FOM_TEP_2 June_2025.xlsx
XLSX spreadsheet 62 KB Posted
- Attached to
- Facilities Other Maintenance
- Solicitation number
- FA822425R0011
About this file
This file is a pricing template (FOM_TEP_2 June_2025.xlsx) for a Facilities Other Maintenance (FOM) contract with the Department of the Air Force Materiel Command Air Force Sustainment Center. The solicitation (FA822425R0011) covers management of the 309th Aircraft Maintenance Group's FOM program for aircraft parts and material at Hill Air Force Base, Utah, and Randolph Air Force Base, Texas, involving aircraft including C-130, F-16, F-22, A-10, T-38, and F-35.
The detailed pricing matrix includes multiple Contract Line Item Numbers (CLINs) for FOM Specialists (Material Coordinators) across different shifts and aircraft maintenance squadrons, with pricing structures broken down by base year and four option years plus a 6-month option. The template requires offerors to provide comprehensive pricing details including base labor rates, fringe, overhead, G&A, and profit percentages. Specific instructions mandate precise numerical pricing, with rates to be contractually binding and used as a Not-to-Exceed (NTE) table for all subsequent task orders, with no modifications allowed after award except at the government's discretion.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary and Insturctions
| Notes and Instructions: |
| 1. BASE LABOR RATES TO BE PROVIDED TO FACILITATE EVALUATION OF SERVICE CONTRACT ACT COMPLIANCE. RATES ARE MINIMUM RATES FOR BASE LABOR. |
| 2. ALL FULLY BURDENED RATES ARE FULLY BURDENED RATES FOR EACH LABOR CATEGORY AND ARE INCLUSIVE OF ALL LABOR COSTS (DIRECT AND INDIRECT) AND PROFIT. |
| 3. PLEASE PROPOSE THE COST FOR EACH CLIN ON AN ANNUAL BASIS. |
| 4. DO NOT ADD CATEGORIES OR CHANGE WORKSHEET COLUMNS OR ROWS. |
| 5. POPULATE ALL RATES FOR ALL YEARS WITH NUMERICAL PRICES FILLING IN ALL BLUE BOXES. DO NOT LEAVE CELLS BLANK, EVEN IF DUPLICATIVE. DO NOT USE ZEROS. DO NOT USE N/A. EXPLAIN IN NARRATIVE DOCUMENTATION ANY OBVIOUS NONCONFORMITIES. |
| 6. DO NOT EXTEND RATES BEYOND TWO DECIMAL PLACES. |
| 7. ENSURE THAT EACH ANNUAL PRICE IS DIVISIBLE BY 12 AS PAYMENT WILL BE MADE MONTHLY. |
| 8. THE RATES IN THIS TABLE WILL BE CONTRACTUALLY BINDING AND WILL BE USED AS AN NTE TABLE FOR ALL SUBSEQUENT TASK ORDERS IN ALL PRICING ARRANGEMENTS FOR ALL TEAM MEMBERS INCLUDING THE PRIME OFFEROR, INTERDIVISIONAL ORDERS, AND SUBCONTRACTORS. THIS TABLE WILL NOT BE MODIFIED AFTER AWARD AND NO ADDITIONAL CATEGORIES OR LABOR RATES WILL BE ADDED DURING CONTRACT PERFORMANCE EXCEPT AT THE GOVERNMENT'S SOLE DISCRETION. |
| 9. AT THE TASK ORDER LEVEL THE GOVERNMENT WILL ENSURE THAT THE PROPOSED RATES DO NOT EXCEED THE NOT TO EXCEED (NTE) RATES BELOW FOR THE REQUIRED LABOR CATEGORY. |
| 10. THE PROPOSED PRICE OF THE OPTION WILL BE PART OF THE TOTAL EVALUATED PRICE. |
| 11. NOTE: TASK ORDER 1 IS ANTICIPATED TO BE CLINS 0001 THORUGH 0016. |
| 12. NOTE: APPENDIX D IN THE PWS IS PROVIDED FOR INFORMATIONAL PURPOSES TO AID OFFERORS IN PUTTING THEIR PRICE PROPOSAL TOGETHER. |
| Annual Rates | Overtime | |
| Base Year | $ - 0 | $ - 0 |
| Option Year 1 | $ - 0 | $ - 0 |
| Option Year 2 | $ - 0 | $ - 0 |
| Option Year 3 | $ - 0 | $ - 0 |
| Option Year 4 | $ - 0 | $ - 0 |
| 6-month Option | $ - 0 | $ - 0 |
TOTAL PROPOSED PRICE $ - 0
Overtime will have a notional value assigned which will be added to the total proposed price for the evaluation purposes.
