b_FA8730-14-R-0004_0001.pdf

PDF 223 KB Posted

Attached to
FPS3 SolicitationFA8730-14-R-0004 Federal contract opportunity
Solicitation number
FA8730-14-R-0004
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hanscom Air Force Base

About this file

Amendment 1

View the file

Other files for this federal contract opportunity

Other files attached to FPS3 SolicitationFA8730-14-R-0004, newest first.
File Type Posted
FA8730-14-R-0004_0002_signature.pdf PDF
FA8730-14-R-0004_0002.pdf PDF
FPS3_RFP_Amendment_2_Cover_Letter__29_Jan_2014.pdf PDF
Questions_Answers_FPS3_RFP_23_Jan_2014.docx DOCX document
Questions_Answers_FPS3_RFP_17_Jan_2014.docx DOCX document
Questions_Answers_FPS3_RFP_14_Jan_2014.docx DOCX document
FA8730-14-R-0004_CONFORMED.docx DOCX document
c_Exhibit_B_AMENDMENT_1_-_FPS3_B-Tables_TM_Labor_Rates_(To_Be_Proposed)_13_Jan_14.xlsx XLSX spreadsheet
d_Attachment_6_AMENDMENT_1_-_FPS3_OCONUS_Location_Specific_Terms_and_Conditions_13_Jan_14.docx DOCX document
Signed_SF30_cover_page_13_Jan_14.pdf PDF
g_Attachment_8_(L-7)_AMENDMENT_1_-_FPS3_Cost_Formats_13_Jan_14.xlsx XLSX spreadsheet
f_Attachment_8_AMENDMENT_1-_FPS3_Section_L_13_Jan_14.docx DOCX document
h_Attachment_8_(L-8)_AMENDMENT_1_-_FPS3_Sample_Problem_1_Drawing_13_Jan_14.pdf PDF
e_Attachment_7_-_FPS3_Work_Breakdown_Structure_(WBS)_13_Jan_14.docx DOCX document
FPS3_Status_Update_for_Industry_13_Jan_14.pdf PDF
i_Attachment_8_(L-8)_AMENDMENT_1_-_FPS3_Sample_Problem_1_Drawing_13_Jan_14.dwg DWG drawing
Questions_Answers_FPS3_RFP_10_Jan_2014.docx DOCX document
FPS3_Status_Update_for_Industry_10_Jan_14.pdf PDF
FPS3_Status_Update_for_Industry_8_Jan_14.pdf PDF
Questions_Answers_FPS3_RFP_8_Jan_14.docx DOCX document
FPS3_Status_Update_for_Industry_6_Jan_14.pdf PDF
Questions_Answers_FPS3_RFP_20_Dec_2013.docx DOCX document
Industry_Update_Q A_Cover_Letter_20_Dec_2013.pdf PDF
Exhibit_A_-_FPS3_Represenative_CDRL_listing_05_Dec_13.docx DOCX document
Attachment_8_(L-7)_-_FPS3_Cost_Formats_05_Dec_13_Letter_Size.xlsx XLSX spreadsheet
Attachment_9_-_FPS3_Section_M_05_Dec_13.doc DOC document
Attachment_6_-_FPS3_OCONUS_Location_Specific_Terms_and_Conditions_5_Dec_13.docx DOCX document
Attachment_8_-_FPS3_-_Section_L_05_Dec_13.docx DOCX document
Attachment_5_-_FPS3_Labor_Categories_05_Dec_13.docx DOCX document
Attachment_8_(L-8)_-_FPS3_Sample_Problem_1_Drawing_05_Dec_13.dwg DWG drawing
Attachment_7_-_FPS3_Work_Breakdown_Structure_(WBS)_05_Dec_13.docx DOCX document
Attachment_8_(L-8)_-_FPS3_Sample_Problem_2_Drawing_05_Dec_13.ppt PPT presentation
Attachment_2_-_FPS3_PWS_05_Dec_13.docx DOCX document
Attachment_4_-_FPS3_Small_Business_Subcontracting_Plan_(To_Be_Proposed)_05_Dec_13.docx DOCX document
Exhibit_B_-_FPS3_B-Tables_T M_Labor_Rates_(To_Be_Proposed)_05_Dec_13.xlsx XLSX spreadsheet
Attachment_3_-_FPS3_DD254_(To_Be_Proposed)_05_Dec_13.pdf PDF
FA8730-14-R-0004_05_Dec_13.pdf PDF
Attachment_1_-_FPS3_SOW_05_Dec_13.docx DOCX document
FPS3_RFP_cover_letter_5_Dec_13.pdf PDF
Attachment_8_(L-8)_-_FPS3_Sample_Problem_1_Drawing_05_Dec_13.pdf PDF
Show all 40

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

See Block #2

PAGE OF PAGES

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

4. REQUISITION/PURCHASE REQ.NO.

5. PROJECT NO. (If applicable)

6. ISSUED BY AFLCMC/HBUUK CODE FA8730 7. ADMINISTERED BY (If other than Item 6) CODE

AIR FORCE MATERIEL COMMAND, USAF

AFLCMC/HBUK

3 EGLIN STREET, BLDG 1612

HANSCOM AFB, MA 01731-1700

BRAYDEN C. BURROUGHS 781-225-1748

brayden.burroughs@hanscom.af.mil

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NO.

