GRASS AREA BETWEEN THE FENCE AND

THE PAVED RAMP.

2. RAMP IS STEEL REINFORCED CONCRETE WITH A 5' ASPHALT

APRON.

3. AIRCRAFT IS 150' LONG AND 145' WING TO WING, AND THE

PARKING SPACES ARE 200' APART FROM ONE ANOTHER.

4. PAVED TAXIWAYS ARE 200' WIDE INCLUDING THE 5' ASPHALT

APRON ON EACH SIDE.

5. HANGAR 2'S HANGAR BAY IS AN EXPLOSIVE HAZARD AREA

WALL TO WALL, CEILING TO FLOOR.

6. TAXIWAY B HAS BEEN RECENTLY REPLACED. THE TAXIWAY

HAS SOME SLABS OF CONCRETE WITH WIRE MESH

REINFORCEMENT AND SOME WITH STEEL REBAR

REINFORCEMENT AS WELL AS A 5' ASPHALT APRON.

7. ALL AREA THAT IS NOT OTHERWISE SPECIFIED SHALL BE

ASSUMED TO BE GRASS.

8. DRAWING IS TO SCALE; 1(AutoCad Unit) : 20 (ft)

OVERHEAD ROLLUP DOOR

FUEL LINES

DRAINAGE LINES

ASPHALT ROADWAY

RESTRICTED AREA BOUNDARY

LIGHTING

POWER PANEL

COMM CONDUIT RUN

MANHOLE

T

A

X

I

W

A

Y

C

POWER CABLE RUN

CULVERT

PERMANENT DRAIN

BLDG.

ITN

ECP 1

ECP 2

Parking Lot

HANGAR 1

HANGAR 2

ECP 2

N

File details come from the government source that posted it. Updated .