Cover Page
FPS3 COST FORMATS
&A &P of &N
Index
| 1. Total Evaluated Price |
| 2. T&M Summary |
| 3. CLIN Summary |
| 4. GFE Summary |
| 5. CLIN 0006AA by Year |
| 6. CLIN 0006AA by WBS |
| 7. CLIN 0011AA by Year |
| 8. CLIN 0011AA by WBS |
| 9. CLIN 0006AB by Year |
| 10. CLIN 0006AB by WBS |
| 11. Bill of Material |
| 12. Subcontracts |
| 13. Labor Hours |
| 14. Other Direct Costs |
| 15. Travel Worksheet |
| 16. Price Track |
FPS3 PROJECT COST FORMATS
&A &P of &N
1. Total Evaluated Price
| Total Evalualted Price | ||
| T&M at BEQ | ||
| Tab 2 | $ - 0 |
| CPFF at GEMPC | |
| Sample Problem 1 |
Fixed Site Design / Install
| CLIN 0006AA (CPFF) | Proposed Estimated Cost from Tab 3 | $ - 0 | |
| Proposed Fixed Fee from Tab 3 | $ - 0 | ||
| Government Probable Cost Adjustment | $ - 0 | ||
| Tab 3 @ GEMPC plus the proposed fixed fee | $ - 0 | ||
| Sample Problem 1 |
Fixed Site
ICS
| CLIN 0011AA (CPFF) | Proposed Estimated Cost from Tab 3 | $ - 0 | |
| Proposed Fixed Fee from Tab 3 | $ - 0 | ||
| Government Probable Cost Adjustment | $ - 0 | ||
| Tab 3 @ GEMPC plus the proposed fixed fee | $ - 0 | ||
| Sample Problem 2 |
Fixed Site Design / Install
| CLIN 0006AB (CPFF) | Proposed Estimated Cost from Tab 3 | $ - 0 | |
| Proposed Fixed Fee from Tab 3 | $ - 0 | ||
| Government Probable Cost Adjustment | $ - 0 | ||
| Tab 3 @ GEMPC plus the proposed fixed fee | $ - 0 | ||
| Total CPFF at GEMPC | $ - 0 |
| Government Furnished Equipment (GFE) | |
| Tab 4 | $ - 0 |
| Total Price | |
| $ - 0 |
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
2. T&M Summary
| T&M Summary |
| Tab 2. T&M Summary, cell B2: In accordance with DFARS 252.216-7002, please breakout separate rates for each category of labor to be performed by each subcontractor and for each category of labor to be performed by the offeror, and for each category of labor to be transferred between divisions,subsidiaries, or affiliates of the offeror under a common control. The below table may be modified by the offeror to establish multiple subcontractor or interdivisional rates as necessary to comply with the DFARS provision. The Government Provided hours for each labor category for each year is 30 hours. The offeror shall then equally distribute the 30 hours between each separately price labor rate such that the total labor hours for that labor category and year equals 30 hours. |
| Fully loaded T&M rates multiplied by the BEQ | |||||||||
| Government Provided hours | Prime Contractor | FY 15 Rate ($/hr) | Total Prime | Subcontractor | FY 15 Rate ($/hr) | Total Subcontractor | Total at BEQ ($) FY15 | ||
| a. | Systems Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| b. | Senior Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| c. | Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| d. | Sr. Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| e. | Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| f. | Logistics Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| g. | Logistics Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| h. | Admin/Clerical | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| i. | Systems Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| j. | Systems Administrator (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| k. | Tactical Systems-Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| l. | Tactical Systems-System Admin (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| m. | Trainer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| n. | Architect | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| o. | Project Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| p. | Quality Assurance Inspector | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| q. | IA Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| Total of T&M rates at the BEQ | $ - 0 | ||||||||
| Escalation (by Contractor Fiscal Year) | |||||||||
| Material Escalation | |||||||||
| Subcontract Escalation | |||||||||
| Labor Escalation | |||||||||
| ODC Escalation |
| Fully loaded T&M rates multiplied by the BEQ | |||||||||
| Government Provided hours | Prime Contractor | FY 16 Rate ($/hr) | Total Prime | Subcontractor | FY 16 Rate ($/hr) | Total Subcontractor | Total at BEQ ($) FY16 | ||
| a. | Systems Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| b. | Senior Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| c. | Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| d. | Sr. Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| e. | Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| f. | Logistics Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| g. | Logistics Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| h. | Admin/Clerical | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| i. | Systems Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| j. | Systems Administrator (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| k. | Tactical Systems-Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| l. | Tactical Systems-System Admin (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| m. | Trainer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| n. | Architect | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| o. | Project Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| p. | Quality Assurance Inspector | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| q. | IA Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| Total of T&M rates at the BEQ | $ - 0 | ||||||||
| Fully loaded T&M rates multiplied by the BEQ | |||||||||
| Government Provided hours | Prime Contractor | FY 17 Rate ($/hr) | Total Prime | Subcontractor | FY 17 Rate ($/hr) | Total Subcontractor | Total at BEQ ($) FY17 | ||
| a. | Systems Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| b. | Senior Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| c. | Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| d. | Sr. Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| e. | Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| f. | Logistics Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| g. | Logistics Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| h. | Admin/Clerical | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| i. | Systems Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| j. | Systems Administrator (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| k. | Tactical Systems-Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| l. | Tactical Systems-System Admin (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| m. | Trainer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| n. | Architect | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| o. | Project Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| p. | Quality Assurance Inspector | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| q. | IA Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| Total of T&M rates at the BEQ | $ - 0 | ||||||||
