g_Attachment_8_(L-7)_AMENDMENT_1_-_FPS3_Cost_Formats_13_Jan_14.xlsx
XLSX spreadsheet 229 KB Posted
- Attached to
- FPS3 SolicitationFA8730-14-R-0004 Federal contract opportunity
- Solicitation number
- FA8730-14-R-0004
About this file
Updated Attachment 8 (L-7) - Cost Formats
View the file
Other files for this federal contract opportunity
Show all 40
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover Page
FPS3 COST FORMATS
&A &P of &N
Index
| 1. Total Evaluated Price |
| 2. T&M Summary |
| 3. CLIN Summary |
| 4. GFE Summary |
| 5. CLIN 0006AA by Year |
| 6. CLIN 0006AA by WBS |
| 7. CLIN 0011AA by Year |
| 8. CLIN 0011AA by WBS |
| 9. CLIN 0006AB by Year |
| 10. CLIN 0006AB by WBS |
| 11. Bill of Material |
| 12. Subcontracts |
| 13. Labor Hours |
| 14. Other Direct Costs |
| 15. Travel Worksheet |
| 16. Price Track |
FPS3 PROJECT COST FORMATS
&A &P of &N
1. Total Evaluated Price
| Total Evalualted Price | ||
| T&M at BEQ | ||
| Tab 2 | $ - 0 |
| CPFF at GEMPC | |
| Sample Problem 1 |
Fixed Site Design / Install
| CLIN 0006AA (CPFF) | Proposed Estimated Cost from Tab 3 | $ - 0 | |
| Proposed Fixed Fee from Tab 3 | $ - 0 | ||
| Government Probable Cost Adjustment | $ - 0 | ||
| Tab 3 @ GEMPC plus the proposed fixed fee | $ - 0 | ||
| Sample Problem 1 |
Fixed Site
ICS
| CLIN 0011AA (CPFF) | Proposed Estimated Cost from Tab 3 | $ - 0 | |
| Proposed Fixed Fee from Tab 3 | $ - 0 | ||
| Government Probable Cost Adjustment | $ - 0 | ||
| Tab 3 @ GEMPC plus the proposed fixed fee | $ - 0 | ||
| Sample Problem 2 |
Fixed Site Design / Install
| CLIN 0006AB (CPFF) | Proposed Estimated Cost from Tab 3 | $ - 0 | |
| Proposed Fixed Fee from Tab 3 | $ - 0 | ||
| Government Probable Cost Adjustment | $ - 0 | ||
| Tab 3 @ GEMPC plus the proposed fixed fee | $ - 0 | ||
| Total CPFF at GEMPC | $ - 0 |
| Government Furnished Equipment (GFE) | |
| Tab 4 | $ - 0 |
| Total Price | |
| $ - 0 |
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
2. T&M Summary
| T&M Summary |
| Tab 2. T&M Summary, cell B2: In accordance with DFARS 252.216-7002, please breakout separate rates for each category of labor to be performed by each subcontractor and for each category of labor to be performed by the offeror, and for each category of labor to be transferred between divisions,subsidiaries, or affiliates of the offeror under a common control. The below table may be modified by the offeror to establish multiple subcontractor or interdivisional rates as necessary to comply with the DFARS provision. The Government Provided hours for each labor category for each year is 30 hours. The offeror shall then equally distribute the 30 hours between each separately price labor rate such that the total labor hours for that labor category and year equals 30 hours. |
| Fully loaded T&M rates multiplied by the BEQ | |||||||||
| Government Provided hours | Prime Contractor | GFY 15 Rate ($/hr) | Total Prime | Subcontractor | GFY 15 Rate ($/hr) | Total Subcontractor | Total at BEQ ($) FY15 | ||
| a. | Systems Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| b. | Senior Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| c. | Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| d. | Sr. Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| e. | Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| f. | Logistics Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| g. | Logistics Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| h. | Admin/Clerical | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| i. | Systems Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| j. | Systems Administrator (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| k. | Tactical Systems-Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| l. | Tactical Systems-System Admin (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| m. | Trainer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| n. | Architect | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| o. | Project Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| p. | Quality Assurance Inspector | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| q. | IA Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| Total of T&M rates at the BEQ | $ - 0 | ||||||||
| Escalation (by Contractor Fiscal Year) | |||||||||
| Material Escalation | |||||||||
| Subcontract Escalation | |||||||||
| Labor Escalation | |||||||||
| ODC Escalation |
| Fully loaded T&M rates multiplied by the BEQ | |||||||||
| Government Provided hours | Prime Contractor | GFY 16 Rate ($/hr) | Total Prime | Subcontractor | GFY 16 Rate ($/hr) | Total Subcontractor | Total at BEQ ($) FY16 | ||
| a. | Systems Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| b. | Senior Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| c. | Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| d. | Sr. Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| e. | Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| f. | Logistics Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| g. | Logistics Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| h. | Admin/Clerical | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| i. | Systems Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| j. | Systems Administrator (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| k. | Tactical Systems-Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| l. | Tactical Systems-System Admin (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| m. | Trainer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| n. | Architect | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| o. | Project Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| p. | Quality Assurance Inspector | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| q. | IA Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| Total of T&M rates at the BEQ | $ - 0 | ||||||||
| Fully loaded T&M rates multiplied by the BEQ | |||||||||
| Government Provided hours | Prime Contractor | GFY 17 Rate ($/hr) | Total Prime | Subcontractor | GFY 17 Rate ($/hr) | Total Subcontractor | Total at BEQ ($) FY17 | ||