Base
| Year 1 | |||||||||||||||||
| CLIN | Position | Location/Shift | Base Labor Rate | Fringe | Overhead | G&A | Profit | Proposed Hours | Proposed Personnel by CLIN | Fully Burdened Rate | Total Price | Burdened Overtime Rate | Notional Hours | ||||
| Hill Air Force Base | Percentage | Amount | Percentage | Amount | Percentage | Amount | Percentage | Amount | 0 | ||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | ||||||||||||||
| 0001 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 572 (C-130) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002 | FOM Specialist (Material Coordinator 21030) | Hill AMXS573 (F-16) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0003 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 570 (F-35) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0004 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 571 (A-10) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0005 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 574 (F-22) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0006 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 572 (C-130) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0007 | FOM Specialist (Material Coordinator 21030) | Hill AMXS, 573 (F-16) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0008 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 570 (F-35), Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0009 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 571 (A-10) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0010 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 574 (F-22) Grave Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0011 | Overtime | Hours to be determined at the task order level | |||||||||||||||
| 0012 | Hill Air Force Base CDRLS | NOT SEPERATELY PRICED | |||||||||||||||
| Randolph Air Force Base | Percentage | Amount | Percentage | Amount | Percentage | Amount | Percentage | Amount | |||||||||
| 0% | 0% | 0% | 0% | ||||||||||||||
| 0013 | FOM Specialist (Material Coordinator 21030) | Randolph 575 AMXS (T-38) Day Shift | $ - 0 | 0.00% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0014 | FOM Specialist (Material Coordinator 21030) | Randolph 575 AMXS (T-38) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0016 | Randolph Air Force Base CDRLS | NOT SEPERATELY PRICED | |||||||||||||||
| TOTAL ANNUAL PRICE | $ - 0 | $ - 0 |
OY 1
| Year 2 | |||||||||||||||||
| CLIN | Position | Location/Shift | Base Labor Rate | Fringe | Overhead | G&A | Profit | Proposed Hours | Proposed Personnel by CLIN | Fully Burdened Rate | Total Price | Burdened Overtime Rate | Notional Hours | ||||
| Hill Air Force Base | Percentage | Amount | Percentage | Amount | Percentage | Amount | Percentage | Amount | 0 | ||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | ||||||||||||||
| 0001 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 572 (C-130) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002 | FOM Specialist (Material Coordinator 21030) | Hill AMXS573 (F-16) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0003 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 570 (F-35) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0004 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 571 (A-10) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0005 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 574 (F-22) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0006 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 572 (C-130) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0007 | FOM Specialist (Material Coordinator 21030) | Hill AMXS, 573 (F-16) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0008 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 570 (F-35), Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0009 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 571 (A-10) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0010 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 574 (F-22) Grave Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0011 | Overtime | Hours to be determined at the task order level | |||||||||||||||
| 0012 | Hill Air Force Base CDRLS | NOT SEPERATELY PRICED | |||||||||||||||
| Randolph Air Force Base | Percentage | Amount | Percentage | Amount | Percentage | Amount | Percentage | Amount | |||||||||
| 0% | 0% | 0% | 0% | ||||||||||||||
| 0013 | FOM Specialist (Material Coordinator 21030) | Randolph 575 AMXS (T-38) Day Shift | $ - 0 | 0.00% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0014 | FOM Specialist (Material Coordinator 21030) | Randolph 575 AMXS (T-38) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0015 | Overtime | Hours to be determined at the task order level | |||||||||||||||
| 0016 | Randolph Air Force Base CDRLS | NOT SEPERATELY PRICED | |||||||||||||||
| TOTAL ANNUAL PRICE | $ - 0 | $ - 0 |
OY 2
| Year 3 | |||||||||||||||||