| Fully loaded T&M rates multiplied by the BEQ | |||||||||
| Government Provided hours | Prime Contractor | FY 18 Rate ($/hr) | Total Prime | Subcontractor | FY 18 Rate ($/hr) | Total Subcontractor | Total at BEQ ($) FY18 | ||
| a. | Systems Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| b. | Senior Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| c. | Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| d. | Sr. Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| e. | Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| f. | Logistics Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| g. | Logistics Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| h. | Admin/Clerical | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| i. | Systems Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| j. | Systems Administrator (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| k. | Tactical Systems-Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| l. | Tactical Systems-System Admin (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| m. | Trainer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| n. | Architect | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| o. | Project Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| p. | Quality Assurance Inspector | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| q. | IA Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| Total of T&M rates at the BEQ | $ - 0 | ||||||||
| Fully loaded T&M rates multiplied by the BEQ | |||||||||
| Government Provided hours | Prime Contractor | FY 19 Rate ($/hr) | Total Prime | Subcontractor | FY 19 Rate ($/hr) | Total Subcontractor | Total at BEQ ($) FY19 | ||
| a. | Systems Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| b. | Senior Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| c. | Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| d. | Sr. Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| e. | Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| f. | Logistics Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| g. | Logistics Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| h. | Admin/Clerical | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| i. | Systems Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| j. | Systems Administrator (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| k. | Tactical Systems-Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| l. | Tactical Systems-System Admin (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| m. | Trainer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| n. | Architect | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| o. | Project Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| p. | Quality Assurance Inspector | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| q. | IA Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| Total of T&M rates at the BEQ | $ - 0 | ||||||||
| Fully loaded T&M rates multiplied by the BEQ | |||||||||
| Government Provided hours | Prime Contractor | FY 20 Rate ($/hr) | Total Prime | Subcontractor | FY 20 Rate ($/hr) | Total Subcontractor | Total at BEQ ($) FY20 | ||
| a. | Systems Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| b. | Senior Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| c. | Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| d. | Sr. Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| e. | Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| f. | Logistics Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| g. | Logistics Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| h. | Admin/Clerical | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| i. | Systems Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| j. | Systems Administrator (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| k. | Tactical Systems-Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| l. | Tactical Systems-System Admin (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| m. | Trainer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| n. | Architect | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| o. | Project Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| p. | Quality Assurance Inspector | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| q. | IA Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| Total of T&M rates at the BEQ | $ - 0 |
| Fully loaded T&M rates multiplied by the BEQ | |||||||||
| Government Provided hours | Prime Contractor | FY 21 Rate ($/hr) | Total Prime | Subcontractor | FY 21 Rate ($/hr) | Total Subcontractor | Total at BEQ ($) FY21 | ||
| a. | Systems Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| b. | Senior Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| c. | Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| d. | Sr. Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| e. | Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| f. | Logistics Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| g. | Logistics Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| h. | Admin/Clerical | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| i. | Systems Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| j. | Systems Administrator (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| k. | Tactical Systems-Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| l. | Tactical Systems-System Admin (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| m. | Trainer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| n. | Architect | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| o. | Project Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| p. | Quality Assurance Inspector | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| q. | IA Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| Total of T&M rates at the BEQ | $ - 0 | ||||||||
| Fully loaded T&M rates multiplied by the BEQ | |||||||||
| Government Provided hours | Prime Contractor | FY 22 Rate ($/hr) | Total Prime | Subcontractor | FY 23 Rate ($/hr) | Total Subcontractor | Total at BEQ ($) FY23 | ||
