B1032 from WWYK180027 IFC PLAN SET.pdf
PDF 151 KB Posted
- Solicitation number
- FA813725R0033
About this file
The document is a fire protection plan drawing (FP102) for Building 1032 at Tinker Air Force Base, detailing a repair and replacement project for fire pumps across various facilities. The plan includes four diesel-driven fire pumps (1032-PFW-1 through 1032-PFW-4), each with a 310 BHP engine rated at 2100 RPM. Key requirements include installing new pump controllers, fire pumps, and diesel-driven fire pump engines with a minimum operating pressure of 125 PSI, along with associated exhaust systems. The drawing specifies technical details such as reinstalling fire pump supervision interfaces, routing exhaust pipes, and ensuring compatibility with the existing fire alarm system. The project is part of the WWYK180027 repair and replacement initiative, designed by HDR and issued on 27 February 2019 for the Air Force Materiel Command 72 ABW Civil Engineer Directorate.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1032-PFW-2 1032-PFW-3 1032-PFW-41032-PFW-1
EX
FACU
XCVR EX
EX
EX
FPC FPC FPC FPC
F I R
E
P
R O
T E
C T
I O
N
FP102
A O
T W
R M
P L
A N
E W
W
O R
K
B U
I L
D I N
G
OF
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
T I N
K E
R
A
I R
F
O R
C
B
S
E
O
K L A
H O
M A
P R
O J E
T
F O
R M
A T
I O
N R
E V
I S
I O
N S
M A
R K
D E
S I G
N
G
R O
U P
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N E
D
B
Y
D A
T E
D E
S C
R I P
T I O
N
2 3 4
E
D
C
B
A
M A
N A
G E
M E
T
F O
R M
A T
I O
N
1 2
E
D
C
B
A
I S
S U
E
D
A T
E
SHEET
SHEET NUMBER
S H
E E
T
T
I T
L E
D E
S I G
N
F
I L
E
L
O C
A T
I O
N
W W
Y K
R
P
A I R
A N
D
R
E P
L A
R
E
P
U M
P S
V A
R I O
U S
C
I L
I T
I E
S
B
R U
A R
Y
H D
R
FIRE PROTECTION PLAN - NEW WORK - BUILDING 1032
SCALE: 1/4" = 1' - 0"
FP102
KEY NOTES:
PROVIDE A NEW PUMP CONTROLLER, NEW DIESEL DRIVEN FIRE
PUMP ENGINE AND NEW FIRE PUMP, AS DETAILED IN THE FIRE
PUMP AND ENGINE SCHEDULES. FIRE PUMP SHALL HAVE A
MINIMUM OPERATING PRESSURE OF 125 PSI.
REINSTALL FIRE PUMP SUPERVISION INTERFACE AND CONDUIT
TO FIRE ALARM SYSTEM. FIRE PUMP SUPERVISION INTERFACE
SHALL BE TESTED AT OF PROJECT. FIRE ALARM SYSTEM SHALL
BE FREE OF TROUBLE AND FAULTS AT COMPLETION OF
INSTALLATION ACTIVITIES.
PROVIDE A NEW EXHAUST PIPE, MUFFLER, SUPPORT HANGERS,
FLEXIBLE CONNECTION, RAIN CAP AND SLEEVE TO PENETRATE
WALL. EXHAUST PIPE SHALL BE WRAPPED WITH MINERAL WOOL
WHEN PENETRATING EXTERIOR SLEEVE AND EXTERIOR SHALL
BE SEALED WITH HIGH HEAT CAULK. ROUTE NEW EXHAUST PIPE
THROUGH EXISTING WALL PENETRATION AND BRACE NEW
MUFFLER TO EXTERIOR OF BUILDING. EXHAUST SYSTEM SHALL
BE INSTALL AS PER MANUFACTURER'S RECOMMENDATION.
PATCH EXISTING OPENING FROM DEMOLISHED EXHAUST PIPE.
PATCH TO MATCH EXISTING SYSTEM.
FIRE PUMP SCHEDULE
ITEM NO.
CAPACITY(GPM) PRESSURE(PSI)
RPM MAX BHP
1032-PFW-1 2500 125 1760 202
1032-PFW-2 2500 125 1785 174
1032-PFW-3 2500 125 1760 202
1032-PFW-4 2500 125 1760 202
ENGINE SCHEDULE
ITEM NO. MOTOR TYPE BHP
1032-PFW-1 DIESEL
310@2100 RPM
1032-PFW-2 DIESEL
310@2100 RPM
1032-PFW-3 DIESEL
310@2100 RPM
1032-PFW-4 DIESEL
310@2100 RPM
3 3 3
1 21
FIRE PUMP CONTROLLER FPC
FIRE PROTECTION LEGEND:
EX EXISTING TO REMAIN
MONACO TRANSCEIVERXCVR
FIRE ALARM CONTROL UNITFACU
NOTE: EXISTING ENGINE RATINGS ARE FOR INFORMATION ONLY.
CONTRACTOR TO VERIFY.
NOTE: EXISTING FIRE PUMP RATINGS ARE FOR INFORMATION ONLY. CONTRACTOR TO VERIFY.
File details come from the government source that posted it. Updated .