FA8730-14-R-0004

X

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers X is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 0 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER.

If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

(X )

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: ( ) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. ITEM

10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See Schedule.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print).

16A. NAME AND TITLE OF SIGNER (Type or print)

15B. CONTRACTOR/OFFEROR

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

16C. DATE SIGNED

(Signature of person authorized to sign)

BY________________________________________

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV.10-83)

PREVIOUS EDITION UNUSABLE Prescribed by GSA ConWrite Version 6.14.1 FAR (48 CFR) 53.243 Created 13 Jan 2014 3:24 PM

SCHEDULE OF CHANGES

FA8730-14-R-0004 0001

The purpose of this amendment is to update the following sections:

1. SECTION B -SUPPLIES OR SERVIES AND PRICES/COST

1) Removed the question marks from the top of page 15

2. SECTION H - SPECIAL CONTRACT REQUIREMENTS

1) Added additional support contractors to clause FPS3-H003 Program Office Support Contractors

2) Added Other Direct Cost to clause FPS3-H005 OCONUS Performance

3) Clarified "delivery order" period of performance to clause FPS3-H002 Vendor Warranties

3. SECTION I - CONTRACT CLAUSES

1) Added clause 252.228-7003 Capture and Detention for OCONUS Performance

2) Removed clause 252.225-7039 Contractors Performing Private Security Functions (Jun 2013)

3) Added clause 52.222-41 Service Contract Act of 1965 (Nov 2007)

4. SECTION J - LIST OF ATTACHMENTS

Exhibit B - FPS3 B-TABLES T&M LABOR RATES

1) Changed note to read "Prime Contractor Rates by Government Fiscal Year (GFY)," added SubContractor T&M rates, removed cost element level of T&M rate.

Attachment 6 - FPS3 OCONUS LOCATION SPECIFIC TERMS AND CONDITIONS

1) Corrected reference to Japan in "Contracts to Be Performed In Germany" on page 8

2) Added Clause "Contracts to Be Performed in Italy" to page 8

Attachment 7 - WORK BREAKDOWN STRUCTURE

1) Added "as applicable" lighting and fence work under 1.8

2) Corrected numbering/title to description of 1.4.2.2 and added clarifying punctuation

3) Deleted 1.8.2.6 as duplicative of 18.2.3

Attachment 8 - SECTION L Changes to Section L have been highlighted throughout; however, please re-read the entire document.

Changes to Section L include, but are not limited to the following:

1) Corrected various paragraph, table numbering, and other small administrative errors

2) Added additional support contractors to paragraph 2.1.5.

3) Updated paragraph 2.2.2 Page Size and Format

4) Updated paragraph 4.4.2, 4.4.3, 4.4.5, 4.5.2 and 4.5.3 to clarify requirements for test approach, QA and management submittals

5) Updated paragraph 6.2.2, 6.3.5.2 and 7.1.10 to indicate that all T&M labor rates shall be based on Government Fiscal Year.

6) Updated paragraph 6.3.3 to clarify Basis of Estimate requirements

7) Updated paragraph 7.1.10 to clarify which documents should, and should not, be submitted as part of an offeror's proposal

8) Corrected paragraph 7.3.2 to remove Government Paying Office

9) Updated Attachment L-2, paragraph 2.2.1 to include office space and internet connectivity assumptions

10) On-site storage and hangar door assumptions added to Attachment L-2, Table 2-1

11) Clarified the composition of the pavement and the Government Furnished Contractor Support to be included for Sample Problem #2, Table 3-1

12) Forward Supply Warehouse information added to Attachment L-2, paragraph 3.2.1h

13) Added Attachment L-2, paragraph 4.2.9.1 to clarify video storage capacity requirements

SCHEDULE OF CHANGES

14) Added storage availability assumptions and definitions of "Catastrophic", "Major", "Partial" failures to Attachment L-2, paragraph 4.2.26

15) Updated Attachment L-2, Table 4-5 to account for obsolete and new products and version numbers

16) Corrected typo in Attachment L-7, Tab 2 to"FY22" and indicated GFY

17) Updated Attachment L-7, Tab 4 to better correspond to Table 4-6 in Attachment L-2

18) Sample Problem #1 drawing has been updated to reflect the correct length of Taxiway C

This amendment also extends the due date of the solictation to 2:00PM (ET) 31 Jan 14.

LIST OF ATTACHMENTS

DOCUMENT PGS DATE TITLE

EXHIBIT B 2 13 JAN 2014 FPS3 B-TABLES T&M LABOR RATES (TO BE

PROPOSED)

ATTACHMENT 6 26 13 JAN 2014 FPS3 OCONUS LOCATION SPECIFIC TERMS AND

CONDITIONS

ATTACHMENT 7 15 13 JAN 2014 FPS3 WORK BREAKDOWN STRUCTURE (WBS)

ATTACHMENT 8 101 13 JAN 2014 FPS3 SECTION L

File details come from the government source that posted it. Updated .