| a. | Systems Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| b. | Senior Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| c. | Engineer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| d. | Sr. Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| e. | Technician | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| f. | Logistics Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| g. | Logistics Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| h. | Admin/Clerical | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| i. | Systems Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| j. | Systems Administrator (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| k. | Tactical Systems-Field Engineer (FE) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| l. | Tactical Systems-System Admin (SA) | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| m. | Trainer | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| n. | Architect | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| o. | Project Manager | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| p. | Quality Assurance Inspector | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| q. | IA Specialist | 30 | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | ||
| Total of T&M rates at the BEQ | $ - 0 |
Total of T&M rates at the BEQ FY15 - FY22 $ - 0
DATE: &D FPS3 PROJECT COST FORMATS
&A &P of &N
3. CLIN Summary
| CLIN SUMMARY | ||||
| Sample Problem 1 | Sample Problem 1 | Sample Problem 2 | Total | |
| Fixed Site | Fixed Site | TASS | ||
| CLIN | CLIN | CLIN | ||
| CPFF | CPFF | CPFF | ||
| 0006AA | 0011AA | 0006AB | ||
| Design / Installation | ICS | Design / Installation | ||
| Cost Element | Basic | Basic | ||
| Direct Material | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subcontracts | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Direct Labor | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Other Direct Costs (ODCs) | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Interdivisional Transfers | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Indirect Costs | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| FCCOM | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total Estimated Cost | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Fee Percentage | 0.00% | 0.00% | 0.00% | |
| Fixed Fee | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Total CPFF | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Note: For purposes of completing the above, indirect cost includes material overhead, fringe, labor overhead, other overhead, and G&A. |
DATE: &D FPS3 PROJECT COST FORMATS
&A &P of &N
4. GFE Summary
| GFE Summary | |||
| TASS Equipment | Average Cost | QTY | Extended Price |
| 1/3 Pallett Garrett Container (w/o Indiv Equip Containers) | $4,306 | $0 | |
| 12v Battery Assembly | $639 | $0 | |
| AIR (ECSI) Alignment Kit | $1,223 | $0 | |
| AIR (ECSI) Anti-Vaulting Option | $4,249 | $0 | |
| AIR Alignment Kit | $3,829 | $0 | |
| Annunciator VI/Desktop (w/o Dual Channel VADS and Firewall) P/N 925212-1 | $8,922 | $0 | |
| Annunciator VI/Server (w/o Dual Channel VADS and Firewall) P/N 925211-1 | $25,038 | $0 | |
| Antenna Cable Connector | $108 | $0 | |
| Base Station Antenna | $3,464 | $0 | |
| Bi-Static Microwave Sensor-S (Pair) | $6,397 | $0 | |
| Boundary Kit Pck w/ pallett & Ind Containers | $9,346 | $0 | |
| Cable Assy Cm DLA UPS | $558 | $0 | |
| CM Cable (EIA 485-2.5 FT) | $274 | $0 | |
| CM/HHM Batteries | $68 | $0 | |
| CMC Assembly (CMC-II) | $3,218 | $0 | |
| CMC/CM Cable (EIA 485-6FT) | $297 | $0 | |
| Color Printer | $350 | $0 | |
| Communications Module | $4,160 | $0 | |
| DLA Surge Protector | $23 | $0 | |
| Equip Container - Size "A" - SW385(6)/CM(5)/HHM(2) | $623 | $0 | |
| Equip Container - Size "A" -TASS Bracket (5), Fence Bracket (4), 12V Battery (2) | $506 | $0 | |
| Equip Container - Size 'A' Empty w/ Foam Surround | $494 | $0 | |
| Equipment Container - Size "B" - SW385(4)/Charger/CM(14)/HHM(4) | $628 | $0 | |
| Equipment Container - Size "D" - UPS and Battery | $532 | $0 | |
| Equipment container Size 'A' Air/fence Bracket (6) | $499 | $0 | |
| Equipment Container Size 'A' PIR (2) / Cables / Fence Brackets | $635 | $0 | |
| Equipment Container Size 'A' RBM (4) | $464 | $0 | |
| Equipment Container Size 'A' RBM(2) / PIR (6) | $506 | $0 | |
| Equipment Container Size 'A' RBM's/CM/HHM | $506 | $0 | |
| Equipment Container Size 'A' Scanner Monitor Keyboard | $627 | $0 | |
| Equipment Container Size 'A' SW310(8) | $496 | $0 | |
| Equipment Container Size 'A' SW385/Piramid (6) MIDS(2) | $506 | $0 | |
| Equipment Container Size 'B' Empty w/Foam Surround | $539 | $0 | |
| Equipment Container Size 'B' FD-205 Fiber Optic Fence Sensor | $550 | $0 | |
| Equipment Container Size 'B' Printer, Annunciator, Cables | $618 | $0 | |
| Equipment Container Size 'B' Solar Panel (5)/Charger | $678 | $0 | |
| Equipment Container Size 'B' Solar Panel (6) / PIR (6) | $678 | $0 | |
| Equipment Container Size 'B' Solar Panel (8) | $678 | $0 | |
| Equipment Container Size 'B' Solar Panel(4)/Charger | $678 | $0 | |
| Equipment Container Size 'C' Empty w/Foam Surround | $431 | $0 | |
| Equipment Container Size 'C' RBM/Charger/CMC(2)/CM(2)/HHM | $532 | $0 | |
| Equipment Container Size 'D' Empty w/Foam Surround | $431 | $0 | |
| FD332 Fence Sensor Kit | $8,545 | $0 | |
| Fence Sensor Installation and Maintenance Tool Kit | $3,794 | $0 | |
| Fiber Optic Link | $7,059 | $0 | |
| Flexible Solar Panel | $949 | $0 | |
| FlyAway Kit Packaging (Individual Cont Only) | $2,809 | $0 | |
| Full Pallet Garrent Container (w/o Ind Equip Containers) | $8,871 | $0 | |
| Hand Held Monitor | $5,926 | $0 | |
| Hardwire Duress Alarm Assembly | $555 | $0 | |
| HQ Kit Packaging (w/ Ind Container Only) | $2,809 | $0 | |
| LCD Video Monitor | $486 | $0 | |
| Long Range AIR Sensor | $14,697 | $0 | |
| Long Range AIR Sensor (ECSI) | $12,463 | $0 | |
| Long Range Thermal Imager w/CCTV (LRTI-CCTV) Complete Kit | $158,442 | $0 | |
| Long Range Thermal Imager w/CCTV (LRTI-CCTV) TICC/PTH Only | $126,916 | $0 | |
| LRTI-CCTV (Complete Kit) (U.S. Army Adaptation) | $155,842 | $0 | |
| LRTI-CCTV Display and Control Unit | $11,214 | $0 | |
| MIDS Tree Screw Assembly | $23 | $0 | |
| Mobile Duress Alarm Kit | $7,576 | $0 | |
| Mobile Duress Alarm Receiver | $2,870 | $0 | |
| Mobile Duress Alarm Tx (w/Label) | $530 | $0 | |
| Monostatic Microwave Sensor | $5,976 | $0 | |
| MSI Relay Cable Assembly | $334 | $0 | |
| MSTAR Alternate Control Station Assembly | $9,528 | $0 | |
| MSTAR Dismount Kit | $24,822 | $0 | |
| MSTAR Radome/Fixed Installation Kit - Misc. Hardware | $13,448 | $0 | |
| MSTAR Ruggedized Shipping Containers | $4,962 | $0 | |
| MSTAR Standalone Control Station | $36,396 | $0 | |
