Attachment_8_(L-7)_-_FPS3_Cost_Formats_05_Dec_13_Letter_Size.xlsx

XLSX spreadsheet 220 KB Posted

Attached to
FPS3 SolicitationFA8730-14-R-0004
Solicitation number
FA8730-14-R-0004
Issued by

About this file

Attachment 8 L-7 - Cost Formats

View the file

Other files

File Type Posted
FA8730-14-R-0004_0002.pdf PDF
FPS3_RFP_Amendment_2_Cover_Letter__29_Jan_2014.pdf PDF
FA8730-14-R-0004_0002_signature.pdf PDF
Questions_Answers_FPS3_RFP_23_Jan_2014.docx DOCX document
Questions_Answers_FPS3_RFP_17_Jan_2014.docx DOCX document
Questions_Answers_FPS3_RFP_14_Jan_2014.docx DOCX document
FA8730-14-R-0004_CONFORMED.docx DOCX document
Signed_SF30_cover_page_13_Jan_14.pdf PDF
e_Attachment_7_-_FPS3_Work_Breakdown_Structure_(WBS)_13_Jan_14.docx DOCX document
c_Exhibit_B_AMENDMENT_1_-_FPS3_B-Tables_TM_Labor_Rates_(To_Be_Proposed)_13_Jan_14.xlsx XLSX spreadsheet
g_Attachment_8_(L-7)_AMENDMENT_1_-_FPS3_Cost_Formats_13_Jan_14.xlsx XLSX spreadsheet
b_FA8730-14-R-0004_0001.pdf PDF
f_Attachment_8_AMENDMENT_1-_FPS3_Section_L_13_Jan_14.docx DOCX document
d_Attachment_6_AMENDMENT_1_-_FPS3_OCONUS_Location_Specific_Terms_and_Conditions_13_Jan_14.docx DOCX document
h_Attachment_8_(L-8)_AMENDMENT_1_-_FPS3_Sample_Problem_1_Drawing_13_Jan_14.pdf PDF
i_Attachment_8_(L-8)_AMENDMENT_1_-_FPS3_Sample_Problem_1_Drawing_13_Jan_14.dwg DWG drawing
FPS3_Status_Update_for_Industry_13_Jan_14.pdf PDF
Questions_Answers_FPS3_RFP_10_Jan_2014.docx DOCX document
FPS3_Status_Update_for_Industry_10_Jan_14.pdf PDF
Questions_Answers_FPS3_RFP_8_Jan_14.docx DOCX document
FPS3_Status_Update_for_Industry_8_Jan_14.pdf PDF
FPS3_Status_Update_for_Industry_6_Jan_14.pdf PDF
Industry_Update_Q A_Cover_Letter_20_Dec_2013.pdf PDF
Questions_Answers_FPS3_RFP_20_Dec_2013.docx DOCX document
Attachment_3_-_FPS3_DD254_(To_Be_Proposed)_05_Dec_13.pdf PDF
Exhibit_B_-_FPS3_B-Tables_T M_Labor_Rates_(To_Be_Proposed)_05_Dec_13.xlsx XLSX spreadsheet
FA8730-14-R-0004_05_Dec_13.pdf PDF
Exhibit_A_-_FPS3_Represenative_CDRL_listing_05_Dec_13.docx DOCX document
Attachment_9_-_FPS3_Section_M_05_Dec_13.doc DOC document
Attachment_6_-_FPS3_OCONUS_Location_Specific_Terms_and_Conditions_5_Dec_13.docx DOCX document
Attachment_1_-_FPS3_SOW_05_Dec_13.docx DOCX document
Attachment_8_-_FPS3_-_Section_L_05_Dec_13.docx DOCX document
FPS3_RFP_cover_letter_5_Dec_13.pdf PDF
Attachment_5_-_FPS3_Labor_Categories_05_Dec_13.docx DOCX document
Attachment_8_(L-8)_-_FPS3_Sample_Problem_1_Drawing_05_Dec_13.pdf PDF
Attachment_8_(L-8)_-_FPS3_Sample_Problem_1_Drawing_05_Dec_13.dwg DWG drawing
Attachment_4_-_FPS3_Small_Business_Subcontracting_Plan_(To_Be_Proposed)_05_Dec_13.docx DOCX document
Attachment_2_-_FPS3_PWS_05_Dec_13.docx DOCX document
Attachment_8_(L-8)_-_FPS3_Sample_Problem_2_Drawing_05_Dec_13.ppt PPT presentation
Attachment_7_-_FPS3_Work_Breakdown_Structure_(WBS)_05_Dec_13.docx DOCX document
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cover Page

FPS3 COST FORMATS

&A &P of &N

Index

1. Total Evaluated Price
2. T&M Summary
3. CLIN Summary
4. GFE Summary
5. CLIN 0006AA by Year
6. CLIN 0006AA by WBS
7. CLIN 0011AA by Year
8. CLIN 0011AA by WBS
9. CLIN 0006AB by Year
10. CLIN 0006AB by WBS
11. Bill of Material
12. Subcontracts
13. Labor Hours
14. Other Direct Costs
15. Travel Worksheet
16. Price Track

FPS3 PROJECT COST FORMATS

&A &P of &N

1. Total Evaluated Price

Total Evalualted Price
T&M at BEQ
Tab 2$ - 0
CPFF at GEMPC
Sample Problem 1

Fixed Site Design / Install

CLIN 0006AA (CPFF)Proposed Estimated Cost from Tab 3$ - 0
Proposed Fixed Fee from Tab 3$ - 0
Government Probable Cost Adjustment$ - 0
Tab 3 @ GEMPC plus the proposed fixed fee$ - 0
Sample Problem 1

Fixed Site

ICS

CLIN 0011AA (CPFF)Proposed Estimated Cost from Tab 3$ - 0
Proposed Fixed Fee from Tab 3$ - 0
Government Probable Cost Adjustment$ - 0
Tab 3 @ GEMPC plus the proposed fixed fee$ - 0
Sample Problem 2

Fixed Site Design / Install

CLIN 0006AB (CPFF)Proposed Estimated Cost from Tab 3$ - 0
Proposed Fixed Fee from Tab 3$ - 0
Government Probable Cost Adjustment$ - 0
Tab 3 @ GEMPC plus the proposed fixed fee$ - 0
Total CPFF at GEMPC$ - 0
Government Furnished Equipment (GFE)
Tab 4$ - 0
Total Price
$ - 0

