WWYK230052 RFI responses COR Signed.pdf

PDF 105 KB Posted

Attached to
Tinker AFB MAC BOA WWYK230052, Replace Vault and Fuel Tank, B1032
Solicitation number
FA813725R0033
Issued by

About this file

This document is a Request for Information (RFI) for a Department of Air Force project at Tinker Air Force Base involving the replacement of fuel tanks in Building 1032. The RFI contains seven technical questions and government responses related to demolition and installation specifics, including details about fire pump fuel oil tanks, electrical disconnection procedures, tank storage requirements, venting specifications, and technical documentation. Key technical points include removing existing tanks and stands, disconnecting electrical components, ensuring proper tank volume per NFPA 25 standards (198 gallons), requiring separate tank vents, and confirming that engines will have their own fuel supply pumps. The RFI is associated with Solicitation FA8137-25-R-0033 and is dated 30 May 2025, with responses indicating that updated documentation will be provided on a revised contractor CD.

View the file

Other files

File Type Posted
10 44 16.pdf PDF
33 08 55.pdf PDF
Att12_230052_Submittal Register_r2.pdf PDF
03 39 00.00 10.pdf PDF
03 30 00.pdf PDF
32 13 14.pdf PDF
10_230052_SOW_BWR_Revision_r1.pdf PDF
000_TABLE OF CONTENTS.pdf PDF
03 20 00.00 10.pdf PDF
31 23 16.pdf PDF
32 16 13.pdf PDF
07 92 00.pdf PDF
32 92 19.pdf PDF
33 52 40.pdf PDF
33 52 23.15.pdf PDF
32 31 13.pdf PDF
03 11 13.00 10.pdf PDF
32 11 23.pdf PDF
Att12_230052_Submittal Register_r2.xlsx XLSX spreadsheet
26 05 00.00 40.pdf PDF
32 12 10.1.pdf PDF
31 00 00.pdf PDF
31 23 06.pdf PDF
26 08 00.pdf PDF
26 00 00.00 20.pdf PDF
06 10 00.pdf PDF
33 56 10.pdf PDF
32 01 22.pdf PDF
31 23 15.pdf PDF
32 92 23.pdf PDF
02 41 00.pdf PDF
32 12 10.2.pdf PDF
Sign-in Sheet WWYK230052 B1132.pdf PDF
Solicitation - FA813725R0033.pdf PDF
Wage Determination.pdf PDF
Att13_230052_Drawings.pdf PDF
Att12_230052_Submittal Register_r1.xlsx XLSX spreadsheet
ENG-34-066-58-75.pdf PDF
2 EAL List - BLANK to Contractors.xlsx XLSX spreadsheet
Att10_230052_SOW_BWR_Revision_24 April.pdf PDF
Fire Pump from WWYK180027.pdf PDF
B1032 from WWYK180027 IFC PLAN SET.pdf PDF
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI

WWYK230052 30 May 2025 Solicitation FA8137-25-R-0033

1. Sheet MD101: Are existing fire pump fuel oil tanks and stand to be removed?

Gov’t Response: Yes, both the stands and tanks inside B1032 are to be demolished. QAG

2. What is the electrical scope for demo and replacement of day tanks?

Gov’t Response: Disconnect day tank level indicator from tank and power junction located behind tank. Place the new tank level indicator on top of the new day tank. MBT

3. Is required storage of 200-gallon net storage required or total available storage of tank with overfill prevention valve and minimum fuel pickup?

Gov’t Response: Per NFPA 25 the storage tank alone must have a volume of 198 gallons, based on a 12-hour fuel consumption requirement and 5 percent volume each for expansion and sump. See Appendix E in the Design Narrative for the mechanical calculations. QAG

4. Will individual Tanks vents be required for each day tank?

Gov’t Response: Yes, per NFPA 25 each tank must have a separate vent and manifold for each main fuel storage space and the interstitial space. QAG

5. Are technical specifications available for the Specification Sections listed in the Submittal Register?

Gov’t Response: Yes, they are included on the revised contractor CD along with the relevant as-builts for the project. QAG

6. Submittal Register indicates Multiple Lines for design requirements Items 77, 81, 82,84, 86, 87, 88 ,89, 90, 91,94, 95 and 96 but Paragraph 3.5 of the Scope of work (SOW) WORKING DOCUMENTS defines minimal design requirements. Please provide guidance on expected design requirement and associated specification sections.

Gov’t Response: All items in the submittal register that are highlighted in yellow are not applicable to the project. These items will be removed and a new submittal register will issued in the revised Contractor CD. JM

7. Will the new day tanks require their own fuel supply pumps? Or do the engines have their own fuel supply pumps?

Gov’t Response: The engines has its own pumps. MBT

2025-06-12T08:15:14-0500
RICHENBURG.PAUL.JOHN.IV.1289951691