| CLIN | Position | Location/Shift | Base Labor Rate | Fringe | Overhead | G&A | Profit | Proposed Hours | Proposed Personnel by CLIN | Fully Burdened Rate | Total Price | Burdened Overtime Rate | Notional Hours | ||||
| Hill Air Force Base | Percentage | Amount | Percentage | Amount | Percentage | Amount | Percentage | Amount | 0 | ||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | ||||||||||||||
| 0001 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 572 (C-130) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002 | FOM Specialist (Material Coordinator 21030) | Hill AMXS573 (F-16) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0003 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 570 (F-35) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0004 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 571 (A-10) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0005 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 574 (F-22) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0006 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 572 (C-130) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0007 | FOM Specialist (Material Coordinator 21030) | Hill AMXS, 573 (F-16) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0008 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 570 (F-35), Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0009 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 571 (A-10) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0010 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 574 (F-22) Grave Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0011 | Overtime | 0 | |||||||||||||||
| 0012 | Hill Air Force Base CDRLS | NOT SEPERATELY PRICED | |||||||||||||||
| Randolph Air Force Base | Percentage | Amount | Percentage | Amount | Percentage | Amount | Percentage | Amount | |||||||||
| 0% | 0% | 0% | 0% | ||||||||||||||
| 0013 | FOM Specialist (Material Coordinator 21030) | Randolph 575 AMXS (T-38) Day Shift | $ - 0 | 0.00% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0014 | FOM Specialist (Material Coordinator 21030) | Randolph 575 AMXS (T-38) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0015 | Overtime | Hours to be determined at the task order level | |||||||||||||||
| 0016 | Randolph Air Force Base CDRLS | NOT SEPERATELY PRICED | |||||||||||||||
| TOTAL ANNUAL PRICE | $ - 0 | $ - 0 |
OY 3
| Year 4 | |||||||||||||||||
| CLIN | Position | Location/Shift | Base Labor Rate | Fringe | Overhead | G&A | Profit | Proposed Hours | Proposed Personnel by CLIN | Fully Burdened Rate | Total Price | Burdened Overtime Rate | Notional Hours | ||||
| Hill Air Force Base | Percentage | Amount | Percentage | Amount | Percentage | Amount | Percentage | Amount | 0 | ||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | ||||||||||||||
| 0001 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 572 (C-130) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002 | FOM Specialist (Material Coordinator 21030) | Hill AMXS573 (F-16) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0003 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 570 (F-35) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0004 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 571 (A-10) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0005 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 574 (F-22) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0006 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 572 (C-130) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0007 | FOM Specialist (Material Coordinator 21030) | Hill AMXS, 573 (F-16) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0008 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 570 (F-35), Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0009 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 571 (A-10) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0010 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 574 (F-22) Grave Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0011 | Overtime | Hours to be determined at the task order level | |||||||||||||||
| 0012 | Hill Air Force Base CDRLS | NOT SEPERATELY PRICED | |||||||||||||||
| Randolph Air Force Base | Percentage | Amount | Percentage | Amount | Percentage | Amount | Percentage | Amount | |||||||||
| 0% | 0% | 0% | 0% | ||||||||||||||
| 0013 | FOM Specialist (Material Coordinator 21030) | Randolph 575 AMXS (T-38) Day Shift | $ - 0 | 0.00% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0014 | FOM Specialist (Material Coordinator 21030) | Randolph 575 AMXS (T-38) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0015 | Overtime | Hours to be determined at the task order level | |||||||||||||||
| 0016 | Randolph Air Force Base CDRLS | NOT SEPERATELY PRICED | |||||||||||||||
| TOTAL ANNUAL PRICE | $ - 0 | $ - 0 |
OY 4
| Year 5 | |||||||||||||||||
| CLIN | Position | Location/Shift | Base Labor Rate | Fringe | Overhead | G&A | Profit | Proposed Hours | Proposed Personnel by CLIN | Fully Burdened Rate | Total Price | Burdened Overtime Rate | Notional Hours | ||||