Date: &D FPS3 PROJECT COST FORMATS

&A &P of &N

2. T&M Summary

T&M Summary
Tab 2. T&M Summary, cell B2: In accordance with DFARS 252.216-7002, please breakout separate rates for each category of labor to be performed by each subcontractor and for each category of labor to be performed by the offeror, and for each category of labor to be transferred between divisions,subsidiaries, or affiliates of the offeror under a common control. The below table may be modified by the offeror to establish multiple subcontractor or interdivisional rates as necessary to comply with the DFARS provision. The Government Provided hours for each labor category for each year is 30 hours. The offeror shall then equally distribute the 30 hours between each separately price labor rate such that the total labor hours for that labor category and year equals 30 hours.
Fully loaded T&M rates multiplied by the BEQ
Government Provided hoursPrime ContractorFY 15 Rate ($/hr)Total PrimeSubcontractorFY 15 Rate ($/hr)Total SubcontractorTotal at BEQ ($) FY15
a.Systems Engineer30$0.00$0.00$0.00$0.00$ - 0
b.Senior Engineer30$0.00$0.00$0.00$0.00$ - 0
c.Engineer30$0.00$0.00$0.00$0.00$ - 0
d.Sr. Technician30$0.00$0.00$0.00$0.00$ - 0
e.Technician30$0.00$0.00$0.00$0.00$ - 0
f.Logistics Manager30$0.00$0.00$0.00$0.00$ - 0
g.Logistics Specialist30$0.00$0.00$0.00$0.00$ - 0
h.Admin/Clerical30$0.00$0.00$0.00$0.00$ - 0
i.Systems Field Engineer (FE)30$0.00$0.00$0.00$0.00$ - 0
j.Systems Administrator (SA)30$0.00$0.00$0.00$0.00$ - 0
k.Tactical Systems-Field Engineer (FE)30$0.00$0.00$0.00$0.00$ - 0
l.Tactical Systems-System Admin (SA)30$0.00$0.00$0.00$0.00$ - 0
m.Trainer30$0.00$0.00$0.00$0.00$ - 0
n.Architect30$0.00$0.00$0.00$0.00$ - 0
o.Project Manager30$0.00$0.00$0.00$0.00$ - 0
p.Quality Assurance Inspector30$0.00$0.00$0.00$0.00$ - 0
q.IA Specialist30$0.00$0.00$0.00$0.00$ - 0
Total of T&M rates at the BEQ$ - 0
Escalation (by Contractor Fiscal Year)
Material Escalation
Subcontract Escalation
Labor Escalation
ODC Escalation
Fully loaded T&M rates multiplied by the BEQ
Government Provided hoursPrime ContractorFY 16 Rate ($/hr)Total PrimeSubcontractorFY 16 Rate ($/hr)Total SubcontractorTotal at BEQ ($) FY16
a.Systems Engineer30$0.00$0.00$0.00$0.00$ - 0
b.Senior Engineer30$0.00$0.00$0.00$0.00$ - 0
c.Engineer30$0.00$0.00$0.00$0.00$ - 0
d.Sr. Technician30$0.00$0.00$0.00$0.00$ - 0
e.Technician30$0.00$0.00$0.00$0.00$ - 0
f.Logistics Manager30$0.00$0.00$0.00$0.00$ - 0
g.Logistics Specialist30$0.00$0.00$0.00$0.00$ - 0
h.Admin/Clerical30$0.00$0.00$0.00$0.00$ - 0
i.Systems Field Engineer (FE)30$0.00$0.00$0.00$0.00$ - 0
j.Systems Administrator (SA)30$0.00$0.00$0.00$0.00$ - 0
k.Tactical Systems-Field Engineer (FE)30$0.00$0.00$0.00$0.00$ - 0
l.Tactical Systems-System Admin (SA)30$0.00$0.00$0.00$0.00$ - 0
m.Trainer30$0.00$0.00$0.00$0.00$ - 0
n.Architect30$0.00$0.00$0.00$0.00$ - 0
o.Project Manager30$0.00$0.00$0.00$0.00$ - 0
p.Quality Assurance Inspector30$0.00$0.00$0.00$0.00$ - 0
q.IA Specialist30$0.00$0.00$0.00$0.00$ - 0
Total of T&M rates at the BEQ$ - 0
Fully loaded T&M rates multiplied by the BEQ
Government Provided hoursPrime ContractorFY 17 Rate ($/hr)Total PrimeSubcontractorFY 17 Rate ($/hr)Total SubcontractorTotal at BEQ ($) FY17
a.Systems Engineer30$0.00$0.00$0.00$0.00$ - 0
b.Senior Engineer30$0.00$0.00$0.00$0.00$ - 0
c.Engineer30$0.00$0.00$0.00$0.00$ - 0
d.Sr. Technician30$0.00$0.00$0.00$0.00$ - 0
e.Technician30$0.00$0.00$0.00$0.00$ - 0
f.Logistics Manager30$0.00$0.00$0.00$0.00$ - 0
g.Logistics Specialist30$0.00$0.00$0.00$0.00$ - 0
h.Admin/Clerical30$0.00$0.00$0.00$0.00$ - 0
i.Systems Field Engineer (FE)30$0.00$0.00$0.00$0.00$ - 0
j.Systems Administrator (SA)30$0.00$0.00$0.00$0.00$ - 0
k.Tactical Systems-Field Engineer (FE)30$0.00$0.00$0.00$0.00$ - 0
l.Tactical Systems-System Admin (SA)30$0.00$0.00$0.00$0.00$ - 0
m.Trainer30$0.00$0.00$0.00$0.00$ - 0
n.Architect30$0.00$0.00$0.00$0.00$ - 0
o.Project Manager30$0.00$0.00$0.00$0.00$ - 0
p.Quality Assurance Inspector30$0.00$0.00$0.00$0.00$ - 0
q.IA Specialist30$0.00$0.00$0.00$0.00$ - 0
Total of T&M rates at the BEQ$ - 0
Fully loaded T&M rates multiplied by the BEQ
Government Provided hoursPrime ContractorFY 18 Rate ($/hr)Total PrimeSubcontractorFY 18 Rate ($/hr)Total SubcontractorTotal at BEQ ($) FY18
a.Systems Engineer30$0.00$0.00$0.00$0.00$ - 0
b.Senior Engineer30$0.00$0.00$0.00$0.00$ - 0
c.Engineer30$0.00$0.00$0.00$0.00$ - 0
d.Sr. Technician30$0.00$0.00$0.00$0.00$ - 0
e.Technician30$0.00$0.00$0.00$0.00$ - 0
f.Logistics Manager30$0.00$0.00$0.00$0.00$ - 0
g.Logistics Specialist30$0.00$0.00$0.00$0.00$ - 0
h.Admin/Clerical30$0.00$0.00$0.00$0.00$ - 0