| MSTAR System (Low Profile) | $233,811 | $0 | |
| MSTAR/ARSS RF/FO Link Kit | $25,876 | $0 | |
| Multi-Sensor Integration (MSI) Assembly | $8,955 | $0 | |
| Passive IR Clamp | $443 | $0 | |
| Passive IR Fence Mount | $920 | $0 | |
| Passive IR Long Range Sensor | $3,523 | $0 | |
| PSRS Base System | $58,774 | $0 | |
| PSRS Fixed Control Station Kit (per Location) | $13,675 | $0 | |
| PSRS Fixed Kit (per PSRS Unit) | $4,900 | $0 | |
| PSRS RF/FO Link Kit | $23,611 | $0 | |
| PSRS Vehicle Kit (per PSRS Unit) | $66,731 | $0 | |
| Ramtech Charger, 4 Position | $2,913 | $0 | |
| Ramtech Charger, Single Position | $924 | $0 | |
| RBM Assembly (RBM-II) | $8,367 | $0 | |
| Relocatable Fence Protection System, FPS-2-2 TASS Sensor | $6,574 | $0 | |
| RF Link (Dual Channel - 1 Ft. Dish) | $74,544 | $0 | |
| RF Link (Dual Channel - 2 Ft. Dish) | $75,868 | $0 | |
| RF Link (Single Channel - 1 Ft. Dish) | $50,111 | $0 | |
| RF Link (Single Channel - 2 Ft. Dish) | $51,371 | $0 | |
| RF/FO Receiver | $23,393 | $0 | |
| RM-83 Microwave Alignment Meter | $383 | $0 | |
| Scanner | $501 | $0 | |
| SENSOR/RBM Cable (12FT) | $335 | $0 | |
| Short Range (Dual) Security Sensor | $1,600 | $0 | |
| Solar Panel - SCD C897511 | $1,127 | $0 | |
| Squad Kit Packaging (w/pallet and Ind Containers) | $9,346 | $0 | |
| Stake Support | $21 | $0 | |
| Stake, Telescoping | $41 | $0 | |
| Start Kit Packaging (w/Pallets and Ind Containers) | $49,729 | $0 | |
| T-2000 LRTI w/CCTV Complete Kit | $227,746 | $0 | |
| T-2000 LRTI w/CCTV TICC/PTH Only | $187,584 | $0 | |
| Tactical AIR Sensor | $685 | $0 | |
| Tactical Breakwire Sensor | $441 | $0 | |
| Tactical Magnetic Sensor | $728 | $0 | |
| Tactical PIR Sensor | $478 | $0 | |
| Tactical Seismic Sensor | $491 | $0 | |
| Tool Kit | $412 | $0 | |
| Tri-Panel Display Assembly | $4,857 | $0 | |
| TRIPOD | $1,114 | $0 | |
| Universal Mounting Clamp | $910 | $0 | |
| UPS (TASS & WSTI) Inverter with Battery Assembly | $9,360 | $0 | |
| Video Archiving and Distribution System (VADS) 40 Channel | $146,496 | $0 | |
| Video Archiving and Distribution System (VADS) Dual Channel | $11,493 | $0 | |
| WSTI Network Stepdown Transformer Assembly | $1,250 | $0 | |
| WSTI Treetop Tower (864081-2 Ref. SCD 864081) | $24,007 | $0 | |
| Total | $0 |
Date: &D FPS3 Cost Formats
&A &P of &N
5. CLIN 0006AA by Year
COST ELEMENT DETAIL FOR CLIN 0006AA
| Year 1 | Year 2 | Year 3 | Total | ||||||||
| Cost Elements | Base | Rate | Total | Base | Rate | Total | Base | Rate | Total | Base | Total |
| Direct Material | ||
| Material Category A | ||
| Material Category B | ||
| Material Category C | ||
| Direct Material Subtotal |
| Subcontracts | ||
| Subcontractor A | ||
| Subcontractor B | ||
| Subcontractor C | ||
| Subcontracts Subtotal |
| Direct Labor | ||
| Labor Category A | ||
| Labor Category B | ||
| Labor Category C | ||
| Labor Category D | ||
| Labor Category E | ||
| Labor Category F | ||
| Labor Category G | ||
| Labor Category H | ||
| Direct Labor Subtotal |
| Other Direct Costs | ||
| ODC A | ||
| ODC B | ||
| ODC C | ||
| ODC D | ||
| ODC E | ||
| ODC F | ||
| ODC Subtotal |
| Interdivisional Transfers | ||
| Interdivisional Transfer A | ||
| Interdivisional Transfer B | ||
| Interdivisional Subtotal |
| Indirect Costs | ||
| Material Overhead | ||
| Fringe | ||
| Labor Overhead | ||
| Other Overhead | ||
| Indirect Subtotal |
G&A
Subtotal Cost
FCCOM
Total Estimated Cost
Fixed Fee
| TOTAL |
| NOTES: |
| 1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable. |
| 2) For each separate cost element, show the base, rate,and extended amount; include embedded formulas that identify all calculations. |
| 3) Cost element breakout shall be broken out by Contractor Fiscal Year (CFY), Offeror shall identify their FY |
| 4) Year 1 and Year 3 represent the first and last years of effort, expand as applicable |
| 5) Include applicable resource codes. |
| 6) Insert separate cost element breakouts in support of any interdivisional cost. |
| 7) Ensure that the material, subcontracts, labor hour, and other direct cost spreadsheet tabs do reconcile back to this cost format and the BOEs in your cost volume. |
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
6. CLIN 0006AA by WBS
| Fixed Site Sample Problem 1: Design and Installation by WBS | ||||||||||||||||||||||||||||||||||||||||||||||||
| Reference | ||||||||||||||||||||||||||||||||||||||||||||||||
| FPS3 Contract WBS and Directory | ||||||||||||||||||||||||||||||||||||||||||||||||
| Materials | Total | Subcontracts | Total SubKtrs | Inter-Div Transfers | Prime Labor | Total Prime Labor | Total | Other Direct Costs | Total | Indirect Costs | Total | Total | ||||||||||||||||||||||||||||||||||||
| WBS | CLIN 0006AA | Materials | SubKtr A (Identify) | SubKtr B (Identify) | SubKtr C (Identify) | SubKtr D (Identify) | Engr Labor - In-Plant | Engr Labor - Field Site | Manufacturing Labor | Other | Engr | Engr | Mfg | Total | Est. Cost | Estimated | ||||||||||||||||||||||||||||||||
| L | L | L | L | WBS | Purchased | Raw | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Direct | Procurement | Overhead | Overhead | Overhead | Indirect | w/o | FCCOM | Cost | ||||||||||||||||||
| 1 | . | 2 | . | 3 | 4 | Description | Parts | Materials | Services | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Dollars | Hours | Dollars | Hours | Dollars | Hours | Dollars | Hours | ODC A | ODC B | ODC C | ODC D | ODC E | Travel | Costs | Overhead | Fringe | In-Plant | Field Site | G&A | Costs | FCCOM | Subtotal | ||
| 1 | . | . | Force Protection Security Systems (FPS3) | $0 | $0 | $0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||
| 1 | . | 1 | . | Fixed Site Intrusion Detection System (IDS) | $0 | $0 | $0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| 1 | . | 1 | . | 1 | Detection | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 2 | Assessment & Surveillance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 3 | Command, Control & Display | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 4 | Access Control | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 5 | Distribution equipment | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 6 | Communications | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 7 | Power | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 8 | Ancillary Equipment (Other) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 9 | GFE | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 10 | Fence (delay/denial) (as applicable) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 11 | Lighting subsystem (as applicable) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 12 | Integration, Assembly, Test & Checkout | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