| a. | Systems Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| b. | Senior Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| c. | Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| d. | Sr. Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| e. | Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| f. | Logistics Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| g. | Logistics Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| h. | Admin/Clerical | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| i. | Systems Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| j. | Systems Administrator (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| k. | Tactical Systems-Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| l. | Tactical Systems-System Admin (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| m. | Trainer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| n. | Architect | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| o. | Project Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| p. | Quality Assurance Inspector | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| q. | IA Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| Total of T&M rates at the BEQ | $ - 0 | ||||||||
| Fully loaded T&M rates multiplied by the BEQ | |||||||||
| Government Provided hours | Prime Contractor | GFY 18 Rate ($/hr) | Total Prime | Subcontractor | GFY 18 Rate ($/hr) | Total Subcontractor | Total at BEQ ($) FY18 | ||
| a. | Systems Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| b. | Senior Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| c. | Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| d. | Sr. Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| e. | Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| f. | Logistics Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| g. | Logistics Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| h. | Admin/Clerical | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| i. | Systems Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| j. | Systems Administrator (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| k. | Tactical Systems-Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| l. | Tactical Systems-System Admin (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| m. | Trainer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| n. | Architect | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| o. | Project Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| p. | Quality Assurance Inspector | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| q. | IA Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| Total of T&M rates at the BEQ | $ - 0 | ||||||||
| Fully loaded T&M rates multiplied by the BEQ | |||||||||
| Government Provided hours | Prime Contractor | GFY 19 Rate ($/hr) | Total Prime | Subcontractor | GFY 19 Rate ($/hr) | Total Subcontractor | Total at BEQ ($) FY19 | ||
| a. | Systems Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| b. | Senior Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| c. | Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| d. | Sr. Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| e. | Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| f. | Logistics Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| g. | Logistics Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| h. | Admin/Clerical | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| i. | Systems Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| j. | Systems Administrator (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| k. | Tactical Systems-Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| l. | Tactical Systems-System Admin (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| m. | Trainer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| n. | Architect | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| o. | Project Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| p. | Quality Assurance Inspector | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| q. | IA Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| Total of T&M rates at the BEQ | $ - 0 | ||||||||
| Fully loaded T&M rates multiplied by the BEQ | |||||||||
| Government Provided hours | Prime Contractor | GFY 20 Rate ($/hr) | Total Prime | Subcontractor | GFY 20 Rate ($/hr) | Total Subcontractor | Total at BEQ ($) FY20 | ||
| a. | Systems Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| b. | Senior Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| c. | Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| d. | Sr. Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| e. | Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| f. | Logistics Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| g. | Logistics Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| h. | Admin/Clerical | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| i. | Systems Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| j. | Systems Administrator (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| k. | Tactical Systems-Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| l. | Tactical Systems-System Admin (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| m. | Trainer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| n. | Architect | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| o. | Project Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| p. | Quality Assurance Inspector | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| q. | IA Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| Total of T&M rates at the BEQ | $ - 0 |
| Fully loaded T&M rates multiplied by the BEQ | |||||||||
| Government Provided hours | Prime Contractor | GFY 21 Rate ($/hr) | Total Prime | Subcontractor | GFY 21 Rate ($/hr) | Total Subcontractor | Total at BEQ ($) FY21 | ||
| a. | Systems Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| b. | Senior Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| c. | Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| d. | Sr. Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| e. | Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| f. | Logistics Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| g. | Logistics Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| h. | Admin/Clerical | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| i. | Systems Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| j. | Systems Administrator (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| k. | Tactical Systems-Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| l. | Tactical Systems-System Admin (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| m. | Trainer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| n. | Architect | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| o. | Project Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| p. | Quality Assurance Inspector | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| q. | IA Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| Total of T&M rates at the BEQ | $ - 0 | ||||||||