i.Systems Field Engineer (FE)30$0.00$0.00$0.00$0.00$ - 0
j.Systems Administrator (SA)30$0.00$0.00$0.00$0.00$ - 0
k.Tactical Systems-Field Engineer (FE)30$0.00$0.00$0.00$0.00$ - 0
l.Tactical Systems-System Admin (SA)30$0.00$0.00$0.00$0.00$ - 0
m.Trainer30$0.00$0.00$0.00$0.00$ - 0
n.Architect30$0.00$0.00$0.00$0.00$ - 0
o.Project Manager30$0.00$0.00$0.00$0.00$ - 0
p.Quality Assurance Inspector30$0.00$0.00$0.00$0.00$ - 0
q.IA Specialist30$0.00$0.00$0.00$0.00$ - 0
Total of T&M rates at the BEQ$ - 0
Fully loaded T&M rates multiplied by the BEQ
Government Provided hoursPrime ContractorFY 19 Rate ($/hr)Total PrimeSubcontractorFY 19 Rate ($/hr)Total SubcontractorTotal at BEQ ($) FY19
a.Systems Engineer30$0.00$0.00$0.00$0.00$ - 0
b.Senior Engineer30$0.00$0.00$0.00$0.00$ - 0
c.Engineer30$0.00$0.00$0.00$0.00$ - 0
d.Sr. Technician30$0.00$0.00$0.00$0.00$ - 0
e.Technician30$0.00$0.00$0.00$0.00$ - 0
f.Logistics Manager30$0.00$0.00$0.00$0.00$ - 0
g.Logistics Specialist30$0.00$0.00$0.00$0.00$ - 0
h.Admin/Clerical30$0.00$0.00$0.00$0.00$ - 0
i.Systems Field Engineer (FE)30$0.00$0.00$0.00$0.00$ - 0
j.Systems Administrator (SA)30$0.00$0.00$0.00$0.00$ - 0
k.Tactical Systems-Field Engineer (FE)30$0.00$0.00$0.00$0.00$ - 0
l.Tactical Systems-System Admin (SA)30$0.00$0.00$0.00$0.00$ - 0
m.Trainer30$0.00$0.00$0.00$0.00$ - 0
n.Architect30$0.00$0.00$0.00$0.00$ - 0
o.Project Manager30$0.00$0.00$0.00$0.00$ - 0
p.Quality Assurance Inspector30$0.00$0.00$0.00$0.00$ - 0
q.IA Specialist30$0.00$0.00$0.00$0.00$ - 0
Total of T&M rates at the BEQ$ - 0
Fully loaded T&M rates multiplied by the BEQ
Government Provided hoursPrime ContractorFY 20 Rate ($/hr)Total PrimeSubcontractorFY 20 Rate ($/hr)Total SubcontractorTotal at BEQ ($) FY20
a.Systems Engineer30$0.00$0.00$0.00$0.00$ - 0
b.Senior Engineer30$0.00$0.00$0.00$0.00$ - 0
c.Engineer30$0.00$0.00$0.00$0.00$ - 0
d.Sr. Technician30$0.00$0.00$0.00$0.00$ - 0
e.Technician30$0.00$0.00$0.00$0.00$ - 0
f.Logistics Manager30$0.00$0.00$0.00$0.00$ - 0
g.Logistics Specialist30$0.00$0.00$0.00$0.00$ - 0
h.Admin/Clerical30$0.00$0.00$0.00$0.00$ - 0
i.Systems Field Engineer (FE)30$0.00$0.00$0.00$0.00$ - 0
j.Systems Administrator (SA)30$0.00$0.00$0.00$0.00$ - 0
k.Tactical Systems-Field Engineer (FE)30$0.00$0.00$0.00$0.00$ - 0
l.Tactical Systems-System Admin (SA)30$0.00$0.00$0.00$0.00$ - 0
m.Trainer30$0.00$0.00$0.00$0.00$ - 0
n.Architect30$0.00$0.00$0.00$0.00$ - 0
o.Project Manager30$0.00$0.00$0.00$0.00$ - 0
p.Quality Assurance Inspector30$0.00$0.00$0.00$0.00$ - 0
q.IA Specialist30$0.00$0.00$0.00$0.00$ - 0
Total of T&M rates at the BEQ$ - 0
Fully loaded T&M rates multiplied by the BEQ
Government Provided hoursPrime ContractorFY 21 Rate ($/hr)Total PrimeSubcontractorFY 21 Rate ($/hr)Total SubcontractorTotal at BEQ ($) FY21
a.Systems Engineer30$0.00$0.00$0.00$0.00$ - 0
b.Senior Engineer30$0.00$0.00$0.00$0.00$ - 0
c.Engineer30$0.00$0.00$0.00$0.00$ - 0
d.Sr. Technician30$0.00$0.00$0.00$0.00$ - 0
e.Technician30$0.00$0.00$0.00$0.00$ - 0
f.Logistics Manager30$0.00$0.00$0.00$0.00$ - 0
g.Logistics Specialist30$0.00$0.00$0.00$0.00$ - 0
h.Admin/Clerical30$0.00$0.00$0.00$0.00$ - 0
i.Systems Field Engineer (FE)30$0.00$0.00$0.00$0.00$ - 0
j.Systems Administrator (SA)30$0.00$0.00$0.00$0.00$ - 0
k.Tactical Systems-Field Engineer (FE)30$0.00$0.00$0.00$0.00$ - 0
l.Tactical Systems-System Admin (SA)30$0.00$0.00$0.00$0.00$ - 0
m.Trainer30$0.00$0.00$0.00$0.00$ - 0
n.Architect30$0.00$0.00$0.00$0.00$ - 0
o.Project Manager30$0.00$0.00$0.00$0.00$ - 0
p.Quality Assurance Inspector30$0.00$0.00$0.00$0.00$ - 0
q.IA Specialist30$0.00$0.00$0.00$0.00$ - 0
Total of T&M rates at the BEQ$ - 0
Fully loaded T&M rates multiplied by the BEQ
Government Provided hoursPrime ContractorFY 22 Rate ($/hr)Total PrimeSubcontractorFY 23 Rate ($/hr)Total SubcontractorTotal at BEQ ($) FY23
a.Systems Engineer30$0.00$0.00$0.00$0.00$ - 0
b.Senior Engineer30$0.00$0.00$0.00$0.00$ - 0
c.Engineer30$0.00$0.00$0.00$0.00$ - 0
d.Sr. Technician30$0.00$0.00$0.00$0.00$ - 0
e.Technician30$0.00$0.00$0.00$0.00$ - 0
f.Logistics Manager30$0.00$0.00$0.00$0.00$ - 0
g.Logistics Specialist30$0.00$0.00$0.00$0.00$ - 0
h.Admin/Clerical30$0.00$0.00$0.00$0.00$ - 0
i.Systems Field Engineer (FE)30$0.00$0.00$0.00$0.00$ - 0
j.Systems Administrator (SA)30$0.00$0.00$0.00$0.00$ - 0
k.Tactical Systems-Field Engineer (FE)30$0.00$0.00$0.00$0.00$ - 0
l.Tactical Systems-System Admin (SA)30$0.00$0.00$0.00$0.00$ - 0
m.Trainer30$0.00$0.00$0.00$0.00$ - 0
n.Architect30$0.00$0.00$0.00$0.00$ - 0
o.Project Manager30$0.00$0.00$0.00$0.00$ - 0
p.Quality Assurance Inspector30$0.00$0.00$0.00$0.00$ - 0
q.IA Specialist30$0.00$0.00$0.00$0.00$ - 0
Total of T&M rates at the BEQ$ - 0