| 1 | . | 2 | . | Tactical Automated Security System (TASS) | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 2 | . | 1 | Sensor Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 2 | Assessment Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 3 | Data/Comm Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 4 | Reporting & Display Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 5 | Power Supply Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
| 1 | . | 4 | . | Systems Engineering | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |||
| 1 | . | 4 | . | 1 | System Architecture (SEIWG) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 2 | System Design | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | ||
| 1 | . | 4 | . | 2 | . | 1 | Site Survey | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 2 | . | 2 | Design & Reviews | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 3 | Configuration Management | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 4 | Supportability Analysis | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 5 | Quality Assurance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 6 | Risk Management | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 7 | Advanced Technology (SEIWG support) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 8 | Special studies and analyses | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 9 | Information Assurance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 5 . Program Management $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 6 | . | Training | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 6 | . | 1 | Simulator (Annunciator) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 6 | . | 2 | Training Services | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 6 | . | 3 | Training Materials | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 7 . Data $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 8 | . | System Installation/Integration (Operational Site Activation) on Site | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 8 | . | 1 | Fixed Site Intrusion Detection System | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 8 | . | 2 | Tactical Automated Security System (TASS) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 9 . Systems Test & Evaluation $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 10 | . | Interim Contractor Support | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 10 | . | 1 | Organizational level | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 10 | . | 2 | Depot level | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 10 | . | 3 | ICS spares and repair parts | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| NOTES: | |||||||||||||||||||||||||||||||||||||||||||||||
| 1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable. | |||||||||||||||||||||||||||||||||||||||||||||||
| 2) Do Not alter the WBS |
DATE: &D FPS3 PROJECT COST FORMATS
&A &P of &N
7. CLIN 0011AA by Year
COST ELEMENT DETAIL FOR CLIN 0011AA
| Year 1 | Year 2 | Year 3 | Total | ||||||||
| Cost Elements | Base | Rate | Total | Base | Rate | Total | Base | Rate | Total | Base | Total |
| Direct Material | ||
| Material Category A | ||
| Material Category B | ||
| Material Category C | ||
| Direct Material Subtotal |
| Subcontracts | ||
| Subcontractor A | ||
| Subcontractor B | ||
| Subcontractor C | ||
| Subcontracts Subtotal |
| Direct Labor | ||
| Labor Category A | ||
| Labor Category B | ||
| Labor Category C | ||
| Labor Category D | ||
| Labor Category E | ||
| Labor Category F | ||
| Labor Category G | ||
| Labor Category H | ||
| Direct Labor Subtotal |
| Other Direct Costs | ||
| ODC A | ||
| ODC B | ||
| ODC C | ||
| ODC D | ||
| ODC E | ||
| ODC F | ||
| ODC Subtotal |
| Interdivisional Transfers | ||
| Interdivisional Transfer A | ||
| Interdivisional Transfer B | ||
| Interdivisional Subtotal |
| Indirect Costs | ||
| Material Overhead | ||
| Fringe | ||
| Labor Overhead | ||
| Other Overhead | ||
| Indirect Subtotal |
G&A
Subtotal Cost
FCCOM
Total Estimated Cost
Fixed Fee
| TOTAL |
| NOTES: |
| 1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable. |
| 2) For each separate cost element, show the base, rate,and extended amount; include embedded formulas that identify all calculations. |
| 3) Cost element breakout shall be broken out by Contractor Fiscal Year (CFY), Offeror shall identify their FY |
| 4) Year 1 and Year 3 represent the first and last years of effort, expand as applicable |
| 5) Include applicable resource codes. |
| 6) Insert separate cost element breakouts in support of any interdivisional cost. |
| 7) Ensure that the material, subcontracts, labor hour, and other direct cost spreadsheet tabs do reconcile back to this cost format and the BOEs in your cost volume. |
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
8. CLIN 0011AA by WBS
| Fixed Site Sample Problem 1: ICS by WBS | ||||||||||||||||||||||||||||||||||||||||||||||||
| Reference | ||||||||||||||||||||||||||||||||||||||||||||||||
| FPS3 Contract WBS and Directory | ||||||||||||||||||||||||||||||||||||||||||||||||
| Materials | Total | Subcontracts | Total SubKtrs | Inter-Div Transfers | Prime Labor | Total Prime Labor | Total | Other Direct Costs | Total | Indirect Costs | Total | Total | ||||||||||||||||||||||||||||||||||||
| WBS | CLIN 0011AA | Materials | SubKtr A (Identify) | SubKtr B (Identify) | SubKtr C (Identify) | SubKtr D (Identify) | Engr Labor - In-Plant | Engr Labor - Field Site | Manufacturing Labor | Other | Engr | Engr | Mfg | Total | Est. Cost | Estimated | ||||||||||||||||||||||||||||||||
| L | L | L | L | WBS | Purchased | Raw | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Direct | Procurement | Overhead | Overhead | Overhead | Indirect | w/o | FCCOM | Cost | ||||||||||||||||||
| 1 | . | 2 | . | 3 | 4 | Description | Parts | Materials | Services | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Dollars | Hours | Dollars | Hours | Dollars | Hours | Dollars | Hours | ODC A | ODC B | ODC C | ODC D | ODC E | Travel | Costs | Overhead | Fringe | In-Plant | Field Site | G&A | Costs | FCCOM | Subtotal | ||
| 1 | . | . | Force Protection Security Systems (FPS3) | $0 | $0 | $0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||