| Fully loaded T&M rates multiplied by the BEQ | |||||||||
| Government Provided hours | Prime Contractor | GFY 22 Rate ($/hr) | Total Prime | Subcontractor | GFY 22 Rate ($/hr) | Total Subcontractor | Total at BEQ ($) FY23 | ||
| a. | Systems Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| b. | Senior Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| c. | Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| d. | Sr. Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| e. | Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| f. | Logistics Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| g. | Logistics Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| h. | Admin/Clerical | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| i. | Systems Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| j. | Systems Administrator (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| k. | Tactical Systems-Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| l. | Tactical Systems-System Admin (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| m. | Trainer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| n. | Architect | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| o. | Project Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| p. | Quality Assurance Inspector | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| q. | IA Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| Total of T&M rates at the BEQ | $ - 0 |
Total of T&M rates at the BEQ FY15 - FY22 $ - 0
DATE: &D FPS3 PROJECT COST FORMATS
&A &P of &N
3. CLIN Summary
| CLIN SUMMARY | ||||
| Sample Problem 1 | Sample Problem 1 | Sample Problem 2 | Total | |
| Fixed Site | Fixed Site | TASS | ||
| CLIN | CLIN | CLIN | ||
| CPFF | CPFF | CPFF | ||
| 0006AA | 0011AA | 0006AB | ||
| Design / Installation | ICS | Design / Installation | ||
| Cost Element | Basic | Basic | ||
| Direct Material | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Direct Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Other Direct Costs (ODCs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Interdivisional Transfers | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Indirect Costs | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| FCCOM | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee Percentage | 0.00% | 0.00% | 0.00% | |
| Fixed Fee | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Note: For purposes of completing the above, indirect cost includes material overhead, fringe, labor overhead, other overhead, and G&A. |
DATE: &D FPS3 PROJECT COST FORMATS
&A &P of &N
4. GFE Summary
| GFE Summary | |||||
| TASS Equipment | SCD | Average Cost | QTY | Extended Price | |
| 1 | Long Range Thermal Imager (FLIR T2000) | IBDSS1000-85 | $227,746 | $0 | |
| 2 | Tri-Panel Monitor | 907853 | $4,857 | $0 | |
| 3 | 40-Channel VADS | 902549 | $146,496 | $0 | |
| 4 | RF Link (Single Channel - 1 Ft. Dish) | C902496 | $50,111 | $0 | |
| 5 | RF/FO Receiver | C902495 | $23,393 | $0 | |
| 6 | RF/FO Transmitter w/RPC | C902494 | $141,000 | $0 | |
| 7 | MSTAR Dismount Kit | C907832 | $24,822 | $0 | |
| 8 | MSTAR Radome/Fixed Installation Kit | C907833 | $13,448 | $0 | |
| 9 | MSTAR Ruggedized Shipping Containers | C907834 | $4,962 | $0 | |
| 10 | MSTAR System (Low Profile) | C907830 | $233,811 | $0 | |
| 11 | MSTAR Alternate Control Station | 907890 | $9,528 | $0 | |
| 12 | MSTAR/ARSS RF/FO Link Kit | 909762 | $25,876 | $0 | |
| 13 | Network Camera Controller | 926632 | $40,000 | $0 | |
| 14 | Annunciator 6.0.1 Server (w/o Dual Channel VADS) | 925212-1 w/C925215-2 S/W | $8,922 | $0 | |
| 15 | Scanner | 858257 | $501 | $0 | |
| 16 | Color Printer | 876702 | $350 | $0 | |
| 17 | DLA Surge Protector | 9473984 | $23 | $0 | |
| 18 | Smart UPS rackmount | 9474041 | $9,360 | $0 | |
| 19 | Jensen Tools Inc. Tool Kit | JTKWER122 | $412 | $0 | |
| 20 | FD332 Fence Sensor | FDTA041 (SCD) | $8,545 | $0 | |
| 21 | FD 332 Install Kit | FDTA041 (SCD) | $3,794 | $0 | |
| 22 | Mobile Duress Alarm Kits | 902540 | $7,576 | $0 | |
| 23 | Short Range Security Sensor (Piramid) | FDTA014 | $1,600 | $0 | |
| 24 | Clamp Assembly ELTEC 864M | 9474120 | $443 | $0 | |
| 25 | ELTEC 864M Passive Infared | 9474148 | $3,523 | $0 | |
| 26 | SW 385 Monostatic Microwave | 9474146 | $5,976 | $0 | |
| 27 | SW 310 Bistatic MW | 9474144/9474153 | $6,397 | $0 | |
| 28 | RBM -12Volt Battery | TASS-1822 | $639 | $0 | |
| 29 | RBM-II | TASS-1800 | $8,367 | $0 | |
| 30 | Base Station Antenna | 9474249 | $3,464 | $0 | |
| 31 | Antenna Cable Connector | 9474025 | $108 | $0 | |
| 32 | Ramtech Battery/Re-conditioner Charger 4 Position | 882457 | $2,913 | $0 | |
| 33 | CMC-II | TASS-1900 | $3,218 | $0 | |
| 34 | DLA "Y" Cable | 9474087 | $558 | $0 | |
| 35 | CM/HHM Batteries Battery NI-CAD Rechargeable, Sand Color | NSN 6140-01-368-8285 (P/N PRC139B-1) | $68 | $0 | |
| 36 | Solar Panels | C897511 | $949 | $0 | |
| 37 | Cables, CM (2.5 ft) | 9473968 | $274 | $0 | |
| 38 | Sensor Cables (12 ft.) | 9473904 | $335 | $0 | |
| 39 | Communication Modules | 858251 | $4,160 | $0 | |
| 40 | Handheld Monitor (HHM) | 858252 | $5,926 | $0 | |
| 41 | Brackets, Tripod (UMB) | 9473916 | $910 | $0 | |
| 42 | RM-83 | RM-83 | $383 | $0 | |
| 43 | Dutch Hill Tripods & Bag | 9473915 & 9474223 | $1,114 | $0 | |
| 44 | TreeTop Towers | 864081-2 | $24,007 | $0 | |
| 45 | MARCENT Garret Container 1 | 270628-30 | $9,400 | $0 | |
| 46 | MARCENT Garret Container 2 | 270628-52 | $9,400 | $0 | |
| 47 | Full Garret Container | 846093-1 | $8,871 | $0 | |
| 48 | 1/3 Garret Container | 846093-2 | $4,306 | $0 | |
| 49 | Empty A Size Container w/foam | 864075-1 | $494 | $0 | |
| 50 | A Size Container, for 4 RBMs | 864075-16 | $464 | $0 | |
| 51 | A Size Container, for 2 SW 310s and 4 SW 385s | 864075-17 | $496 | $0 | |
| 52 | A Size Container, for 2 RBMs, 13 CM's, 3 HHM's | 864075-22 | $506 | $0 | |