Total of T&M rates at the BEQ FY15 - FY22 $ - 0

DATE: &D FPS3 PROJECT COST FORMATS

&A &P of &N

3. CLIN Summary

CLIN SUMMARY
Sample Problem 1Sample Problem 1Sample Problem 2Total
Fixed SiteFixed SiteTASS
CLINCLINCLIN
CPFFCPFFCPFF
0006AA0011AA0006AB
Design / InstallationICSDesign / Installation
Cost ElementBasicBasic
Direct Material$ - 0$ - 0$ - 0$ - 0
Subcontracts$ - 0$ - 0$ - 0$ - 0
Direct Labor$ - 0$ - 0$ - 0$ - 0
Other Direct Costs (ODCs)$ - 0$ - 0$ - 0$ - 0
Interdivisional Transfers$ - 0$ - 0$ - 0$ - 0
Indirect Costs$ - 0$ - 0$ - 0$ - 0
Subtotal Cost$ - 0$ - 0$ - 0$ - 0
FCCOM$ - 0$ - 0$ - 0$ - 0
Total Estimated Cost$ - 0$ - 0$ - 0$ - 0
Fee Percentage0.00%0.00%0.00%
Fixed Fee$ - 0$ - 0$ - 0$ - 0
Total CPFF$ - 0$ - 0$ - 0$ - 0
Note: For purposes of completing the above, indirect cost includes material overhead, fringe, labor overhead, other overhead, and G&A.

DATE: &D FPS3 PROJECT COST FORMATS

&A &P of &N

4. GFE Summary

GFE Summary
TASS EquipmentAverage CostQTYExtended Price
1/3 Pallett Garrett Container (w/o Indiv Equip Containers)$4,306$0
12v Battery Assembly$639$0
AIR (ECSI) Alignment Kit$1,223$0
AIR (ECSI) Anti-Vaulting Option$4,249$0
AIR Alignment Kit$3,829$0
Annunciator VI/Desktop (w/o Dual Channel VADS and Firewall) P/N 925212-1$8,922$0
Annunciator VI/Server (w/o Dual Channel VADS and Firewall) P/N 925211-1$25,038$0
Antenna Cable Connector$108$0
Base Station Antenna$3,464$0
Bi-Static Microwave Sensor-S (Pair)$6,397$0
Boundary Kit Pck w/ pallett & Ind Containers$9,346$0
Cable Assy Cm DLA UPS$558$0
CM Cable (EIA 485-2.5 FT)$274$0
CM/HHM Batteries$68$0
CMC Assembly (CMC-II)$3,218$0
CMC/CM Cable (EIA 485-6FT)$297$0
Color Printer$350$0
Communications Module$4,160$0
DLA Surge Protector$23$0
Equip Container - Size "A" - SW385(6)/CM(5)/HHM(2)$623$0
Equip Container - Size "A" -TASS Bracket (5), Fence Bracket (4), 12V Battery (2)$506$0
Equip Container - Size 'A' Empty w/ Foam Surround$494$0
Equipment Container - Size "B" - SW385(4)/Charger/CM(14)/HHM(4)$628$0
Equipment Container - Size "D" - UPS and Battery$532$0
Equipment container Size 'A' Air/fence Bracket (6)$499$0
Equipment Container Size 'A' PIR (2) / Cables / Fence Brackets$635$0
Equipment Container Size 'A' RBM (4)$464$0
Equipment Container Size 'A' RBM(2) / PIR (6)$506$0
Equipment Container Size 'A' RBM's/CM/HHM$506$0
Equipment Container Size 'A' Scanner Monitor Keyboard$627$0
Equipment Container Size 'A' SW310(8)$496$0
Equipment Container Size 'A' SW385/Piramid (6) MIDS(2)$506$0
Equipment Container Size 'B' Empty w/Foam Surround$539$0
Equipment Container Size 'B' FD-205 Fiber Optic Fence Sensor$550$0
Equipment Container Size 'B' Printer, Annunciator, Cables$618$0
Equipment Container Size 'B' Solar Panel (5)/Charger$678$0
Equipment Container Size 'B' Solar Panel (6) / PIR (6)$678$0
Equipment Container Size 'B' Solar Panel (8)$678$0
Equipment Container Size 'B' Solar Panel(4)/Charger$678$0
Equipment Container Size 'C' Empty w/Foam Surround$431$0
Equipment Container Size 'C' RBM/Charger/CMC(2)/CM(2)/HHM$532$0
Equipment Container Size 'D' Empty w/Foam Surround$431$0
FD332 Fence Sensor Kit$8,545$0
Fence Sensor Installation and Maintenance Tool Kit$3,794$0
Fiber Optic Link$7,059$0
Flexible Solar Panel$949$0
FlyAway Kit Packaging (Individual Cont Only)$2,809$0
Full Pallet Garrent Container (w/o Ind Equip Containers)$8,871$0
Hand Held Monitor$5,926$0
Hardwire Duress Alarm Assembly$555$0
HQ Kit Packaging (w/ Ind Container Only)$2,809$0
LCD Video Monitor$486$0
Long Range AIR Sensor$14,697$0
Long Range AIR Sensor (ECSI)$12,463$0
Long Range Thermal Imager w/CCTV (LRTI-CCTV) Complete Kit$158,442$0
Long Range Thermal Imager w/CCTV (LRTI-CCTV) TICC/PTH Only$126,916$0
LRTI-CCTV (Complete Kit) (U.S. Army Adaptation)$155,842$0
LRTI-CCTV Display and Control Unit$11,214$0
MIDS Tree Screw Assembly$23$0
Mobile Duress Alarm Kit$7,576$0
Mobile Duress Alarm Receiver$2,870$0
Mobile Duress Alarm Tx (w/Label)$530$0
Monostatic Microwave Sensor$5,976$0
MSI Relay Cable Assembly$334$0
MSTAR Alternate Control Station Assembly$9,528$0
MSTAR Dismount Kit$24,822$0
MSTAR Radome/Fixed Installation Kit - Misc. Hardware$13,448$0
MSTAR Ruggedized Shipping Containers$4,962$0
MSTAR Standalone Control Station$36,396$0
MSTAR System (Low Profile)$233,811$0
MSTAR/ARSS RF/FO Link Kit$25,876$0
Multi-Sensor Integration (MSI) Assembly$8,955$0
Passive IR Clamp$443$0
Passive IR Fence Mount$920$0
Passive IR Long Range Sensor$3,523$0
PSRS Base System$58,774$0
PSRS Fixed Control Station Kit (per Location)$13,675$0
PSRS Fixed Kit (per PSRS Unit)$4,900$0
PSRS RF/FO Link Kit$23,611$0
PSRS Vehicle Kit (per PSRS Unit)$66,731$0
Ramtech Charger, 4 Position$2,913$0
Ramtech Charger, Single Position$924$0
RBM Assembly (RBM-II)$8,367$0
Relocatable Fence Protection System, FPS-2-2 TASS Sensor$6,574$0
RF Link (Dual Channel - 1 Ft. Dish)$74,544$0
RF Link (Dual Channel - 2 Ft. Dish)$75,868$0
RF Link (Single Channel - 1 Ft. Dish)$50,111$0
RF Link (Single Channel - 2 Ft. Dish)$51,371$0
RF/FO Receiver$23,393$0
RM-83 Microwave Alignment Meter$383$0
Scanner$501$0
SENSOR/RBM Cable (12FT)$335$0
Short Range (Dual) Security Sensor$1,600$0
Solar Panel - SCD C897511$1,127$0
Squad Kit Packaging (w/pallet and Ind Containers)$9,346$0
Stake Support$21$0
Stake, Telescoping$41$0
Start Kit Packaging (w/Pallets and Ind Containers)$49,729$0
T-2000 LRTI w/CCTV Complete Kit$227,746$0
T-2000 LRTI w/CCTV TICC/PTH Only$187,584$0
Tactical AIR Sensor$685$0
Tactical Breakwire Sensor$441$0
Tactical Magnetic Sensor$728$0
Tactical PIR Sensor$478$0
Tactical Seismic Sensor$491$0
Tool Kit$412$0
Tri-Panel Display Assembly$4,857$0
TRIPOD$1,114$0
Universal Mounting Clamp$910$0
UPS (TASS & WSTI) Inverter with Battery Assembly$9,360$0
Video Archiving and Distribution System (VADS) 40 Channel$146,496$0
Video Archiving and Distribution System (VADS) Dual Channel$11,493$0
WSTI Network Stepdown Transformer Assembly$1,250$0
WSTI Treetop Tower (864081-2 Ref. SCD 864081)$24,007$0
Total$0