| Hill Air Force Base | Percentage | Amount | Percentage | Amount | Percentage | Amount | Percentage | Amount | 0 | ||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | ||||||||||||||
| 0001 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 572 (C-130) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002 | FOM Specialist (Material Coordinator 21030) | Hill AMXS573 (F-16) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0003 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 570 (F-35) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0004 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 571 (A-10) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0005 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 574 (F-22) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0006 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 572 (C-130) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0007 | FOM Specialist (Material Coordinator 21030) | Hill AMXS, 573 (F-16) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0008 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 570 (F-35), Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0009 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 571 (A-10) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0010 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 574 (F-22) Grave Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0011 | Overtime | Hours to be determined at the task order level | |||||||||||||||
| 0012 | Hill Air Force Base CDRLS | NOT SEPERATELY PRICED | |||||||||||||||
| Randolph Air Force Base | Percentage | Amount | Percentage | Amount | Percentage | Amount | Percentage | Amount | |||||||||
| 0% | 0% | 0% | 0% | ||||||||||||||
| 0013 | FOM Specialist (Material Coordinator 21030) | Randolph 575 AMXS (T-38) Day Shift | $ - 0 | 0.00% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0014 | FOM Specialist (Material Coordinator 21030) | Randolph 575 AMXS (T-38) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0015 | Overtime | Hours to be determined at the task order level | |||||||||||||||
| 0016 | Randolph Air Force Base CDRLS | NOT SEPERATELY PRICED | |||||||||||||||
| TOTAL ANNUAL PRICE | $ - 0 | $ - 0 |
6-month Option
| 6-Month Option | |||||||||||||||||
| CLIN | Position | Location/Shift | Base Labor Rate | Fringe | Overhead | G&A | Profit | Proposed Hours | Proposed Personnel by CLIN | Fully Burdened Rate | Total Price | Burdened Overtime Rate | Notional Hours | ||||
| Hill Air Force Base | Percentage | Amount | Percentage | Amount | Percentage | Amount | Percentage | Amount | 0 | ||||||||
| 0.00% | 0.00% | 0.00% | 0.00% | ||||||||||||||
| 0001 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 572 (C-130) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0002 | FOM Specialist (Material Coordinator 21030) | Hill AMXS573 (F-16) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0003 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 570 (F-35) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0004 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 571 (A-10) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0005 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 574 (F-22) Day Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0006 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 572 (C-130) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0007 | FOM Specialist (Material Coordinator 21030) | Hill AMXS, 573 (F-16) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0008 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 570 (F-35), Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0009 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 571 (A-10) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0010 | FOM Specialist (Material Coordinator 21030) | Hill AMXS 574 (F-22) Grave Shift | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0011 | Overtime | Hours to be determined at the task order level | |||||||||||||||
| 0012 | Hill Air Force Base CDRLS | NOT SEPERATELY PRICED | |||||||||||||||
| Randolph Air Force Base | Percentage | Amount | Percentage | Amount | Percentage | Amount | Percentage | Amount | |||||||||
| 0% | 0% | 0% | 0% | ||||||||||||||
| 0013 | FOM Specialist (Material Coordinator 21030) | Randolph 575 AMXS (T-38) Day Shift | $ - 0 | 0.00% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0014 | FOM Specialist (Material Coordinator 21030) | Randolph 575 AMXS (T-38) Swing Shift | $ - 0 | 0.00% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0% | $ - 0 | 0.00 | 0.00 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 0015 | Overtime | Hours to be determined at the task order level | |||||||||||||||
| 0016 | Randolph Air Force Base CDRLS | NOT SEPERATELY PRICED | |||||||||||||||
| TOTAL ANNUAL PRICE | $ - 0 | $ - 0 |
File details come from the government source that posted it. Updated .