| 53 | A Size Container, for PIR/Piramid/Fence Bracket | 864075-25 | $506 | $0 | |
| 54 | A Size Container, for scanner/monitor/keyboard | 864075-26 | $627 | $0 | |
| 55 | Equipment Container Size B Solar Panel (8) | 864083-8 | $678 | $0 | |
| 56 | Equipment Container - Size B - SW385(4)/Charger/CM(14)/HHM(4) | 864083-9 | $628 | $0 | |
| 57 | Equipment Container Size B - Printer/Desktop Annunciator | 864083-12 | $618 | $0 | |
| 58 | Equipment Container Size B - FD205 (FD 332) | 864083-31 | $550 | $0 | |
| 59 | Equipment Container - Size D - UPS and Battery | 864144-4 | $532 | $0 | |
| Total | $0 |
Date: &D FPS3 Cost Formats
&A &P of &N
5. CLIN 0006AA by Year
COST ELEMENT DETAIL FOR CLIN 0006AA
| Year 1 | Year 2 | Year 3 | Total | ||||||||
| Cost Elements | Base | Rate | Total | Base | Rate | Total | Base | Rate | Total | Base | Total |
| Direct Material | ||
| Material Category A | ||
| Material Category B | ||
| Material Category C | ||
| Direct Material Subtotal |
| Subcontracts | ||
| Subcontractor A | ||
| Subcontractor B | ||
| Subcontractor C | ||
| Subcontracts Subtotal |
| Direct Labor | ||
| Labor Category A | ||
| Labor Category B | ||
| Labor Category C | ||
| Labor Category D | ||
| Labor Category E | ||
| Labor Category F | ||
| Labor Category G | ||
| Labor Category H | ||
| Direct Labor Subtotal |
| Other Direct Costs | ||
| ODC A | ||
| ODC B | ||
| ODC C | ||
| ODC D | ||
| ODC E | ||
| ODC F | ||
| ODC Subtotal |
| Interdivisional Transfers | ||
| Interdivisional Transfer A | ||
| Interdivisional Transfer B | ||
| Interdivisional Subtotal |
| Indirect Costs | ||
| Material Overhead | ||
| Fringe | ||
| Labor Overhead | ||
| Other Overhead | ||
| Indirect Subtotal |
G&A
Subtotal Cost
FCCOM
Total Estimated Cost
Fixed Fee
| TOTAL |
| NOTES: |
| 1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable. |
| 2) For each separate cost element, show the base, rate,and extended amount; include embedded formulas that identify all calculations. |
| 3) Cost element breakout shall be broken out by Contractor Fiscal Year (CFY), Offeror shall identify their FY |
| 4) Year 1 and Year 3 represent the first and last years of effort, expand as applicable |
| 5) Include applicable resource codes. |
| 6) Insert separate cost element breakouts in support of any interdivisional cost. |
| 7) Ensure that the material, subcontracts, labor hour, and other direct cost spreadsheet tabs do reconcile back to this cost format and the BOEs in your cost volume. |
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
6. CLIN 0006AA by WBS
| Fixed Site Sample Problem 1: Design and Installation by WBS | ||||||||||||||||||||||||||||||||||||||||||||||||
| Reference | ||||||||||||||||||||||||||||||||||||||||||||||||
| FPS3 Contract WBS and Directory | ||||||||||||||||||||||||||||||||||||||||||||||||
| Materials | Total | Subcontracts | Total SubKtrs | Inter-Div Transfers | Prime Labor | Total Prime Labor | Total | Other Direct Costs | Total | Indirect Costs | Total | Total | ||||||||||||||||||||||||||||||||||||
| WBS | CLIN 0006AA | Materials | SubKtr A (Identify) | SubKtr B (Identify) | SubKtr C (Identify) | SubKtr D (Identify) | Engr Labor - In-Plant | Engr Labor - Field Site | Manufacturing Labor | Other | Engr | Engr | Mfg | Total | Est. Cost | Estimated | ||||||||||||||||||||||||||||||||
| L | L | L | L | WBS | Purchased | Raw | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Direct | Procurement | Overhead | Overhead | Overhead | Indirect | w/o | FCCOM | Cost | ||||||||||||||||||
| 1 | . | 2 | . | 3 | 4 | Description | Parts | Materials | Services | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Dollars | Hours | Dollars | Hours | Dollars | Hours | Dollars | Hours | ODC A | ODC B | ODC C | ODC D | ODC E | Travel | Costs | Overhead | Fringe | In-Plant | Field Site | G&A | Costs | FCCOM | Subtotal | ||
| 1 | . | . | Force Protection Security Systems (FPS3) | $0 | $0 | $0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||
| 1 | . | 1 | . | Fixed Site Intrusion Detection System (IDS) | $0 | $0 | $0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| 1 | . | 1 | . | 1 | Detection | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 2 | Assessment & Surveillance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 3 | Command, Control & Display | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 4 | Access Control | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 5 | Distribution equipment | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 6 | Communications | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 7 | Power | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 8 | Ancillary Equipment (Other) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 9 | GFE | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 10 | Fence (delay/denial) (as applicable) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 11 | Lighting subsystem (as applicable) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 12 | Integration, Assembly, Test & Checkout | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
| 1 | . | 2 | . | Tactical Automated Security System (TASS) | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 2 | . | 1 | Sensor Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 2 | Assessment Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 3 | Data/Comm Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 4 | Reporting & Display Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 5 | Power Supply Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
| 1 | . | 4 | . | Systems Engineering | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |||
| 1 | . | 4 | . | 1 | System Architecture (SEIWG) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 2 | System Design | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | ||
| 1 | . | 4 | . | 2 | . | 1 | Site Survey | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 2 | . | 2 | Design & Reviews | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 3 | Configuration Management | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 4 | Supportability Analysis | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 5 | Quality Assurance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 6 | Risk Management | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 7 | Advanced Technology (SEIWG support) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 8 | Special studies and analyses | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 9 | Information Assurance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 5 . Program Management $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 6 | . | Training | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 6 | . | 1 | Simulator (Annunciator) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 6 | . | 2 | Training Services | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 6 | . | 3 | Training Materials | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 7 . Data $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 8 | . | System Installation/Integration (Operational Site Activation) on Site | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 8 | . | 1 | Fixed Site Intrusion Detection System | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 8 | . | 2 | Tactical Automated Security System (TASS) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 9 . Systems Test & Evaluation $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 10 | . | Interim Contractor Support | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 10 | . | 1 | Organizational level | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 10 | . | 2 | Depot level | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 10 | . | 3 | ICS spares and repair parts | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| NOTES: | |||||||||||||||||||||||||||||||||||||||||||||||
| 1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable. | |||||||||||||||||||||||||||||||||||||||||||||||
| 2) Do Not alter the WBS |
DATE: &D FPS3 PROJECT COST FORMATS
&A &P of &N
7. CLIN 0011AA by Year
COST ELEMENT DETAIL FOR CLIN 0011AA
| Year 1 | Year 2 | Year 3 | Total | ||||||||
| Cost Elements | Base | Rate | Total | Base | Rate | Total | Base | Rate | Total | Base | Total |
| Direct Material | ||
| Material Category A | ||
| Material Category B | ||
| Material Category C | ||
| Direct Material Subtotal |
| Subcontracts | ||
| Subcontractor A | ||
| Subcontractor B | ||
| Subcontractor C | ||
| Subcontracts Subtotal |
| Direct Labor | ||
| Labor Category A | ||
| Labor Category B | ||
| Labor Category C | ||
| Labor Category D | ||
| Labor Category E | ||
| Labor Category F | ||
| Labor Category G | ||
| Labor Category H | ||
| Direct Labor Subtotal |
| Other Direct Costs | ||
| ODC A | ||
| ODC B | ||
| ODC C | ||
| ODC D | ||
| ODC E | ||
| ODC F | ||
| ODC Subtotal |
| Interdivisional Transfers | ||
| Interdivisional Transfer A | ||
| Interdivisional Transfer B | ||
| Interdivisional Subtotal |
| Indirect Costs | ||
| Material Overhead | ||
| Fringe | ||
| Labor Overhead | ||
| Other Overhead | ||
| Indirect Subtotal |
G&A
Subtotal Cost
FCCOM
Total Estimated Cost
Fixed Fee
| TOTAL |
| NOTES: |
| 1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable. |
| 2) For each separate cost element, show the base, rate,and extended amount; include embedded formulas that identify all calculations. |
| 3) Cost element breakout shall be broken out by Contractor Fiscal Year (CFY), Offeror shall identify their FY |
| 4) Year 1 and Year 3 represent the first and last years of effort, expand as applicable |
| 5) Include applicable resource codes. |
| 6) Insert separate cost element breakouts in support of any interdivisional cost. |
| 7) Ensure that the material, subcontracts, labor hour, and other direct cost spreadsheet tabs do reconcile back to this cost format and the BOEs in your cost volume. |
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
8. CLIN 0011AA by WBS
| Fixed Site Sample Problem 1: ICS by WBS | ||||||||||||||||||||||||||||||||||||||||||||||||
| Reference | ||||||||||||||||||||||||||||||||||||||||||||||||
| FPS3 Contract WBS and Directory | ||||||||||||||||||||||||||||||||||||||||||||||||
| Materials | Total | Subcontracts | Total SubKtrs | Inter-Div Transfers | Prime Labor | Total Prime Labor | Total | Other Direct Costs | Total | Indirect Costs | Total | Total | ||||||||||||||||||||||||||||||||||||
| WBS | CLIN 0011AA | Materials | SubKtr A (Identify) | SubKtr B (Identify) | SubKtr C (Identify) | SubKtr D (Identify) | Engr Labor - In-Plant | Engr Labor - Field Site | Manufacturing Labor | Other | Engr | Engr | Mfg | Total | Est. Cost | Estimated | ||||||||||||||||||||||||||||||||
| L | L | L | L | WBS | Purchased | Raw | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Direct | Procurement | Overhead | Overhead | Overhead | Indirect | w/o | FCCOM | Cost | ||||||||||||||||||
| 1 | . | 2 | . | 3 | 4 | Description | Parts | Materials | Services | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Dollars | Hours | Dollars | Hours | Dollars | Hours | Dollars | Hours | ODC A | ODC B | ODC C | ODC D | ODC E | Travel | Costs | Overhead | Fringe | In-Plant | Field Site | G&A | Costs | FCCOM | Subtotal | ||
| 1 | . | . | Force Protection Security Systems (FPS3) | $0 | $0 | $0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||
| 1 | . | 1 | . | Fixed Site Intrusion Detection System (IDS) | $0 | $0 | $0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| 1 | . | 1 | . | 1 | Detection | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 2 | Assessment & Surveillance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 3 | Command, Control & Display | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 4 | Access Control | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 5 | Distribution equipment | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 6 | Communications | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 7 | Power | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 8 | Ancillary Equipment (Other) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 9 | GFE | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 10 | Fence (delay/denial) (as applicable) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 11 | Lighting subsystem (as applicable) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 12 | Integration, Assembly, Test & Checkout | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
| 1 | . | 2 | . | Tactical Automated Security System (TASS) | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 2 | . | 1 | Sensor Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 2 | Assessment Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 3 | Data/Comm Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 4 | Reporting & Display Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 5 | Power Supply Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
| 1 | . | 4 | . | Systems Engineering | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |||
| 1 | . | 4 | . | 1 | System Architecture (SEIWG) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 2 | System Design | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | ||
| 1 | . | 4 | . | 2 | . | 1 | Site Survey | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 2 | . | 2 | Design & Reviews | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 3 | Configuration Management | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 4 | Supportability Analysis | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 5 | Quality Assurance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 6 | Risk Management | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 7 | Advanced Technology (SEIWG support) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 8 | Special studies and analyses | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 9 | Information Assurance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 5 . Program Management $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 6 | . | Training | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 6 | . | 1 | Simulator (Annunciator) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 6 | . | 2 | Training Services | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 6 | . | 3 | Training Materials | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 7 . Data $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 8 | . | System Installation/Integration (Operational Site Activation) on Site | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 8 | . | 1 | Fixed Site Intrusion Detection System | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 8 | . | 2 | Tactical Automated Security System (TASS) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 9 . Systems Test & Evaluation $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 10 | . | Interim Contractor Support | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 10 | . | 1 | Organizational level | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 10 | . | 2 | Depot level | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 10 | . | 3 | ICS spares and repair parts | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| NOTES: | |||||||||||||||||||||||||||||||||||||||||||||||
| 1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable. | |||||||||||||||||||||||||||||||||||||||||||||||
| 2) Do Not alter the WBS |
DATE: &D FPS3 PROJECT COST FORMATS
&A &P of &N
9. CLIN 0006AB by Year
COST ELEMENT DETAIL FOR CLIN 0006AB
| Year 1 | Year 2 | Year 3 | Total | ||||||||
| Cost Elements | Base | Rate | Total | Base | Rate | Total | Base | Rate | Total | Base | Total |
| Direct Material | ||
| Material Category A | ||
| Material Category B | ||
| Material Category C | ||
| Direct Material Subtotal |
| Subcontracts | ||
| Subcontractor A | ||
| Subcontractor B | ||
| Subcontractor C | ||
| Subcontracts Subtotal |
| Direct Labor | ||
| Labor Category A | ||
| Labor Category B | ||
| Labor Category C | ||
| Labor Category D | ||
| Labor Category E | ||
| Labor Category F | ||
| Labor Category G | ||
| Labor Category H | ||
| Direct Labor Subtotal |
| Other Direct Costs | ||
| ODC A | ||
| ODC B | ||
| ODC C | ||
| ODC D | ||
| ODC E | ||
| ODC F | ||
| ODC Subtotal |
| Interdivisional Transfers | ||
| Interdivisional Transfer A | ||
| Interdivisional Transfer B | ||
| Interdivisional Subtotal |
| Indirect Costs | ||
| Material Overhead | ||
| Fringe | ||
| Labor Overhead | ||
| Other Overhead | ||
| Indirect Subtotal |
G&A
Subtotal Cost
FCCOM
Total Estimated Cost
Fixed Fee
| TOTAL |
| NOTES: |
| 1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable. |
| 2) For each separate cost element, show the base, rate,and extended amount; include embedded formulas that identify all calculations. |
| 3) Cost element breakout shall be broken out by Contractor Fiscal Year (CFY), Offeror shall identify their FY |
| 4) Year 1 and Year 3 represent the first and last years of effort, expand as applicable |
| 5) Include applicable resource codes. |
| 6) Insert separate cost element breakouts in support of any interdivisional cost. |
| 7) Ensure that the material, subcontracts, labor hour, and other direct cost spreadsheet tabs do reconcile back to this cost format and the BOEs in your cost volume. |
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
10. CLIN 0006AB by WBS
| TASS Sample Problem 2: Design and Installation by WBS | ||||||||||||||||||||||||||||||||||||||||||||||||
| Reference | ||||||||||||||||||||||||||||||||||||||||||||||||
| FPS3 Contract WBS and Directory | ||||||||||||||||||||||||||||||||||||||||||||||||
| CLIN 0006AB | Materials | Total | Subcontracts | Total SubKtrs | Inter-Div Transfers | Prime Labor | Total Prime Labor | Total | Other Direct Costs | Totsl | Indirect Costs | Total | Total | |||||||||||||||||||||||||||||||||||
| WBS | Materials | SubKtr A (Identify) | SubKtr B (Identify) | SubKtr C (Identify) | SubKtr D (Identify) | Engr Labor - In-Plant | Engr Labor - Field Site | Manufacturing Labor | Other | Engr | Engr | Mfg | Total | Est. Cost | Estimated | |||||||||||||||||||||||||||||||||
| L | L | L | L | WBS | Purchased | Raw | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Direct | Procurement | Overhead | Overhead | Overhead | Indirect | w/o | FCCOM | Cost | ||||||||||||||||||
| 1 | . | 2 | . | 3 | 4 | Description | Parts | Materials | Services | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Dollars | Hours | Dollars | Hours | Dollars | Hours | Dollars | Hours | ODC A | ODC B | ODC C | ODC D | ODC E | Travel | Costs | Overhead | Fringe | In-Plant | Field Site | G&A | Costs | FCCOM | Subtotal | ||
| 1 | . | . | Force Protection Security Systems (FPS3) | $0 | $0 | $0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||