Date: &D FPS3 Cost Formats

&A &P of &N

5. CLIN 0006AA by Year

COST ELEMENT DETAIL FOR CLIN 0006AA

Year 1Year 2Year 3Total
Cost ElementsBaseRateTotalBaseRateTotalBaseRateTotalBaseTotal
Direct Material
Material Category A
Material Category B
Material Category C
Direct Material Subtotal
Subcontracts
Subcontractor A
Subcontractor B
Subcontractor C
Subcontracts Subtotal
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Direct Labor Subtotal
Other Direct Costs
ODC A
ODC B
ODC C
ODC D
ODC E
ODC F
ODC Subtotal
Interdivisional Transfers
Interdivisional Transfer A
Interdivisional Transfer B
Interdivisional Subtotal
Indirect Costs
Material Overhead
Fringe
Labor Overhead
Other Overhead
Indirect Subtotal

G&A

Subtotal Cost

FCCOM

Total Estimated Cost

Fixed Fee

TOTAL
NOTES:
1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable.
2) For each separate cost element, show the base, rate,and extended amount; include embedded formulas that identify all calculations.
3) Cost element breakout shall be broken out by Contractor Fiscal Year (CFY), Offeror shall identify their FY
4) Year 1 and Year 3 represent the first and last years of effort, expand as applicable
5) Include applicable resource codes.
6) Insert separate cost element breakouts in support of any interdivisional cost.
7) Ensure that the material, subcontracts, labor hour, and other direct cost spreadsheet tabs do reconcile back to this cost format and the BOEs in your cost volume.

Date: &D FPS3 PROJECT COST FORMATS

&A &P of &N

6. CLIN 0006AA by WBS

Fixed Site Sample Problem 1: Design and Installation by WBS
Reference
FPS3 Contract WBS and Directory
MaterialsTotalSubcontractsTotal SubKtrsInter-Div TransfersPrime LaborTotal Prime LaborTotalOther Direct CostsTotalIndirect CostsTotalTotal
WBSCLIN 0006AAMaterialsSubKtr A (Identify)SubKtr B (Identify)SubKtr C (Identify)SubKtr D (Identify)Engr Labor - In-PlantEngr Labor - Field SiteManufacturing LaborOtherEngrEngrMfgTotalEst. CostEstimated
LLLLWBSPurchasedRawLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborDirectProcurementOverheadOverheadOverheadIndirectw/oFCCOMCost
1.2.34DescriptionPartsMaterialsServicesAmountHoursAmountHoursAmountHoursAmountHoursAmountHoursAmountHoursAmountHoursDollarsHoursDollarsHoursDollarsHoursDollarsHoursODC AODC BODC CODC DODC ETravelCostsOverheadFringeIn-PlantField SiteG&ACostsFCCOMSubtotal
1..Force Protection Security Systems (FPS3)$0$0$0$00$00$00$00$00$00$00$00$00$00$00$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
1.1.Fixed Site Intrusion Detection System (IDS)$0$0$0$00$00$00$00$00$00$00$00$00$00$00$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
1.1.1Detection$00$00$00$0$0$0$0
1.1.2Assessment & Surveillance$00$00$00$0$0$0$0
1.1.3Command, Control & Display$00$00$00$0$0$0$0
1.1.4Access Control$00$00$00$0$0$0$0
1.1.5Distribution equipment$00$00$00$0$0$0$0
1.1.6Communications$00$00$00$0$0$0$0
1.1.7Power$00$00$00$0$0$0$0
1.1.8Ancillary Equipment (Other)$00$00$00$0$0$0$0
1.1.9GFE$00$00$00$0$0$0$0
1.1.10Fence (delay/denial) (as applicable)$00$00$00$0$0$0$0
1.1.11Lighting subsystem (as applicable)$00$00$00$0$0$0$0
1.1.12Integration, Assembly, Test & Checkout$00$00$00$0$0$0$0
1.2.Tactical Automated Security System (TASS)000$0000000000$0000000000$00000000$0000000$0$00$0
1.2.1Sensor Subsystem$00$00$00$0$0$0$0
1.2.2Assessment Subsystem$00$00$00$0$0$0$0
1.2.3Data/Comm Subsystem$00$00$00$0$0$0$0
1.2.4Reporting & Display Subsystem$00$00$00$0$0$0$0
1.2.5Power Supply Subsystem$00$00$00$0$0$0$0
1.4.Systems Engineering000$0000000000$0000000000$00000000$0000000$0$00$0
1.4.1System Architecture (SEIWG)$00$00$00$0$0$0$0
1.4.2System Design000$0000000000$0000000000$00000000$0000000$0$00$0
1.4.2.1Site Survey$00$00$00$0$0$0$0
1.4.2.2Design & Reviews$00$00$00$0$0$0$0
1.4.3Configuration Management$00$00$00$0$0$0$0
1.4.4Supportability Analysis$00$00$00$0$0$0$0
1.4.5Quality Assurance$00$00$00$0$0$0$0
1.4.6Risk Management$00$00$00$0$0$0$0
1.4.7Advanced Technology (SEIWG support)$00$00$00$0$0$0$0
1.4.8Special studies and analyses$00$00$00$0$0$0$0
1.4.9Information Assurance$00$00$00$0$0$0$0