| 1 | . | 1 | . | Fixed Site Intrusion Detection System (IDS) | $0 | $0 | $0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| 1 | . | 1 | . | 1 | Detection | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 2 | Assessment & Surveillance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 3 | Command, Control & Display | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 4 | Access Control | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 5 | Distribution equipment | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 6 | Communications | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 7 | Power | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 8 | Ancillary Equipment (Other) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 9 | GFE | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 10 | Fence (delay/denial) (as applicable) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 11 | Lighting subsystem (as applicable) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 12 | Integration, Assembly, Test & Checkout | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
| 1 | . | 2 | . | Tactical Automated Security System (TASS) | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 2 | . | 1 | Sensor Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 2 | Assessment Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 3 | Data/Comm Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 4 | Reporting & Display Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 5 | Power Supply Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
| 1 | . | 4 | . | Systems Engineering | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |||
| 1 | . | 4 | . | 1 | System Architecture (SEIWG) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 2 | System Design | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | ||
| 1 | . | 4 | . | 2 | . | 1 | Site Survey | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 2 | . | 2 | Design & Reviews | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 3 | Configuration Management | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 4 | Supportability Analysis | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 5 | Quality Assurance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 6 | Risk Management | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 7 | Advanced Technology (SEIWG support) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 8 | Special studies and analyses | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 9 | Information Assurance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 5 . Program Management $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 6 | . | Training | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 6 | . | 1 | Simulator (Annunciator) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 6 | . | 2 | Training Services | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 6 | . | 3 | Training Materials | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 7 . Data $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 8 | . | System Installation/Integration (Operational Site Activation) on Site | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 8 | . | 1 | Fixed Site Intrusion Detection System | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 8 | . | 2 | Tactical Automated Security System (TASS) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 9 . Systems Test & Evaluation $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 10 | . | Interim Contractor Support | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 10 | . | 1 | Organizational level | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 10 | . | 2 | Depot level | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 10 | . | 3 | ICS spares and repair parts | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| NOTES: | |||||||||||||||||||||||||||||||||||||||||||||||
| 1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable. | |||||||||||||||||||||||||||||||||||||||||||||||
| 2) Do Not alter the WBS |
DATE: &D FPS3 PROJECT COST FORMATS
&A &P of &N
9. CLIN 0006AB by Year
COST ELEMENT DETAIL FOR CLIN 0006AB
| Year 1 | Year 2 | Year 3 | Total | ||||||||
| Cost Elements | Base | Rate | Total | Base | Rate | Total | Base | Rate | Total | Base | Total |
| Direct Material | ||
| Material Category A | ||
| Material Category B | ||
| Material Category C | ||
| Direct Material Subtotal |
| Subcontracts | ||
| Subcontractor A | ||
| Subcontractor B | ||
| Subcontractor C | ||
| Subcontracts Subtotal |
| Direct Labor | ||
| Labor Category A | ||
| Labor Category B | ||
| Labor Category C | ||
| Labor Category D | ||
| Labor Category E | ||
| Labor Category F | ||
| Labor Category G | ||
| Labor Category H | ||
| Direct Labor Subtotal |
| Other Direct Costs | ||
| ODC A | ||
| ODC B | ||
| ODC C | ||
| ODC D | ||
| ODC E | ||
| ODC F | ||
| ODC Subtotal |
| Interdivisional Transfers | ||
| Interdivisional Transfer A | ||
| Interdivisional Transfer B | ||
| Interdivisional Subtotal |
| Indirect Costs | ||
| Material Overhead | ||
| Fringe | ||
| Labor Overhead | ||
| Other Overhead | ||
| Indirect Subtotal |
G&A
Subtotal Cost
FCCOM
Total Estimated Cost
Fixed Fee
| TOTAL |
| NOTES: |
| 1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable. |
| 2) For each separate cost element, show the base, rate,and extended amount; include embedded formulas that identify all calculations. |
| 3) Cost element breakout shall be broken out by Contractor Fiscal Year (CFY), Offeror shall identify their FY |
| 4) Year 1 and Year 3 represent the first and last years of effort, expand as applicable |
| 5) Include applicable resource codes. |
| 6) Insert separate cost element breakouts in support of any interdivisional cost. |
| 7) Ensure that the material, subcontracts, labor hour, and other direct cost spreadsheet tabs do reconcile back to this cost format and the BOEs in your cost volume. |
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
10. CLIN 0006AB by WBS
| TASS Sample Problem 2: Design and Installation by WBS | ||||||||||||||||||||||||||||||||||||||||||||||||
| Reference | ||||||||||||||||||||||||||||||||||||||||||||||||
| FPS3 Contract WBS and Directory | ||||||||||||||||||||||||||||||||||||||||||||||||
| CLIN 0006AB | Materials | Total | Subcontracts | Total SubKtrs | Inter-Div Transfers | Prime Labor | Total Prime Labor | Total | Other Direct Costs | Totsl | Indirect Costs | Total | Total | |||||||||||||||||||||||||||||||||||
| WBS | Materials | SubKtr A (Identify) | SubKtr B (Identify) | SubKtr C (Identify) | SubKtr D (Identify) | Engr Labor - In-Plant | Engr Labor - Field Site | Manufacturing Labor | Other | Engr | Engr | Mfg | Total | Est. Cost | Estimated | |||||||||||||||||||||||||||||||||