| 1 | . | 1 | . | Fixed Site Intrusion Detection System (IDS) | $0 | $0 | $0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| 1 | . | 1 | . | 1 | Detection | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 2 | Assessment & Surveillance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 3 | Command, Control & Display | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 4 | Access Control | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 5 | Distribution equipment | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 6 | Communications | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 7 | Power | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 8 | Ancillary Equipment (Other) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 9 | GFE | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 10 | Fence (delay/denial) (as applicable) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 11 | Lighting subsystem (as applicable) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 12 | Integration, Assembly, Test & Checkout | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
| 1 | . | 2 | . | Tactical Automated Security System (TASS) | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 2 | . | 1 | Sensor Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 2 | Assessment Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 3 | Data/Comm Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 4 | Reporting & Display Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 5 | Power Supply Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
| 1 | . | 4 | . | Systems Engineering | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |||
| 1 | . | 4 | . | 1 | System Architecture (SEIWG) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 2 | System Design | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | ||
| 1 | . | 4 | . | 2 | . | 1 | Site Survey | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 2 | . | 2 | Design & Reviews | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 3 | Configuration Management | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 4 | Supportability Analysis | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 5 | Quality Assurance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 6 | Risk Management | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 7 | Advanced Technology (SEIWG support) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 8 | Special studies and analyses | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 9 | Information Assurance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 5 . Program Management $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 6 | . | Training | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 6 | . | 1 | Simulator (Annunciator) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 6 | . | 2 | Training Services | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 6 | . | 3 | Training Materials | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 7 . Data $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 8 | . | System Installation/Integration (Operational Site Activation) on Site | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 8 | . | 1 | Fixed Site Intrusion Detection System | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 8 | . | 2 | Tactical Automated Security System (TASS) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 9 . Systems Test & Evaluation $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 10 | . | Interim Contractor Support | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 10 | . | 1 | Organizational level | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 10 | . | 2 | Depot level | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 10 | . | 3 | ICS spares and repair parts | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| NOTES: | |||||||||||||||||||||||||||||||||||||||||||||||
| 1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable. | |||||||||||||||||||||||||||||||||||||||||||||||
| 2) Do Not alter the WBS |
DATE: &D FPS3 PROJECT COST FORMATS
&A &P of &N
11. Bill of Material Bill of Material (BOM)
For the cost type CLINs, insert spreadsheets that lists the material to be provided by either the prime, an interdivisional transfer, or a subcontractor. All material items with an extended amount greater than $5,000 shall be identified to include the item's nomenclature, supplier, supplier's part number, quantity, unit price, any escalation amount if applicable, any factored amount if applicable, and the resulting extended amount. Each line item, shall identify the applicable source (i.e. prime, division, or subcontractor), applicable CLIN, resource code, WBS, and the basis of estimate in order to enable a cross-referencing between the detailed cost element spreadsheets and the cost volume. If a supplier or part number is not available, provide the rationale for the estimate. Material items with an extended amount of less than $5,000 may be lumped together.
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
12. Subcontracts Subcontracts
For the cost type CLINs, insert a spreadsheet identifying each separate subcontract costs to be incurred by either the prime, an interdivisional transfer, or another subcontractor. Each line item, shall identify the applicable source (i.e. prime, division, or subcontractor), applicable CLIN, resource code, WBS, task description, and the basis of estimate in order to enable a cross-referencing between the detailed cost element spreadsheets and the cost volume. Reference Section L para 6.2.6.
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
13. Labor Hours Labor Hours
For the cost type CLINs, insert a spreadsheet listing of all labor hours to be performed by either the prime, an interdivisional transfer, or a subcontractor. Each line item, shall identify the applicable source (i.e. prime, division, or subcontractor), applicable CLIN, resource code, labor category, WBS, and the basis of estimate in order to enable a cross-referencing between the detailed cost element spreadsheets and the cost volume.
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
14. Other Direct Costs Other Direct Costs
For the cost type CLINs, insert a spreadsheet identifying each separate other direct costs to be incurred by either the prime, an interdivisional transfer, or another subcontractor. Each line item, shall identify the applicable source (i.e. prime, division, or subcontractor), applicable CLIN, resource code, WBS, task description, and the basis of estimate in order to enable a cross-referencing between the detailed cost element spreadsheets and the cost volume.