1 . 5 . Program Management $0 0 $0 0 $0 0 $0 $0 $0 $0

1.6.Training000$0000000000$0000000000$00000000$0000000$0$00$0
1.6.1Simulator (Annunciator)$00$00$00$0$0$0$0
1.6.2Training Services$00$00$00$0$0$0$0
1.6.3Training Materials$00$00$00$0$0$0$0

1 . 7 . Data $0 0 $0 0 $0 0 $0 $0 $0 $0

1.8.System Installation/Integration (Operational Site Activation) on Site000$0000000000$0000000000$00000000$0000000$0$00$0
1.8.1Fixed Site Intrusion Detection System$00$00$00$0$0$0$0
1.8.2Tactical Automated Security System (TASS)$00$00$00$0$0$0$0

1 . 9 . Systems Test & Evaluation $0 0 $0 0 $0 0 $0 $0 $0 $0

1.10.Interim Contractor Support000$0000000000$0000000000$00000000$0000000$0$00$0
1.10.1Organizational level$00$00$00$0$0$0$0
1.10.2Depot level$00$00$00$0$0$0$0
1.10.3ICS spares and repair parts$00$00$00$0$0$0$0
NOTES:
1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable.
2) Do Not alter the WBS

DATE: &D FPS3 PROJECT COST FORMATS

&A &P of &N

7. CLIN 0011AA by Year

COST ELEMENT DETAIL FOR CLIN 0011AA

Year 1Year 2Year 3Total
Cost ElementsBaseRateTotalBaseRateTotalBaseRateTotalBaseTotal
Direct Material
Material Category A
Material Category B
Material Category C
Direct Material Subtotal
Subcontracts
Subcontractor A
Subcontractor B
Subcontractor C
Subcontracts Subtotal
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Direct Labor Subtotal
Other Direct Costs
ODC A
ODC B
ODC C
ODC D
ODC E
ODC F
ODC Subtotal
Interdivisional Transfers
Interdivisional Transfer A
Interdivisional Transfer B
Interdivisional Subtotal
Indirect Costs
Material Overhead
Fringe
Labor Overhead
Other Overhead
Indirect Subtotal

G&A

Subtotal Cost

FCCOM

Total Estimated Cost

Fixed Fee

TOTAL
NOTES:
1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable.
2) For each separate cost element, show the base, rate,and extended amount; include embedded formulas that identify all calculations.
3) Cost element breakout shall be broken out by Contractor Fiscal Year (CFY), Offeror shall identify their FY
4) Year 1 and Year 3 represent the first and last years of effort, expand as applicable
5) Include applicable resource codes.
6) Insert separate cost element breakouts in support of any interdivisional cost.
7) Ensure that the material, subcontracts, labor hour, and other direct cost spreadsheet tabs do reconcile back to this cost format and the BOEs in your cost volume.

Date: &D FPS3 PROJECT COST FORMATS

&A &P of &N

8. CLIN 0011AA by WBS

Fixed Site Sample Problem 1: ICS by WBS
Reference
FPS3 Contract WBS and Directory
MaterialsTotalSubcontractsTotal SubKtrsInter-Div TransfersPrime LaborTotal Prime LaborTotalOther Direct CostsTotalIndirect CostsTotalTotal
WBSCLIN 0011AAMaterialsSubKtr A (Identify)SubKtr B (Identify)SubKtr C (Identify)SubKtr D (Identify)Engr Labor - In-PlantEngr Labor - Field SiteManufacturing LaborOtherEngrEngrMfgTotalEst. CostEstimated
LLLLWBSPurchasedRawLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborDirectProcurementOverheadOverheadOverheadIndirectw/oFCCOMCost
1.2.34DescriptionPartsMaterialsServicesAmountHoursAmountHoursAmountHoursAmountHoursAmountHoursAmountHoursAmountHoursDollarsHoursDollarsHoursDollarsHoursDollarsHoursODC AODC BODC CODC DODC ETravelCostsOverheadFringeIn-PlantField SiteG&ACostsFCCOMSubtotal
1..Force Protection Security Systems (FPS3)$0$0$0$00$00$00$00$00$00$00$00$00$00$00$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
1.1.Fixed Site Intrusion Detection System (IDS)$0$0$0$00$00$00$00$00$00$00$00$00$00$00$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
1.1.1Detection$00$00$00$0$0$0$0
1.1.2Assessment & Surveillance$00$00$00$0$0$0$0
1.1.3Command, Control & Display$00$00$00$0$0$0$0
1.1.4Access Control$00$00$00$0$0$0$0
1.1.5Distribution equipment$00$00$00$0$0$0$0
1.1.6Communications$00$00$00$0$0$0$0
1.1.7Power$00$00$00$0$0$0$0
1.1.8Ancillary Equipment (Other)$00$00$00$0$0$0$0
1.1.9GFE$00$00$00$0$0$0$0
1.1.10Fence (delay/denial) (as applicable)$00$00$00$0$0$0$0
1.1.11Lighting subsystem (as applicable)$00$00$00$0$0$0$0
1.1.12Integration, Assembly, Test & Checkout$00$00$00$0$0$0$0
1.2.Tactical Automated Security System (TASS)000$0000000000$0000000000$00000000$0000000$0$00$0
1.2.1Sensor Subsystem$00$00$00$0$0$0$0
1.2.2Assessment Subsystem$00$00$00$0$0$0$0
1.2.3Data/Comm Subsystem$00$00$00$0$0$0$0
1.2.4Reporting & Display Subsystem$00$00$00$0$0$0$0
1.2.5Power Supply Subsystem$00$00$00$0$0$0$0
1.4.Systems Engineering000$0000000000$0000000000$00000000$0000000$0$00$0
1.4.1System Architecture (SEIWG)$00$00$00$0$0$0$0
1.4.2System Design000$0000000000$0000000000$00000000$0000000$0$00$0
1.4.2.1Site Survey$00$00$00$0$0$0$0
1.4.2.2Design & Reviews$00$00$00$0$0$0$0
1.4.3Configuration Management$00$00$00$0$0$0$0
1.4.4Supportability Analysis$00$00$00$0$0$0$0
1.4.5Quality Assurance$00$00$00$0$0$0$0
1.4.6Risk Management$00$00$00$0$0$0$0
1.4.7Advanced Technology (SEIWG support)$00$00$00$0$0$0$0
1.4.8Special studies and analyses$00$00$00$0$0$0$0
1.4.9Information Assurance$00$00$00$0$0$0$0

1 . 5 . Program Management $0 0 $0 0 $0 0 $0 $0 $0 $0

1.6.Training000$0000000000$0000000000$00000000$0000000$0$00$0
1.6.1Simulator (Annunciator)$00$00$00$0$0$0$0
1.6.2Training Services$00$00$00$0$0$0$0
1.6.3Training Materials$00$00$00$0$0$0$0