| L | L | L | L | WBS | Purchased | Raw | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Labor | Direct | Procurement | Overhead | Overhead | Overhead | Indirect | w/o | FCCOM | Cost | ||||||||||||||||||
| 1 | . | 2 | . | 3 | 4 | Description | Parts | Materials | Services | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Amount | Hours | Dollars | Hours | Dollars | Hours | Dollars | Hours | Dollars | Hours | ODC A | ODC B | ODC C | ODC D | ODC E | Travel | Costs | Overhead | Fringe | In-Plant | Field Site | G&A | Costs | FCCOM | Subtotal | ||
| 1 | . | . | Force Protection Security Systems (FPS3) | $0 | $0 | $0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||
| 1 | . | 1 | . | Fixed Site Intrusion Detection System (IDS) | $0 | $0 | $0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||
| 1 | . | 1 | . | 1 | Detection | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 2 | Assessment & Surveillance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 3 | Command, Control & Display | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 4 | Access Control | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 5 | Distribution equipment | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 6 | Communications | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 7 | Power | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 8 | Ancillary Equipment (Other) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 9 | GFE | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 10 | Fence (delay/denial) (as applicable) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 11 | Lighting subsystem (as applicable) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | |||||||||||||||||||||||||||||||||
| 1 | . | 1 | . | 12 | Integration, Assembly, Test & Checkout | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
| 1 | . | 2 | . | Tactical Automated Security System (TASS) | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 2 | . | 1 | Sensor Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 2 | Assessment Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 3 | Data/Comm Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 4 | Reporting & Display Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 2 | . | 5 | Power Supply Subsystem | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
| 1 | . | 4 | . | Systems Engineering | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |||
| 1 | . | 4 | . | 1 | System Architecture (SEIWG) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 2 | System Design | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | ||
| 1 | . | 4 | . | 2 | . | 1 | Site Survey | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 2 | . | 2 | Design & Reviews | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 3 | Configuration Management | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 4 | Supportability Analysis | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 5 | Quality Assurance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 6 | Risk Management | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 7 | Advanced Technology (SEIWG support) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 8 | Special studies and analyses | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||||
| 1 | . | 4 | . | 9 | Information Assurance | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 5 . Program Management $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 6 | . | Training | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 6 | . | 1 | Simulator (Annunciator) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 6 | . | 2 | Training Services | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 6 | . | 3 | Training Materials | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 7 . Data $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 8 | . | System Installation/Integration (Operational Site Activation) on Site | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 8 | . | 1 | Fixed Site Intrusion Detection System | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 8 | . | 2 | Tactical Automated Security System (TASS) | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 |
1 . 9 . Systems Test & Evaluation $0 0 $0 0 $0 0 $0 $0 $0 $0
| 1 | . | 10 | . | Interim Contractor Support | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | 0 | 0 | 0 | 0 | 0 | 0 | $0 | $0 | 0 | $0 | |
| 1 | . | 10 | . | 1 | Organizational level | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 10 | . | 2 | Depot level | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| 1 | . | 10 | . | 3 | ICS spares and repair parts | $0 | 0 | $0 | 0 | $0 | 0 | $0 | $0 | $0 | $0 | ||||||||||||||||||||||||||||||||
| NOTES: | |||||||||||||||||||||||||||||||||||||||||||||||
| 1) The cost elements shown above are for illustration purposes only. The actual cost elements should be consistent with the offeror's estimating system, revise as applicable. | |||||||||||||||||||||||||||||||||||||||||||||||
| 2) Do Not alter the WBS |
DATE: &D FPS3 PROJECT COST FORMATS
&A &P of &N
11. Bill of Material Bill of Material (BOM)
For the cost type CLINs, insert spreadsheets that lists the material to be provided by either the prime, an interdivisional transfer, or a subcontractor. All material items with an extended amount greater than $5,000 shall be identified to include the item's nomenclature, supplier, supplier's part number, quantity, unit price, any escalation amount if applicable, any factored amount if applicable, and the resulting extended amount. Each line item, shall identify the applicable source (i.e. prime, division, or subcontractor), applicable CLIN, resource code, WBS, and the basis of estimate in order to enable a cross-referencing between the detailed cost element spreadsheets and the cost volume. If a supplier or part number is not available, provide the rationale for the estimate. Material items with an extended amount of less than $5,000 may be lumped together.
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
12. Subcontracts Subcontracts
For the cost type CLINs, insert a spreadsheet identifying each separate subcontract costs to be incurred by either the prime, an interdivisional transfer, or another subcontractor. Each line item, shall identify the applicable source (i.e. prime, division, or subcontractor), applicable CLIN, resource code, WBS, task description, and the basis of estimate in order to enable a cross-referencing between the detailed cost element spreadsheets and the cost volume. Reference Section L para 6.2.6.