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
15. Travel Worksheet
| TRAVEL | |||
| Travel CLIN 0006AA | |||
| Fixed Site Sample Problem 1: CLIN 0006AA | Days | Air | Days |
Robert Campbell:
1st and last day of per diem at 75% Per Per No. Vehicle Robert Campbell: D = Daily W = Weekly
| M = Monthly | Vehicle | Vehicle | Vehicle | Trans | Trans | Auto | ||||||||||||||||||||||||
| No. of | No. of | per | Air | Fare | Nights | Lodging | Lodging | Per | Diem | Diem | Vehicles | Rental | Rental | Rental | Rental | Home to | Airport | No. of | Mileage | Mileage | Rental | |||||||||
| WBS | Itinerary | Purpose | Persons | Trips | Trip | Fare | Amount | Lodging | Rate | Amount | Diem | Rate | Amount | Rented | Basis | Qty | Rate | Amount | Airport | to Home | Parking | Miles | Rate | Amount | Gasoline | Identify | Identify | Identify | Totals |
| Travel related (CLIN 0006AA) | ||||||||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| Total Travel related (CLIN 0006AA) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Total Travel | $0 |
| G&A | |
| Total 0302AA including Burden | $0 |
| Travel CLIN 0011AA | |||
| Fixed Site Sample Problem 1 ICS: CLIN 0011AA | Days | Air | Days |
Robert Campbell:
1st and last day of per diem at 75% Per Per No. Vehicle Robert Campbell: D = Daily W = Weekly
| M = Monthly | Vehicle | Vehicle | Vehicle | Trans | Trans | Auto | ||||||||||||||||||||||||
| No. of | No. of | per | Air | Fare | Nights | Lodging | Lodging | Per | Diem | Diem | Vehicles | Rental | Rental | Rental | Rental | Home to | Airport | No. of | Mileage | Mileage | Rental | |||||||||
| WBS | Itinerary | Purpose | Persons | Trips | Trip | Fare | Amount | Lodging | Rate | Amount | Diem | Rate | Amount | Rented | Basis | Qty | Rate | Amount | Airport | to Home | Parking | Miles | Rate | Amount | Gasoline | Identify | Identify | Identify | Totals |
| Travel related (CLIN 0011AA) | ||||||||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| Total Travel related (CLIN 0011AA) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Travel CLIN 0006AB | |||
| TASS Sample Problem 2: CLIN 0006AB | Days | Air | Days |
Robert Campbell:
1st and last day of per diem at 75%
Robert Campbell: D = Daily W = Weekly M = Monthly Per Per No. Vehicle Robert Campbell: D = Daily W = Weekly M = Monthly Robert Campbell:
1st and last day of per diem at 75%
| Vehicle | Vehicle | Vehicle | Trans | Trans | Auto | ||||||||||||||||||||||||
| No. of | No. of | per | Air | Fare | Nights | Lodging | Lodging | Per | Diem | Diem | Vehicles | Rental | Rental | Rental | Rental | Home to | Airport | No. of | Mileage | Mileage | Rental | ||||||||
| WBS | Itinerary | Purpose | Persons | Trips | Trip | Fare | Amount | Lodging | Rate | Amount | Diem | Rate | Amount | Rented | Basis | Qty | Rate | Amount | Airport | to Home | Parking | Miles | Rate | Amount | Gasoline | Identify | Identify | Identify | Totals |
| Travel related (CLIN XXXX) | ||||||||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| Total Travel related (CLIN 0006AB) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| NOTES: |
| 1) Travel Worksheet is an example and can be used. Offeror can revise travel worksheet as applicable to be consistent with their estimating system, revise as applicable |
| 2) For each travel line item, show all applicable rational for travel, amounts, including embedded formulas that identify all calculations |
| 3) Cost element breakout shall be by calendar year unless the offerors forward pricing rates are not based on a calendar year. If not calendar year, identify the fiscal year time period. |
| 4) Identify whether the travel will be performed by either the prime, an interdivisional transfer, or a subcontractor. |
DATE: &D FPS3 PROJECT COST FORMATS
&A &P of &N
16. Price Track Price Track
Price Track Tab: This worksheet tab is to be used to summarize the impact of changes (e.g., revised labor hours or direct and/or indirect rates, escalation factors, subcontract prices, changes in technical approach, etc.) made to your proposal in developing your Final Proposal Revision. Dollars in this format may be shown in thousands. Any changes in the Offeror’s proposal from initial to final should be reflected through profit/fee. As an example, the amount that could be shown for a change in the effort could reflect the change in Direct Labor dollars, and also include any burdens (Fringe, Overhead, G&A, Facilities Capital Cost of Money, and Profit/Fee). The headings on the “Changes” column are for illustrative purposes only.
The Offeror is free to delete those headings and substitute more appropriate headings that may be more descriptive of specific reasons for changes between the Initial and Final proposals. The offeror's FPR shall provide detailed rationale supporting all changes identified in this Price Track.
| Offeror shall also make notes in Cost Formats where Cost Tracks have occurred in tab 11 - tab 15 RED BOLD and Underlined |
| PRICE TRACK ($) |
Description INITIAL PROPOSAL PRICE Schedule Shift Spec. Changes Change in Material Cost Change in Labor Hours (Specify) Change in Labor or Burden Rates Change in Fee Other Changes Total Changes FPR PRICE
TOTAL PROPOSAL
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
Sheet1
Microsoft_Word_Document1.docx For Official Use Only (FOUO)
D-ILS Statement of Objectives 1st DRAFT V ((0) 13-May-2009
ATTACHMENT 8
INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
INSTRUCTIONS FOR PROPOSAL PREPARATION (IFPP)
SECTION L
ATTACHMENT L-7
VOLUME IV, COST FORMATS
FOR
FORCE PROTECTION SITE SECURITY SYSTEM (FPS3)
13 January 2014 i
For Official Use Only (FOUO) image1.emf
File details come from the government source that posted it. Updated .