1 . 7 . Data $0 0 $0 0 $0 0 $0 $0 $0 $0

1.8.System Installation/Integration (Operational Site Activation) on Site000$0000000000$0000000000$00000000$0000000$0$00$0
1.8.1Fixed Site Intrusion Detection System$00$00$00$0$0$0$0
1.8.2Tactical Automated Security System (TASS)$00$00$00$0$0$0$0

1 . 9 . Systems Test & Evaluation $0 0 $0 0 $0 0 $0 $0 $0 $0

1.10.Interim Contractor Support000$0000000000$0000000000$00000000$0000000$0$00$0
1.10.1Organizational level$00$00$00$0$0$0$0
1.10.2Depot level$00$00$00$0$0$0$0
1.10.3ICS spares and repair parts$00$00$00$0$0$0$0
NOTES:
1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable.
2) Do Not alter the WBS

DATE: &D FPS3 PROJECT COST FORMATS

&A &P of &N

9. CLIN 0006AB by Year

COST ELEMENT DETAIL FOR CLIN 0006AB

Year 1Year 2Year 3Total
Cost ElementsBaseRateTotalBaseRateTotalBaseRateTotalBaseTotal
Direct Material
Material Category A
Material Category B
Material Category C
Direct Material Subtotal
Subcontracts
Subcontractor A
Subcontractor B
Subcontractor C
Subcontracts Subtotal
Direct Labor
Labor Category A
Labor Category B
Labor Category C
Labor Category D
Labor Category E
Labor Category F
Labor Category G
Labor Category H
Direct Labor Subtotal
Other Direct Costs
ODC A
ODC B
ODC C
ODC D
ODC E
ODC F
ODC Subtotal
Interdivisional Transfers
Interdivisional Transfer A
Interdivisional Transfer B
Interdivisional Subtotal
Indirect Costs
Material Overhead
Fringe
Labor Overhead
Other Overhead
Indirect Subtotal

G&A

Subtotal Cost

FCCOM

Total Estimated Cost

Fixed Fee

TOTAL
NOTES:
1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable.
2) For each separate cost element, show the base, rate,and extended amount; include embedded formulas that identify all calculations.
3) Cost element breakout shall be broken out by Contractor Fiscal Year (CFY), Offeror shall identify their FY
4) Year 1 and Year 3 represent the first and last years of effort, expand as applicable
5) Include applicable resource codes.
6) Insert separate cost element breakouts in support of any interdivisional cost.
7) Ensure that the material, subcontracts, labor hour, and other direct cost spreadsheet tabs do reconcile back to this cost format and the BOEs in your cost volume.

Date: &D FPS3 PROJECT COST FORMATS

&A &P of &N

10. CLIN 0006AB by WBS

TASS Sample Problem 2: Design and Installation by WBS
Reference
FPS3 Contract WBS and Directory
CLIN 0006ABMaterialsTotalSubcontractsTotal SubKtrsInter-Div TransfersPrime LaborTotal Prime LaborTotalOther Direct CostsTotslIndirect CostsTotalTotal
WBSMaterialsSubKtr A (Identify)SubKtr B (Identify)SubKtr C (Identify)SubKtr D (Identify)Engr Labor - In-PlantEngr Labor - Field SiteManufacturing LaborOtherEngrEngrMfgTotalEst. CostEstimated
LLLLWBSPurchasedRawLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborLaborDirectProcurementOverheadOverheadOverheadIndirectw/oFCCOMCost
1.2.34DescriptionPartsMaterialsServicesAmountHoursAmountHoursAmountHoursAmountHoursAmountHoursAmountHoursAmountHoursDollarsHoursDollarsHoursDollarsHoursDollarsHoursODC AODC BODC CODC DODC ETravelCostsOverheadFringeIn-PlantField SiteG&ACostsFCCOMSubtotal
1..Force Protection Security Systems (FPS3)$0$0$0$00$00$00$00$00$00$00$00$00$00$00$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
1.1.Fixed Site Intrusion Detection System (IDS)$0$0$0$00$00$00$00$00$00$00$00$00$00$00$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0$0
1.1.1Detection$00$00$00$0$0$0$0
1.1.2Assessment & Surveillance$00$00$00$0$0$0$0
1.1.3Command, Control & Display$00$00$00$0$0$0$0
1.1.4Access Control$00$00$00$0$0$0$0
1.1.5Distribution equipment$00$00$00$0$0$0$0
1.1.6Communications$00$00$00$0$0$0$0
1.1.7Power$00$00$00$0$0$0$0
1.1.8Ancillary Equipment (Other)$00$00$00$0$0$0$0
1.1.9GFE$00$00$00$0$0$0$0
1.1.10Fence (delay/denial) (as applicable)$00$00$00$0$0$0$0
1.1.11Lighting subsystem (as applicable)$00$00$00$0$0$0$0
1.1.12Integration, Assembly, Test & Checkout$00$00$00$0$0$0$0
1.2.Tactical Automated Security System (TASS)000$0000000000$0000000000$00000000$0000000$0$00$0
1.2.1Sensor Subsystem$00$00$00$0$0$0$0
1.2.2Assessment Subsystem$00$00$00$0$0$0$0
1.2.3Data/Comm Subsystem$00$00$00$0$0$0$0
1.2.4Reporting & Display Subsystem$00$00$00$0$0$0$0
1.2.5Power Supply Subsystem$00$00$00$0$0$0$0
1.4.Systems Engineering000$0000000000$0000000000$00000000$0000000$0$00$0
1.4.1System Architecture (SEIWG)$00$00$00$0$0$0$0
1.4.2System Design000$0000000000$0000000000$00000000$0000000$0$00$0
1.4.2.1Site Survey$00$00$00$0$0$0$0
1.4.2.2Design & Reviews$00$00$00$0$0$0$0
1.4.3Configuration Management$00$00$00$0$0$0$0
1.4.4Supportability Analysis$00$00$00$0$0$0$0
1.4.5Quality Assurance$00$00$00$0$0$0$0
1.4.6Risk Management$00$00$00$0$0$0$0
1.4.7Advanced Technology (SEIWG support)$00$00$00$0$0$0$0
1.4.8Special studies and analyses$00$00$00$0$0$0$0
1.4.9Information Assurance$00$00$00$0$0$0$0

1 . 5 . Program Management $0 0 $0 0 $0 0 $0 $0 $0 $0

1.6.Training000$0000000000$0000000000$00000000$0000000$0$00$0
1.6.1Simulator (Annunciator)$00$00$00$0$0$0$0
1.6.2Training Services$00$00$00$0$0$0$0
1.6.3Training Materials$00$00$00$0$0$0$0

1 . 7 . Data $0 0 $0 0 $0 0 $0 $0 $0 $0

1.8.System Installation/Integration (Operational Site Activation) on Site000$0000000000$0000000000$00000000$0000000$0$00$0
1.8.1Fixed Site Intrusion Detection System$00$00$00$0$0$0$0
1.8.2Tactical Automated Security System (TASS)$00$00$00$0$0$0$0