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
13. Labor Hours Labor Hours
For the cost type CLINs, insert a spreadsheet listing of all labor hours to be performed by either the prime, an interdivisional transfer, or a subcontractor. Each line item, shall identify the applicable source (i.e. prime, division, or subcontractor), applicable CLIN, resource code, labor category, WBS, and the basis of estimate in order to enable a cross-referencing between the detailed cost element spreadsheets and the cost volume.
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
14. Other Direct Costs Other Direct Costs
For the cost type CLINs, insert a spreadsheet identifying each separate other direct costs to be incurred by either the prime, an interdivisional transfer, or another subcontractor. Each line item, shall identify the applicable source (i.e. prime, division, or subcontractor), applicable CLIN, resource code, WBS, task description, and the basis of estimate in order to enable a cross-referencing between the detailed cost element spreadsheets and the cost volume.
Date: &D FPS3 PROJECT COST FORMATS
&A &P of &N
15. Travel Worksheet
| TRAVEL | |||
| Travel CLIN 0006AA | |||
| Fixed Site Sample Problem 1: CLIN 0006AA | Days | Air | Days |
Robert Campbell:
1st and last day of per diem at 75% Per Per No. Vehicle Robert Campbell: D = Daily W = Weekly
| M = Monthly | Vehicle | Vehicle | Vehicle | Trans | Trans | Auto | ||||||||||||||||||||||||
| No. of | No. of | per | Air | Fare | Nights | Lodging | Lodging | Per | Diem | Diem | Vehicles | Rental | Rental | Rental | Rental | Home to | Airport | No. of | Mileage | Mileage | Rental | |||||||||
| WBS | Itinerary | Purpose | Persons | Trips | Trip | Fare | Amount | Lodging | Rate | Amount | Diem | Rate | Amount | Rented | Basis | Qty | Rate | Amount | Airport | to Home | Parking | Miles | Rate | Amount | Gasoline | Identify | Identify | Identify | Totals |
| Travel related (CLIN 0006AA) | ||||||||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| Total Travel related (CLIN 0006AA) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Total Travel | $0 |
| G&A | |
| Total 0302AA including Burden | $0 |
| Travel CLIN 0011AA | |||
| Fixed Site Sample Problem 1 ICS: CLIN 0011AA | Days | Air | Days |
Robert Campbell:
1st and last day of per diem at 75% Per Per No. Vehicle Robert Campbell: D = Daily W = Weekly
| M = Monthly | Vehicle | Vehicle | Vehicle | Trans | Trans | Auto | ||||||||||||||||||||||||
| No. of | No. of | per | Air | Fare | Nights | Lodging | Lodging | Per | Diem | Diem | Vehicles | Rental | Rental | Rental | Rental | Home to | Airport | No. of | Mileage | Mileage | Rental | |||||||||
| WBS | Itinerary | Purpose | Persons | Trips | Trip | Fare | Amount | Lodging | Rate | Amount | Diem | Rate | Amount | Rented | Basis | Qty | Rate | Amount | Airport | to Home | Parking | Miles | Rate | Amount | Gasoline | Identify | Identify | Identify | Totals |
| Travel related (CLIN 0011AA) | ||||||||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| Total Travel related (CLIN 0011AA) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| Travel CLIN 0006AB | |||
| TASS Sample Problem 2: CLIN 0006AB | Days | Air | Days |
Robert Campbell:
1st and last day of per diem at 75%
Robert Campbell: D = Daily W = Weekly M = Monthly Per Per No. Vehicle Robert Campbell: D = Daily W = Weekly M = Monthly Robert Campbell:
1st and last day of per diem at 75%
| Vehicle | Vehicle | Vehicle | Trans | Trans | Auto | ||||||||||||||||||||||||
| No. of | No. of | per | Air | Fare | Nights | Lodging | Lodging | Per | Diem | Diem | Vehicles | Rental | Rental | Rental | Rental | Home to | Airport | No. of | Mileage | Mileage | Rental | ||||||||
| WBS | Itinerary | Purpose | Persons | Trips | Trip | Fare | Amount | Lodging | Rate | Amount | Diem | Rate | Amount | Rented | Basis | Qty | Rate | Amount | Airport | to Home | Parking | Miles | Rate | Amount | Gasoline | Identify | Identify | Identify | Totals |
| Travel related (CLIN XXXX) | ||||||||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| $0 | 0 | $0 | $0 | $0 | $0 | $0 | ||||||||
| Total Travel related (CLIN 0006AB) | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 |
| NOTES: |
| 1) Travel Worksheet is an example and can be used. Offeror can revise travel worksheet as applicable to be consistent with their estimating system, revise as applicable |
| 2) For each travel line item, show all applicable rational for travel, amounts, including embedded formulas that identify all calculations |
| 3) Cost element breakout shall be by calendar year unless the offerors forward pricing rates are not based on a calendar year. If not calendar year, identify the fiscal year time period. |
| 4) Identify whether the travel will be performed by either the prime, an interdivisional transfer, or a subcontractor. |
DATE: &D FPS3 PROJECT COST FORMATS
&A &P of &N
16. Price Track Price Track
Price Track Tab: This worksheet tab is to be used to summarize the impact of changes (e.g., revised labor hours or direct and/or indirect rates, escalation factors, subcontract prices, changes in technical approach, etc.) made to your proposal in developing your Final Proposal Revision. Dollars in this format may be shown in thousands. Any changes in the Offeror’s proposal from initial to final should be reflected through profit/fee. As an example, the amount that could be shown for a change in the effort could reflect the change in Direct Labor dollars, and also include any burdens (Fringe, Overhead, G&A, Facilities Capital Cost of Money, and Profit/Fee). The headings on the “Changes” column are for illustrative purposes only.
The Offeror…