1 . 9 . Systems Test & Evaluation $0 0 $0 0 $0 0 $0 $0 $0 $0

1.10.Interim Contractor Support000$0000000000$0000000000$00000000$0000000$0$00$0
1.10.1Organizational level$00$00$00$0$0$0$0
1.10.2Depot level$00$00$00$0$0$0$0
1.10.3ICS spares and repair parts$00$00$00$0$0$0$0
NOTES:
1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable.
2) Do Not alter the WBS

DATE: &D FPS3 PROJECT COST FORMATS

&A &P of &N

11. Bill of Material Bill of Material (BOM)

For the cost type CLINs, insert spreadsheets that lists the material to be provided by either the prime, an interdivisional transfer, or a subcontractor. All material items with an extended amount greater than $5,000 shall be identified to include the item's nomenclature, supplier, supplier's part number, quantity, unit price, any escalation amount if applicable, any factored amount if applicable, and the resulting extended amount. Each line item, shall identify the applicable source (i.e. prime, division, or subcontractor), applicable CLIN, resource code, WBS, and the basis of estimate in order to enable a cross-referencing between the detailed cost element spreadsheets and the cost volume. If a supplier or part number is not available, provide the rationale for the estimate. Material items with an extended amount of less than $5,000 may be lumped together.

Date: &D FPS3 PROJECT COST FORMATS

&A &P of &N

12. Subcontracts Subcontracts

For the cost type CLINs, insert a spreadsheet identifying each separate subcontract costs to be incurred by either the prime, an interdivisional transfer, or another subcontractor. Each line item, shall identify the applicable source (i.e. prime, division, or subcontractor), applicable CLIN, resource code, WBS, task description, and the basis of estimate in order to enable a cross-referencing between the detailed cost element spreadsheets and the cost volume. Reference Section L para 6.2.6.

Date: &D FPS3 PROJECT COST FORMATS

&A &P of &N

13. Labor Hours Labor Hours

For the cost type CLINs, insert a spreadsheet listing of all labor hours to be performed by either the prime, an interdivisional transfer, or a subcontractor. Each line item, shall identify the applicable source (i.e. prime, division, or subcontractor), applicable CLIN, resource code, labor category, WBS, and the basis of estimate in order to enable a cross-referencing between the detailed cost element spreadsheets and the cost volume.

Date: &D FPS3 PROJECT COST FORMATS

&A &P of &N

14. Other Direct Costs Other Direct Costs

For the cost type CLINs, insert a spreadsheet identifying each separate other direct costs to be incurred by either the prime, an interdivisional transfer, or another subcontractor. Each line item, shall identify the applicable source (i.e. prime, division, or subcontractor), applicable CLIN, resource code, WBS, task description, and the basis of estimate in order to enable a cross-referencing between the detailed cost element spreadsheets and the cost volume.

Date: &D FPS3 PROJECT COST FORMATS

&A &P of &N

15. Travel Worksheet

TRAVEL
Travel CLIN 0006AA
Fixed Site Sample Problem 1: CLIN 0006AADaysAirDays

Robert Campbell:

1st and last day of per diem at 75% Per Per No. Vehicle Robert Campbell: D = Daily W = Weekly

M = MonthlyVehicleVehicleVehicleTransTransAuto
No. ofNo. ofperAirFareNightsLodgingLodgingPerDiemDiemVehiclesRentalRentalRentalRentalHome toAirportNo. ofMileageMileageRental
WBSItineraryPurposePersonsTripsTripFareAmountLodgingRateAmountDiemRateAmountRentedBasisQtyRateAmountAirportto HomeParkingMilesRateAmountGasolineIdentifyIdentifyIdentifyTotals
Travel related (CLIN 0006AA)
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
Total Travel related (CLIN 0006AA)$0$0$0$0$0$0$0$0$0$0$0$0$0
Total Travel$0
G&A
Total 0302AA including Burden$0
Travel CLIN 0011AA
Fixed Site Sample Problem 1 ICS: CLIN 0011AADaysAirDays

Robert Campbell:

1st and last day of per diem at 75% Per Per No. Vehicle Robert Campbell: D = Daily W = Weekly

M = MonthlyVehicleVehicleVehicleTransTransAuto
No. ofNo. ofperAirFareNightsLodgingLodgingPerDiemDiemVehiclesRentalRentalRentalRentalHome toAirportNo. ofMileageMileageRental
WBSItineraryPurposePersonsTripsTripFareAmountLodgingRateAmountDiemRateAmountRentedBasisQtyRateAmountAirportto HomeParkingMilesRateAmountGasolineIdentifyIdentifyIdentifyTotals
Travel related (CLIN 0011AA)
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
Total Travel related (CLIN 0011AA)$0$0$0$0$0$0$0$0$0$0$0$0$0
Travel CLIN 0006AB
TASS Sample Problem 2: CLIN 0006ABDaysAirDays

Robert Campbell:

1st and last day of per diem at 75%

Robert Campbell: D = Daily W = Weekly M = Monthly Per Per No. Vehicle Robert Campbell: D = Daily W = Weekly M = Monthly Robert Campbell:

1st and last day of per diem at 75%

VehicleVehicleVehicleTransTransAuto
No. ofNo. ofperAirFareNightsLodgingLodgingPerDiemDiemVehiclesRentalRentalRentalRentalHome toAirportNo. ofMileageMileageRental
WBSItineraryPurposePersonsTripsTripFareAmountLodgingRateAmountDiemRateAmountRentedBasisQtyRateAmountAirportto HomeParkingMilesRateAmountGasolineIdentifyIdentifyIdentifyTotals
Travel related (CLIN XXXX)
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
$00$0$0$0$0$0
Total Travel related (CLIN 0006AB)$0$0$0$0$0$0$0$0$0$0$0$0$0
NOTES:
1) Travel Worksheet is an example and can be used. Offeror can revise travel worksheet as applicable to be consistent with their estimating system, revise as applicable
2) For each travel line item, show all applicable rational for travel, amounts, including embedded formulas that identify all calculations
3) Cost element breakout shall be by calendar year unless the offerors forward pricing rates are not based on a calendar year. If not calendar year, identify the fiscal year time period.
4) Identify whether the travel will be performed by either the prime, an interdivisional transfer, or a subcontractor.

DATE: &D FPS3 PROJECT COST FORMATS

&A &P of &N

16. Price Track Price Track

Price Track Tab: This worksheet tab is to be used to summarize the impact of changes (e.g., revised labor hours or direct and/or indirect rates, escalation factors, subcontract prices, changes in technical approach, etc.) made to your proposal in developing your Final Proposal Revision. Dollars in this format may be shown in thousands. Any changes in the Offeror’s proposal from initial to final should be reflected through profit/fee. As an example, the amount that could be shown for a change in the effort could reflect the change in Direct Labor dollars, and also include any burdens (Fringe, Overhead, G&A, Facilities Capital Cost of Money, and Profit/Fee). The headings on the “Changes” column are for illustrative purposes only.

The Offeror…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .